Linear Programming Formulation
Linear Programming Formulation
Resource
Labour (Hrs/Unit)
Material (Kg/Unit)
Profit (Rs. /Unit)
Resource
requirement
A
B
C
7
3
6
4
4
5
4
2
3
Availability
150 Hrs
200 Kg
2
Sasadhar Bera, IIM Ranchi
Resources
7 X1 +3 X2 +6 X3
4 X1 +4 X2 +5X3
150
200
X1 , X2, X3 0
Decision variables: X1, X2, X3
Sasadhar Bera, IIM Ranchi
6
Sasadhar Bera, IIM Ranchi
7
Sasadhar Bera, IIM Ranchi
8
Sasadhar Bera, IIM Ranchi
Inspection Problem
A company has two grades of inspector A and B that are to
be assigning to a QC inspection. It is required that at least 800
pieces be inspected per 8 hrs day.
Grade A inspector can check pieces at the rate of 25/hr with
an accuracy of 98%.
Grade B inspector can check pieces at the rate of 15/hr with
an accuracy of 95%.
Wage rate of grade A inspector Rs. 4/hr and that of grade B
inspector Rs. 3/hr.
Each time an error is made by the cost to the company Rs. 2.
The company has available for inspector 8 numbers of grade A
and 10 numbers of Grade B.
The company wants to determine the optimal assign of
inspector that minimizes total cost of inspection.
Sasadhar Bera, IIM Ranchi
Objective function
Production requirement
XA , XB 0 and integer
Sasadhar Bera, IIM Ranchi
10
Wage
(Rs/Hr)
1900
1
Hours
Persons
Needed
2 PM 8 PM
1700
8 PM 2 AM
2 AM 8 AM
1800
2100
8 AM
12Noon
12 Noon
4 PM
4 PM
8 PM
8 PM
Mid Night
Mid Night
4 AM
4 AM
8 AM
20
12
30
15
Wage
(Rs./Hr)
1900
1700
1800
2100
Working Shift
Period Number
8 AM 2 PM 2 PM 8 PM 8 PM 2 AM 2 AM 8 AM
1
8 AM 12 Noon
12 Noon 4 PM
4 PM 8 PM
8 PM Mid Night
Mid Night 4 AM
4 AM 8 AM
1
1
0
0
0
0
0
1
1
0
0
0
Sasadhar Bera, IIM Ranchi
0
0
0
1
1
0
0
0
0
0
1
1
Persons
Needed
20
12
30
15
4
7
12
20 (For Period 1)
12 (For Period 2)
30 (For Period 3)
15 (For Period 4)
4
(For Period 5)
7
(For Period 6)
13
Interest rate
0.140
0.130
0.120
0.125
0.100
15
Restaurants
B
54
40
58
2000
4000
3000
5000
1500
4000
1000
3500
1200
30%
20%
15%
16
Subject to
17
18
19
Production
Costs (Rs.)
20
25
30
40
50
60
Production
Capacity (ton)
1500
2000
2200
3000
2700
2500
Demand (tons)
(D)
1100
1500
1800
1600
2300
2500
Selling Price
(Rs.)
180
180
250
270
300
320
Formulate the linear programming problem that provides the optimal production
Sasadhar Bera, IIM Ranchi
20
schedule and maximize profit.
21
Sasadhar Bera, IIM Ranchi
22
23