Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Contract Data Fidic MDB 2010 Const2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Section 8 - Particular Conditions of Contract

8-1

Section 8 - Particular Conditions of Contract


The following Particular Conditions of Contract (PCC) shall supplement the General Conditions of
Contract (GCC). Whenever there is a conflict, the provisions herein shall prevail over those in the
GCC.

Part A Contract Data


Conditions

Ref. GCC

Employers name and address

1.1.2.2 & 1.3

Engineers name and address

1.1.2.4 & 1.3

Banks name

1.1.2.11

Data

Borrowers name

1.1.2.12

Time for Completion

1.1.3.3

........... days

Defects Notification Period

1.1.3.7

........... days.

Sections

1.1.5.6

.............

Electronic transmission systems

1.3

.............

Governing Law

1.4

.............

Ruling language

1.4

Language for communications

1.4

.............

Time for access to the Site

2.1

........ days after Commencement Date

Engineers Duties and Authority

3.1(B)(ii)

.............

Performance Security

4.2

The performance security will be in the form of an


unconditional bank guarantee in the amount of ............
% of the Contract Price

Normal working hours

6.5

.............

Delay damages for the Works

8.7 & 14.15(b)

............. % of the Contract Price per day, in the


currencies and proportions in which the Contract Price is
payable.

Maximum amount of delay damages

8.7

............. % of the Contract Price.

Provisional Sums

13.5.(b)(ii)

............. %

Adjustments for Changes in Cost

13.8

.............

The Contract Price

14.1

.............

Total advance payment

14.2

.............% of the Accepted Contract Amount payable in


the currencies and proportions in which the Accepted
Contract Amount is payable.

Number and timing of installment

14.2

.............

Currencies and proportions

14.2

............. % in
............. % in

Repayment amortization of advance payment

14.2(b)

.............%

Percentage of Retention

14.3(c)

.............%

Limit of Retention Money

14.3(c)

.............% of the Accepted Contract Amount.

Plant and Materials

14.5(b)(i)

If Sub-Clause 14.5 applies:


Plant and Materials for payment when shipped en route to
the Site : ..................
( list )

..........................................................porject.

Contract No......................................................

Section 8 - Particular Conditions of Contract

14.5(c)(i)

Materials for payment when delivered to the Site, placed


in acceptable stockpiles, and complying with relevant
specifications:
.............

( list )

Minimum Amount of Interim Payment


Certificates

14.6

............. % of the Accepted Contract Amount.

Maximum total liability of the Contractor to the


Employer

17.6

.............

Periods for submission of insurance:

18.1

a. evidence of insurance.

............. days after Commencement Date

b. relevant policies

............. days after Commencement Date

Maximum amount of deductibles for

18.2(d)

.............

18.3

.............

Date by which the DB shall be appointed

20.2

.............days after the Commencement

The DB shall be comprised of

20.2

.............

insurance of the Employer's risks


Minimum amount of third party
Insurance

List of potential DB sole members

20.2

.............

Appointment (if not agreed) to be

20.3

.............

International arbitration

20.6 (a)

..............

Place of arbitration

20.6

.............

made by

...................................................................project

Contract No. .........................................

You might also like