Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Materials Log Book

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 43
At a glance
Powered by AI
The documents log details of road construction projects including materials used and activities performed each day.

Construction materials like concrete, base materials, asphalt sealant are being logged along with details of where and when they are used.

Project activities like excavation, pouring of concrete, installation of steel forms, compaction of base are being monitored on a daily basis.

MATERIALS LOG BOOK

PROJECT

Date
Time

LOCATION :
Weather
CONTRACTOR :

A.M
P.M

PROJECT ACTIVITIES:

MQC ACTIVITIES:

COMMENTS:

VISITORS:

Prepared by:

Materials Engineer

Certififed Correct:

Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

10/5/2007
7:00 A.M - 7:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Excavation of line canal


Installation of steel forms at Km 161+000 - Km 161+099 LL
Pouring of concrete at Km 161+968.50 - Km 162+058.50 RL

MQC ACTIVITIES:
Curing of completed PCCP
Sampling of beam samples
checked consistensy of water-cement ratio

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

10/4/2007
7:00 A.M - 6:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Excavation of line canal


Re compaction of base in preparation of pouring of concrete
at Km 161+000 - Km 162+058.50 RL
Installation of steel forms at Km 161+968.50 - Km 162+058.50 RL

MQC ACTIVITIES:
Curing of completed PCCP
Checked worksheets of tests

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

10/01 to 03/2007
7:00 A.M - 8:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Excavation of line canal


Re compaction of base in preparation of pouring of concrete
at Km 161+000 - Km 162+058.50 RL

MQC ACTIVITIES:
Curing of completed PCCP
Checked worksheets of tests

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/27 to 9/30/2007
7:00 A.M - 8:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Excavation of Line canal

MQC ACTIVITIES:
Curing of completed PCCP
Checked worksheets of tests

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/26/2007
7:00 A.M - 8:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Excavation of Line canal


Pouring of PCCP at Km 159+447 - Km 159+ 378 RL
Final preparation and installation of forms at Km 162+162 - Km 162+058.50 RL

MQC ACTIVITIES:
Curing of completed PCCP
Conducted FDT
Sampling of beam samples
Removal and curing of beam samples

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/25/2007
7:00 A.M - 8:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Excavation of Line canal


Pouring of concrete at Km 159+888-Km 159+960 RL
and Km 159+528 - Km 159+447 RL
Installation of Steel forms at Km 159+447 - Km 159+378 RL

MQC ACTIVITIES:
Curing of completed PCCP
Removal and curing of beam samples
Conducted FDT
Grading and LL/PL tests perfomance of ABC

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/24/2007
7:00 A.M - 8:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Excavation of Line canal


Pouring of concrete at Km 159+888-Km 159+960 RL
Installation of Steel forms at Km 159+528 - Km 159+447 RL

MQC ACTIVITIES:
Curing of completed PCCP
Sampling of beam samples
Conducted FDT
Sampling of ABC

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/23/2007
7:00 A.M - 8:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Excavation of Line canal


Final preparation of base and installation of steel forms at Km 159+888-Km 159+960 RL

MQC ACTIVITIES:
Curing of completed PCCP
Check compaction of base

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/19 to 22/2007
7:00 A.M - 6:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:
Spreading of base materials
Excavation of Line canal

MQC ACTIVITIES:
Curing of completed PCCP

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/18/2007
7:00 A.M - 6:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Compaction of embankment materials

MQC ACTIVITIES:
Curing of completed PCCP
Supervision of FDT works

COMMENTS:
Needs more compaction of embankment materials

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/17/2007
7:00 A.M - 9:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Compaction of embankment materials at Km 162

MQC ACTIVITIES:
Removal and curing of beam samples
Supervision of works
Curing of completed PCCP

COMMENTS:
Needs more compaction of embankment materials

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/16/2007
7:00 A.M - 9:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Pouring of PCCP at Km 159+820.50 - Km 159+888 RL

MQC ACTIVITIES:
Supervision of concrete pouring
Checked consistensy of water-cement ratio
Sampling of beam samples
Removal and curing of beam of samples
Curing of completed PCCP

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/15/2007
7:00 A.M - 9:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Pouring of PCCP at Km 159+748.50 - Km 159+820.50 RL


Installation of steel forms at Km 159+820.50 - Km 159+888 RL

MQC ACTIVITIES:
Supervision of concrete pouring
Checked consistensy of water-cement ratio
Sampling of beam samples
Removal and curing of beam of samples
Curing of completed PCCP
Conducted FDT

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/14/2007
7:00 A.M - 9:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Pouring of PCCP at Km 159+676.50 - Km 159+748.50 RL


Installation of steel forms at Km 159+748.50 - Km 159+820.50 RL

MQC ACTIVITIES:
Supervision of concrete pouring
Checked consistensy of water-cement ratio
Sampling of beam samples
Removal and curing of beam samples
Curing of completed PCCP

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/13/2007
7:00 A.M - 9:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Pouring of PCCP at Km 159+604.50 - Km 159+676.50 RL


Installation of steel forms at Km 159+676.50 - Km 748.50 RL

MQC ACTIVITIES:
Supervision of concrete pouring
Checked consistensy of water-cement ratio
Sampling of beam samples
Removal of curing of beam samples
Curing of completed of PCCP

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/12/2007
7:00 A.M - 9:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:

Excavation of Line Canal


Compaction of embankment materials
Final Preparation of base at Km 159+748.50 to KM 159+888 RL
Pouring of PCCP at Km 159+537-Km 159+604.50 RL
Installation of forms at Km 159+604.50 - Km 159+676.50 RL

MQC ACTIVITIES:
Supervision of concrete pouring
Checked consistensy of water-cement ratio
Sampling of beam samples

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/11/2007
7:00 A.M - 6:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Compaction of embankment materials
Final Preparation of base at Km 159+676.50 to Km 159+748.50 RL

MQC ACTIVITIES:
Inspection of site for pouring of concrete
Curing of completed PCCP

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/10/2007
7:00 A.M - 6:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Compaction of embankment materials
Final Preparation of base at Km 159+604.50 to Km 159+676.50 RL
and installation of steel forms at Km 159+537 - Km 159+604.50 RL

MQC ACTIVITIES:
Inspection of site for pouring of concrete
Curing of completed PCCP

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/9/2007
7:00 A.M - 6:00 P.M

Weather A.M
P.M

PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Compaction of embankment materials
Final Preparation of base and installation of forms for pouring of concrete
at Km 159+537-Km 159+604.50 RL

MQC ACTIVITIES:
Inspection of site for pouring of concrete
Curing of completed PCCP

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/8/2007
7:00 A.M - 6:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Spreading of embankment materials
Preparation of base at Km 159+604.50 to Km 159+960 RL

MQC ACTIVITIES:

Curing of completed PCCP


Checked compaction of base

COMMENTS:
Advised the contractor's foreman to sprinkle water before compaction of base

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/7/2007
7:00 A.M - 6:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Spreading of embankment materials at Km 162 onwards
Preparation of base at Km 159+604.50 to Km 159+960 RL

MQC ACTIVITIES:

Curing of completed PCCP


Checked compaction of base

COMMENTS:
Advised the contractor's foreman to sprinkle water before compaction of base

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/6/2007
7:00 A.M - 6:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Backfilling of Item 506
Preparation of base at Km 159+537 to Km 159+604.50 RL
Spreading of embankment materials at Km 162

MQC ACTIVITIES:
Checked worksheets of grading tests of fine and coarse aggregates
Curing of completed PCCP
Checked compaction of base

COMMENTS:
Advised the contractor's foreman to sprinkle water before compaction of base

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/5/2007
7:00 A.M - 6:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Backfilling of Item 506

MQC ACTIVITIES:
Supervised grading test performance of coarse aggregates
Curing of completed PCCP

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/4/2007
7:00 A.M - 6:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Backfilling of Item 506

MQC ACTIVITIES:
Supervised grading test performance of fine aggregates
Curing of completed PCCP

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/3/2007
7:00 A.M - 6:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials
Backfilling of Item 506

MQC ACTIVITIES:
Sampling of fine and coarse aggregates
Curing of completed PCCP

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/2/2007
7:00 A.M - 6:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials

MQC ACTIVITIES:
Inspection of stockpiles of coarse aggregate
Curing of completed PCCP

COMMENTS:
Instructed the contractor's personnel to removed oversized materials by screening
at the quarry and handpicking the on site materials

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of Calapan South Road


Calapan-Mansalay Road
(Don Pedro, Cagancan and Budburan Section)
Mansalay, Oriental Mindoro
Green Horizon Landscapers and Developers, Incorporated

Date
Time

16-Feb-08
7:00 A.M - 6:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:

Hauling of fine and coarse aggregates

MQC ACTIVITIES:
Curing of completed PCCP
Supervised test performance of sieve analysis of fine aggregates and
compaction of aggregate base course
Sampling of coarse aggregates

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer

MATERIALS LOG BOOK

Concreting of Calapan South Road


Calapan-Mansalay Road
(Don Pedro, Cagancan and Budburan Section)
Mansalay, Oriental Mindoro
Green Horizon Landscapers and Developers, Incorporated

Date
Time

19-Feb-08
7:00 A.M - 6:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:

Spreading of shoulder materials along Cagancan Section


Watering and Compaction of shoulder materials

MQC ACTIVITIES:
Sampling of coarse aggregates
Curing of completed PCCP
Supervised FDT performance

COMMENTS:
Instructed the contractor's personnel to removed oversized materials
by screening at the quarry and handpicking the on site materials

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer

MATERIALS LOG BOOK

Concreting of Calapan South Road


Calapan-Mansalay Road
(Don Pedro, Cagancan and Budburan Section)
Mansalay, Oriental Mindoro
Green Horizon Landscapers and Developers, Incorporated

Date
Time

22-Jan-08
7:00 A.M - 6:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Final preparation of base
Watering and compaction of base
Installation of steel forms Km 155+669 - Km 155+462 RL

MQC ACTIVITIES:

Checked compaction of base


Curing of poured PCCP
Checked worksheets of FDT

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer

MATERIALS LOG BOOK

Concreting of Calapan South Road


Calapan-Mansalay Road
(Don Pedro, Cagancan and Budburan Section)
Mansalay, Oriental Mindoro
Green Horizon Landscapers and Developers, Incorporated

Date
Time

2-Feb-08
7:00 A.M - 8:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Final preparation of base
Pouring of concrete at Km. 157+550 - Km. 157+338.50 LL
Installation of steel forms at Km. 157+338.50 - Km. 157+127 LL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint

MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer

MATERIALS LOG BOOK

Concreting of Calapan South Road


Calapan-Mansalay Road
(Don Pedro, Cagancan and Budburan Section)
Mansalay, Oriental Mindoro
Green Horizon Landscapers and Developers, Incorporated

Date
Time

1-Feb-08
7:00 A.M - 8:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Final preparation of base
Pouring of concrete at Km. 157+761.50 - Km. 157+550 LL
Installation of steel forms at Km. 157+555 - Km. 157+338.50 LL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint

MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer

MATERIALS LOG BOOK

Concreting of Calapan South Road


Calapan-Mansalay Road
(Don Pedro, Cagancan and Budburan Section)
Mansalay, Oriental Mindoro
Green Horizon Landscapers and Developers, Incorporated

Date
Time

Jan. 31, 2008


7:00 A.M - 8:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Hauling, spreading of base materials
Pouring of concreteat Km. 154+625 - Km. 154+508 RL and KM 159+091.90 - Km 159+058 LL
Installation of steel forms at Km. 157+761.50 - Km. 157+550 LL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint

MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer

MATERIALS LOG BOOK

Concreting of Calapan South Road


Calapan-Mansalay Road
(Don Pedro, Cagancan and Budburan Section)
Mansalay, Oriental Mindoro
Green Horizon Landscapers and Developers, Incorporated

Date
Time

Jan. 30, 2008


7:00 A.M - 8:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Hauling, spreading of base materials
Pouring of concrete at Km 154+836.50 - Km 154+625 RL
Installation of steel forms at Km. 154+625 - Km. 154+508 RL and KM 159+091.90 - Km 159+058 LL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint

MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer

MATERIALS LOG BOOK

Concreting of Calapan South Road


Calapan-Mansalay Road
(Don Pedro, Cagancan and Budburan Section)
Mansalay, Oriental Mindoro
Green Horizon Landscapers and Developers, Incorporated

Date
Time

Jan. 29, 2008


7:00 A.M - 8:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Hauling, spreading of base materials
Pouring of concrete at Km155+048 - Km 154+836.50 RL
Installation of steel forms at Km. 154+836.50 - Km. 154+625 RL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint

MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer

MATERIALS LOG BOOK

Concreting of East Coast Road


Calapan-Mansalay Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction Corporation

Date
Time

9/2/2007
7:00 A.M - 6:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Excavation of Line Canal
Disposal of waste materials

MQC ACTIVITIES:
Inspection of stockpiles of coarse aggregate
Curing of completed PCCP

COMMENTS:
Instructed the contractor's personnel to removed oversized materials by screening
at the quarry and handpicking the on site materials

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ALFREDO S. NERY
Project Engineer

MATERIALS LOG BOOK

Concreting of Calapan South Road


Calapan-Mansalay Road
(Don Pedro, Cagancan and Budburan Section)
Mansalay, Oriental Mindoro
Green Horizon Landscapers and Developers, Incorporated

Date
Time

Jan. 27, 2008


7:00 A.M - 8:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Hauling, spreading of base materials
Pouring of concrete at Km. 165+446.40 - Km 165+630.90 RL
Installation of steel forms at Km. 155+259.90 - Km. 155+048 RL
and Km 165+630.90-Km 165+734.40 RL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint

MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer

MATERIALS LOG BOOK

Concreting of Calapan South Road


Calapan-Mansalay Road
(Don Pedro, Cagancan and Budburan Section)
Mansalay, Oriental Mindoro
Green Horizon Landscapers and Developers, Incorporated

Date
Time

Jan. 25, 2008


7:00 A.M - 8:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Hauling, spreading of base materials
Pouring of concrete at Km. 155+462 - Km 155+259.50 RL
Installation of steel forms at Km. 165+234.90 - Km. 165+446.40 RL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint

MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer

MATERIALS LOG BOOK

Concreting of Calapan South Road


Calapan-Mansalay Road
(Don Pedro, Cagancan and Budburan Section)
Mansalay, Oriental Mindoro
Green Horizon Landscapers and Developers, Incorporated

Date
Time

Jan. 24, 2008


7:00 A.M - 8:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Hauling, spreading of base materials
Pouring of concrete at Km. 165+023.40 - Km 165+234.90 RL
Final preparation of base and installation of steel forms at Km. 155+462 - Km. 155+259.50 RL
Watering and compaction of base
Cutting and application of asphalt sealant for the weakened plane joint

MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples
Removal of beam samples from the molds and submerged it into the water for curing

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer

MATERIALS LOG BOOK

Concreting of Calapan South Road


Calapan-Mansalay Road
(Don Pedro, Cagancan and Budburan Section)
Mansalay, Oriental Mindoro
Green Horizon Landscapers and Developers, Incorporated

Date
Time

Jan. 23, 2008


7:00 A.M - 8:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Hauling, spreading of base materials
Final preparation of base for Km. 165+023.40 - Km 165+234.90 RL
Installation of steel forms
Compaction of base
Pouring of concrete at Km. 155+669 - Km. 155+462 RL

MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP
Checked water-cement ratio
Sampling of beam samples

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certififed Correct:
ARISTEO I. BUCAS
Materials Engineer

MATERIALS LOG BOOK

Concreting of Calapan South Road


Calapan-Mansalay Road
(Don Pedro, Cagancan and Budburan Section)
Mansalay, Oriental Mindoro
Green Horizon Landscapers and Developers, Incorporated

Date
Time

Jan. 22, 2008


7:00 A.M - 6:00 P.M

Weather A.M
P.M

Fair
Fair

PROJECT ACTIVITIES:
Final preparation of base for Km. 155+669 - Km 155+462 RL
Installation of steel forms
Compaction of base

MQC ACTIVITIES:
Inspection of area for pouring of concrete
Checked compaction of base
Curing of poured PCCP

COMMENTS:

VISITORS:

Prepared by:
MELLY I. ELANGA
Materials In-Charge

Certified Correct:
ARISTEO I. BUCAS
Materials Engineer

LOG BOOK
Concreting of East Coast Road
(Mabaho Section)
Mansalay, Oriental Mindoro
Barman Construction

Date
Time
Weather

MANPOWER:

EQUIPMENT:

PROJECT ACTIVITY:

MQC ACTIVITY:

VISITORS:

Prepared by:

MELLY I. ELANGA
Materials In-charge
Checked by:

ARISTEO I. BUCAS
Materials Engineer

Attested by:

ALFREDO S. NERY
Project Engineer