MEPCO-Projects/A1.2/407/ASR
February 15, 2016.
PROJECT: Contract No. ADB-2727-MEPCO-17 & 18 (ICB) Procurement of Conversion 66kV AIS Grid
Stations to 132kV AIS-Design, Supply, Installation, Erection, Testing and Commissioning
on Turn Key Basis at Lot - 1(A): 66kV Grid Station Alipur and New Transmission Line, Lot 1(B): 66kV Grid Station Fatehpur and New Transmission Line
SUBJECT: Alipur Transmission Line
Ref:
Dear Sir,
With reference to your above referred letters, it is to state that our team could not start the foundation work at 04
Nos tower locations, once again. Police after reviewing the Court orders and listening to the representatives of
both the parties, advised MEPCO to negotiate with Landowner as he is claiming that none of the MEPCO officials
visited him for settlement. Police officials stated that Police will only intervene if this negotiation failed.
It is therefore requested to resolve the situation on urgent basis and facilitate the Contractor in resuming work as
the delay is not due to reasons attributable to Siemens.
Assuring you of our best services and cooperation at all times, we remain.
Yours faithfully,
On behalf of SIEMENS PAKISTAN ENGINEERING CO. LTD.
Mohsin Ali
Arshad Mahmood
Branch Controller
EM TS Lahore- Region
Cc:
Chief Executive Officer, MEPCO, Multan
Chief Financial Officer, MEPCO, Multan
Siemens (Pakistan) Engineering Co. Ltd.
Office address:
Siemens (Pakistan) Engg. Co.
Ltd.
15-A, Sir Agha Khan Road,
Lahore.
Siemens (Pakistan) Engg. Co. Ltd., MD & CEO: Helmut von Struve; CFO: Umer Anwer;
Company Secretary: Abdul Mannan Majid
Co. Reg. No. 0000617; Reg. Address: B-72, Estate Avenue, S.I.T.E., Karachi.
SCF DL2010-11
Ref: MEPCO-Projects/A1.2/404/ASR
Date: February 08 , 2016