BN-S-UC001B Checklist For The Mechanical Completion, Incl. Pre-Commissioning Activities
BN-S-UC001B Checklist For The Mechanical Completion, Incl. Pre-Commissioning Activities
BN-S-UC001B Checklist For The Mechanical Completion, Incl. Pre-Commissioning Activities
pre-commissioning activities
Table of contents
1. General Procedures
2. Specific Procedures
1. General Procedures
b
.
Client
1.2 Inspection
a.
b.
c.
d.
e.
Note: Equipment which has been shop inspected will not be reopened for inspection in the field
except as specifically noted herein.
1.3 Permits
a.
b.
c.
b.
c.
d.
1.6 Housekeeping
a.
b.
XX
1.7 Instructions
a.
b.
c.
2 Specific Procedures
b.
c.
d.
e.
f.
g.
h.
i.
Test and set switchgear and motor control center relays for
proper functioning
j.
k.
l.
m.
n.
XX
o.
p.
q.
XX
b.
c.
d.
e.
f.
Clean all air supply headers by blowing with clean air and check
for tightness
g.
h.
i.
j.
k.
l.
n.
XX
o.
XX
p.
q.
r.
XX
s.
t.
u.
v.
w.
Check all analyzers, clean and flush lines to/from arrange for
vendor representation for calibration of analyzers if required (e.g.
chromatographs)
x.
Test and adjust all safety devices and seals where necessary
use vendor if required
y.
Install all safety devices e.g. pressure relief valves after testing
z.
X
X
b.
c.
d.
X
X
f.
g.
h.
i.
j.
k.
l.
m.
n.
o.
p.
q.
r.
s.
t.
XX
X
X
X
XX
a.
b.
c.
d.
e.
f.
g.
X
XX
X
X
2.4.2 Field-Erected:
a.
b.
c.
d.
e.
f.
XX
g.
b.
c.
d.
Open after dry out and chemical cleaning and charge materials
as chemicals, resins, desiccants and catalysts (procurement by
X
XX
Owner)
Note: When vessels have been subjected to a shop test, they will not be further tested in the field but
may be included as part of a piping system test.
b.
XX
c.
d.
e.
XX
f.
b.
b.
c.
d.
e.
f.
b.
c.
Blow fuel lines, check for cleanliness, and connect burner piping
XX
d.
e.
f.
g.
h.
XX
X
Level baseplates and sole plates and grout all bearing surfaces,
cold align units and furnish record of alignment
b.
Check for and remove any excess piping stresses which may be
imposed on the equipment
c.
Chemically clean the installation of any seal and lube oil system,
if specified
d.
e.
XX
f.
Circulate for cleaning purposes any seal oil, lube oil and cooling
systems
XX
g.
h.
X
X
i.
j.
k.
l.
m.
n.
Witness all tests, checks and test runs of large compressors and
turbines.
Fully assemble rotary filters except for final filter media (cloth or
screens)
b.
c.
d.
e.
f.
g.
b.
d.
Blow fuel lines, check for cleanliness and connect burner piping
e.
f.
g.
Obtain and charge treated water (per specifications) for boil out
and initial operation as required
h.
i.
j.
k.
XX
XX
b.
Provide and install initial charge of ion exchange resins and inert
bed material
c.
d.
e.
a.
b.
Initially clean cooling tower basin and install screens in suction pit
prior to water circulation
c.
Test well delivery and flush well piping if wells are furnished by
Contractor
d.
XX
e.
XX
f.
g.
h.
i.
b.
b.
c.
d.
b.
X*
c.
X*