Supply Chain Resource Slides
Supply Chain Resource Slides
Supply Chain Resource Slides
Suppliers
(International)
13 Transshipment
Points (TPs in Europe)
Warehouse
JIT PC Assembly
Plant
1.2 million PC/Yr
Glasgow UK
Port
Country-wide
Distribution Centers (DCs)
Retailers
What SCM is
A Supply Chain is a network of organizations
Goal: Produce value for the ultimate consumer
Primary purpose:
- Satisfy customer needs
- Manage flows of goods and information
- Generate profits for itself
- Decide locations, which products to produce at what stage, how to produce and
how to distribute
Procurement
Manufacturing/Assembly
Inbound logistics
Warehousing
Distribution
Outbound logistics
Q
Usage rate
Quantity
on hand
Reorder
point
Receive
Order
Place
order
Receive
order
Lead Time
Place
order
Receive
order
Time
Annual Cost
TC = H+ S
Ordering Costs
Supplier
Customer
Supplier
Customer
Supplier
Customer
Supplier
Customer
Supplier
Customer
Supplier
Customer
Supplier
Customer
Outside
Organisation
External Supplier
Supplier
Customer
86
Xbar
84
+
82
+ + +
80
+ +
78
LCL
76
1
11
13
15
17
19 Sample
Range
20
UCL
+
15
+
10
+
+
+
+
+
+
+
+
LCL
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Sample
$
Tier 1
Supplier
Tier 2
Supplier
Tier 2
Supplier
$
MFg
Plants
Tier 1
Supplier
Distribution
MFg
Plants
$
Customers
Customers
Distribution
Customers
$
Distribution
Customers
Visible production
problems are only
some of the total
Visible Productivity
In-Process
Inventory
Workload
Imbalances
Worker
Absenteeism
Control Specs
Problems
Material
Shortages
Quality Problems
Dimensions of Quality
Quality Improvement
Quality improvement is the reduction of variability in processes and products.
Alternatively, quality improvement is also seen as waste reduction (muda).
VISIBLE COSTS
HIDDEN COSTS
1K
100
10
Best in Class
1
2
5
SIGMA
1. Define (D)
2. Measure (M)
3. Analyze (A)
Causes of defects
4. Improve (I)
5. Control (C)
Maintain quality
Factor
Level
High
Low
15
20
Type of glue
Acryl
Urethan
Thickness of Foam
Styrene
Thick
Thin
Thickness of Logo
Thick
Thin
Amount of pressure
Small
Big
Pressure
application time
Short
Long
Yes
No
Adhesion Area
(cm2)
Primer applied
No.
Gluing
Str
9.8
8.9
9.2
8.9
12.3
13
13.9
12.6
Gluing Strength
6.5
5.58
5.65
5.58
5.43
5.5
4.6
Adherence Area
Type of Glue
Thickness of
Foam Styrene
Thickness of logo