Project Title : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)

Location : 4F CHED Building, C.P. Garcia Avenue, UP Diliman, Quezon City


Subject : BILL OF QUANTITIES (BOQ)
Date :

Item
Description Quantity Unit Unit Cost Total Cost
No.

1.0 GENERAL REQUIREMENTS


1. Bonds and Insurance 1.00 lot
2. Hauling / Delivery of Materials 1.00 lot
3. Temporary Facilities and Field Office 1.00 lot
4. Power, Water Consumption, Security Services, 1.00 lot
Provision of Personal Protective Equipment and
Safety Signage
5. As-Built Plans/ Drawings 1.00 lot
Sub-Total for Item No. 1.0 >>> 0.00
2.0 DEMOLITION & REPAIR WORKS
1. Demolished portion of (E) walls and remove (E) 385.00 m2
doors; Protect adjoining walls, beams columns &
floor. Prepare for new layout; See proposed floor
plan

2. Remove (E) ceiling and (E) ceiling mounted 1,050.00 m2


fixtures. Returned dismantled / unused materials to
the owner. Prepare for (N) ceiling; see attached
ceiling plan.

3. Remove (E) floor tiles and floor finishes. Embed 1,050.00 m2


new conduits & wiring devices; See attached
dwgs.Prepare existing surfaces to receive new
finish.

4. Removed (E) ACU for re-use/relocation. Return 33.00 units


dismantled/unused materials to the owner. Prepare
for reinstallation of refurbished A/C units;Coordinate
to the owner for the final locations. See mechanical
dwgs.

5. Removed (E) Audio Visual Equipments, electrical 1.00 lot


wiring, and damaged gutter/roofing. Return
dismantled / unused materials to the owner for
reused / refurbishing. Prepare for (N) layout of the
Audio Visual Equipments; see plans for details

6. Board ups (E) openings with materials & finishes to 31.75 m2


match existing
Sub-Total for Item No. 2.0 >>> 0.00
3.0 ARCHITECTURAL/STRUCTURAL WORKS
ENSURE all materials & quantities are as per drawings &
specs
1. Walls & Wall Finishes
a. Glass Partition using ½ thk Tempered Glass with 315.00 m2
wooden accent design and Patch Fittings Door
(Office of the Chairman and Commissioners)

b. Construct (N) 150mm thk. Reinf. CHB wall (to 45.00 m2


extend to the underside of the slab / beam).
Securely fasten / weld (N) rebars to (E) slab/beam
reinforcement; Plastered and latex painted finished

c. (N) Marine board double wall covered with wall 135.00 m2


paper design for drop wall and door portal submit
sample for approval. See plan for detail
d. Install (N) 300x600mm homogeneous wall tiles 250.00 m2
(polished) at toilet;submit sample for selection and
approval.

1
Item
Description Quantity Unit Unit Cost Total Cost
No.

2. Doors and Windows


Fabricate & install the following doors / windows as
complete assemblies including finish hardware &
accessories as per plan
a. D-01: 0.90 X 2.15 m 12mm thk tempered frameless 17.00 set/s
glass door with frosted stripped film. See plan for
details
b. D-02: 0.90 X 2.15 m 45mm thk Tanguile solid core 11.00 set/s
panel swing door with groove and 20mmx100mm
solid wood casing (both sides), submit sample for
approval

c. D-03: 1.80 X 2.15 m Powder coated aluminum 2.00 set/s


double acting swing door 10mm thk tempered
frosted glass for door panels,submit sample for
approval

d. D-04: 1.40 X 2.15 m 12mm thk tempered frameless 1.00 set/s


glass door with frosted stripped film. See plan for
details, submit sample for approval
e. D-05: 0.90 X 2.15 m 45mm thk Hollow core flush 1.00 set/s
sliding door, painted finish with 10mm thk clear
wired glass vision lite and solid wood top panel &
jambs, submit sample for approval

f. D-06: 0.90 X 2.10 m 45mm thk Tanguile (Marine 10.00 set/s


Plywood) Hollow core flush swing door with bottom
louvers for CR, submit sample for approval

g. (N) Roll-up window shades and valance for Exterior 120.00 m2


and interior windows
3. Built-in Overhead Cabinets, Counters, Modular
Partitions Assembly and Furnitures
Fabricate & install the following assemblies;
(Coordinate with owner on loose furniture / Eqpt
dimensions for appropriate
clearances/heights/finish

a. Advertising Poster Stands 1.20x1.80m 18.00 sets


b. Furnitures for Chairman and Commissioners (See 1.00 lot
attached furniture plans for type and location)

c. OCH 1 Overhead cabinet assembly including 5.00 set/s


supports; for chairman and commissioners; see
details
d. OCH 2 Overhead cabinet assembly including 3.00 set/s
supports; for chairman and commissioners; see
details
e. OCH 3 Overhead cabinet assembly including 3.00 set/s
supports; for chairman and commissioners; see
details
f. Modular Partition and table top assembly with 3 1.00 lot
drawers mobile pedestal for Chairman and
Commissioners follow as per plan; submit samples
for approval by the owner.

4. Ceiling Finishes
a. CT1-(N) 10mm thk.x 600 x 600 white acrylic panels 490.00 m2
on white t-runners by CKM bldg materials Inc..
including shadow line trim (see plan for detail)

b. CT2-(N) 24mm thk seamless Acoustical Ceiling 450.00 m2


(see plan for detail)

2
Item
Description Quantity Unit Unit Cost Total Cost
No.

c. CT3-(N) 10mm thk.x 600 x 600 white acrylic panels 290.00 m2


on white t-runners by CKM bldg materials Inc.
including shadow line trim for hallways & common
area (see plan for detail)

d. (N) Drop wall and door portal wood design; (see 135.00 m2
plan for detail)
5. Floor Finishes
a. Install (N)3mm thk 600X600mm Carpet Tiles (Gray) 262.15 m2
Main offices of Chairman and Commissioners;
submit samples for selection/approval

b. Install (N) 200X1000mm Vitrified semi glazed wood 296.08 m2


planks tile replica floor tile (Staff area, pantry,
receiving area & Board room reception): submit
samples for selections/approval

c. Install (N) 600X600mm Homogeneous floor Tiles 94.32 m2


(white) Comm. Adamat and Darilag Receiving area;
submit samples for selection/approval

d. Install (N)3mm thk 600X600mm Carpet Tiles (blue) 161.59 m2


Conference Rooms; submit samples for
selection/approval
e. Install (N)300X300mm Homogeneous floor tiles for 28.04 m2
all CR; submit samples for selection/approval
f. Install (N)3mm thk 600X600mm Carpet Tiles 20.00 m2
(brown) VIP Waiting Lounge Office of the
Chairman; submit samples for selection/approval

6. Toilet Accessories and Plumbing Works


a. Hook/Bumper (To be installed at the back of the 8.00 set/s
toilet door)
b. Toilet Paper Holder: Use Acasia 3443 by American 8.00 set/s
Standard
c. Towel Bar: Use Acasia 3446 Towel Bar by 8.00 set/s
American Standard
d. Towel Ring (to be intalled near lavatory) 8.00 set/s
e. Water Closet; see specs 8.00 set/s
f. Granite counter top lavatory ; see specs 8.00 set/s
g. Floor drain; Brass nickel-plated 8.00 set/s
h. Hand Spray (bidet); see specs 8.00 set/s
i. 6mm thk frameless (unbeveled) Face Quality Q2 8.00 set/s
Mirror on 20mm thk Marine Plywood Backing
j. Plumbing Works and accessories 1.00 lot
7. Painting/ Varnishing/ Waxing Works (Including Prep &
Patching Works)
a. Masonry Surfaces 320.00 m2
b. Wooden Surfaces 65.00 m2
c. Gypsum Board Surfaces 560.00 m2
8. Roofing Works and Water proofing of concrete gutters

a. Replacement of roofing at the Office of the 1,400.00 m2


Chairman and Commissioners & installation of
Roofing going to Chairman's Board room (See plan
for details)

b. Water proofing of concrete deck and gutters 75.00 m2


Sub-Total for Item No. 3.0 >>> 0.00
4.0 ELECTRICAL / MECHANICAL WORKS
ENSURE all materials & quantities are as per drawings &
specs
1. Roughing-Ins, Conduits and Raceways (provide
detailed breakdown)

3
Item
Description Quantity Unit Unit Cost Total Cost
No.

a. PVC Pipes 1/2" dia. 2,993.00 l.m.


b. PVC adapater 1/2" dia. 1,041.00 pcs
c. Wireway 70.00 l.m.
2. Wires and Cables (provide detailed breakdown)
a. Wires and Cables for Lighting layout 4,845.00 l.m.
b. Wires and Cables for Convenience outlet 12,502.00 l.m.
3. Wiring Devices
a. Three-gang Wall Push Switch, 16A, 250V 14.00 set/s
(Panasonic - With Light Swith)
b. Two-gang Wall Push Switch, 16A, 250V (Panasonic 10.00 set/s
- With Light Swith)
c. One- gang Wall Push Switch, 16A, 250V 18.00 set/s
(Panasonic - With Light Switch)
d. Three-Way Three-gang Wall Push Switch, 16A, 3.00 set/s
250V, (Panasonic -With Light Switch)
e. Three-Way Two-gang Wall Push Switch, 16A, 8.00 set/s
250V, (Panasonic -With Light Switch)

f. Duplex Universal Outlet with Ground and Shutter, 134.00 set/s


Panel Type, Panasonic Wide Series,16A, 250V;
Verify Specs
g. Single Universal Outlet with Ground and Shutter, 49.00 set/s
Panel Tye, Panasonic Wide Series,16A, 250V;
Verify Specs

h. Weather proof Duplex Universal Outlet with 6.00 set/s


Ground and Shutter, Panel Type, Panasonic Wide
Series,16A, 250V; Verify Specs
i. Junction box/Pull box 578.00 set/s
j. Smoke Detector; See specs 42.00 set/s
k. Heat Detector; See specs 6.00 set/s
4. Lighting / Ventilation Fixtures/AC
a. 2-36 Watts, fluorescent (ledlight) 600 x 1200 60.00 set/s
Recessed Mounted Powder Coated Fixture with
100 x 100 mm egg-crate aluminum reflector (matte
finish); see specs

b. 1-36 W /18W fluorescent box type (ledlight) surface 17.00 set/s


mounted Fixture; see specs
c. 36 Watts LED Panel Light 600mm x 600mm Flush 45.00 set/s
Mounted Fixture With Aluminum Housing; see
specs
d. 14 Watts,watts Led strip light, 5m commercial 35.00 set/s
grade; see specs
e. 14 Watts, T5 fluorescent (ledlight) Surface Mounted 38.00 set/s
Fixture with separate togle switch; see specs

f. 12w PLC cfl type 230v (ledlight) horiz. Mounted on 84.00 set/s
recess-mounted fixture with tempered glass cover
200mm dia; see specs
g. Emergency Light; see specs 38.00 set/s
h. Illuminated Exit signs; see specs 12.00 set/s
i. (N) Carrier or approved equal 3HP, ACCU, Inverter, 8.00 set/s
230V, 60Hz, Single Phase, Wall Mounted,
complete with mounting brackets/accessories and
drain pipe to nearest catch basin; see detail and
mechanical dwgs.

j. (N) Carrier or approved equal 3TR ACCU Inverter, 1.00 set/s


230V, 60Hz, Single Phase, 60hz, Floor Mounted,
complete w/ mounting brackets/accessories and
drain pipe to nearest catch basin; see detail and
mechanical dwgs.

4
Item
Description Quantity Unit Unit Cost Total Cost
No.

k. (N) Carrier or approved equal, 3TR ACCU Inverter, 9.00 set/s


230V, 60hz, Single Phase, Ceiling Mounted,
complete w/ mounting brackets/accessories and
drain pipe to nearest catch basin; see detail and
mechanical dwgs.

l. (N) Carrier or approved equal, 5TR, ACCU, 1.00 set/s


Inverter, 230V, 60hz, Three Phase, Ceiling
Mounted, complete w/ mounting
brackets/accessories and drain pipe to nearest
catch basin; see detail and mechanical dwgs.

m. Ceiling-Mounted exhaust fan including ductwork, 14.00 set


supports, louver,bird screen and misc. accessories;
see mech dwgs
Sub-Total for Item No. 4.0 >>> 0.00
5.0 DATACOM WORKS, AUDIO VISUAL AND CCTV
SYSTEM
Note: Verify with the owner's IT Dept. for Datacom Specs
and Scopes of Work
1. Roughing-ins, Conduit and Raceways (provide detailed
breakdown)
a. PVC Pipes 3/4" dia 1,026.00 l.m.
b. PVC adapter 3/4" dia. 352.00 pcs
c. Wireway 375.00 l.m.
d. Data Cabinet 3.00 assy
2. Cables & Wiring
a. Data / VOIP Duplex Outlet 50.00 set/s
b. Wifi and wifi Outlet 12.00 set/s
c. CAT 6 Cables (Verify Specs) 3,490.00 l.m.
d. Telephone Outlet 14.00 set/s
e. Miscellaneous Materials and Consumables 1.00 lot
3. Conference Rooms Audio Visual Equipment
a. Ceiling speakers Extron SFG 3CT LP 4.00 set/s
b. Audio Mixer -12-Channel Mixing Console: Max. 6 2.00 set/s
Mic / 12 Line Inputs (4 mono + 4 stereo) / 2
GROUP Buses + 1 Stereo Bus / 2 AUX (incl. FX)

c. Discussion Microphones 20.00 pcs


d. Discussion System Control Unit with Recorder 2.00 set/s
e. Media Presentation switcher Extron 602 MA 2.00 set/s
f. Motorized Screen 16:9 and Projector Units 2.00 set/s
g. Software, Cables, Connectors, Brackets, 1.00 lot
Consumables, Customized Equipment Rack,
Installation and Extensive Training
h. Smart PTZ conferencing camera (lumens or 6.00 units
approved equal)
4. CCTV System (Verify Existing for capacity and
compatibility)
Note: Verify with the owner's Gen. Servs. Dept. for CCTV
system Specs. & Scope of Work
(Submit Brochures, Product Specs and Samples for
comments / approval)
1 CCTV Camera 14.00 set/s
2. CCTV Monitor 1.00 set/s
3. CCTV Pullbox 5.00 set/s
4. CCTV Control Equipment 1.00 set/s
5. Roughing-Ins, Conduit and Raceways (provide 20.00 l.m.
detailed breakdown)
6. RG-59 Coaxial Cable (verify specs) 1,200.00 l.m.
7. Miscellaneous Materials and Consumables 1.00 lot
Sub-Total for Item No. 5.0 >>> 0.00

5
Item
Description Quantity Unit Unit Cost Total Cost
No.

6.0 OTHER ITEMS NEEDED TO COMPLETE WORK:


1. Panel Board Surface Mounted Nema 1 5.00 assy
Main: 150At/ 225 AF, 3P, 220Vac "TQD" GE
Branches: 15-30AT/ 50AF, 2P "TQC" GE
3-Spare 30AT/ 50AF, 3P, "TQC" GE
w/ grounding busbar
2. Roughing-ins, Conduit and Raceways (provide
detailed breakdown) (SMOKE DETECTOR to
FACP)

a. Cable wire 2.0mm² THHN 1,890.00 l.m.


b. PVC Pipes 150.00 l.m.
c. Addressable Fire Alarm Control Panel (FACP) 1.00 set
Sub-Total for Item No. 6.0 >>> 0.00

Direct Cost (Item No. 1+2+3+4+5+6)


Mob/Demob
OCM
Profit
Indirect Cost
Tax 12.00%
Total Cost

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________

6
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
General Requirements
DUPA-1 lot 1.00
1. Bonds and Insurance
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
General Requirements
DUPA-2 2. Hauling / Delivery of Materials lot 1.00

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
General Requirements
DUPA-3 3. Temporary Facilities and Field lot 1.00
Office
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
General Requirements
DUPA-4 4. Power, Water Consumption and lot 1.00
Security Services
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
General Requirements
DUPA-5 lot 1.00
5. As-Built Plans/ Drawings
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Demolition & Repair Works
1. Demolished portion of (E)
walls and remove (E) doors; Protect
DUPA-6 m2 385.00
adjoining walls, beams columns & floor.
Prepare for new layout; See proposed
floor plan
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

Demolition & Repair Works


2. Remove (E) ceiling and (E)
ceiling mounted fixtures. Returned
DUPA-7 dismantled / unused materials to the m2 1050.00
owner. Prepare for (N) ceiling; see
attached ceiling plan.
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)

Demolition & Repair Works


3. Remove (E) floor tiles
and floor finishes. Embed new conduits
DUPA-8 & wiring devices; See attached dwgs. m2 1050.00
Coordinate with the Modular Partition
supplier for outlet locations. prepare
existing surfaces to receive new finish.

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

Demolition & Repair Works


4. Removed (E) ACU for re-
use/relocation. Return
DUPA-9 dismantled/unused materials to the units 33.00
owner. Prepare for (N) ceiling; See
reflected ceiling plan & mechanical
dwgs.

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

Demolition & Repair Works


5. Removed (E) Equipments,
electrical wiring & repair of roofing.
DUPA-10 Return dismantled / unused materials to lot 1.00
the owner for reused / refurbishing.
Prepare for (N) layout; see plans for
details

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date 0
Project #REF!
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Demolition & Repair Works
6. Board ups (E) openings
DUPA-11 m2 31.75
with materials & finishes to match
existing
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

Architectural Works
1. Walls & Wall Finishes
a. Glass Partition using ½ thk
DUPA-12 Tempered Glass and Patch Fittings Door m2 315.00
(Office of the Chairman and
Commissioners)
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days


0.00
SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)

Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Architectural Works
1. Walls & Wall Finishes
b.Construct (N) 150mm thk. Reinf.
CHB wall (to extend to the underside of
DUPA-13 m2 45.00
the slab / beam). Securely fasten / weld
(N) rebars to (E) slab/beam
reinforcement; Plastered and latex
painted finished
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)

Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Architectural Works
1. Walls & Wall Finishes
c. (N) Marine board double wall
DUPA-14 covered with wall paper design submit m2 135.00
sample for approval. See plan for detail

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.Architectural/Structural Works
2. Doors and Windows
d.Install (N) 300x600mm
DUPA-15 m2 250.00
homogeneous wall tiles (polished) at
toilet;submit sample for selection and
approval.
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)

Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

3.Architectural/Structural Works
2. Doors and Windows
b. D-02: 0.90 X 2.15 m
DUPA-16 45mm thk Tanguile solid core panel set/s 17.00
swing door with groove and
20mmx100mm solid wood casing (both
sides), submit sample for approval

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

3.Architectural/Structural Works
2. Doors and Windows
b. D-02: 0.90 X 2.15 m
DUPA-17 45mm thk Tanguile solid core panel set/s 11.00
swing door with groove and
20mmx100mm solid wood casing (both
sides), submit sample for approval

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
3.Architectural/Structural Works
2. Doors and Windows
c. D-03: 1.80 X 2.15 m
DUPA-18 Powder coated aluminum double acting set/s 2.00
swing door 10mm thk tempered frosted
glass for door panels,submit sample for
approval
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

3.Architectural/Structural Works
2. Doors and Windows
d. D-04: 1.40 X 2.15 m
DUPA-19 set/s 1.00
12mm thk tempered frameless glass
door with frosted stripped film. See plan
for details, submit sample for approval

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)

Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)

3.Architectural/Structural Works
2. Doors and Windows
e. D-05: 0.90 X 2.15 m
45mm thk Hollow core flush sliding door,
DUPA-20 set/s 1.00
painted finish with 10mm thk clear
wired glass vision lite and solid wood top
panel & jambs, submit sample for
approval

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________


(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Item No. Description Unit Quantity Unit Cost (Pesos) Amount


(Pesos)
3.Architectural/Structural Works
2. Doors and Windows
f. D-06: 0.90 X 2.10 m
45mm thk Tanguile (Marine Plywood)
DUPA-21 Hollow core flush swing door with set/s 10.00
bottom louvers for CR, submit sample
for approval

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.Architectural/Structural Works
2. Doors and Windows
g. (N) Roll-up window
DUPA-22 shades and valance for Exterior and m2 120.00
interior windows

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.Architectural/Structural Works
3. Built-in Overhead
Cabinets, Counters, Modular Partitions
DUPA-23 Assembly and Furnitures sets 18.00
a. Advertising Poster
Stands 1.20x1.80m
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.Architectural/Structural Works
3. Built-in Overhead
Cabinets, Counters, Modular Partitions
Assembly and Furnitures
DUPA-24 lot 1.00
b. Furnitures for
Chairman and Commissioners (See
attached furniture plans for type and
location)
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)

Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Unit Cost Amount


Item No. Description Unit Quantity
(Pesos) (Pesos)
3.Architectural/Structural Works
3. Built-in Overhead Cabinets,
Counters, Modular Partitions Assembly and
DUPA-25 Furnitures set/s 5.00
c.OCH 1 Overhead cabinet assembly
including supports; for chairman and
commissioners; see details
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number
Days
of

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Architectural Works
3. Built-in Overhead Cabinets,
Counters and Accessories
DUPA-26 d. OCH 2 set/s 3.00
Overhead cabinet assembly including
supports; for chairman and
commissioners; see details
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Architectural Works
3. Built-in Overhead Cabinets,
Counters and Accessories
DUPA-27 e. OCH 3 set/s 3.00
Overhead cabinet assembly including
supports; for chairman and
commissioners; see details
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Item No. Description Unit Quantity Unit Cost (Pesos) Amount


(Pesos)
Architectural Works
3. Built-in Overhead Cabinets,
Counters, Modular Partition and
DUPA-28 Accessories lot 1.00
f. Modular Partition and table top
assembly with 3 drawers mobile
pedestal follow as per plan; submit
samples for approval by the owner.
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
Architectural Works
4. Ceiling Finishes
a. CT1-(N) 10mm thk.x 600
DUPA-29 x 600 white acrylic panels on white t- m2 490.00
runners by CKM bldg materials Inc..
including shadow line trim (see plan for
detail)
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Architectural Works
4. Ceiling Finishes
DUPA-30 b.CT2-(N) 24mm thk m2 450.00
seamless Acoustical Ceiling (see plan for
detail)
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days
0.00

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)

Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)

Architectural Works
4. Ceiling Finishes
c. CT3-(N) 10mm
DUPA-31 thk.x 1200 x 2400 Boral Unispan Gypsum m2 290.00
Board Ceiling & downwall/soffit on
metal joists; including shadow line trim
(see plan for detail)

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________


(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
Architectural Works
4. Ceiling Finishes
DUPA-32 d. (N) Drop wall and m2 135.00
door portal wood design; (see plan for
detail)
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. Architectural Works
5. Floor Finishes
a. Install (N)3mm
DUPA-33 thk 600X600mm Carpet Tiles (Gray) m2 262.15
Main offices of Chairman and
Commissioners; submit samples for
selection/approval

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. Architectural Works
5. Floor Finishes
b. Install (N)
200X1000mm Vitrified semi glazed wood
DUPA-34 m2 296.08
planks tile replica floor tile (Staff area,
pantry, receiving area & Board room
reception): submit samples for
selections/approval
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Unit Cost Amount
Item No. Description Unit Quantity (Pesos) (Pesos)
3. Architectural Works
5. Floor Finishes
c. Install (N)
DUPA-35 600X600mm Homogeneous floor Tiles m2 94.32
(white) Comm. Adamat and Darilag
Receiving area; submit samples for
selection/approval
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.Architectural Works
5. Floor Finishes
d. Install (N)3mm
DUPA-36 m2 161.59
thk 600X600mm Carpet Tiles (blue)
Conference Rooms; submit samples for
selection/approval
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. Architectural Works
5. Floor Finishes
e.Install
DUPA-37 (N)300X300mm Homogeneous floor tiles m2 28.04
for all CR; submit samples for
selection/approval
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

3. Architectural Works
5. Floor Finishes
f. Install (N)3mm
DUPA- 38 thk 600X600mm Carpet Tiles (brown) m2 20.00
VIP Waiting Lounge Office of the
Chairman; submit samples for
selection/approval
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

3. Architectural Works
6. Toilet Accessories and Plumbing
DUPA-39 Works set/s 8.00
a. Hook/Bumper (To be installed at the
back of the toilet door)

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

3.Architectural Works
6. Toilet Accessories and Plumbing
DUPA-40 Works set/s 8.00
b. Toilet Paper Holder: Use Acasia 3443
by American Standard

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

3. Architectural Works
6. Toilet Accessories and Plumbing
DUPA-41 Works set/s 8.00
c. Towel Bar: Use Acasia 3446 Towel
Bar by American Standard

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

3. Architectural Works
6. Toilet Accessories and Plumbing
DUPA-42 Works set/s 8.00
d. Towel Ring (to be intalled near
lavatory)

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Item No. Description Unit Quantity Unit Cost (Pesos) Amount
(Pesos)
3. Architectural Works
DUPA-43 6. Toilet Accessories and Plumbing set/s 8.00
Works
e. Water Closet; see specs
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

3. Architectural Works
6. Toilet Accessories and Plumbing
DUPA-44 Works set/s 8.00
f. Granite counter top lavatory ; see
specs
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)

3. Architectural Works
6. Toilet Accessories and Plumbing
DUPA-45 Works set/s 8.00
g. Floor drain; Brass nickel-plated

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

3. Architectural Works
6. Toilet Accessories and Plumbing
DUPA-46 Works set/s 8.00
h. Hand Spray (bidet); see specs

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. Architectural Works
6. Toilet Accessories
i. 6mm thk
DUPA-47 set/s 8.00
frameless (unbeveled) Face Quality Q2
Mirror on 20mm thk Marine Plywood
Backing
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Item No. Description Unit Quantity Unit Cost (Pesos) Amount


(Pesos)
3. ARCHITECTURAL WORKS
DUPA-48 6. Toilet Accessories lot 1.00
j. Plumbing Works and
accessories
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.ARCHITECTURAL WORKS
7. Painting/ Varnishing/
DUPA-49 Waxing Works (Including Prep & m2 320.00
Patching Works)
a. Masonry Surfaces
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3. ARCHITECTURAL WORKS
7. Painting/ Varnishing/
DUPA-50 Waxing Works (Including Prep & m2 65.00
Patching Works)
b. Wooden Surfaces
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)

Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
3.ARCHITECTURAL/STRUCTURAL
WORKS
7. Painting/ Varnishing/ Waxing Works
DUPA-51 m2 560.00
(Including Prep & Patching Works)
c. Gypsum
Board Surfaces
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

3.ARCHITECTURAL/STRUCTURAL
WORKS
8. Roofing Works and Water proofing of
concrete gutters
DUPA-52 a. Replacement of roofing at the m2 1400.00
Office of the Chairman and
Commissioners & installation of Roofing
going to Chairman's Board room (See
plan for details)

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

3.ARCHITECTURAL/STRUCTURAL
WORKS
8. Roofing Works and Water proofing of
DUPA-52 m2 75.00
concrete gutters
b. Water proofing of concrete
deck and gutters

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Item No. Description Unit Quantity Unit Cost (Pesos) Amount


(Pesos)

4.ELECTRICAL / MECHANICAL WORKS


1. Roughing-Ins,
DUPA-54 Conduits and Raceways (provide l.m. 2,993.00
detailed breakdown)
a. PVC Pipes 1/2" dia.
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Item No. Description Unit Quantity Unit Cost (Pesos) Amount


(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
1. Roughing-Ins,
DUPA-55 Conduits and Raceways (provide pcs 1,041.00
detailed breakdown)
b. PVC adapater 1/2" dia.
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4.ELECTRICAL / MECHANICAL WORKS
1. Roughing-Ins,
DUPA-56 Conduits and Raceways (provide l.m. 70.00
detailed breakdown)
c. Wireway
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
ELECTRICAL / MECHANICAL WORKS
2. Wires and Cables
DUPA-57 (provide detailed breakdown) l.m. 4,845.00
a. Wires and Cables for
lighting layout
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
2. Wires and
Cables (provide detailed breakdown)
DUPA-58 l.m. 12,502.00
b. Wires and Cables for
Convenience outlet
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
DUPA-59 a.Three-gang set/s 14.00
Wall Push Switch, 16A, 250V (Panasonic
- With Light Swith)
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
DUPA-60 b.Two-gang set/s 10.00
Wall Push Switch, 16A, 250V (Panasonic
- With Light Swith)
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
DUPA-61 c.One- gang set/s 18.00
Wall Push Switch, 16A, 250V (Panasonic
- With Light Switch)
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

4. ELECTRICAL / MECHANICAL WORKS


3. Wiring Devices
DUPA-62 d. Three-Way set/s 3.00
Three-gang Wall Push Switch, 16A, 250V,
(Panasonic -With Light Switch)
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)

4. ELECTRICAL / MECHANICAL WORKS


3. Wiring Devices
DUPA-63 e.Three-Way set/s 8.00
Two-gang Wall Push Switch, 16A, 250V,
(Panasonic -With Light Switch)
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
f.Duplex
DUPA-64 set/s 134.00
Universal Outlet with Ground and
Shutter, Panel Type, Panasonic Wide
Series,16A, 250V; Verify Specs
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________

OIC-Executive Director IV
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
g. Single
DUPA-65 set/s 49.00
Universal Outlet with Ground and
Shutter, Panel Tye, Panasonic Wide
Series,16A, 250V; Verify Specs
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
h. Weather
DUPA-66 proof Duplex Universal Outlet with set/s 6.00
Ground and Shutter, Panel Type,
Panasonic Wide Series,16A, 250V; Verify
Specs
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
DUPA-67 set/s 578.00
i. Junction
box/Pull box
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
3. Wiring Devices
DUPA-68 set/s 42.00
j. Smoke
Detector; See specs
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
DUPA-69 3. Wiring Devices set/s 6.00
k. Heat Detector
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

4. ELECTRICAL / MECHANICAL WORKS


4. Lighting / Ventilation
Fixtures/AC a. 2-
DUPA-70 36 Watts, fluorescent (ledlight) 600 x 1200 set/s 60.00
Recessed Mounted Powder Coated Fixture
with 100 x 100 mm egg-crate aluminum
reflector (matte finish); see specs

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
4. Lighting /
DUPA-71 Ventilation Fixtures/AC set/s 17.00
b.1-36 W /18W fluorescent box
type (ledlight) surface mounted Fixture;
see specs
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Item No. Description Unit Quantity Unit Cost (Pesos) Amount


(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
4. Lighting /
Ventilation Fixtures/AC
DUPA-72 c.36 Watts LED Panel Light set/s 45.00
600mm x 600mm Flush Mounted
Fixture With Aluminum Housing; see
specs
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
4. Lighting /
Ventilation Fixtures/AC
DUPA-73 d. 18w plc cfl type 230v set/s 35.00
(daylight) horiz. Mounted on recess-
mounted fixture with tempered glass
cover; see specs
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
4. Lighting /
DUPA-74 Ventilation Fixtures/AC set/s 38.00
e. 14 Watts, T5 fluorescent
(ledlight) Surface Mounted Fixture with
separate togle switch; see specs
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
4. Lighting /
Ventilation Fixtures/AC
DUPA-75 f. 12w PLC cfl type 230v set/s 84.00
(ledlight) horiz. Mounted on recess-
mounted fixture with tempered glass
cover 200mm dia; see specs
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________

OIC-Executive Director IV
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
DUPA-76 4. Lighting / set/s 38.00
Ventilation Fixtures/AC
g. Emergency Light; see specs
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
4. Lighting /
DUPA-77 Ventilation Fixtures/AC set/s 12.00
h. Illuminated Exit signs; see
specs
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

4. ELECTRICAL / MECHANICAL WORKS


4. Lighting /
Ventilation Fixtures/AC
i.(N) Carrier or approved equal
DUPA-78 3HP, ACCU, Inverter, 230V, 60Hz, Single set/s 8.00
Phase, Wall Mounted, complete with
mounting brackets/accessories and
drain pipe to nearest catch basin; see
detail and mechanical dwgs.
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________


(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

4. ELECTRICAL / MECHANICAL WORKS


4. Lighting /
Ventilation Fixtures/AC
j. (N) Carrier or approved equal
DUPA-79 3TR ACCU Inverter, 230V, 60Hz, Single set/s 1.00
Phase, 60hz, Floor Mounted, complete
w/ mounting brackets/accessories and
drain pipe to nearest catch basin; see
detail and mechanical dwgs.
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

4. ELECTRICAL / MECHANICAL WORKS


4. Lighting /
Ventilation Fixtures/AC
l. (N) Carrier or approved equal,
DUPA-80 3TR ACCU Inverter, 230V, 60hz, Single set/s 9.00
Phase, Ceiling Mounted, complete w/
mounting brackets/accessories and
drain pipe to nearest catch basin; see
detail and mechanical dwgs.
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

4. ELECTRICAL / MECHANICAL WORKS


4. Lighting /
Ventilation Fixtures/AC
m.(N) Carrier or approved
DUPA-81 equal, 5TR, ACCU, Inverter, 230V, 60hz, set/s 1.00
Three Phase, Ceiling Mounted, complete
w/ mounting brackets/accessories and
drain pipe to nearest catch basin; see
detail and mechanical dwgs.
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
4. ELECTRICAL / MECHANICAL WORKS
4. Lighting /
Ventilation Fixtures/AC
DUPA-82 n. Ceiling-Mounted exhaust fan set 14.00
including ductwork, supports,
louver,bird screen and misc. accessories;
see mech dwgs
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
1. Roughing-Ins, Conduits and
DUPA-83 l.m. 1026.00
Raceways (provide detailed breakdown)
a. PVC
Pipes 3/4" dia
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
1. Roughing-Ins, Conduits and
DUPA-84 Raceways (provide detailed breakdown) pcs 352.00
b.
PVC adapter 3/4" dia.
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Item No. Description Unit Quantity Unit Cost (Pesos) Amount


(Pesos)

5. DATACOM WORKS, AUDIO VISUAL


AND CCTV SYSTEM
DUPA-85 1. Roughing-Ins, Conduits and Raceways l.m. 375.00
(provide detailed breakdown)
c. Wireway

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________


(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
1. Roughing-Ins, Conduits and
DUPA-86 Raceways (provide detailed breakdown) assy 3.00
d. Data
Cabinet
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________


(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

5. DATACOM WORKS, AUDIO VISUAL


DUPA-87 AND CCTV SYSTEM set/s 50.00
2. Cables & Wiring
a. Data / VOIP Duplex Outlet

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

5. DATACOM WORKS, AUDIO VISUAL


AND CCTV SYSTEM
DUPA-88 set/s 12.00
2. Cables & Wiring
b. Wifi and wifi Outlet

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________


(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

5. DATACOM WORKS, AUDIO VISUAL


AND CCTV SYSTEM
DUPA-89 l.m. 3490.00
2. Cables & Wiring
c. CAT 6 Cables (Verify Specs)

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________


(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

5. DATACOM WORKS, AUDIO VISUAL


AND CCTV SYSTEM
DUPA-90 set/s 14.00
2. Cables & Wiring
d. Telephone Outlet

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________


(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
2. Cables & Wiring
DUPA-91 lot 1.00
e.
Miscellaneous Materials and
Consumables
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

5. DATACOM WORKS, AUDIO VISUAL


AND CCTV SYSTEM
3. Conference Rooms Audio Visual
DUPA-92 set/s 4.00
Equipment
a. Active DSP-
controlled full range loudspeaker

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

5. DATACOM WORKS, AUDIO VISUAL


AND CCTV SYSTEM
3. Conference Rooms Audio Visual
Equipment
DUPA-93 b. Audio Mixer -12- set/s 2.00
Channel Mixing Console: Max. 6 Mic / 12
Line Inputs (4 mono + 4 stereo) / 2
GROUP Buses + 1 Stereo Bus / 2 AUX
(incl. FX)
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
3. Conference Rooms Audio Visual
DUPA-94 pcs 20.00
Equipment
c. Discussion
Microphones
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

5. DATACOM WORKS, AUDIO VISUAL


AND CCTV SYSTEM
3. Conference Rooms Audio Visual
DUPA-95 set/s 2.00
Equipment
d. Discussion System
Control Unit with Recorder

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

5. DATACOM WORKS, AUDIO VISUAL


AND CCTV SYSTEM
3. Conference Rooms Audio Visual
DUPA-96 set/s 2.00
Equipment
e. Media Presentation
switcher Extron 602 MA

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
3. Conference Rooms Audio Visual
DUPA-97 Equipment set/s 2.00
f. Customized
Equipment Rack
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)

5. DATACOM WORKS, AUDIO VISUAL


AND CCTV SYSTEM
3. Conference Rooms Audio Visual
DUPA-98 Equipment lot 1.00
g. Software, Cables,
Connectors, Brackets ,Consumables,
Installation and Extensive Training

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
3. Conference Rooms Audio Visual
DUPA-99 Equipment units 6.00
h. Smart PTZ
conferencing camera (lumens or
approved equal)
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
4. CCTV System (Verify Existing for
DUPA-100 capacity and compatibility) set/s 14.00
1. CCTV
Camera
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
4. CCTV System (Verify Existing for
DUPA-101 set/s 1.00
capacity and compatibility)
2. CCTV
Monitor
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
4. CCTV System (Verify Existing for
DUPA-102 capacity and compatibility) set/s 5.00
3. CCTV
Pullbox
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
4. CCTV System (Verify Existing for
DUPA-103 set/s 1.00
capacity and compatibility)
4. CCTV
Control Equipment
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
4. CCTV System (Verify Existing for
DUPA-104 capacity and compatibility) l.m. 20.00
5.
Roughing-Ins, Conduit and Raceways
(provide detailed breakdown)
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
4. CCTV System (Verify Existing for
DUPA-105 l.m. 1200.00
capacity and compatibility)
6. RG-59
Coaxial Cable (verify specs)
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)
5. DATACOM WORKS, AUDIO VISUAL
AND CCTV SYSTEM
4. CCTV System (Verify Existing for
DUPA-106 capacity and compatibility) lot 1.00
7.
Miscellaneous Materials and
Consumables
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)
Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY
Item No. Description Unit Quantity Unit Cost (Pesos) Amount
(Pesos)
OTHER ITEMS NEEDED TO COMPLETE
WORK:
DUPA-107 assy 5.00
1. Panel Board Surface Mounted Nema 1

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________

Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos)
(Pesos)

6. OTHER ITEMS NEEDED TO COMPLETE


WORK: (pls. specify)
DUPA-108 2. Roughing-Ins, Conduits and l.m. 1890.00
Raceways (provide detailed breakdown)
a. EMT
Pipes

A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:
Name of the Representative of the Bidder: __________________________________________
(Signature over Printed Name)
Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
6. OTHER ITEMS NEEDED TO COMPLETE
WORK: (pls. specify)
2. Roughing-Ins, Conduits and
DUPA-109 l.m. 150.00
Raceways (provide detailed breakdown)
b.
PVC Pipes
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________

OIC-Executive Director IV
DETAILED UNIT PRICE ANALYSIS (DUPA)

Date
Project : Renovation of the CHED Central Office Building (Office of the Chairman and Commissioners)
Location : CHED CENTRAL OFFICE, HEDC BLDG., UP-DILIMAN, QUEZON CITY

Amount
Item No. Description Unit Quantity Unit Cost (Pesos) (Pesos)
6. OTHER ITEMS NEEDED TO COMPLETE
WORK: (pls. specify)
2. Roughing-Ins, Conduits and
DUPA-110 set 1.00
Raceways (provide detailed breakdown)
c.
Addressable Fire Alarm Control Panel
A MATERIALS

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

B LABOR COST Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00

C EQUIPMENT RENTAL Number Rate/day Number of Days

SUB-TOTAL 0.00
UNIT COST/ ITEM 0.00
D Total Direct Cost (TDC) (A+B+C) 0.00
E Unit Cost (UC) = TDC/Quantity (D/ Quantity) -

Submitted by:

Name of the Representative of the Bidder: __________________________________________

(Signature over Printed Name)


Position: _____________________________________

Company Name of Bidder: ________________________________________________


Date:_________________________________________