Item
Description Quantity Unit Unit Cost Total Cost
No.
1
Item
Description Quantity Unit Unit Cost Total Cost
No.
4. Ceiling Finishes
a. CT1-(N) 10mm thk.x 600 x 600 white acrylic panels 490.00 m2
on white t-runners by CKM bldg materials Inc..
including shadow line trim (see plan for detail)
2
Item
Description Quantity Unit Unit Cost Total Cost
No.
d. (N) Drop wall and door portal wood design; (see 135.00 m2
plan for detail)
5. Floor Finishes
a. Install (N)3mm thk 600X600mm Carpet Tiles (Gray) 262.15 m2
Main offices of Chairman and Commissioners;
submit samples for selection/approval
3
Item
Description Quantity Unit Unit Cost Total Cost
No.
f. 12w PLC cfl type 230v (ledlight) horiz. Mounted on 84.00 set/s
recess-mounted fixture with tempered glass cover
200mm dia; see specs
g. Emergency Light; see specs 38.00 set/s
h. Illuminated Exit signs; see specs 12.00 set/s
i. (N) Carrier or approved equal 3HP, ACCU, Inverter, 8.00 set/s
230V, 60Hz, Single Phase, Wall Mounted,
complete with mounting brackets/accessories and
drain pipe to nearest catch basin; see detail and
mechanical dwgs.
4
Item
Description Quantity Unit Unit Cost Total Cost
No.
5
Item
Description Quantity Unit Unit Cost Total Cost
No.
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
6
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
General Requirements
DUPA-1 lot 1.00
1. Bonds and Insurance
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
General Requirements
DUPA-2 2. Hauling / Delivery of Materials lot 1.00
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
General Requirements
DUPA-3 3. Temporary Facilities and Field lot 1.00
Office
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
General Requirements
DUPA-4 4. Power, Water Consumption and lot 1.00
Security Services
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
General Requirements
DUPA-5 lot 1.00
5. As-Built Plans/ Drawings
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Demolition & Repair Works
1. Demolished portion of (E)
walls and remove (E) doors; Protect
DUPA-6 m2 385.00
adjoining walls, beams columns & floor.
Prepare for new layout; See proposed
floor plan
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date 0
Project #REF!
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Demolition & Repair Works
6. Board ups (E) openings
DUPA-11 m2 31.75
with materials & finishes to match
existing
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Architectural Works
1. Walls & Wall Finishes
a. Glass Partition using ½ thk
DUPA-12 Tempered Glass and Patch Fittings Door m2 315.00
(Office of the Chairman and
Commissioners)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
Submitted by:
Name of the Representative of the Bidder: __________________________________________
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Architectural Works
1. Walls & Wall Finishes
b.Construct (N) 150mm thk. Reinf.
CHB wall (to extend to the underside of
DUPA-13 m2 45.00
the slab / beam). Securely fasten / weld
(N) rebars to (E) slab/beam
reinforcement; Plastered and latex
painted finished
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Architectural Works
1. Walls & Wall Finishes
c. (N) Marine board double wall
DUPA-14 covered with wall paper design submit m2 135.00
sample for approval. See plan for detail
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.Architectural/Structural Works
2. Doors and Windows
d.Install (N) 300x600mm
DUPA-15 m2 250.00
homogeneous wall tiles (polished) at
toilet;submit sample for selection and
approval.
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.Architectural/Structural Works
2. Doors and Windows
b. D-02: 0.90 X 2.15 m
DUPA-16 45mm thk Tanguile solid core panel set/s 17.00
swing door with groove and
20mmx100mm solid wood casing (both
sides), submit sample for approval
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.Architectural/Structural Works
2. Doors and Windows
b. D-02: 0.90 X 2.15 m
DUPA-17 45mm thk Tanguile solid core panel set/s 11.00
swing door with groove and
20mmx100mm solid wood casing (both
sides), submit sample for approval
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
3.Architectural/Structural Works
2. Doors and Windows
c. D-03: 1.80 X 2.15 m
DUPA-18 Powder coated aluminum double acting set/s 2.00
swing door 10mm thk tempered frosted
glass for door panels,submit sample for
approval
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.Architectural/Structural Works
2. Doors and Windows
d. D-04: 1.40 X 2.15 m
DUPA-19 set/s 1.00
12mm thk tempered frameless glass
door with frosted stripped film. See plan
for details, submit sample for approval
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
3.Architectural/Structural Works
2. Doors and Windows
e. D-05: 0.90 X 2.15 m
45mm thk Hollow core flush sliding door,
DUPA-20 set/s 1.00
painted finish with 10mm thk clear
wired glass vision lite and solid wood top
panel & jambs, submit sample for
approval
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.Architectural/Structural Works
2. Doors and Windows
g. (N) Roll-up window
DUPA-22 shades and valance for Exterior and m2 120.00
interior windows
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.Architectural/Structural Works
3. Built-in Overhead
Cabinets, Counters, Modular Partitions
DUPA-23 Assembly and Furnitures sets 18.00
a. Advertising Poster
Stands 1.20x1.80m
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.Architectural/Structural Works
3. Built-in Overhead
Cabinets, Counters, Modular Partitions
Assembly and Furnitures
DUPA-24 lot 1.00
b. Furnitures for
Chairman and Commissioners (See
attached furniture plans for type and
location)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number
Days
of
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Architectural Works
3. Built-in Overhead Cabinets,
Counters and Accessories
DUPA-26 d. OCH 2 set/s 3.00
Overhead cabinet assembly including
supports; for chairman and
commissioners; see details
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Architectural Works
3. Built-in Overhead Cabinets,
Counters and Accessories
DUPA-27 e. OCH 3 set/s 3.00
Overhead cabinet assembly including
supports; for chairman and
commissioners; see details
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
Architectural Works
4. Ceiling Finishes
a. CT1-(N) 10mm thk.x 600
DUPA-29 x 600 white acrylic panels on white t- m2 490.00
runners by CKM bldg materials Inc..
including shadow line trim (see plan for
detail)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Architectural Works
4. Ceiling Finishes
DUPA-30 b.CT2-(N) 24mm thk m2 450.00
seamless Acoustical Ceiling (see plan for
detail)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
Position: _____________________________________
Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
Architectural Works
4. Ceiling Finishes
c. CT3-(N) 10mm
DUPA-31 thk.x 1200 x 2400 Boral Unispan Gypsum m2 290.00
Board Ceiling & downwall/soffit on
metal joists; including shadow line trim
(see plan for detail)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Architectural Works
4. Ceiling Finishes
DUPA-32 d. (N) Drop wall and m2 135.00
door portal wood design; (see plan for
detail)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. Architectural Works
5. Floor Finishes
a. Install (N)3mm
DUPA-33 thk 600X600mm Carpet Tiles (Gray) m2 262.15
Main offices of Chairman and
Commissioners; submit samples for
selection/approval
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. Architectural Works
5. Floor Finishes
b. Install (N)
200X1000mm Vitrified semi glazed wood
DUPA-34 m2 296.08
planks tile replica floor tile (Staff area,
pantry, receiving area & Board room
reception): submit samples for
selections/approval
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Unit Cost Amount
Item No. Description Unit Quantity (Pesos) (Pesos)
3. Architectural Works
5. Floor Finishes
c. Install (N)
DUPA-35 600X600mm Homogeneous floor Tiles m2 94.32
(white) Comm. Adamat and Darilag
Receiving area; submit samples for
selection/approval
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.Architectural Works
5. Floor Finishes
d. Install (N)3mm
DUPA-36 m2 161.59
thk 600X600mm Carpet Tiles (blue)
Conference Rooms; submit samples for
selection/approval
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. Architectural Works
5. Floor Finishes
e.Install
DUPA-37 (N)300X300mm Homogeneous floor tiles m2 28.04
for all CR; submit samples for
selection/approval
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. Architectural Works
5. Floor Finishes
f. Install (N)3mm
DUPA- 38 thk 600X600mm Carpet Tiles (brown) m2 20.00
VIP Waiting Lounge Office of the
Chairman; submit samples for
selection/approval
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. Architectural Works
6. Toilet Accessories and Plumbing
DUPA-39 Works set/s 8.00
a. Hook/Bumper (To be installed at the
back of the toilet door)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.Architectural Works
6. Toilet Accessories and Plumbing
DUPA-40 Works set/s 8.00
b. Toilet Paper Holder: Use Acasia 3443
by American Standard
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. Architectural Works
6. Toilet Accessories and Plumbing
DUPA-41 Works set/s 8.00
c. Towel Bar: Use Acasia 3446 Towel
Bar by American Standard
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. Architectural Works
6. Toilet Accessories and Plumbing
DUPA-42 Works set/s 8.00
d. Towel Ring (to be intalled near
lavatory)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Item No. Description Unit Quantity Unit Cost (Pesos) Amount
(Pesos)
3. Architectural Works
DUPA-43 6. Toilet Accessories and Plumbing set/s 8.00
Works
e. Water Closet; see specs
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. Architectural Works
6. Toilet Accessories and Plumbing
DUPA-44 Works set/s 8.00
f. Granite counter top lavatory ; see
specs
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
3. Architectural Works
6. Toilet Accessories and Plumbing
DUPA-45 Works set/s 8.00
g. Floor drain; Brass nickel-plated
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. Architectural Works
6. Toilet Accessories and Plumbing
DUPA-46 Works set/s 8.00
h. Hand Spray (bidet); see specs
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. Architectural Works
6. Toilet Accessories
i. 6mm thk
DUPA-47 set/s 8.00
frameless (unbeveled) Face Quality Q2
Mirror on 20mm thk Marine Plywood
Backing
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.ARCHITECTURAL WORKS
7. Painting/ Varnishing/
DUPA-49 Waxing Works (Including Prep & m2 320.00
Patching Works)
a. Masonry Surfaces
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. ARCHITECTURAL WORKS
7. Painting/ Varnishing/
DUPA-50 Waxing Works (Including Prep & m2 65.00
Patching Works)
b. Wooden Surfaces
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
Position: _____________________________________
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.ARCHITECTURAL/STRUCTURAL
WORKS
8. Roofing Works and Water proofing of
concrete gutters
DUPA-52 a. Replacement of roofing at the m2 1400.00
Office of the Chairman and
Commissioners & installation of Roofing
going to Chairman's Board room (See
plan for details)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.ARCHITECTURAL/STRUCTURAL
WORKS
8. Roofing Works and Water proofing of
DUPA-52 m2 75.00
concrete gutters
b. Water proofing of concrete
deck and gutters
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4.ELECTRICAL / MECHANICAL WORKS
1. Roughing-Ins,
DUPA-56 Conduits and Raceways (provide l.m. 70.00
detailed breakdown)
c. Wireway
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
ELECTRICAL / MECHANICAL WORKS
2. Wires and Cables
DUPA-57 (provide detailed breakdown) l.m. 4,845.00
a. Wires and Cables for
lighting layout
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
2. Wires and
Cables (provide detailed breakdown)
DUPA-58 l.m. 12,502.00
b. Wires and Cables for
Convenience outlet
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
DUPA-59 a.Three-gang set/s 14.00
Wall Push Switch, 16A, 250V (Panasonic
- With Light Swith)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
DUPA-60 b.Two-gang set/s 10.00
Wall Push Switch, 16A, 250V (Panasonic
- With Light Swith)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
DUPA-61 c.One- gang set/s 18.00
Wall Push Switch, 16A, 250V (Panasonic
- With Light Switch)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
f.Duplex
DUPA-64 set/s 134.00
Universal Outlet with Ground and
Shutter, Panel Type, Panasonic Wide
Series,16A, 250V; Verify Specs
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
OIC-Executive Director IV
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
g. Single
DUPA-65 set/s 49.00
Universal Outlet with Ground and
Shutter, Panel Tye, Panasonic Wide
Series,16A, 250V; Verify Specs
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
h. Weather
DUPA-66 proof Duplex Universal Outlet with set/s 6.00
Ground and Shutter, Panel Type,
Panasonic Wide Series,16A, 250V; Verify
Specs
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
DUPA-67 set/s 578.00
i. Junction
box/Pull box
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
DUPA-68 set/s 42.00
j. Smoke
Detector; See specs
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
DUPA-69 3. Wiring Devices set/s 6.00
k. Heat Detector
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
4. Lighting /
DUPA-71 Ventilation Fixtures/AC set/s 17.00
b.1-36 W /18W fluorescent box
type (ledlight) surface mounted Fixture;
see specs
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
4. Lighting /
Ventilation Fixtures/AC
DUPA-73 d. 18w plc cfl type 230v set/s 35.00
(daylight) horiz. Mounted on recess-
mounted fixture with tempered glass
cover; see specs
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
4. Lighting /
DUPA-74 Ventilation Fixtures/AC set/s 38.00
e. 14 Watts, T5 fluorescent
(ledlight) Surface Mounted Fixture with
separate togle switch; see specs
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
4. Lighting /
Ventilation Fixtures/AC
DUPA-75 f. 12w PLC cfl type 230v set/s 84.00
(ledlight) horiz. Mounted on recess-
mounted fixture with tempered glass
cover 200mm dia; see specs
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
OIC-Executive Director IV
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
DUPA-76 4. Lighting / set/s 38.00
Ventilation Fixtures/AC
g. Emergency Light; see specs
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
4. Lighting /
DUPA-77 Ventilation Fixtures/AC set/s 12.00
h. Illuminated Exit signs; see
specs
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
4. Lighting /
Ventilation Fixtures/AC
DUPA-82 n. Ceiling-Mounted exhaust fan set 14.00
including ductwork, supports,
louver,bird screen and misc. accessories;
see mech dwgs
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
1. Roughing-Ins, Conduits and
DUPA-83 l.m. 1026.00
Raceways (provide detailed breakdown)
a. PVC
Pipes 3/4" dia
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
1. Roughing-Ins, Conduits and
DUPA-84 Raceways (provide detailed breakdown) pcs 352.00
b.
PVC adapter 3/4" dia.
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
1. Roughing-Ins, Conduits and
DUPA-86 Raceways (provide detailed breakdown) assy 3.00
d. Data
Cabinet
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
2. Cables & Wiring
DUPA-91 lot 1.00
e.
Miscellaneous Materials and
Consumables
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
4. CCTV System (Verify Existing for
DUPA-100 capacity and compatibility) set/s 14.00
1. CCTV
Camera
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
4. CCTV System (Verify Existing for
DUPA-101 set/s 1.00
capacity and compatibility)
2. CCTV
Monitor
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
4. CCTV System (Verify Existing for
DUPA-105 l.m. 1200.00
capacity and compatibility)
6. RG-59
Coaxial Cable (verify specs)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
4. CCTV System (Verify Existing for
DUPA-106 capacity and compatibility) lot 1.00
7.
Miscellaneous Materials and
Consumables
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Item No. Description Unit Quantity Unit Cost (Pesos) Amount
(Pesos)
OTHER ITEMS NEEDED TO COMPLETE
WORK:
DUPA-107 assy 5.00
1. Panel Board Surface Mounted Nema 1
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
6. OTHER ITEMS NEEDED TO COMPLETE
WORK: (pls. specify)
2. Roughing-Ins, Conduits and
DUPA-109 l.m. 150.00
Raceways (provide detailed breakdown)
b.
PVC Pipes
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by:
OIC-Executive Director IV
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
6. OTHER ITEMS NEEDED TO COMPLETE
WORK: (pls. specify)
2. Roughing-Ins, Conduits and
DUPA-110 set 1.00
Raceways (provide detailed breakdown)
c.
Addressable Fire Alarm Control Panel
A MATERIALS
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
Submitted by: