Dupa - 4sty20cl
Dupa - 4sty20cl
Dupa - 4sty20cl
of CL= 20
No. of Sty= 4
Formworks
Column Bar Size Bend Bend to Upper Face of Footing Height F-GF Total Height No. of Total Qty
Bars/Column
C1 0.67 0.67 0.67 1.7 13 9.92 32 0.52 0.375 1.7 2.595 16 208 2,609.56 2,609.56 59.228
C2 0.77 0.77 0.67 1.7 13 11.40 32 0.52 0.375 1.7 2.595 24 312 3,914.34 6,523.91 68.068
C3 0.62 0.62 0.52 1.7 13 7.13 32 0.52 0.375 1.7 2.595 16 208 2,609.56 9,133.47 54.808
C4 0.67 0.67 0.67 1.7 0 0.00 32 0.52 0.375 1.7 2.595 0 0 0.00 9,133.47 0
0.67 0.67 0.67 1.7 0 0.00 32 0.52 0.375 1.7 2.595 0 0 0.00 9,133.47 0
Footing Tie Beam Bar Size No. of Continuous Concrete Cover Bend Length of Total Weight Cumm. Weight Bar Size No. of Bars Length Total Wt Cumm. Wt.
Reinforcement Reinforcement
FTB-1 4.5 3.83 0.45 0.7 10 12.06 25 6 0.05 4.95 1,144.69 1,144.69 16 2 4.95 156.29 156.29 103.5
4.5 3.73 0.45 0.7 10 11.75 25 6 0.05 4.95 1,144.69 2,289.38 16 2 4.95 156.29 312.58 103.5
4.5 3.88 0.45 0.7 10 12.22 25 6 0.05 4.95 1,144.69 3,434.07 16 2 4.95 156.29 468.86 103.5
5 4.38 0.45 0.7 2 2.76 25 6 0.05 6.182 285.92 3,719.98 16 2 6.182 39.04 507.90 23
FTB-1A 5 4.33 0.45 0.7 2 2.73 Continuous 25 8 0.05 6.182 381.22 4,101.21 Web Bar 16 2 6.182 39.04 546.94 23
5 4.23 0.45 0.7 2 2.66 25 8 0.05 6.182 381.22 4,482.43 16 2 6.182 39.04 585.98 23
FTB-2 2.5 1.805 0.6 0.7 13 9.86 25 12 0.05 3.036 1,825.40 6,307.83 16 2 3.036 124.61 710.59 84.5
7 6.28 0.6 0.7 9 23.74 25 12 0.05 8.0135 3,335.62 9,643.45 16 2 8.0135 227.71 938.30 163.8
2.5 1.83 0.6 0.7 0 0.00 25 12 0.05 3.0635 0.00 9,643.45 16 2 3.0635 0.00 938.30 0
FTB-2A 7 6.28 0.6 0.7 4 10.55 25 12 0.05 8.0135 1,482.50 11,125.95 16 2 8.0135 101.21 1,039.51 72.8
7 6.33 0.6 0.7 0 0.00 25 12 0.05 8.0135 0.00 11,125.95 16 2 8.0135 0.00 1,039.51 0
No. of Temp Bars along No. of Temp Bars
Slab Bar Size Short Side along Long Side Weight Short Side Length Long Side Total Weight
No. of
Column b h thck/lgth Net thck/lgth set Conc. Volume Bar Size Height GF-F Total Height Total Qty Total Weight Cumm. Weight
Bars/Column
C1 0.6 0.6 3.15 3.15 13 14.742 32 3.15 3.15 16 208 3,167.68 3,167.68 98.28
C2 0.7 0.7 3.15 3.15 13 20.0655 32 3.15 3.15 24 312 4,751.52 7,919.19 114.66
C3 0.55 0.55 3.15 3.15 13 12.387375 32 3.15 3.15 16 208 3,167.68 11,086.87 90.09
C4 0.6 0.6 3.15 3.15 0 0 28 3.15 3.15 0 0 0.00 11,086.87 0
Beam/Girder Bar Size No. of Continuous Concrete Cover Bend Length of Total Weight Cumm. Weight Bar Size No. of Bars Length Total Wt Cumm. Wt.
Reinforcement Reinforcement
G1 0.45 0.7 7 6.35 9 18.00225 25 10 0.05 7.975 2,766.33 2,766.33 16 2 7.975 226.62 226.62 144.9
G-1A 0.45 0.7 2.5 1.875 9 5.315625 25 10 0.05 2.9975 1,039.76 3,806.09 16 2 2.9975 85.18 311.79 51.75
G-1B 0.45 0.7 2.5 1.875 4 2.3625 25 12 0.05 2.9975 554.54 4,360.63 16 2 2.9975 37.86 349.65 23
G-1C 0.45 0.7 7 6.35 2 4.0005 25 12 0.05 7.975 737.69 5,098.32 16 2 7.975 50.36 400.01 32.2
0.45 0.7 7 6.35 2 4.0005 25 12 0.05 7.975 737.69 5,836.00 16 2 7.975 50.36 450.37 32.2
G-2 0.3 0.4 4.5 3.95 10 4.74 25 4 0.05 4.95 763.13 6,599.13 450.37 63
0.3 0.4 4.5 3.9 10 4.68 Continuous 25 4 0.05 4.29 661.38 7,260.51 Web Bar 450.37 63
0.3 0.4 5 4.425 4 2.124 25 4 0.05 Ian: 5.775 356.13 6,955.26 450.37 28
G-3 0.4 0.5 4.5 3.8 10 7.6 25 7 0.05 assuming 20 mm 4.95 1,335.47 8,290.73 16 2 4.95 156.29 606.66 81
clear cover
0.4 0.5 5 4.3 2 1.72 25 7 0.05 5.3 285.98 8,576.70 16 2 5.3 33.47 640.13 18
B-1 0.3 0.4 4.5 4.5 8 4.32 25 4 0.05 4.95 610.50 9,187.21 50.4
0.3 0.4 4.5 4.5 2 1.08 25 4 0.05 5.1425 158.56 9,345.77 12.6
0.3 0.4 5 5 2 1.2 25 4 0.05 5.6925 175.52 9,521.29 14
0.3 0.4 3.8 3.8 2 0.912 25 4 0.05 4.455 137.36 9,658.65 10.64
B-2 0.25 0.4 4.5 4.5 2 0.9 20 4 0.05 4.95 97.68 9,756.33 11.7
CB-1 0.25 0.4 1.3 1.3 3 0.39 20 6 0.05 1.43 63.49 9,819.82 5.07
LB1 0.25 0.4 3.5 3.5 2 0.7 20 4 0.05 3.85 75.97 9,895.79 9.1
No. of Bars along Short No. of Bars along No. of Top Bars No. of Top Bars Length of Bend Length of Bend
Slab Bar Size Depth of Bend Ba Total Length Total Weight Cumm. Wt.
Dir. Long Dir. along Short Dir. along Long Dir. Bar along Short Bar along Long
S1 4.5 3.5 0.1 0.1 20 31.5 12 25 15 13 8 0.06 3.5252 4.5252 7,850.16 6,970.95 6,970.95 16
5 3.2 0.1 0.1 2 3.2 12 27 14 15 7 0.06 3.2252 5.0252 793.67 704.78 7,675.73 1.64
S2 4.5 2.5 0.1 0.1 10 11.25 12 25 11 13 6 0.06 2.5252 4.5252 2,844.07 2,525.54 10,201.26 7
5 2.5 0.1 0.1 2 2.5 12 27 11 15 6 0.06 2.5252 5.0252 626.92 556.70 10,757.97 1.5
S3 1.5 3.8 0.1 0.1 2 1.14 12 21 7 - 4 0.06 1.5252 3.8 233.46 192.88 10,950.84 1.06
S-Canopy 4.5 1.3 0.1 0.1 2 1.17 12 19 4 - - 0.06 1.324 4.5 86.31 87.75 11,038.59 1.16
Total= 162.00
2FL-3FL
No. of
Column b h thck/lgth Net thck/lgth set Conc. Volume Bar Size Height GF-F Total Height Total Qty Total Weight Cumm. Weight
Bars/Column
C1 0.6 0.6 3.15 3.15 13 14.742 32 3.15 3.15 8 104 1,583.84 1,583.84 98.28
C2 0.7 0.7 3.15 3.15 13 20.0655 32 3.15 3.15 16 208 3,167.68 4,751.52 114.66
C3 0.55 0.55 3.15 3.15 13 12.387375 32 3.15 3.15 12 156 2,375.76 7,127.27 90.09
C4 0.6 0.6 3.15 3.15 0 0 32 3.15 3.15 0 0 0.00 7,127.27 0
Beam/Girder Bar Size No. of Continuous Concrete Cover Bend Length of Total Weight Cumm. Weight Bar Size No. of Bars Length Total Wt Cumm. Wt.
Reinforcement Reinforcement
3FlL-4FL
No. of
Column b h thck/lgth Net thck/lgth set Conc. Volume Bar Size Height GF-F Total Height Total Qty Total Weight Cumm. Weight
Bars/Column
C1 0.6 0.6 3.15 3.15 13 14.742 32 3.15 3.15 8 104 1,583.84 1,583.84 98.28
C2 0.7 0.7 3.15 3.15 13 20.0655 32 3.15 3.15 16 208 3,167.68 4,751.52 114.66
C3 0.55 0.55 3.15 3.15 13 12.387375 32 3.15 3.15 8 104 1,583.84 6,335.35 90.09
C4 0.6 0.6 3.15 3.15 0 0 32 3.15 3.15 0 Ian: 0 0.00 6,335.35 0
assuming 20 mm
clear cover
No. of Continuous Length of
Beam/Girder Bar Size Concrete Cover Bend Total Weight Cumm. Weight Bar Size No. of Bars Length Total Wt Cumm. Wt.
Reinforcement Reinforcement
G1 0.45 0.7 7 6.35 9 18.00225 25 6 0.05 7.975 1,659.80 1,659.80 16 2 7.975 226.62 226.62 144.9
G-1A 0.45 0.7 2.5 1.875 9 5.315625 25 8 0.05 2.9975 831.81 2,491.61 16 2 2.9975 85.18 311.79 51.75
G-1B 0.45 0.7 2.5 1.875 4 2.3625 25 6 0.05 2.9975 277.27 2,768.87 16 2 2.9975 37.86 349.65 23
G-1C 0.45 0.7 7 6.35 2 4.0005 25 8 0.05 7.975 491.79 3,260.67 16 2 7.975 50.36 400.01 32.2
0.45 0.7 7 6.35 2 4.0005 25 8 0.05 7.975 491.79 3,752.46 16 2 7.975 50.36 450.37 32.2
G-2 0.30 0.4 4.5 3.95 10 4.74 Continuous 25 4 0.05 4.95 763.13 4,515.58 Web Bar 63
0.3 0.4 4.5 3.9 10 4.68 25 4 0.05 4.29 661.38 5,176.96 63
0.3 0.4 5 4.425 4 2.124 25 4 0.05 5.775 356.13 5,533.09 28
G-3 0.30 0.55 4.5 3.8 10 6.27 25 6 0.05 4.95 1,144.69 6,677.77 16 2 4.95 156.29 606.66 76.5
0.3 0.55 5 4.3 2 1.419 25 6 0.05 5.3 245.13 6,922.90 16 2 5.3 33.47 640.13 17
B-1 0.3 0.4 4.5 4.5 8 4.32 25 4 0.05 4.95 610.50 7,533.40 50.4
0.30 0.4 4.5 4.5 2 1.08 25 4 0.05 5.1425 158.56 7,691.96 12.6
0.3 0.4 5 5 2 1.2 25 4 0.05 5.6925 175.52 7,867.48 14
0.3 0.4 3.8 3.8 2 0.912 25 4 0.05 4.4 135.67 8,003.15 10.64
LB1 0.25 0.4 3.5 3.5 2 0.7 20 4 0.05 3.85 75.97 8,079.12 9.1
No. of Bars along Short No. of Bars along No. of Top Bars No. of Top Bars Length of Bend Length of Bend
Slab Bar Size Depth of Bend Ba Total Length Total Weight Cumm. Wt.
Dir. Long Dir. along Short Dir. along Long Dir. Bar along Short Bar along Long
S1 4.5 3.5 0.1 0.1 20 31.5 12 25 15 13 8 0.06 3.5252 4.5252 7,850.16 6,970.95 6,970.95 16
5 3.2 0.1 0.1 2 3.2 12 27 14 15 7 0.06 3.2252 5.0252 793.67 704.78 7,675.73 1.64
S2 4.5 2.5 0.1 0.1 10 11.25 12 25 11 13 6 0.06 2.5252 4.5252 2,844.07 2,525.54 10,201.26 7
5 2.5 0.1 0.1 2 2.5 12 27 11 15 6 0.06 2.5252 5.0252 626.92 556.70 10,757.97 1.5
S3 1.5 3.8 0.1 0.1 2 1.14 12 21 7 - 4 0.06 1.5252 3.8 233.46 192.88 10,950.84 1.06
Total= 157.911
4FL-RD
Column b h thck/lgth Net thck/lgth Set Conc. Volume Bar Size Height GF-F Total Height No. of Total Qty Total Weight Cumm. Weight
Bars/Column
C1 0.55 0.55 3.15 3.15 13 12.387375 32 3.15 3.15 8 104 1,583.84 1,583.84 90.09
C2 0.55 0.55 3.15 3.15 13 12.387375 32 3.15 3.15 12 156 2,375.76 3,959.60 90.09
C3 0.55 0.55 3.15 3.15 13 12.387375 32 3.15 3.15 8 104 1,583.84 5,543.43 90.09
C4 0.6 0.6 3.15 3.15 0 0 32 3.15 3.15 0 0 0.00 5,543.43 0
Beam/Girder Bar Size No. of Continuous Concrete Cover Bend Length of Total Weight Cumm. Weight Bar Size No. of Bars Length Total Wt Cumm. Wt.
Reinforcement Reinforcement
Slab Bar Size No. of Bars along Short No. of Bars along No. of Top Bars No. of Top Bars Depth of Bend Length of Bend Length of Bend
Dir. Long Dir. along Short Dir. along Long Dir. Bar Bar along Short Bar along Long Total Length Total Weight Cumm. Wt.
S4 5 3.2 0.12 0.12 2 3.84 12 27 14 15 7 0.08 3.2336 5.0336 794.36 705.39 705.39 1.968
Total= 89.22
Weight (10 Weight (12
Others mm) mm) Total Weight 4899.962
Parapet/Conc. Gutter 110 0.34 1 37.4 1 13 441 6 551 4 336 6 138 6 1243.201243 735.2647353 1978.465978 37.4
HW Floor Slab 7 1.6 0.1 2 2.24 25 7 178 109.7667764 109.7667764 1.72
Handwashing 6.65 0.1 2 1.33 1 4 28 6 35 5 20 6 74.000074 74.000074
Conc. Bench 36 0.1 0.4 1 1.44 0.5 180 12 27 6 99.9000999 99.9000999 14.44
Ramp 5.6 1.6 0.1 2 1.792 20 7 142 87.56675423 87.56675423 1.44
RC Wall 2.2 1.575 0.15 2 1.0395 11 12 48 38 59.2000592 67.48806749 126.6881267 1.1325
Stairs Riser Tread No. of Steps Stringer Stair Width Landing Waist Length Conc. Vol. 1 Conc. Vol. 2 Conc. Vol. 3 Total Volume
Thickness Length (Landing)
0.175 0.3 9 0.15 1.575 1.25 2.78 0.66 0.33075 0.609375 9.97 15.048
Stairs Stair Nosing Volume 0.062015625 52.542
Stairs (4FL-RD) 0.175 0.25 9 0.15 1 1.25 2.44 0.37 0.175 0.1875 1.465
22.8756875 29.7675
Reinforcement Stairs Bend Total Lngth No. of Bars Total Length Total Weight 20.55
16-mm Ø @ 150 mm 4.03 11 531.96 1,679.58 5074.002
12-mm Ø temp bars 1.575 10 94.5 167.83
Landing 3.25 5 195 346.32
Nosing 85.05 104.90
4FL-RD
16-mm Ø @ 150 mm 3.69 11 162.36 512.63
12-mm Ø temp bars 1 9 36 63.94
Landing 1 5 25 44.40
Nosing 18 31.97
2,951.55
5% wastage
G-40 77286.29 81,150.60
G-60 125,342.21 131,609.32
Concrete 1043.13 1095.29
10 3.08 3.7
12 4.44 5.33
13 5.21 6.25
16 7.90 9.47
20 12.33 14.8
25 19.27 23.12
28 24.17 29
30 27.75 33.29
32 31.57 37.88
36 39.96 47.95
Bar Weight
0.62
0.89
1.58
2.47
3.85
4.83
12
DETAILED UNIT PRICE ANALYSIS
Item No./ Description : A.1.1 (8) Provision of Field Office for the Engineer (Rental Basis)
Unit of Measurement : mo
Output : 1
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Month/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
Fees:
a. Zoning l.s. 1.00 34,154.00 34,154.00
b. Fire l.s. 1.00 28,865.00 28,865.00
c. Plumbing/ Sanitary l.s. 1.00 8,554.65 8,554.65
d. Electrical l.s. 1.00 22,880.00 22,880.00
e. Mechanical l.s. 1.00 7,100.00 7,100.00
f. Electronics l.s. 1.00 2,500.00 2,500.00
g. Other Fees l.s. 1.00 26,497.00 26,497.00
Sub - Total for F 139,294.65
G. Direct Unit Cost (E + F) 139,294.65
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G 0.00
I. Contractor's Profit (CP) 0% of G 0.00
J. Value Added Tax (VAT) 5% of (G + H + I) 6,964.73
K. Total Unit Cost (G + H + I + J) 146,259.38
DETAILED UNIT PRICE ANALYSIS (DUPA)
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Daily Rate Amount (PhP)
Day/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
Item No./Descripti : 900(1)c2 Structural Concrete, Class A, 28 days (Slab on Fill, 2500 psi)
Unit of Measurem : m3
Output per hour : 0.357
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
Area= 205.01 m2
a. H-Frame 1.7 m x 1.2m, set 40 9,582.00 6.08 2,330,342.40
- 2 pcs H-frames
- 4 pcs diagonal cross braces
- 4 pcs horizontal braces
- 8 pcs joint pins
b. Shoring Jack, 3.8 m full extension 62 9,582.00 4.50 2,673,378.00
c. Adjustable, U-head Jack, 0.6m 80 9,582.00 0.85 651,576.00
d. Adjustable, Base Jack, 0.6m 80 9,582.00 0.85 651,576.00
e.1-1/2" GI Pipe x 6m 62 9,582.00 2.50 1,485,210.00
f.1-1/2" GI Pipe x 3m 16 9,582.00 1.25 191,640.00
g.1-1/2" GI Pipe x 4m 32 9,582.00 1.75 536,592.00
h.1-1/2" GI Pipe x 1m 216 9,582.00 0.50 1,034,856.00
i.Tie Rod x 0.6m 278 9,582.00 1.00 2,663,796.00
j.Round Wing Nut 558 9,582.00 0.15 802,013.40
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
Item No./Description : 1046(2)a1 CHB Non Load Bearing Wall (including Reinforcing Steel), 100 mm
Unit of Measurement : m2
Output per hour : 3.825
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
Item No./Description : 1046(2)a2 CHB Non Load Bearing Wall (including Reinforcing Steel), 150 mm
Unit of Measurement : m2
Output per hour : 3.18
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
Installation
a. Construction Foreman 1 60.00 88.12 5,287.20
b. Skilled Laborer 1 80.00 63.79 5,103.20
c. Unskilled Laborer 1 80.00 49.20 3,936.00
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
(Labor cost for these items are to be considered/included in the installation of doors, windows, and other fabricated materials.)
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
Installation
a. Construction Foreman 1 1.00 88.12 88.12
b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
a. Wood Panel Doors (w/ Transom Fixed Glass) m2 75.60 4,500.00 340,200.00
b. Hallow Core Flush Door m2 43.44 650.00 28,236.00
c. Door Frames set 75.00 2,000.00 150,000.00
d. Consumbale (5% of Material Cost of Door 7,500.00
Frames)
Item No./Description : 1003(1)a1 Ceiling (4.5mm Fiber Cement Board on Metal Frame)
Unit of Measurement : m2
Output per hour : 1.243
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
Installation
a. Construction Foreman 1 0.30 88.12 26.44
b. Skilled Laborer 1 0.30 63.79 19.14
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
Item No./Description : 1014(1)b1 Prepainted Metal Sheets, Long Span, Corrugated, 0.4 mm thk
Unit of Measurement : m2
Output per hour : 2.076
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
Item No./Description : 1013(2)a1 Fabricated Metal Roofing Accessory (Ridge Roll, 0.5 mm thk.)
Unit of Measurement : l.m.
Output per hour : 10.00
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
Item No./Description : 1013(2)a2 Fabricated Metal Roofing Accessory (Flashing, 0.6 mm thk.)
Unit of Measurement : l.m.
Output per hour : 10.00
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
Item No./Description : 1013(2)b1 Fabricated Metal Roofing Accessory (Gutter, 0.6 mm thk.)
Unit of Measurement : l.m.
Output per hour : 11.80
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
Fabrication
a. Construction Foreman 1 1.00 88.12 88.12
b. Skilled Laborer 2 1.00 63.79 127.58
c. Unskilled Laborer 2 1.00 49.20 98.40
Erection
a. Skilled Laborer 3 0.50 63.79 95.69
b. Unskilled Laborer 3 0.50 49.20 73.80
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
a. Water Closet complete w/ fittings & accs. sets 20.00 7,500.00 150,000.00
b. Wall Hung Lavatory, complete w/ fittings & accs. sets 2.00 6,550.00 13,100.00
c. Concrete Counter Sink (3 Faucet) sets 8.00 6,028.00 48,224.00
d. Trough Urinal sets 4.00 9,500.00 38,000.00
e. Gate Valve, 50mm dia pcs 4.00 980.00 3,920.00
f. Gate Valve 32mm dia pcs 16.00 627.00 10,032.00
g. Check Valve, 50mm dia. pcs 1.00 954.00 954.00
h. S.S. Floor Drain 4'x4'' pcs 39.00 250.00 9,750.00
i. S.S. Sink Drain 4'x4'' pcs 15.00 250.00 3,750.00
j. S.S. Flip Up Down Grab Rail 1-1/2" dia. pcs 2.00 1,200.00 2,400.00
k. S.S. L-Type Grab Rail 1-1/2" dia. pcs 2.00 2,500.00 5,000.00
l. Mirror ft2 100.71 650.00 65,463.84
m. Faucet pcs 49.00 180.00 8,820.00
n. Consumables 5% 17,970.69
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
No. of
Designation Person/ Hourly Rate Amount (PhP)
Hour/s
s
A. Labor
No. of
No. of Amount
Designation Person/ Hourly Rate
Hour/s (PhP)
s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
F. Materials
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
Item No./Description : 1102(1) Panel Boards with Main and Branch Breakers
Unit of Measurement : l.s.
Output per hour : 1
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
Item No./Description : 1013(2)b1 Fabricated Metal Roofing Accessory (Gutter, 0.6 mm thk.)
Unit of Measurement : l.m.
Output per hour : 11.8
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Daily Rate Amount (PhP)
Day/s
A. Labor
No. of
Designation No. of Person/s Daily Rate Amount (PhP)
Day/s
A. Labor
No. of
Designation No. of Person/s Daily Rate Amount (PhP)
Day/s
A. Labor
No. of
Designation No. of Person/s Daily Rate Amount (PhP)
Day/s
A. Labor
No. of
Designation No. of Person/s Daily Rate Amount (PhP)
Day/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
Item No./Description : 1010(1) Frames (Jambs, Sill, Head, Transoms and Mullions)
Unit of Measurement : set
Output : 1
No. of Amount
Designation No. of Person/s Hourly Rate
Hour/s (PhP)
A. Labor
No. of Amount
Designation No. of Person/s Hourly Rate
Hour/s (PhP)
A. Labor
No. of Amount
Designation No. of Person/s Hourly Rate
Hour/s (PhP)
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
(Labor cost for these items are to be considered/included in the installation of doors, windows, and other
fabricated materials.)
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
Installation
a. Construction Foreman 1 45 88.12 3,965.40
b. Skilled Laborer 1 60 63.79 3,827.40
c. Unskilled Laborer 1 60 49.20 2,952.00
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
Installation
a. Construction Foreman 1 36 88.12 3,172.32
b. Skilled Laborer 1 48 63.79 3,061.92
c. Unskilled Laborer 1 48 49.20 2,361.60
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
Installation
a. Construction Foreman 1 27 88.12 2,379.24
b. Skilled Laborer 1 36 63.79 2,296.44
c. Unskilled Laborer 1 36 49.20 1,771.20
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
Installation
a. Construction Foreman 1 18 88.12 1,586.16
b. Skilled Laborer 1 24 63.79 1,530.96
c. Unskilled Laborer 1 24 49.20 1,180.80
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
Installation
a. Construction Foreman 1 9 88.12 793.08
b. Skilled Laborer 1 12 63.79 765.48
c. Unskilled Laborer 1 12 49.20 590.40
Amount
Designation No. of Person/s No. of Hour/s Hourly Rate
(PhP)
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
o. duplex C.O. grounding type, 15A, 250V set 30.00 180.00 5,400.00
p. duplex C.O. grounding type, 15A, 250V, WP set 9.00 367.00 3,303.00
q. KWHR meter round with base set 1.00 2,200.00 2,200.00
r. Consumables (5% of Materials Cost) 1.00 16,640.63 16,640.63
Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (15 CL)
Unit of Measurement : l.s.
Output per hour : 1
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
MDP - Flush Mounted, NEMA 1 Enclosure w/ Ground Terminal set 1.00 115,731.20 115,731.20
Main: 700at, 800af, 3p, 240v, 65 kaic
Branches: 1 - 60at, 50af, 2p, 240v
2 - 50at, 50af, 2p, 240v
1 - 600at, 600af, 3p, 240v
40at, 50af, 2p, 240v in NEMA 3R enclosure set 2.00 1,200.00 2,400.00
40at, 50af, 3p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
20at, 50af, 2p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. 2 x 36 watts FL fixture box type w/ canopy base and stem 1.5 ft.
set 60.00 1,800.00 108,000.00
(450mm) length similar to amco AP-113-1.5 or aproved equal.
b. 2 x 36 watts FL fixture. set 30.00 980.00 29,400.00
c. 1 x 36 watts FL fixture box type. set 58.00 546.00 31,668.00
d. 1 - 18 watts CFL w/ medium base keyless type porcelain receptacle. set 6.00 320.00 1,920.00
e. Wall Fan with control Switch set 30.00 1,200.00 36,000.00
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. uPVC pipe, 150mm dia. x 3m, S-1000 length 19.00 1,975.29 37,530.51
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 18.00 798.00 14,364.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 6.00 400.00 2,400.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 4.00 250.00 1,000.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 30.00 250.00 7,500.00
f. Elbow, 150mm dia. - 90 deg bend pc 5.00 538.33 2,691.65
g. Elbow, 50mm dia. - 90 deg bend pc 12.00 48.00 576.00
h. Wye, 150mm dia. pc 4.00 1,136.21 4,544.84
h. Wye, 100mm dia. pc 15.00 150.00 2,250.00
i. Wye, 50mm dia. pc 12.00 45.00 540.00
j. Wye Reducer, 150mm dia. - 100mm dia. pc 4.00 807.29 3,229.16
k.Wye, Reducer, 100mm dia. - 75mm dia. pc 2.00 180.00 360.00
m. uPVC Tee, 150mm dia. x 150mm dia. pc 4.00 926.89 3,707.56
n. uPVC Tee, 50mm dia. x 50mm dia. pc 36.00 50.00 1,800.00
o. Clean Out with cover, 150mm dia. pc 9.00 627.90 5,651.10
p. Clean Out with cover, 100mm dia. pc 4.00 100.00 400.00
q. Clean Out with cover, 50mm dia. pc 4.00 40.00 160.00
r. uPVC P-trap, 50mm dia. pc 59.00 170.00 10,030.00
s. PVC Cement can 8.00 150.00 1,200.00
t. Consumables (5% of Materials) 3,139.73
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. Water Closet - Complete w/ fittings and acc. set 15.00 7,500.00 112,500.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
d. Faucet, Hose Bibb, Brass 12mm dia. pc 18.00 180.00 3,240.00
e. Wall Hung Lavatory - Complete w/ fittings & acc. set 2.00 6,550.00 13,100.00
f. Gate Valve, 50mm dia. pc 3.00 980.00 2,940.00
g. Gate Valve, 32mm dia. pc 6.00 627.00 3,762.00
h. Gate Valve, 20mm dia. pc 3.00 650.00 1,950.00
i. Check Valve, 50mm dia. pc 1.00 954.00 954.00
j. S.S Floor Drain 4' x 4" pc 59.00 250.00 14,750.00
k. Mirror sq.ft. 36.00 650.00 23,400.00
l. Handrail (PWD) set 2.00 4,500.00 9,000.00
m. Consumables 12,513.20
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
o. duplex C.O. grounding type, 15A, 250V set 30.00 180.00 5,400.00
p. duplex C.O. grounding type, 15A, 250V, WP set 9.00 367.00 3,303.00
q. KWHR meter round with base set 1.00 2,200.00 2,200.00
r. Consumables (5% of Materials Cost) 1.00 16,640.63 16,640.63
Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (12 CL)
Unit of Measurement : l.s.
Output per hour : 1
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
40at, 50af, 2p, 240v in NEMA 3R enclosure set 2.00 1,200.00 2,400.00
40at, 50af, 3p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
20at, 50af, 2p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. 2 x 36 watts FL fixture box type w/ canopy base and stem 1.5 ft.
set 60.00 1,800.00 108,000.00
(450mm) length similar to amco AP-113-1.5 or aproved equal.
b. 2 x 36 watts FL fixture. set 30.00 980.00 29,400.00
c. 1 x 36 watts FL fixture box type. set 58.00 546.00 31,668.00
d. 1 - 18 watts CFL w/ medium base keyless type porcelain receptacle. set 6.00 320.00 1,920.00
e. Wall Fan with control Switch set 30.00 1,200.00 36,000.00
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. uPVC pipe, 150mm dia. x 3m, S-1000 length 19.00 1,975.29 37,530.51
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 18.00 798.00 14,364.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 6.00 400.00 2,400.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 4.00 250.00 1,000.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 30.00 250.00 7,500.00
f. Elbow, 150mm dia. - 90 deg bend pc 5.00 538.33 2,691.65
g. Elbow, 50mm dia. - 90 deg bend pc 12.00 48.00 576.00
h. Wye, 150mm dia. pc 4.00 1,136.21 4,544.84
h. Wye, 100mm dia. pc 15.00 150.00 2,250.00
i. Wye, 50mm dia. pc 12.00 45.00 540.00
j. Wye Reducer, 150mm dia. - 100mm dia. pc 4.00 807.29 3,229.16
k.Wye, Reducer, 100mm dia. - 75mm dia. pc 2.00 180.00 360.00
m. uPVC Tee, 150mm dia. x 150mm dia. pc 4.00 926.89 3,707.56
n. uPVC Tee, 50mm dia. x 50mm dia. pc 36.00 50.00 1,800.00
o. Clean Out with cover, 150mm dia. pc 9.00 627.90 5,651.10
p. Clean Out with cover, 100mm dia. pc 4.00 100.00 400.00
q. Clean Out with cover, 50mm dia. pc 4.00 40.00 160.00
r. uPVC P-trap, 50mm dia. pc 59.00 170.00 10,030.00
s. PVC Cement can 8.00 150.00 1,200.00
t. Consumables (5% of Materials) 3,139.73
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. Water Closet - Complete w/ fittings and acc. set 15.00 7,500.00 112,500.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
e. Faucet, Hose Bibb, Brass 12mm dia. pc 18.00 180.00 3,240.00
f. Wall Hung Lavatory - Complete w/ fittings & acc. set 2.00 6,550.00 13,100.00
g. Gate Valve, 50mm dia. pc 3.00 980.00 2,940.00
h. Gate Valve, 32mm dia. pc 6.00 610.00 3,660.00
i. Gate Valve, 20mm dia. pc 3.00 650.00 1,950.00
j. Check Valve, 50mm dia. pc 1.00 954.00 954.00
k. S.S Floor Drain 4' x 4" pc 59.00 250.00 14,750.00
l. Mirror sq.ft. 36.00 650.00 23,400.00
m. Handrail (PWD) set 2.00 4,500.00 9,000.00
n. Consumables 12,508.10
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
o. duplex C.O. grounding type, 15A, 250V set 30.00 180.00 5,400.00
p. duplex C.O. grounding type, 15A, 250V, WP set 9.00 367.00 3,303.00
q. KWHR meter round with base set 1.00 2,200.00 2,200.00
r. Consumables (5% of Materials Cost) 1.00 16,640.63 16,640.63
Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (9 CL)
Unit of Measurement : l.s.
Output per hour : 1
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
40at, 50af, 2p, 240v in NEMA 3R enclosure set 2.00 1,200.00 2,400.00
40at, 50af, 3p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
20at, 50af, 2p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. 2 x 36 watts FL fixture box type w/ canopy base and stem 1.5 ft.
set 60.00 1,800.00 108,000.00
(450mm) length similar to amco AP-113-1.5 or aproved equal.
b. 2 x 36 watts FL fixture. set 30.00 980.00 29,400.00
c. 1 x 36 watts FL fixture box type. set 58.00 546.00 31,668.00
d. 1 - 18 watts CFL w/ medium base keyless type porcelain receptacle. set 6.00 320.00 1,920.00
e. Wall Fan with control Switch set 30.00 1,200.00 36,000.00
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. uPVC pipe, 150mm dia. x 3m, S-1000 length 19.00 1,975.29 37,530.51
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 18.00 798.00 14,364.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 6.00 400.00 2,400.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 4.00 250.00 1,000.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 30.00 250.00 7,500.00
f. Elbow, 150mm dia. - 90 deg bend pc 5.00 538.33 2,691.65
g. Elbow, 50mm dia. - 90 deg bend pc 12.00 48.00 576.00
h. Wye, 150mm dia. pc 4.00 1,136.21 4,544.84
h. Wye, 100mm dia. pc 15.00 150.00 2,250.00
i. Wye, 50mm dia. pc 12.00 45.00 540.00
j. Wye Reducer, 150mm dia. - 100mm dia. pc 4.00 807.29 3,229.16
k.Wye, Reducer, 100mm dia. - 75mm dia. pc 2.00 180.00 360.00
m. uPVC Tee, 150mm dia. x 150mm dia. pc 4.00 926.89 3,707.56
n. uPVC Tee, 50mm dia. x 50mm dia. pc 36.00 50.00 1,800.00
o. Clean Out with cover, 150mm dia. pc 9.00 627.90 5,651.10
p. Clean Out with cover, 100mm dia. pc 4.00 100.00 400.00
q. Clean Out with cover, 50mm dia. pc 4.00 40.00 160.00
r. uPVC P-trap, 50mm dia. pc 59.00 170.00 10,030.00
s. PVC Cement can 8.00 150.00 1,200.00
t. Consumables (5% of Materials) 3,139.73
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. Water Closet - Complete w/ fittings and acc. set 15.00 7,500.00 112,500.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
e. Faucet, Hose Bibb, Brass 12mm dia. pc 18.00 180.00 3,240.00
f. Wall Hung Lavatory - Complete w/ fittings & acc. set 2.00 6,550.00 13,100.00
g. Gate Valve, 50mm dia. pc 3.00 980.00 2,940.00
h. Gate Valve, 32mm dia. pc 6.00 627.00 3,762.00
i. Gate Valve, 20mm dia. pc 3.00 650.00 1,950.00
j. Check Valve, 50mm dia. pc 1.00 954.00 954.00
k. S.S Floor Drain 4' x 4" pc 59.00 250.00 14,750.00
l. Mirror sq.ft. 36.00 650.00 23,400.00
m. Handrail (PWD) set 2.00 4,500.00 9,000.00
n. Consumables 12,513.20
No. of No. of
Designation
Person/s Hour/s
A. Labor
88.12 69,460.59
63.79 100,564.94
49.20 155,127.60
325,153.13
Hourly Rate Amount (PhP)
32,515.31
32,515.31
357,668.44
357,668.44
Unit Cost Amount (PhP)
1,889.00 37,780.00
984.00 147,600.00
708.00 42,480.00
425.00 8,500.00
317.00 123,630.00
192.00 13,056.00
149,218.40 149,218.40
503.00 65,390.00
518.00 3,108.00
24,000.00 144,000.00
6,825.00 102,375.00
887,692.31 887,692.31
180,000.00 180,000.00
31,680.00 31,680.00
36,118.45 36,118.45
17,500.00 17,500.00
63,360.00 63,360.00
9,114.00 9,114.00
104,099.33 104,099.33
77,396.68 77,396.68
6,468.00 6,468.00
8,303.00 8,303.00
971.13 971.13
6,500.00 6,500.00
18,000.00 18,000.00
58,084.99 58,084.99
19,557.51 19,557.51
16,199.14 16,199.14
37,304.60 37,304.60
15,000.00 15,000.00 Hangers and Support Unit Cost
5,000.00 5,000.00 Fittings Unit Cost
94,229.47 94,229.47
167,000.00 334,000.00
162,962.00 162,962.00
6,434.06 99,406.16 Testing and Commissioning
57.98 37,621.47
181.14 11,955.02
50.00 7,950.00
21,000.00 42,000.00
36,780.00 73,560.00
3,299,170.66
3,656,839.09
of G 438,820.69
of G 292,547.13
of (G + H + I) 219,410.35
(G + H + I + J) 4,607,617.26
373,046.00
37,304.60
149,218.40
1,884,589.31
94,229.47
DETAILED UNIT PRICE ANALYSIS (DUPA)
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
o. duplex C.O. grounding type, 15A, 250V set 30.00 180.00 5,400.00
p. duplex C.O. grounding type, 15A, 250V,
set 9.00 367.00 3,303.00
WP
q. KWHR meter round with base set 1.00 2,200.00 2,200.00
r. Consumables (5% of Materials Cost) 1.00 16,640.63 16,640.63
Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (6 CL)
Unit of Measurement : l.s.
Output per hour : 1
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
40at, 50af, 2p, 240v in NEMA 3R enclosure set 2.00 1,200.00 2,400.00
40at, 50af, 3p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
20at, 50af, 2p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. 2 x 36 watts FL fixture box type w/ canopy base and stem 1.5 ft.
set 60.00 1,800.00 108,000.00
(450mm) length similar to amco AP-113-1.5 or aproved equal.
b. 2 x 36 watts FL fixture. set 30.00 980.00 29,400.00
c. 1 x 36 watts FL fixture box type. set 58.00 546.00 31,668.00
d. 1 - 18 watts CFL w/ medium base keyless type porcelain receptacle. set 6.00 320.00 1,920.00
e. Wall Fan with control Switch set 30.00 1,200.00 36,000.00
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. uPVC pipe, 150mm dia. x 3m, S-1000 length 19.00 1,975.29 37,530.51
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 18.00 798.00 14,364.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 6.00 400.00 2,400.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 4.00 250.00 1,000.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 30.00 250.00 7,500.00
f. Elbow, 150mm dia. - 90 deg bend pc 5.00 538.33 2,691.65
g. Elbow, 50mm dia. - 90 deg bend pc 12.00 48.00 576.00
h. Wye, 150mm dia. pc 4.00 1,136.21 4,544.84
h. Wye, 100mm dia. pc 15.00 150.00 2,250.00
i. Wye, 50mm dia. pc 12.00 45.00 540.00
j. Wye Reducer, 150mm dia. - 100mm dia. pc 4.00 807.29 3,229.16
k.Wye, Reducer, 100mm dia. - 75mm dia. pc 2.00 180.00 360.00
m. uPVC Tee, 150mm dia. x 150mm dia. pc 4.00 926.89 3,707.56
n. uPVC Tee, 50mm dia. x 50mm dia. pc 36.00 50.00 1,800.00
o. Clean Out with cover, 150mm dia. pc 9.00 627.90 5,651.10
p. Clean Out with cover, 100mm dia. pc 4.00 100.00 400.00
q. Clean Out with cover, 50mm dia. pc 4.00 40.00 160.00
r. uPVC P-trap, 50mm dia. pc 59.00 170.00 10,030.00
s. PVC Cement can 8.00 150.00 1,200.00
t. Consumables (5% of Materials) 3,139.73
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. Water Closet - Complete w/ fittings and acc. set 15.00 7,500.00 112,500.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
e. Faucet, Hose Bibb, Brass 12mm dia. pc 18.00 180.00 3,240.00
f. Wall Hung Lavatory - Complete w/ fittings & acc. set 2.00 6,550.00 13,100.00
g. Gate Valve, 50mm dia. pc 3.00 980.00 2,940.00
h. Gate Valve, 32mm dia. pc 6.00 627.00 3,762.00
i. Gate Valve, 20mm dia. pc 3.00 650.00 1,950.00
j. Check Valve, 50mm dia. pc 1.00 954.00 954.00
k. S.S Floor Drain 4' x 4" pc 59.00 250.00 14,750.00
l. Mirror sq.ft. 36.00 650.00 23,400.00
m. Handrail (PWD) set 2.00 4,500.00 9,000.00
n. Consumables 12,513.20
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
o. duplex C.O. grounding type, 15A, 250V set 30.00 180.00 5,400.00
p. duplex C.O. grounding type, 15A, 250V,
set 9.00 367.00 3,303.00
WP
q. KWHR meter round with base set 1.00 2,200.00 2,200.00
r. Consumables (5% of Materials Cost) 1.00 16,640.63 16,640.63
Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (3 CL)
Unit of Measurement : l.s.
Output per hour : 1
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
40at, 50af, 2p, 240v in NEMA 3R enclosure set 2.00 1,200.00 2,400.00
40at, 50af, 3p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
20at, 50af, 2p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. 2 x 36 watts FL fixture box type w/ canopy base and stem 1.5 ft.
set 60.00 1,800.00 108,000.00
(450mm) length similar to amco AP-113-1.5 or aproved equal.
b. 2 x 36 watts FL fixture. set 30.00 980.00 29,400.00
c. 1 x 36 watts FL fixture box type. set 58.00 546.00 31,668.00
d. 1 - 18 watts CFL w/ medium base keyless type porcelain receptacle. set 6.00 320.00 1,920.00
e. Wall Fan with control Switch set 30.00 1,200.00 36,000.00
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. uPVC pipe, 150mm dia. x 3m, S-1000 length 19.00 1,975.29 37,530.51
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 18.00 798.00 14,364.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 6.00 400.00 2,400.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 4.00 250.00 1,000.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 30.00 250.00 7,500.00
f. Elbow, 150mm dia. - 90 deg bend pc 5.00 538.33 2,691.65
g. Elbow, 50mm dia. - 90 deg bend pc 12.00 48.00 576.00
h. Wye, 150mm dia. pc 4.00 1,136.21 4,544.84
h. Wye, 100mm dia. pc 15.00 150.00 2,250.00
i. Wye, 50mm dia. pc 12.00 45.00 540.00
j. Wye Reducer, 150mm dia. - 100mm dia. pc 4.00 807.29 3,229.16
k.Wye, Reducer, 100mm dia. - 75mm dia. pc 2.00 180.00 360.00
m. uPVC Tee, 150mm dia. x 150mm dia. pc 4.00 926.89 3,707.56
n. uPVC Tee, 50mm dia. x 50mm dia. pc 36.00 50.00 1,800.00
o. Clean Out with cover, 150mm dia. pc 9.00 627.90 5,651.10
p. Clean Out with cover, 100mm dia. pc 4.00 100.00 400.00
q. Clean Out with cover, 50mm dia. pc 4.00 40.00 160.00
r. uPVC P-trap, 50mm dia. pc 59.00 170.00 10,030.00
s. PVC Cement can 8.00 150.00 1,200.00
t. Consumables (5% of Materials) 3,139.73
No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
a. Water Closet - Complete w/ fittings and acc. set 15.00 7,500.00 112,500.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
e. Faucet, Hose Bibb, Brass 12mm dia. pc 18.00 180.00 3,240.00
f. Wall Hung Lavatory - Complete w/ fittings & acc. set 2.00 6,550.00 13,100.00
g. Gate Valve, 50mm dia. pc 3.00 980.00 2,940.00
h. Gate Valve, 32mm dia. pc 6.00 627.00 3,762.00
i. Gate Valve, 20mm dia. pc 3.00 650.00 1,950.00
j. Check Valve, 50mm dia. pc 1.00 954.00 954.00
k. S.S Floor Drain 4' x 4" pc 59.00 250.00 14,750.00
l. Mirror sq.ft. 36.00 650.00 23,400.00
m. Handrail (PWD) set 2.00 4,500.00 9,000.00
n. Consumables 12,513.20
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor
No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor