WBS For OGP
WBS For OGP
WBS For OGP
Structure (WBS)
1.2.4.2.3
Pipe Stress Analysis
1.2.4.2.4
Hazard Analysis
1.2.4.2.5
Specifications, Data Sheets, and Request for Quotations
1.2.4.2.6
Vendor Data Reviews
1.2.4.2.7
Weight, Material Takeoffs, Bill of Materials
1.2.4.2.8
AFC Drawings for:
1.2.4.2.8.1
Process Flow Diagrams/Utility Flow Diagrams
1.2.4.2.8.2
Mechanical Flow Diagrams/Piping and Instrument
Drawings
1.2.4.2.8.3
Equipment Layouts/Arrangements/Skid Layouts
1.2.4.2.8.4
Piping Supports
1.2.4.2.8.5
Piping General Arrangements, Elevations, and
Isometrics
1.2.4.2.8.6
Other AFC Drawings
1.2.4.2.9
Data Books, Equipment Manuals, Engineering and Design
Report
1.2.4.3
Electrical Engineering & Drafting
1.2.4.3.1
Electrical Engineering and Design
1.2.4.3.2
Electrical Specifications, Data Sheets, and Request for
Quotations
1.2.4.3.3
Electrical Load Study/List
1.2.4.3.4
Vendor Data Reviews
1.2.4.3.5
Weight, Material Takeoffs, Bill of Materials
1.2.4.3.6
AFC Drawings for:
1.2.4.3.6.1
Area Classifications
1.2.4.3.6.2
Electrical Symbol Legend
1.2.4.3.6.3
Electrical One-Line Drawings
1.2.4.3.6.4
Schematics/Schedule/Plans
1.2.4.3.6.5
Buildings and Equipment Layouts
1.2.4.3.6.6
Electrical Arrangement and Cable Tray Routing
1.2.4.3.6.7
Electrical Installation Details
1.2.4.3.6.8
Other AFC Drawings
1.2.4.3.7
Data Books, Equipment Manuals, Engineering and Design
Report
1.2.4.4
Instrument Engineering & Drafting
1.2.4.4.1
Instrument Engineering & Design
1.2.4.4.2
Fire & Safety Engineering & Design
1.2.4.4.3
Relief Systems Sizing Calculations
1.2.4.4.4
Instrument Specification, Data Sheets, and Request for
Quotations
1.2.4.4.5
Instrument Index
1.2.4.4.6
Vendor Data Reviews
1.2.4.5
Weight, Material Takeoffs, Bill of Materials
1.2.4.6
AFC Drawings for:
1.2.4.6.1
SAFE Charts/PSFDs
1.2.4.6.2
Control Panels
Practice Standard for Work Breakdown StructuresSecond Edition
2006 Project Management Institute
Oil, Gas, and Petrochemical (OGP) WBS
1.2.4.6.3
PLC System
1.2.4.6.4
Tubing Tray Routing
1.2.4.6.5
Loop Diagrams
1.2.4.6.6
Instrument Installation Details
1.2.4.6.7
Fire and Safety
1.2.4.6.8
Pressure Relief Systems
1.2.4.6.9
Other AFC Drawings
1.2.4.7
Data Books, Equipment Manuals, Engineering and Design Reports
1.3
Procurement
1.3.1
General
1.3.1.1
Procurement Procedures
1.3.1.2
Expediting and Inspection Procedures
1.3.2
Jacket
1.3.2.1
Owner Furnished Equipment (OFE)
1.3.2.2
Contractor Furnished Reimbursable Equipment (CFRE)
1.3.2.3
All Other Contractor Supplied Equipment
1.3.2.4
Bulk MaterialsContractor Supplied
1.3.2.4.1
Structural
1.3.2.4.2
Anodes
1.3.3
Piling
1.3.3.1
Bulk MaterialsContractor Supplied
1.3.3.1.1
Structural
1.3.4 Topsides
1.3.4.1
Owner Furnished Equipment (OFE)
1.3.4.1.1
Rotating Equipment
1.3.4.1.2
Pressure Vessels
1.3.4.1.3
Electrical Generation
1.3.4.2
Contractor Furnished Reimbursable Equipment (CFRE)
1.3.4.2.1
Rotating Equipment
1.3.4.2.2
Pressure Vessels
1.3.4.2.3
Other CFRE
1.3.4.3
All Other Contractor Supplied Equipment
1.3.4.4
Bulk MaterialsContractor Supplied
1.3.4.4.1
Structural
1.3.4.4.2
Piping, Valves, and Fittings
1.3.4.4.3
Electrical
1.3.4.4.4
Instrument
1.4
Fabrication
1.4.1
General
1.4.1.1
Safety Manual and Plan
1.4.1.2
Yard and Work-Force Mobilization
1.4.1.3
Qualification of Welding Procedures and Welders
1.4.1.3.1
Structural
1.4.1.3.2
Piping
1.4.1.4
Shop Drawings
1.4.1.4.1
Structural
Practice Standard for Work Breakdown StructuresSecond Edition
2006 Project Management Institute
Oil, Gas, and Petrochemical (OGP) WBS
1.4.1.4.2
Piping Isometrics
1.4.1.4.3
Piping Spools
1.4.1.5
Receipt of Materials
1.4.1.6
QA/QC, NDT, and Dimensional Control
1.4.1.7
Weight Control Reports
1.4.1.8
As-Built Drawings and Certification Dossier
1.4.2
Jacket
1.4.2.1
Frames
1.4.2.1.1
Frame 1
1.4.2.1.2
Frame 2
1.4.2.1.3
Frame A
1.4.2.1.4
Frame B
1.4.2.2
Horizontal Levels
1.4.2.2.1
Level 1
1.4.2.2.2
Level 2
1.4.2.2.3
Level 3
1.4.2.2.4
Level 4
1.4.2.3
Appurtenances
1.4.2.3.1
Disposal Pile
1.4.2.3.2
Caissons
1.4.2.3.3
Risers
1.4.2.3.4
Boat Landing
1.4.2.3.5
Corrosion Protection
1.4.2.3.6 Stairs, Walkways, and Landings
1.4.2.4
Installation Aids
1.4.2.5
Loadout and Seafasten
1.4.3
Piling
1.4.3.1
Pile A1
1.4.3.2
Pile A2
1.4.3.3
Pile B1
1.4.3.4
Pile B2
1.4.3.5
Loadout and Seafasten
1.4.4
Topsides
1.4.4.1
Main Deck
1.4.4.1.1
Plate Girders
1.4.4.1.2
Deck Panels
1.4.4.1.3
Tertiary Steel
1.4.4.2
Cellar Deck
1.4.4.2.1
Plate Girders
1.4.4.2.2
Deck Panels
1.4.4.2.3
Tertiary Steel
1.4.4.3
Sub-Cellar Deck
1.4.4.4
Legs
1.4.4.5
Bracing
1.4.4.6
Equipment Installation
1.4.4.7
Interconnect Piping
Practice Standard for Work Breakdown StructuresSecond Edition
2006 Project Management Institute
Oil, Gas, and Petrochemical (OGP) WBS
1.4.4.8
Electrical
1.4.4.9
Instrumentation
1.4.4.10
Precommissioning
1.4.4.11
Appurtenances
1.4.4.11.1
Flare Boom
1.4.4.11.2
Stairs, Walkways, & Landings
1.4.4.11.3
Installation Aids
1.4.4.12
Loadout and Seafasten
1.5
Transportation
1.5.1
General
1.5.1.1
Safety Manual and Plan
1.5.1.2
Seafastening Drawings
1.5.1.3
Marine Warranty Surveyor Review and Approval
1.5.2
Jacket
1.5.3
Piling
1.5.4
Topsides
1.6
Installation, Hookup, and Commissioning
1.6.1
General
1.6.1.1
Safety Manual and Plan
1.6.1.2
Installation Procedures and Drawings
1.6.1.3
Qualification of Welding Procedures and Welders
1.6.1.3.1
Structural
1.6.1.3.2
Piping
1.6.1.4
As-Installed Drawings
1.6.1.5
Mobilization
1.6.1.6
Demobilization
1.6.2
Jacket
1.6.3
Piling
1.6.4
Topsides
1.6.4.1
Hookup
1.6.4.2
Commissioning
1.6.4.3
Startup