Materials Log Book
Materials Log Book
Materials Log Book
PROJECT
Date
Time
LOCATION :
Weather
CONTRACTOR :
A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
COMMENTS:
VISITORS:
Prepared by:
Materials Engineer
Certififed Correct:
Project Engineer
Date
Time
10/5/2007
7:00 A.M - 7:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Curing of completed PCCP
Sampling of beam samples
checked consistensy of water-cement ratio
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
10/4/2007
7:00 A.M - 6:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Curing of completed PCCP
Checked worksheets of tests
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
10/01 to 03/2007
7:00 A.M - 8:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Curing of completed PCCP
Checked worksheets of tests
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/27 to 9/30/2007
7:00 A.M - 8:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Curing of completed PCCP
Checked worksheets of tests
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/26/2007
7:00 A.M - 8:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Curing of completed PCCP
Conducted FDT
Sampling of beam samples
Removal and curing of beam samples
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/25/2007
7:00 A.M - 8:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Curing of completed PCCP
Removal and curing of beam samples
Conducted FDT
Grading and LL/PL tests perfomance of ABC
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/24/2007
7:00 A.M - 8:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Curing of completed PCCP
Sampling of beam samples
Conducted FDT
Sampling of ABC
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/23/2007
7:00 A.M - 8:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Curing of completed PCCP
Check compaction of base
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/19 to 22/2007
7:00 A.M - 6:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
Spreading of base materials
Excavation of Line canal
MQC ACTIVITIES:
Curing of completed PCCP
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/18/2007
7:00 A.M - 6:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Curing of completed PCCP
Supervision of FDT works
COMMENTS:
Needs more compaction of embankment materials
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/17/2007
7:00 A.M - 9:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Removal and curing of beam samples
Supervision of works
Curing of completed PCCP
COMMENTS:
Needs more compaction of embankment materials
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/16/2007
7:00 A.M - 9:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Supervision of concrete pouring
Checked consistensy of water-cement ratio
Sampling of beam samples
Removal and curing of beam of samples
Curing of completed PCCP
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/15/2007
7:00 A.M - 9:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Supervision of concrete pouring
Checked consistensy of water-cement ratio
Sampling of beam samples
Removal and curing of beam of samples
Curing of completed PCCP
Conducted FDT
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/14/2007
7:00 A.M - 9:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Supervision of concrete pouring
Checked consistensy of water-cement ratio
Sampling of beam samples
Removal and curing of beam samples
Curing of completed PCCP
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/13/2007
7:00 A.M - 9:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Supervision of concrete pouring
Checked consistensy of water-cement ratio
Sampling of beam samples
Removal of curing of beam samples
Curing of completed of PCCP
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/12/2007
7:00 A.M - 9:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Supervision of concrete pouring
Checked consistensy of water-cement ratio
Sampling of beam samples
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/11/2007
7:00 A.M - 6:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Compaction of embankment materials
Final Preparation of base at Km 159+676.50 to Km 159+748.50 RL
MQC ACTIVITIES:
Inspection of site for pouring of concrete
Curing of completed PCCP
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/10/2007
7:00 A.M - 6:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Compaction of embankment materials
Final Preparation of base at Km 159+604.50 to Km 159+676.50 RL
and installation of steel forms at Km 159+537 - Km 159+604.50 RL
MQC ACTIVITIES:
Inspection of site for pouring of concrete
Curing of completed PCCP
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/9/2007
7:00 A.M - 6:00 P.M
Weather A.M
P.M
PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Compaction of embankment materials
Final Preparation of base and installation of forms for pouring of concrete
at Km 159+537-Km 159+604.50 RL
MQC ACTIVITIES:
Inspection of site for pouring of concrete
Curing of completed PCCP
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/8/2007
7:00 A.M - 6:00 P.M
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Spreading of embankment materials
Preparation of base at Km 159+604.50 to Km 159+960 RL
MQC ACTIVITIES:
COMMENTS:
Advised the contractor's foreman to sprinkle water before compaction of base
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/7/2007
7:00 A.M - 6:00 P.M
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Spreading of embankment materials at Km 162 onwards
Preparation of base at Km 159+604.50 to Km 159+960 RL
MQC ACTIVITIES:
COMMENTS:
Advised the contractor's foreman to sprinkle water before compaction of base
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/6/2007
7:00 A.M - 6:00 P.M
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Backfilling of Item 506
Preparation of base at Km 159+537 to Km 159+604.50 RL
Spreading of embankment materials at Km 162
MQC ACTIVITIES:
Checked worksheets of grading tests of fine and coarse aggregates
Curing of completed PCCP
Checked compaction of base
COMMENTS:
Advised the contractor's foreman to sprinkle water before compaction of base
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/5/2007
7:00 A.M - 6:00 P.M
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Backfilling of Item 506
MQC ACTIVITIES:
Supervised grading test performance of coarse aggregates
Curing of completed PCCP
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/4/2007
7:00 A.M - 6:00 P.M
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Backfilling of Item 506
MQC ACTIVITIES:
Supervised grading test performance of fine aggregates
Curing of completed PCCP
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/3/2007
7:00 A.M - 6:00 P.M
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Backfilling of Item 506
MQC ACTIVITIES:
Sampling of fine and coarse aggregates
Curing of completed PCCP
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
9/2/2007
7:00 A.M - 6:00 P.M
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
MQC ACTIVITIES:
Inspection of stockpiles of coarse aggregate
Curing of completed PCCP
COMMENTS:
Instructed the contractor's personnel to removed oversized materials by screening
at the quarry and handpicking the on site materials
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
16-Feb-08
7:00 A.M - 6:00 P.M
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Curing of completed PCCP
Supervised test performance of sieve analysis of fine aggregates and
compaction of aggregate base course
Sampling of coarse aggregates
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer
Date
Time
19-Feb-08
7:00 A.M - 6:00 P.M
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
MQC ACTIVITIES:
Sampling of coarse aggregates
Curing of completed PCCP
Supervised FDT performance
COMMENTS:
Instructed the contractor's personnel to removed oversized materials
by screening at the quarry and handpicking the on site materials
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer
Date
Time
22-Jan-08
7:00 A.M - 6:00 P.M
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Final preparation of base
Watering and compaction of base
Installation of steel forms Km 155+669 - Km 155+462 RL
MQC ACTIVITIES:
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer
Date
Time
2-Feb-08
7:00 A.M - 8:00 P.M
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Final preparation of base
Pouring of concrete at Km. 157+550 - Km. 157+338.50 LL
Installation of steel forms at Km. 157+338.50 - Km. 157+127 LL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint
MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer
Date
Time
1-Feb-08
7:00 A.M - 8:00 P.M
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Final preparation of base
Pouring of concrete at Km. 157+761.50 - Km. 157+550 LL
Installation of steel forms at Km. 157+555 - Km. 157+338.50 LL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint
MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer
Date
Time
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Hauling, spreading of base materials
Pouring of concreteat Km. 154+625 - Km. 154+508 RL and KM 159+091.90 - Km 159+058 LL
Installation of steel forms at Km. 157+761.50 - Km. 157+550 LL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint
MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer
Date
Time
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Hauling, spreading of base materials
Pouring of concrete at Km 154+836.50 - Km 154+625 RL
Installation of steel forms at Km. 154+625 - Km. 154+508 RL and KM 159+091.90 - Km 159+058 LL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint
MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer
Date
Time
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Hauling, spreading of base materials
Pouring of concrete at Km155+048 - Km 154+836.50 RL
Installation of steel forms at Km. 154+836.50 - Km. 154+625 RL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint
MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer
Date
Time
9/2/2007
7:00 A.M - 6:00 P.M
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
MQC ACTIVITIES:
Inspection of stockpiles of coarse aggregate
Curing of completed PCCP
COMMENTS:
Instructed the contractor's personnel to removed oversized materials by screening
at the quarry and handpicking the on site materials
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ALFREDO S. NERY
Project Engineer
Date
Time
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Hauling, spreading of base materials
Pouring of concrete at Km. 165+446.40 - Km 165+630.90 RL
Installation of steel forms at Km. 155+259.90 - Km. 155+048 RL
and Km 165+630.90-Km 165+734.40 RL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint
MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer
Date
Time
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Hauling, spreading of base materials
Pouring of concrete at Km. 155+462 - Km 155+259.50 RL
Installation of steel forms at Km. 165+234.90 - Km. 165+446.40 RL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint
MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer
Date
Time
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Hauling, spreading of base materials
Pouring of concrete at Km. 165+023.40 - Km 165+234.90 RL
Final preparation of base and installation of steel forms at Km. 155+462 - Km. 155+259.50 RL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint
MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer
Date
Time
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Hauling, spreading of base materials
Final preparation of base for Km. 165+023.40 - Km 165+234.90 RL
Installation of steel forms
Compaction of base
Pouring of concrete at Km. 155+669 - Km. 155+462 RL
MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer
Date
Time
Weather A.M
P.M
Fair
Fair
PROJECT ACTIVITIES:
Final preparation of base for Km. 155+669 - Km 155+462 RL
Installation of steel forms
Compaction of base
MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
COMMENTS:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-Charge
Certified Correct:
ARISTEO I. BUCAS
Materials Engineer
LOG BOOK
Concreting of East Coast Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction
Date
Time
Weather
MANPOWER:
EQUIPMENT:
PROJECT ACTIVITY:
MQC ACTIVITY:
VISITORS:
Prepared by:
MELLY I. ELANGA
Materials In-charge
Checked by:
ARISTEO I. BUCAS
Materials Engineer
Attested by:
ALFREDO S. NERY
Project Engineer