Location via proxy:
[ UP ]
[Report a bug]
[Manage cookies]
No cookies
No scripts
No ads
No referrer
Show this form
Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
318 views
Lesson Linear Programming
Lesson on Linear Programming using Excel
Uploaded by
prashantgargindia_93
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Lesson Linear Programming For Later
Download
Save
Save Lesson Linear Programming For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
318 views
Lesson Linear Programming
Lesson on Linear Programming using Excel
Uploaded by
prashantgargindia_93
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Lesson Linear Programming For Later
Carousel Previous
Carousel Next
Save
Save Lesson Linear Programming For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 4
Search
Fullscreen
Modeling with Linear Programming otal of $500, which may be played only once. The exact outeo, cima aol acum a priori Because of this uncertainty, the gamblers strategy . ane avze the minimum return produced by the three outcomes. How should the antler allocate the $500 among the four choices? Solve the model using Solver og RMI (in The gambler’ net return may be positive ero.or negative) Lewis (1996). Monthly bills in a household are received monthly (e-g., utilities and ho, 7. onenea: Cluarterly (eg.-estimated tax payments), semiannually insurance) ge™ annus (eg aubscription renewals and dues). The following table provides the mony, bills for next year. 40 Chapter 2 Aug. Sep. Oct. Nov. Dec, 1000 900 1100 1300 1600 May June July 1500 Month | Jan. Feb. Mar. Apr. 800 1200 400 700 600 To account for these expenses, the family sets aside $1000 per month, which is the averag. of the total divided by 12 months If the money is deposited in a regular savings account, i .d it stays in the account at least 1 month. The bank can earn 4% annual interest, provide \ also offers 3-month and 6-month certificates of deposit that can earn 5.5% and 7% annua interest, respectively. Develop a 12-month investment schedule that will maximize the family’s total return for the year. State any assumptions or requirements needed to reach a feasible solution. Solve the model using Solver of AMPL. 900 4.2 Production Planning and Inventory Control There is a wealth of LP applications to production planning and inventory control. This section presents three examples. The first deals with production scheduling to meet a single. period demand. The second deals with the use of inventory in a multiperiod production system to meet future demand, and the third deals with the use of inventory and worker hiring/firing to “smooth” production over a multiperiod planning horizon. Example 2.4-2 (Single-Period Production Model) In preparation for the winter season, a clothing company is manufacturing parka and goose overcoats, insulated pants, and gloves. All products are manufactured in four different depart. ments: cutting, insulating, sewing, and packaging. The company has received firm orders for its products. The contract stipulates a penalty for undelivered items. Devise an optimal production plan for the company based on the following data: Time per units (hr) Department Parka’ Goose Pa Gloves Capacity (hr) Cutting 30 30 96 15 1000 Insulating 25 35 10 1000 Sewing 45 50 2 1000 Packaging AS AS 05 1000 Demand 800 750 600 500 Unit profit $30 $40 $20 $10 Unit penalty $15 $20 $10 $8 pee A ce eee2.4 Linear Programming Applications 41 Mathematical Model: The variables of the problem are 44, = number of parka jackets x = number of goose jackets X3 = number of pairs of pants X4 = number of pairs of gloves ‘The company is penalized for not meeting demand. The objective then is to maximize the net Profit, defined as Net profit = Total profit — Total penalty The total profit is 30x, + 40x. + 20x; + 10x4. To compute the total penalty, the demand con: straints can be written as 1 + 5, = 800, x2 + 52 = 750, x3 + 33 = 600, x4 + 54 = 500, x, = 0,5, 20,j = 1,2,3,4 The new variable 5; represents the shortage in demand for product j, and the total penalty can be computed as 15s, + 20s, + 10s; + 854. The complete model thus becomes Maximize z = 30x, + 40x, + 20x3 + 10x4 — (155, + 20s, + 10s; + 854) subject to 30x, + 30x) + 25x53 + .15x4 < 1000 25x, + 35x2 + 30x; + .10x4 < 1000 45x, + 50x2 + 40x; + .22x4 = 1000 15x, + .15x, + .10x3 + .05x4 = 1000 800, x2 + 5) = 750, x3 + 53 = 600, x4 + 54 = 500 =0,j = 1,2,3,4 xy+tH= x; = 0, Solution: The optimum solution (obtained using file amplEx2.4-2.txt) is z = $64,625, x; = 800, x2 = 750; x3 = 387.5, x4 = 500, 51 = 52 = 54 = 0,53 = 212.5. The solution satisfies all the demand for both types of jackets and the gloves. A shortage of 213 (rounded up from 212.5) pairs of pants will result in a penalty cost of 213 x $10 = $2130. Example 2.4-3 (Multiple Period Production-Inventory Model) Acme Manufacturing Company has a contract to deliver 100, 250, 190, 140, 220, and 110 home windows over the next 6 months. Production cost (labor, material, and utilities) per window . $48, $52, and $50 over the next 6 months. cturing cost, Acme can produce more win- e extra units for delivery in later months. This varies by period and is estimated to To take advantage of th dows than needed in a giveri mot:316 Chapter 9 integer Linear Programming Hor convenience, a problem is defined as a pure integer Program when o, integerianad ntc8e®: Else, itis a mixed integer program (MIP) Invalving mixta the integer and continuous variables, me ot 9.1.1 Capital Budgeting Decisions about whether or not to undertake a project is usually made under limited. Considerations and preset priorities The next example deals with one of these situations Example 9.1-1_ (Project Selection) on Five projects are being evaluated over a 3-year planning horizon. The following table gives y expected returns for each project and the associated yearly expenditures. the Expenditures ($ millionyyear Project 1 2 3 Returns ($ milion) H 3 i 8 20 2 4 7 10 0 3 3 9 2 20 4 7 4 1 15 5 8 6 10 30 Available funds (§ million) 25 25 25 Which projects should be selected over the 3-year horizon? ‘The problem reduces to a “yes-no” decision for each project. Define the binary variable x, a5 i ae { 1, if project jis selected _ 0, if project j is not selected The ILP model is Maximize z = 20x, + 40x, + 20x3 + 15x4 + 30x subject to Sey + dx, + 3x3 + Tay + 8x5 < 25 X1 + Ixy + 9x, + 4x4 + 6x5 < 25 8x, + 10x, + 2x3 + x4 + 10x5 < 25 Hy X2y X35 X45 X5 = (0,1) The optimum integer solution (obtained by AMPL, Solver, or TORA)! is x == 43 = 4 75 = O,with z = 95 ($ million). The solution excludes project 5 from the product nix. "To use TORA, select Integer Progr screen, and select Automated B&H the targeted variables must be de Parameters dialogue box when yeu adc same as in linear programn integer (or binary) in var x{J}>=0, integer tovar x{J} binary; om Main Meni. After entering the problem data, goto outpt ‘nun solution. Solver use is the same as in LP except that “he integer option (int of bin) is available in the Solver *'s\, AMPL implementation for integer programming she ne variables are declared integers by adding the key word * the targeted variables, For example, the statement ger for all je J.Ifxjis binary, the statements changed ‘option solver cplex; must precede solve; .9.1 Illustrative Applications Remarks. It is interesting to compare the continuous LP sol solution. The LP ‘ optimum, obtained by replacing x, = (0,1) with on pimitsoen ate | yale x, = 5789, ' a2 = 42 = 44" 1 Xs = 7368, and @ = 108.68 ($ million), {he solution is meaningless because ' binary *1 and x5 assume fractional values. We may round the solution to the closest integer, which yields x1 © xs = 1. However, the resulting solution violates the constraints. Moreover, the concept of rounding is meaningless here because 4) Tepresents a““yes-no” § PROBLEM SET 9.1A2 1. Modify and solve the capital budgeti 1 -1 to account for the following additional restrictions, 1 Of Example 91-1 to account for (a) Project 5 must be selected if either Project 1 or project 3 is selected. (b) Projects 2 and 3 are mutually exclusive. 2. Five items are to be loaded in a vessel, The wei for item i 4 tabulated bac e weight w), volume v,, and value r; for Item? Unit weight, 1, (tons) Unit volume, vi (yd*) Unit worth, 7, ($100) : 5 1 4 2 8 8 7 3 3 6 6 4 2 5 5 5 7 4 4 NA) The maximum allowable cargo weight and volume are 112 tons and 109 yd, respectively. Formulate the ILP model, and find the most valuable cargo. *3, Suppose that you have 7 full wine bottles, 7 half-full, and 7 empty. You would like to divide the 21 bottles among three individuals so that each will receive exactly 7. Additionally, each individual must receive the same quantity of wine. Express the y problem as ILP constraints, and find a solution. (Hint: Use a dummy objective function in which all the objective coefficients are zeros.) 4, An eccentric sheikh left a will to distribute a herd of camels among his three children: Tarek receives at least one-half of the herd, Sharif gets at least one third, and Maisa gets at least one-ninth. The remainder goes to charity. The will does not specify the size of the herd except to say that it is an odd number of camels and that the named charity receives exactly one camel. Use ILP to determine how many camels the sheikh left in the estate and how many each child got. 5. The three children of a farm couple are sent to the market to sell 90 apples. Karen, the oldest, carries 50 apples; Bill, the middle one, carries 30; and John, the youngest, carries only 10. The parents have stipulated five rules: (a) The selling price is either $1 for 7 apples or $3 for 1 apple, or a combination of the two prices. (b) Each child may exercise one or both options of the selling price. (c) Each of the three children must return with exactly the same amount of money. (d) Each child’s income must be in whole dollars (no cents allowed). (¢) Ehe amount received by each child must be the largest possible Problems 3 to 6 are adap Pp. 39-182, 1994. Problem puzzles/puzzles1.html. Yahan, El Hombre que Calculaba, Editoriat Limusa, Mexico Cit adapted from puzzles compiled in http://www.chlond.demon.cou
You might also like
Excel Skills For Business: Intermediate II: Week 2: Conditional Logic
PDF
No ratings yet
Excel Skills For Business: Intermediate II: Week 2: Conditional Logic
9 pages
Industry 4 With Sap
PDF
No ratings yet
Industry 4 With Sap
44 pages
Problems
PDF
100% (1)
Problems
1 page
Inventory Numerical
PDF
No ratings yet
Inventory Numerical
2 pages
Industry Analysis of Hyundai
PDF
No ratings yet
Industry Analysis of Hyundai
3 pages
4-6 Analytics Lifecycle Case Study Netflix
PDF
0% (1)
4-6 Analytics Lifecycle Case Study Netflix
2 pages
IEOR 162 Group Project (Fall 2013)
PDF
0% (2)
IEOR 162 Group Project (Fall 2013)
4 pages
Operations Assignment PDF
PDF
No ratings yet
Operations Assignment PDF
3 pages
Computer Simulation With Crystal Ball Solution To Solved Problems
PDF
No ratings yet
Computer Simulation With Crystal Ball Solution To Solved Problems
3 pages
CH 10
PDF
No ratings yet
CH 10
18 pages
Integer Mhs
PDF
No ratings yet
Integer Mhs
70 pages
OM-1 Question Paper
PDF
No ratings yet
OM-1 Question Paper
10 pages
Chapter 1 Introduction To Supply Chain Management-Merged Removed
PDF
No ratings yet
Chapter 1 Introduction To Supply Chain Management-Merged Removed
48 pages
CASE 3-1 Nestle's ERP Implementation-Session 7-8
PDF
No ratings yet
CASE 3-1 Nestle's ERP Implementation-Session 7-8
1 page
LogDes Final
PDF
No ratings yet
LogDes Final
163 pages
Evans - Analytics2e - PPT - 14 Final
PDF
100% (1)
Evans - Analytics2e - PPT - 14 Final
89 pages
Burlingham Case Assignment
PDF
No ratings yet
Burlingham Case Assignment
2 pages
Individual Assignment
PDF
No ratings yet
Individual Assignment
8 pages
Readme Cplex
PDF
No ratings yet
Readme Cplex
33 pages
Application of Linear Optimization
PDF
No ratings yet
Application of Linear Optimization
43 pages
10 Managing Economics of Scale in A Supply Chain - Cycle Inventory
PDF
No ratings yet
10 Managing Economics of Scale in A Supply Chain - Cycle Inventory
25 pages
Problems
PDF
No ratings yet
Problems
4 pages
SCM Module - 4
PDF
No ratings yet
SCM Module - 4
21 pages
Business Logistics/Supply Chain-A Vital Subject
PDF
No ratings yet
Business Logistics/Supply Chain-A Vital Subject
32 pages
CRM Unit 5 - Customer Analytics Part I
PDF
No ratings yet
CRM Unit 5 - Customer Analytics Part I
23 pages
Supply Chain Strategies S22
PDF
No ratings yet
Supply Chain Strategies S22
9 pages
Oscm Mid Term Question Paper
PDF
No ratings yet
Oscm Mid Term Question Paper
1 page
Course Syllabus Online 305
PDF
No ratings yet
Course Syllabus Online 305
7 pages
Marketing Model (BA ZC 421) Sidharth Mishra 13/01/2021: BITS Pilani BITS Pilani
PDF
No ratings yet
Marketing Model (BA ZC 421) Sidharth Mishra 13/01/2021: BITS Pilani BITS Pilani
268 pages
Supply Chain Management and The Emarketplace
PDF
No ratings yet
Supply Chain Management and The Emarketplace
20 pages
3-Supply Chain Decisions and Performance Metrics (A)
PDF
No ratings yet
3-Supply Chain Decisions and Performance Metrics (A)
21 pages
Quiz Week 8 - 9 - Cost Management - Attempt Review
PDF
No ratings yet
Quiz Week 8 - 9 - Cost Management - Attempt Review
10 pages
Production Planning and Control: Unit Notes
PDF
No ratings yet
Production Planning and Control: Unit Notes
44 pages
Demand Forecasting: TH TH TH TH
PDF
No ratings yet
Demand Forecasting: TH TH TH TH
4 pages
Session 6
PDF
No ratings yet
Session 6
32 pages
ERP - New - Lab Manual - 2
PDF
No ratings yet
ERP - New - Lab Manual - 2
26 pages
Rondot Automotive Case Study: Group - 8
PDF
No ratings yet
Rondot Automotive Case Study: Group - 8
10 pages
Decision Making Using The Analytic Hierarchy Process (AHP) A Step by Step Approach
PDF
No ratings yet
Decision Making Using The Analytic Hierarchy Process (AHP) A Step by Step Approach
4 pages
Inventory
PDF
No ratings yet
Inventory
19 pages
Chapter 11, Part B Inventory Models: Probabilistic Demand
PDF
No ratings yet
Chapter 11, Part B Inventory Models: Probabilistic Demand
25 pages
Problems: Linear Programming Modeling Applications: With Computer Analyses in Excel
PDF
No ratings yet
Problems: Linear Programming Modeling Applications: With Computer Analyses in Excel
3 pages
c05 Net Models
PDF
No ratings yet
c05 Net Models
55 pages
Transportation Problem Excel
PDF
No ratings yet
Transportation Problem Excel
4 pages
Intro S4HANA Using Global Bike Case Study SD en v4.1
PDF
No ratings yet
Intro S4HANA Using Global Bike Case Study SD en v4.1
51 pages
Perencanaan Dan Pengendalian Produksi IEH2S2
PDF
No ratings yet
Perencanaan Dan Pengendalian Produksi IEH2S2
43 pages
0-1 Integer Linear Programming Model For Location Selection of Fire Station: A Case Study in Indonesia
PDF
100% (1)
0-1 Integer Linear Programming Model For Location Selection of Fire Station: A Case Study in Indonesia
8 pages
Starbucks Corporation
PDF
No ratings yet
Starbucks Corporation
1 page
Chapter 15 - Short-Term Scheduling
PDF
No ratings yet
Chapter 15 - Short-Term Scheduling
38 pages
Services Marketing - Building Relationship
PDF
No ratings yet
Services Marketing - Building Relationship
11 pages
Ch04-Discussion Questions and Answers
PDF
No ratings yet
Ch04-Discussion Questions and Answers
4 pages
Developing Disruptive Business Strategies With Simulation: White Paper
PDF
No ratings yet
Developing Disruptive Business Strategies With Simulation: White Paper
24 pages
Storage Systems Layout: Facplad Notes
PDF
No ratings yet
Storage Systems Layout: Facplad Notes
90 pages
Six Sigma Green Belt Roadmap - LiL PDF
PDF
No ratings yet
Six Sigma Green Belt Roadmap - LiL PDF
4 pages
Collaborative Demand Planning: For Profit-Driven Supply Chains
PDF
No ratings yet
Collaborative Demand Planning: For Profit-Driven Supply Chains
10 pages
Chapter 15 - Resource Planning Answers To Questions, Problems, and Case Problems Answers To Questions
PDF
No ratings yet
Chapter 15 - Resource Planning Answers To Questions, Problems, and Case Problems Answers To Questions
32 pages
SAP Transport-Sr
PDF
No ratings yet
SAP Transport-Sr
13 pages
IE6404 Production Planning and Control: Course Materials
PDF
No ratings yet
IE6404 Production Planning and Control: Course Materials
15 pages
Textile Management System Final Review
PDF
No ratings yet
Textile Management System Final Review
40 pages
Unit4 CKNG PDF
PDF
No ratings yet
Unit4 CKNG PDF
64 pages
Integer Programming
PDF
No ratings yet
Integer Programming
28 pages
73 220 Lecture13
PDF
No ratings yet
73 220 Lecture13
30 pages
Milp For Cse - 2023
PDF
No ratings yet
Milp For Cse - 2023
38 pages
07 Integer Programming I
PDF
No ratings yet
07 Integer Programming I
50 pages
M6A1 Textbook Assignment: Comprehensive Problems
PDF
No ratings yet
M6A1 Textbook Assignment: Comprehensive Problems
2 pages
Half Secon1 Second 2 Second 3 Second
PDF
No ratings yet
Half Secon1 Second 2 Second 3 Second
7 pages
Chapter 4
PDF
No ratings yet
Chapter 4
40 pages
QFD
PDF
No ratings yet
QFD
29 pages
A Emelia
PDF
No ratings yet
A Emelia
27 pages
On Regression
PDF
No ratings yet
On Regression
57 pages
Excel Solution
PDF
No ratings yet
Excel Solution
14 pages
Brad Statistics
PDF
No ratings yet
Brad Statistics
25 pages
P (Test Ve Disease) /P (Disease)
PDF
No ratings yet
P (Test Ve Disease) /P (Disease)
8 pages
Sponsorship Brochure - Kshitij 2009
PDF
No ratings yet
Sponsorship Brochure - Kshitij 2009
48 pages
Finance Assignment
PDF
No ratings yet
Finance Assignment
1 page
0c314d463e6c38b3367ef04a02dcfb68_2ed9699358e389d7fe07dd8347a3d609
PDF
No ratings yet
0c314d463e6c38b3367ef04a02dcfb68_2ed9699358e389d7fe07dd8347a3d609
1 page
Ashok Leyland Annual Report 2015-16
PDF
100% (1)
Ashok Leyland Annual Report 2015-16
171 pages
Sample Questions
PDF
No ratings yet
Sample Questions
10 pages
BEO1105 SUMMER 2015/16: 2 Marks
PDF
No ratings yet
BEO1105 SUMMER 2015/16: 2 Marks
1 page
Macroeconomics Course Outline 2015
PDF
No ratings yet
Macroeconomics Course Outline 2015
4 pages