Dupa - 4sty20cl

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 171

No.

of CL= 20
No. of Sty= 4

Formworks

Footing-GF Ian: Footing-GF


Computed
Cumm.
Footing L (m) L'(m) W (m) H/thck (m) Set Conc. Volume Bar Size Bar Weight Cut Lgth Cut Width No. of pcs No. of Sets Total Qty. Total Weight
Weight
F1 3.8 3.8 3.8 0.5 13 93.86 25 3.85 3.8 3.8 22 13 286 4,188.71 4,188.71 98.8
CF1 5.5 5.5 4 0.5 13 143.00 25 2.47 5.5 4 65 13 845 17,912.26 22,100.97 143
SF1 0.8 0.8 0.6 0.2 4 0.38 10 0.62 0.8 0.5 7 4 28 13.81 22,114.78 0.64
WF1 8.55 8.55 0.4 0.2 2 1.37 10 0.62 0.9 6.4 34 2 68 306.11 22,420.90
STC1 0.4 0.4 0.2 1.025 4 0.33 16 1.58 1.025 - 4 4 16 25.89 22,446.79

Column Bar Size Bend Bend to Upper Face of Footing Height F-GF Total Height No. of Total Qty
Bars/Column
C1 0.67 0.67 0.67 1.7 13 9.92 32 0.52 0.375 1.7 2.595 16 208 2,609.56 2,609.56 59.228
C2 0.77 0.77 0.67 1.7 13 11.40 32 0.52 0.375 1.7 2.595 24 312 3,914.34 6,523.91 68.068
C3 0.62 0.62 0.52 1.7 13 7.13 32 0.52 0.375 1.7 2.595 16 208 2,609.56 9,133.47 54.808
C4 0.67 0.67 0.67 1.7 0 0.00 32 0.52 0.375 1.7 2.595 0 0 0.00 9,133.47 0
0.67 0.67 0.67 1.7 0 0.00 32 0.52 0.375 1.7 2.595 0 0 0.00 9,133.47 0

Footing Tie Beam Bar Size No. of Continuous Concrete Cover Bend Length of Total Weight Cumm. Weight Bar Size No. of Bars Length Total Wt Cumm. Wt.
Reinforcement Reinforcement
FTB-1 4.5 3.83 0.45 0.7 10 12.06 25 6 0.05 4.95 1,144.69 1,144.69 16 2 4.95 156.29 156.29 103.5
4.5 3.73 0.45 0.7 10 11.75 25 6 0.05 4.95 1,144.69 2,289.38 16 2 4.95 156.29 312.58 103.5
4.5 3.88 0.45 0.7 10 12.22 25 6 0.05 4.95 1,144.69 3,434.07 16 2 4.95 156.29 468.86 103.5
5 4.38 0.45 0.7 2 2.76 25 6 0.05 6.182 285.92 3,719.98 16 2 6.182 39.04 507.90 23
FTB-1A 5 4.33 0.45 0.7 2 2.73 Continuous 25 8 0.05 6.182 381.22 4,101.21 Web Bar 16 2 6.182 39.04 546.94 23
5 4.23 0.45 0.7 2 2.66 25 8 0.05 6.182 381.22 4,482.43 16 2 6.182 39.04 585.98 23
FTB-2 2.5 1.805 0.6 0.7 13 9.86 25 12 0.05 3.036 1,825.40 6,307.83 16 2 3.036 124.61 710.59 84.5
7 6.28 0.6 0.7 9 23.74 25 12 0.05 8.0135 3,335.62 9,643.45 16 2 8.0135 227.71 938.30 163.8
2.5 1.83 0.6 0.7 0 0.00 25 12 0.05 3.0635 0.00 9,643.45 16 2 3.0635 0.00 938.30 0
FTB-2A 7 6.28 0.6 0.7 4 10.55 25 12 0.05 8.0135 1,482.50 11,125.95 16 2 8.0135 101.21 1,039.51 72.8
7 6.33 0.6 0.7 0 0.00 25 12 0.05 8.0135 0.00 11,125.95 16 2 8.0135 0.00 1,039.51 0
No. of Temp Bars along No. of Temp Bars
Slab Bar Size Short Side along Long Side Weight Short Side Length Long Side Total Weight

Ground 55 55 9.5 0.1 1 52.25 10 184 32 1077.93 187.47 1265.40 12.9


Total 407.97
GF-2FL GF-2FL

No. of
Column b h thck/lgth Net thck/lgth set Conc. Volume Bar Size Height GF-F Total Height Total Qty Total Weight Cumm. Weight
Bars/Column
C1 0.6 0.6 3.15 3.15 13 14.742 32 3.15 3.15 16 208 3,167.68 3,167.68 98.28
C2 0.7 0.7 3.15 3.15 13 20.0655 32 3.15 3.15 24 312 4,751.52 7,919.19 114.66
C3 0.55 0.55 3.15 3.15 13 12.387375 32 3.15 3.15 16 208 3,167.68 11,086.87 90.09
C4 0.6 0.6 3.15 3.15 0 0 28 3.15 3.15 0 0 0.00 11,086.87 0

Beam/Girder Bar Size No. of Continuous Concrete Cover Bend Length of Total Weight Cumm. Weight Bar Size No. of Bars Length Total Wt Cumm. Wt.
Reinforcement Reinforcement

G1 0.45 0.7 7 6.35 9 18.00225 25 10 0.05 7.975 2,766.33 2,766.33 16 2 7.975 226.62 226.62 144.9
G-1A 0.45 0.7 2.5 1.875 9 5.315625 25 10 0.05 2.9975 1,039.76 3,806.09 16 2 2.9975 85.18 311.79 51.75
G-1B 0.45 0.7 2.5 1.875 4 2.3625 25 12 0.05 2.9975 554.54 4,360.63 16 2 2.9975 37.86 349.65 23
G-1C 0.45 0.7 7 6.35 2 4.0005 25 12 0.05 7.975 737.69 5,098.32 16 2 7.975 50.36 400.01 32.2
0.45 0.7 7 6.35 2 4.0005 25 12 0.05 7.975 737.69 5,836.00 16 2 7.975 50.36 450.37 32.2
G-2 0.3 0.4 4.5 3.95 10 4.74 25 4 0.05 4.95 763.13 6,599.13 450.37 63
0.3 0.4 4.5 3.9 10 4.68 Continuous 25 4 0.05 4.29 661.38 7,260.51 Web Bar 450.37 63
0.3 0.4 5 4.425 4 2.124 25 4 0.05 Ian: 5.775 356.13 6,955.26 450.37 28
G-3 0.4 0.5 4.5 3.8 10 7.6 25 7 0.05 assuming 20 mm 4.95 1,335.47 8,290.73 16 2 4.95 156.29 606.66 81
clear cover
0.4 0.5 5 4.3 2 1.72 25 7 0.05 5.3 285.98 8,576.70 16 2 5.3 33.47 640.13 18
B-1 0.3 0.4 4.5 4.5 8 4.32 25 4 0.05 4.95 610.50 9,187.21 50.4
0.3 0.4 4.5 4.5 2 1.08 25 4 0.05 5.1425 158.56 9,345.77 12.6
0.3 0.4 5 5 2 1.2 25 4 0.05 5.6925 175.52 9,521.29 14
0.3 0.4 3.8 3.8 2 0.912 25 4 0.05 4.455 137.36 9,658.65 10.64
B-2 0.25 0.4 4.5 4.5 2 0.9 20 4 0.05 4.95 97.68 9,756.33 11.7
CB-1 0.25 0.4 1.3 1.3 3 0.39 20 6 0.05 1.43 63.49 9,819.82 5.07
LB1 0.25 0.4 3.5 3.5 2 0.7 20 4 0.05 3.85 75.97 9,895.79 9.1
No. of Bars along Short No. of Bars along No. of Top Bars No. of Top Bars Length of Bend Length of Bend
Slab Bar Size Depth of Bend Ba Total Length Total Weight Cumm. Wt.
Dir. Long Dir. along Short Dir. along Long Dir. Bar along Short Bar along Long
S1 4.5 3.5 0.1 0.1 20 31.5 12 25 15 13 8 0.06 3.5252 4.5252 7,850.16 6,970.95 6,970.95 16
5 3.2 0.1 0.1 2 3.2 12 27 14 15 7 0.06 3.2252 5.0252 793.67 704.78 7,675.73 1.64
S2 4.5 2.5 0.1 0.1 10 11.25 12 25 11 13 6 0.06 2.5252 4.5252 2,844.07 2,525.54 10,201.26 7
5 2.5 0.1 0.1 2 2.5 12 27 11 15 6 0.06 2.5252 5.0252 626.92 556.70 10,757.97 1.5
S3 1.5 3.8 0.1 0.1 2 1.14 12 21 7 - 4 0.06 1.5252 3.8 233.46 192.88 10,950.84 1.06
S-Canopy 4.5 1.3 0.1 0.1 2 1.17 12 19 4 - - 0.06 1.324 4.5 86.31 87.75 11,038.59 1.16
Total= 162.00
2FL-3FL
No. of
Column b h thck/lgth Net thck/lgth set Conc. Volume Bar Size Height GF-F Total Height Total Qty Total Weight Cumm. Weight
Bars/Column
C1 0.6 0.6 3.15 3.15 13 14.742 32 3.15 3.15 8 104 1,583.84 1,583.84 98.28
C2 0.7 0.7 3.15 3.15 13 20.0655 32 3.15 3.15 16 208 3,167.68 4,751.52 114.66
C3 0.55 0.55 3.15 3.15 13 12.387375 32 3.15 3.15 12 156 2,375.76 7,127.27 90.09
C4 0.6 0.6 3.15 3.15 0 0 32 3.15 3.15 0 0 0.00 7,127.27 0

Beam/Girder Bar Size No. of Continuous Concrete Cover Bend Length of Total Weight Cumm. Weight Bar Size No. of Bars Length Total Wt Cumm. Wt.
Reinforcement Reinforcement

G1 0.45 0.7 7 6.35 9 18.00225 25 10 0.05 Ian:


7.975 2,766.33 2,766.33 16 2 7.975 226.62 226.62 144.9
G-1A 0.45 0.7 2.5 1.875 9 5.315625 25 10 0.05 assuming 20 mm 2.9975 1,039.76 3,806.09 16 2 2.9975 85.18 311.79 51.75
G-1B 0.45 0.7 2.5 1.875 4 2.3625 25 10 0.05 clear cover 2.9975 462.12 4,268.20 16 2 2.9975 37.86 349.65 23
G-1C 0.45 0.7 7 6.35 2 4.0005 25 10 0.05 7.975 614.74 4,882.94 16 2 7.975 50.36 400.01 32.2
0.45 0.7 7 6.35 2 4.0005 25 10 0.05 7.975 614.74 5,497.69 16 2 7.975 50.36 450.37 32.2
G-2 0.30 0.4 4.5 3.95 10 4.74 Continuous 25 4 0.05 4.95 763.13 6,260.81 Web Bar 63
0.3 0.4 4.5 3.9 10 4.68 25 4 0.05 4.29 661.38 6,922.19 63
0.3 0.4 5 4.425 4 2.124 25 4 0.05 5.775 356.13 7,278.31 28
G-3 0.30 0.55 4.5 3.8 10 6.27 25 8 0.05 4.95 1,526.25 8,804.56 16 2 4.95 156.29 606.66 76.5
0.3 0.55 5 4.3 2 1.419 25 8 0.05 5.3 326.83 9,131.40 16 2 5.3 33.47 640.13 17
B-1 0.3 0.4 4.5 4.5 8 4.32 25 4 0.05 4.95 610.50 9,741.90 50.4
0.30 0.4 4.5 4.5 2 1.08 25 4 0.05 5.1425 158.56 9,900.46 12.6
0.3 0.4 5 5 2 1.2 25 4 0.05 5.6925 175.52 10,075.98 14
0.3 0.4 3.8 3.8 2 0.912 25 4 0.05 4.4 135.67 10,211.64 10.64
LB1 0.25 0.4 3.5 3.5 2 0.7 20 4 0.05 3.85 75.97 10,287.62 9.1
No. of Bars along Short No. of Bars along No. of Top Bars No. of Top Bars Length of Bend Length of Bend
Slab Bar Size Depth of Bend Ba Total Length Total Weight Cumm. Wt.
Dir. Long Dir. along Short Dir. along Long Dir. Bar along Short Bar along Long
S1 4.5 3.5 0.1 0.1 20 31.5 12 25 15 13 8 0.06 3.5252 4.5252 7,850.16 6,970.95 6,970.95 16
5 3.2 0.1 0.1 2 3.2 12 27 14 15 7 0.06 3.2252 5.0252 793.67 704.78 7,675.73 1.64
S2 4.5 2.5 0.1 0.1 10 11.25 12 25 11 13 6 0.06 2.5252 4.5252 2,844.07 2,525.54 10,201.26 7
5 2.5 0.1 0.1 2 2.5 12 27 11 15 6 0.06 2.5252 5.0252 626.92 556.70 10,757.97 1.5
S3 1.5 3.8 0.1 0.1 2 1.14 12 21 7 - 4 0.06 1.5252 3.8 233.46 192.88 10,950.84 1.06
Total= 157.911

3FlL-4FL
No. of
Column b h thck/lgth Net thck/lgth set Conc. Volume Bar Size Height GF-F Total Height Total Qty Total Weight Cumm. Weight
Bars/Column
C1 0.6 0.6 3.15 3.15 13 14.742 32 3.15 3.15 8 104 1,583.84 1,583.84 98.28
C2 0.7 0.7 3.15 3.15 13 20.0655 32 3.15 3.15 16 208 3,167.68 4,751.52 114.66
C3 0.55 0.55 3.15 3.15 13 12.387375 32 3.15 3.15 8 104 1,583.84 6,335.35 90.09
C4 0.6 0.6 3.15 3.15 0 0 32 3.15 3.15 0 Ian: 0 0.00 6,335.35 0
assuming 20 mm
clear cover
No. of Continuous Length of
Beam/Girder Bar Size Concrete Cover Bend Total Weight Cumm. Weight Bar Size No. of Bars Length Total Wt Cumm. Wt.
Reinforcement Reinforcement

G1 0.45 0.7 7 6.35 9 18.00225 25 6 0.05 7.975 1,659.80 1,659.80 16 2 7.975 226.62 226.62 144.9
G-1A 0.45 0.7 2.5 1.875 9 5.315625 25 8 0.05 2.9975 831.81 2,491.61 16 2 2.9975 85.18 311.79 51.75
G-1B 0.45 0.7 2.5 1.875 4 2.3625 25 6 0.05 2.9975 277.27 2,768.87 16 2 2.9975 37.86 349.65 23
G-1C 0.45 0.7 7 6.35 2 4.0005 25 8 0.05 7.975 491.79 3,260.67 16 2 7.975 50.36 400.01 32.2
0.45 0.7 7 6.35 2 4.0005 25 8 0.05 7.975 491.79 3,752.46 16 2 7.975 50.36 450.37 32.2
G-2 0.30 0.4 4.5 3.95 10 4.74 Continuous 25 4 0.05 4.95 763.13 4,515.58 Web Bar 63
0.3 0.4 4.5 3.9 10 4.68 25 4 0.05 4.29 661.38 5,176.96 63
0.3 0.4 5 4.425 4 2.124 25 4 0.05 5.775 356.13 5,533.09 28
G-3 0.30 0.55 4.5 3.8 10 6.27 25 6 0.05 4.95 1,144.69 6,677.77 16 2 4.95 156.29 606.66 76.5
0.3 0.55 5 4.3 2 1.419 25 6 0.05 5.3 245.13 6,922.90 16 2 5.3 33.47 640.13 17
B-1 0.3 0.4 4.5 4.5 8 4.32 25 4 0.05 4.95 610.50 7,533.40 50.4
0.30 0.4 4.5 4.5 2 1.08 25 4 0.05 5.1425 158.56 7,691.96 12.6
0.3 0.4 5 5 2 1.2 25 4 0.05 5.6925 175.52 7,867.48 14
0.3 0.4 3.8 3.8 2 0.912 25 4 0.05 4.4 135.67 8,003.15 10.64
LB1 0.25 0.4 3.5 3.5 2 0.7 20 4 0.05 3.85 75.97 8,079.12 9.1
No. of Bars along Short No. of Bars along No. of Top Bars No. of Top Bars Length of Bend Length of Bend
Slab Bar Size Depth of Bend Ba Total Length Total Weight Cumm. Wt.
Dir. Long Dir. along Short Dir. along Long Dir. Bar along Short Bar along Long
S1 4.5 3.5 0.1 0.1 20 31.5 12 25 15 13 8 0.06 3.5252 4.5252 7,850.16 6,970.95 6,970.95 16
5 3.2 0.1 0.1 2 3.2 12 27 14 15 7 0.06 3.2252 5.0252 793.67 704.78 7,675.73 1.64
S2 4.5 2.5 0.1 0.1 10 11.25 12 25 11 13 6 0.06 2.5252 4.5252 2,844.07 2,525.54 10,201.26 7
5 2.5 0.1 0.1 2 2.5 12 27 11 15 6 0.06 2.5252 5.0252 626.92 556.70 10,757.97 1.5
S3 1.5 3.8 0.1 0.1 2 1.14 12 21 7 - 4 0.06 1.5252 3.8 233.46 192.88 10,950.84 1.06
Total= 157.911

4FL-RD

Column b h thck/lgth Net thck/lgth Set Conc. Volume Bar Size Height GF-F Total Height No. of Total Qty Total Weight Cumm. Weight
Bars/Column
C1 0.55 0.55 3.15 3.15 13 12.387375 32 3.15 3.15 8 104 1,583.84 1,583.84 90.09
C2 0.55 0.55 3.15 3.15 13 12.387375 32 3.15 3.15 12 156 2,375.76 3,959.60 90.09
C3 0.55 0.55 3.15 3.15 13 12.387375 32 3.15 3.15 8 104 1,583.84 5,543.43 90.09
C4 0.6 0.6 3.15 3.15 0 0 32 3.15 3.15 0 0 0.00 5,543.43 0

Beam/Girder Bar Size No. of Continuous Concrete Cover Bend Length of Total Weight Cumm. Weight Bar Size No. of Bars Length Total Wt Cumm. Wt.
Reinforcement Reinforcement

RG-1 0.3 0.5 7 7 2 2.1 25 4 0.05 7.9475 245.05 245.05 22.4


RG-2 0.4 0.5 7 7 2 2.8 25 4 0.05 Ian: 7.9475 245.05 490.10 16 2 7.9475 50.19 50.19 25.2
assuming 20 mm
RB-1 0.3 0.5 2.5 2.5 11 4.125 25 4 0.05 clear cover 2.9975 508.33 998.42 44
RB-1A 0.4 0.5 2.5 2.5 2 1 25 4 0.05 2.9975 92.42 1,090.85 9
RB-2 0.35 0.5 7 7 9 11.025 25 4 0.05 7.9475 1,102.72 2,193.56 107.1
RB-3 0.25 0.4 4.5 4.5 10 4.5 25 4 0.05 4.95 763.13 2,956.69 58.5
0.25 0.4 4.5 4.5 10 4.5 25 4 0.05 4.95 763.13 3,719.81 58.5
0.25 0.4 4.5 4.5 10 4.5 25 4 0.05 4.95 763.13 4,482.94 58.5
0.25 0.4 5 5 2 1 25 4 0.05 5.7475 177.21 4,660.15 13
0.25 0.4 5 5 2 1 25 4 0.05 5.7475 177.21 4,837.37 13
0.25 0.4 5 5 2 1 Continuous 25 4 0.05 5.7475 177.21 5,014.58 Web Bar 13
0.25 0.4 1.55 1.55 2 0.31 25 4 0.05 1.705 52.57 5,067.16 4.03
RB-3A 0.25 0.4 0 0 0 0 25 4 0.05 0 0.00 5,067.16 0
RB-4 0.2 0.3 4.5 4.5 19 5.13 16 4 0.05 4.95 593.89 5,661.05 85.5
0.2 0.3 5 5 2 0.6 16 4 0.05 5.7475 72.59 5,733.64 10
0.2 0.3 5 5 2 0.6 16 4 0.05 5.7475 72.59 5,806.22 10
RB-5 0.2 0.4 4.5 4.5 1 0.36 20 4 0.05 4.95 48.84 5,855.06 5.4
0.2 0.4 5 5 2 0.8 20 4 0.05 5.665 111.79 5,966.85 12
RB-6 0.25 0.35 3.2 3.2 2 0.56 20 4 0.05 3.52 69.46 6,036.32 7.68
RCB-1 0.25 0.3 1.1 1.1 11 0.9075 20 4 0.05 1.1 119.39 6,155.70 13.31
0.25 0.3 1.1 1.1 11 0.9075 20 4 0.05 1.1 119.39 6,275.09 13.31
0.25 0.3 1.1 1.1 4 0.33 20 4 0.05 1.1 43.41 6,318.50 4.84
RCB-2 0.25 0.3 1.1 1.1 2 0.165 20 4 0.05 1.1 21.71 6,340.21 2.42
LRB-1 0.2 0.3 0 0 0 0 20 4 0.05 0 0.00 6,340.21 0

Slab Bar Size No. of Bars along Short No. of Bars along No. of Top Bars No. of Top Bars Depth of Bend Length of Bend Length of Bend
Dir. Long Dir. along Short Dir. along Long Dir. Bar Bar along Short Bar along Long Total Length Total Weight Cumm. Wt.
S4 5 3.2 0.12 0.12 2 3.84 12 27 14 15 7 0.08 3.2336 5.0336 794.36 705.39 705.39 1.968
Total= 89.22
Weight (10 Weight (12
Others mm) mm) Total Weight 4899.962

Parapet/Conc. Gutter 110 0.34 1 37.4 1 13 441 6 551 4 336 6 138 6 1243.201243 735.2647353 1978.465978 37.4
HW Floor Slab 7 1.6 0.1 2 2.24 25 7 178 109.7667764 109.7667764 1.72
Handwashing 6.65 0.1 2 1.33 1 4 28 6 35 5 20 6 74.000074 74.000074
Conc. Bench 36 0.1 0.4 1 1.44 0.5 180 12 27 6 99.9000999 99.9000999 14.44
Ramp 5.6 1.6 0.1 2 1.792 20 7 142 87.56675423 87.56675423 1.44
RC Wall 2.2 1.575 0.15 2 1.0395 11 12 48 38 59.2000592 67.48806749 126.6881267 1.1325

Stairs Riser Tread No. of Steps Stringer Stair Width Landing Waist Length Conc. Vol. 1 Conc. Vol. 2 Conc. Vol. 3 Total Volume
Thickness Length (Landing)
0.175 0.3 9 0.15 1.575 1.25 2.78 0.66 0.33075 0.609375 9.97 15.048
Stairs Stair Nosing Volume 0.062015625 52.542
Stairs (4FL-RD) 0.175 0.25 9 0.15 1 1.25 2.44 0.37 0.175 0.1875 1.465
22.8756875 29.7675
Reinforcement Stairs Bend Total Lngth No. of Bars Total Length Total Weight 20.55
16-mm Ø @ 150 mm 4.03 11 531.96 1,679.58 5074.002
12-mm Ø temp bars 1.575 10 94.5 167.83
Landing 3.25 5 195 346.32
Nosing 85.05 104.90
4FL-RD
16-mm Ø @ 150 mm 3.69 11 162.36 512.63
12-mm Ø temp bars 1 9 36 63.94
Landing 1 5 25 44.40
Nosing 18 31.97
2,951.55

5% wastage
G-40 77286.29 81,150.60
G-60 125,342.21 131,609.32
Concrete 1043.13 1095.29

Slab on Fill 56.28


Others 1039.01
Bar Sizes 5 6 7.5 9 10.5 12 13.5
8 1.98 2.37

10 3.08 3.7

12 4.44 5.33
13 5.21 6.25
16 7.90 9.47
20 12.33 14.8
25 19.27 23.12

28 24.17 29

30 27.75 33.29
32 31.57 37.88
36 39.96 47.95
Bar Weight
0.62

0.89

1.58
2.47
3.85
4.83
12
DETAILED UNIT PRICE ANALYSIS

Item No./ Description : A.1.1 (8) Provision of Field Office for the Engineer (Rental Basis)
Unit of Measurement : mo
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Month/s
A. Labor

Sub - Total for A


No. of
Name and Capacity No of Unit/s Monthly Rate Amount (PhP)
Month/s
B. Equipment

a. 40 footer Container Van or its


equivalent with ACU, furnished and 1 1.00 26,000.00 26,000.00
maintained

Sub - Total for B 26,000.00


C. Total (A + B) 26,000.00
D. Output = 1 mo
E. Direct Unit Cost (C ÷ D) 26,000.00
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

Sub - Total for F


G. Direct Unit Cost (E + F) 26,000.00
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G 0.00
I. Contractor's Profit (CP) 10% of G 2,600.00
J. Value Added Tax (VAT) 5% of (G + H + I) 1,430.00
K. Total Unit Cost (G + H + I + J) 30,030.00
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : B.3 Permits and Clearances


Unit of Measurement : l.s.
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

Sub - Total for A


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Sub - Total for B


C. Total (A + B) 0.00
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 0.00
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

Printing l.s. 1.00 8,744.00 8,744.00

Fees:
a. Zoning l.s. 1.00 34,154.00 34,154.00
b. Fire l.s. 1.00 28,865.00 28,865.00
c. Plumbing/ Sanitary l.s. 1.00 8,554.65 8,554.65
d. Electrical l.s. 1.00 22,880.00 22,880.00
e. Mechanical l.s. 1.00 7,100.00 7,100.00
f. Electronics l.s. 1.00 2,500.00 2,500.00
g. Other Fees l.s. 1.00 26,497.00 26,497.00
Sub - Total for F 139,294.65
G. Direct Unit Cost (E + F) 139,294.65
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G 0.00
I. Contractor's Profit (CP) 0% of G 0.00
J. Value Added Tax (VAT) 5% of (G + H + I) 6,964.73
K. Total Unit Cost (G + H + I + J) 146,259.38
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : B.5 Project Billboard/ Sign Board


Unit of Measurement : ea
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 4.00 88.12 352.48


b. Skilled Laborer 1 4.00 63.79 255.16
c. Unskilled Laborer 1 4.00 49.20 196.80

Sub - Total for A 804.44


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 80.44

Sub - Total for B 80.44


C. Total (A + B) 884.88
D. Output = 1 ea
E. Direct Unit Cost (C ÷ D) 884.88
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 8' x 8' Tarpaulin ft2 64.00 20.00 1,280.00


b. Good Lumber (Frames) bd-ft 48.00 48.00 2,304.00
c. Assorted Common Working Nails kg 1.00 85.00 85.00

Sub - Total for F 3,669.00


G. Direct Unit Cost (E + F) 4,553.88
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 546.47
I. Contractor's Profit (CP) 10% of G 455.39
J. Value Added Tax (VAT) 5% of (G + H + I) 277.79
K. Total Unit Cost (G + H + I + J) 5,833.53
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : B.7 (2) Occupational Safety and Health Program


Unit of Measurement : l.s.
Output : 1

No. of
Designation No. of Person/s Daily Rate Amount (PhP)
Day/s
A. Labor

a. Part Time Safety Officer 1 14.00 510.32 7,144.48

Sub - Total for A 7,144.48


Name and Capacity Unit Quantity Daily Rate Amount (PhP)
B. Equipment

Sub - Total for B


C. Total (A + B) 7,144.48
D. Output = 1 mo.
E. Direct Unit Cost (C ÷ D) 7,144.48
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

First Aid Kit l.s. 1.00 1,000.00 1,000.00

Personal Protective Equipment(PPE)


a. Safety Helmet man-days 6,236.00 0.25 1,559.00
b. Safety Shoes man-days 6,236.00 2.77 17,273.72
c. Safety Gloves man-days 6,236.00 7.67 47,830.12

Signages and Barricades


a. PPE Signage (4' x 8') set 1.00 506.37 506.37
b. Safety First (4' x 4') set 1.00 270.87 270.87
c. Warning Signs (2' x 3') sets 27.00 123.68 3,339.36
d. Caution Tape, 100ft roll 1.00 800.00 800.00

Sub - Total for F 72,579.44


G. Direct Unit Cost (E + F) 79,723.92
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G 0.00
I. Contractor's Profit (CP) 10% of G 7,972.39
J. Value Added Tax (VAT) 5% of (G + H + I) 4,384.82
K. Total Unit Cost (G + H + I + J) 92,081.13
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : B.9 Mobilization/Demobilization


Unit of Measurement : l.s.
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

Sub - Total for A 0.00


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Mobilization/ Demobilization (1% of Civil Works) 293,529.86

Sub - Total for B 293,529.86


C. Total (A + B) 293,529.86
D. Output = 1.00 l.s.
E. Direct Unit Cost (C ÷ D) 293,529.86
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

Sub - Total for F


G. Direct Unit Cost (E + F) 293,529.86
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G 0.00
I. Contractor's Profit (CP) 0% of G 0.00
J. Value Added Tax (VAT) 5% of (G + H + I) 14,676.49
K. Total Unit Cost (G + H + I + J) 308,206.35
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 801(1) Removal of Structure and Obstruction


Unit of Measurement : l.s.
Output per hour : 1.00

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 30.00 88.12 2,643.60


b. Unskilled Laborer 2 30.00 49.20 2,952.00

Sub - Total for A 5,595.60


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Backhoe w/ breaker (0.80 m 3) 1 15.00 1,998.10 29,971.50


b. Backhoe (0.80 m3) - for loading 1 7.50 1,537.00 11,527.50
c. Dump Truck (12 yd3) 1 15.00 1,420.00 21,300.00
d. Cutting Outfit 1 30.00 45.45 1,363.50

Sub - Total for B 64,162.50


C. Total (A + B) 69,758.10
D. Output per Hour = 1.00 l.s.
E. Direct Unit Cost (C ÷ D) 69,758.10
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Acetylene kg 8.96 150.00 1,344.00


a. Oxygen kg 8.96 120.00 1,075.20

Sub - Total for F 2,419.20


G. Direct Unit Cost (E + F) 72,177.30
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 8,661.28
I. Contractor's Profit (CP) 10% of G 7,217.73
J. Value Added Tax (VAT) 5% of (G + H + I) 4,402.82
K. Total Unit Cost (G + H + I + J) 92,459.12
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 803(1)a Structure Excavation (Common Soil)


Unit of Measurement : m3
Output per hour : 20.00

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Unskilled Laborer 3 1.00 49.20 147.60

Sub - Total for A 235.72


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Backhoe (0.80 m3) 1 1.00 1,537.00 1,537.00


b. Dump Truck (12 yd3) 2 1.00 1,420.00 2,840.00
Minor Tools (10% of Labor Cost) 23.57

Sub - Total for B 4,400.57


C. Total (A + B) 4,636.29
D. Output per Hour = 20.00 m3
E. Direct Unit Cost (C ÷ D) 231.81
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

Sub - Total for F


G. Direct Unit Cost (E + F) 231.81
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 27.82
I. Contractor's Profit (CP) 10% of G 23.18
J. Value Added Tax (VAT) 5% of (G + H + I) 14.14
K. Total Unit Cost (G + H + I + J) 296.95
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 804(1)a Embankment from Structure Excavation


Unit of Measurement : m3
Output per hour : 9.84

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Unskilled Laborer 3 1.00 49.20 147.60

Sub - Total for A 235.72


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Plate Compactor (5 hp) 1 0.75 123.00 92.25


b. Backhoe (0.80 m3) 1 0.75 1,537.00 1,152.75
Minor Tools (10% of Labor Cost) 23.57

Sub - Total for B 1,268.57


C. Total (A + B) 1,504.29
D. Output per Hour = 9.84 m3
E. Direct Unit Cost (C ÷ D) 152.88
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

Sub - Total for F


G. Direct Unit Cost (E + F) 152.88
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 18.35
I. Contractor's Profit (CP) 10% of G 15.29
J. Value Added Tax (VAT) 5% of (G + H + I) 9.33
K. Total Unit Cost (G + H + I + J) 195.83
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 804(1)b Embankment (Borrow)


Unit of Measurement : m3
Output per hour : 9.84

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Unskilled Laborer 3 1.00 49.20 147.60

Sub - Total for A 235.72


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Plate Compactor (5 hp) 1 0.75 123.00 92.25


b. Backhoe (0.80 m3) 1 0.75 1,537.00 1,152.75
Minor Tools (10% of Labor Cost) 23.57

Sub - Total for B 1,268.57


C. Total (A + B) 1,504.29
D. Output per Hour = 9.84 m3
E. Direct Unit Cost (C ÷ D) 152.88
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

Embankment Materials m3 1.25 612.00 765.00


(w/ 25% Shrinkage Factor)

Sub - Total for F 765.00


G. Direct Unit Cost (E + F) 917.88
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 110.15
I. Contractor's Profit (CP) 10% of G 91.79
J. Value Added Tax (VAT) 5% of (G + H + I) 55.99
K. Total Unit Cost (G + H + I + J) 1,175.80
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 804(4) Gravel Fill


Unit of Measurement : m3
Output per hour : 1.20

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Unskilled Laborer 3 1.00 49.20 147.60

Sub - Total for A 235.72


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Plate Compactor 1 0.50 123.00 61.50


Minor Tools (10% of Labor Cost) 23.57

Sub - Total for B 85.07


C. Total (A + B) 320.79
D. Output per Hour = 1.20 m3
E. Direct Unit Cost (C ÷ D) 267.33
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Gravel Bedding (G1) m3 1.05 1,127.00 1,183.35


(w/ 5% Shrinkage Factor)

Sub - Total for F 1,183.35


G. Direct Unit Cost (E + F) 1,450.68
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 174.08
I. Contractor's Profit (CP) 10% of G 145.07
J. Value Added Tax (VAT) 5% of (G + H + I) 88.49
K. Total Unit Cost (G + H + I + J) 1,858.32
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Descripti : 900(1)c1 Structural Concrete, Class A, 28 days (4000 psi)


Unit of Measurem : m3
Output per hour : 0.27

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 4 1.00 49.20 196.80

Sub - Total for A 348.71


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. One Bagger Mixer 1 1.00 172.00 172.00

Sub - Total for B 172.00


C. Total (A + B) 520.71
D. Output per Hour = 0.27 m3
E. Direct Unit Cost (C ÷ D) 1,928.56
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Gravel m3 1.00 1,127.00 1,127.00


b. Sand m3 0.50 1,045.00 522.50
c. Portland Cement bags 10.50 272.00 2,856.00

Sub - Total for F 4,505.50


G. Direct Unit Cost (E + F) 6,434.06
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 772.09
I. Contractor's Profit (CP) 10% of G 643.41
J. Value Added Tax (VAT) 5% of (G + H + I) 392.48
K. Total Unit Cost (G + H + I + J) 8,242.03
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Descripti : 900(1)c2 Structural Concrete, Class A, 28 days (Slab on Fill, 2500 psi)
Unit of Measurem : m3
Output per hour : 0.357

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 4 1.00 49.20 196.80

Sub - Total for A 348.71


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

a. One-bagger mixer 1 1.00 172.00 172.00


Minor Tools (10% of Labor Cost) 34.87

Sub - Total for B 206.87


C. Total (A + B) 555.58
D. Output per Hour = 0.357 m2
E. Direct Unit Cost (C ÷ D) 1,556.25
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Gravel m3 1.00 1,127.00 1,127.00


b. Sand m3 0.50 1,045.00 522.50
c. Portland Cement bags 9.10 272.00 2,475.20

Sub - Total for F 4,124.70


G. Direct Unit Cost (E + F) 5,680.95
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 681.71
I. Contractor's Profit (CP) 10% of G 568.09
J. Value Added Tax (VAT) 5% of (G + H + I) 346.54
K. Total Unit Cost (G + H + I + J) 7,277.30
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Descript : 902(1)a Reinforcing Steel, Grade 40


Unit of Measurem : kg
Output per hour : 129.094

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 3 1.00 63.79 191.37
c. Unskilled Laborer 12 1.00 49.20 590.40

Sub - Total for A 869.89


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Bar Cutter 1 0.50 219.75 109.88


b. Bar Bender 1 0.50 351.50 175.75
Minor Tools (10% of Labor Cost) 86.99

Sub - Total for B 372.61


C. Total (A + B) 1,242.50
D. Output per Hour = 129.094 kg
E. Direct Unit Cost (C ÷ D) 9.62
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Deformed Reinforcing Steel


Grade 60/Grade 40 kg 1.00 45.00 45.00
b. #16 Galvanized Iron Wire kg 0.015 70.00 1.05
c. Consumables (5% of Materials Cost) 2.30

Sub - Total for F 48.35


G. Direct Unit Cost (E + F) 57.98
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 6.96
I. Contractor's Profit (CP) 10% of G 5.80
J. Value Added Tax (VAT) 5% of (G + H + I) 3.54
K. Total Unit Cost (G + H + I + J) 74.27
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 902(1)b Reinforcing Steel, Grade 60


Unit of Measurement : kg
Output per hour : 129.094

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 3 1.00 63.79 191.37
c. Unskilled Laborer 12 1.00 49.20 590.40

Sub - Total for A 869.89


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Bar Cutter 1 0.50 219.75 109.88


b. Bar Bender 1 0.50 351.50 175.75
Minor Tools (10% of Labor Cost) 86.99

Sub - Total for B 372.61


C. Total (A + B) 1,242.50
D. Output per Hour = 129.094 kg
E. Direct Unit Cost (C ÷ D) 9.62
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Deformed Reinforcing Steel kg 1.00 45.00 45.00


Grade
b. #16 60/GradeIron
Galvanized 40 Wire kg 0.015 70.00 1.05
c. Consumables (5% of Materials Cost) 2.30

Sub - Total for F 48.35


G. Direct Unit Cost (E + F) 57.98
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 6.96
I. Contractor's Profit (CP) 10% of G 5.80
J. Value Added Tax (VAT) 5% of (G + H + I) 3.54
K. Total Unit Cost (G + H + I + J) 74.27
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 903(2) Formworks and Falseworks


Unit of Measurement : l.s.
Output per hour : 1

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


A. Labor
Installation
a. Construction Foreman 1 680.75 88.12 59,987.79
b. Skilled Laborer 4 680.75 63.79 173,700.45
c. Unskilled Laborer 6 680.75 49.20 200,957.73
Stripping
a. Construction Foreman 1 381.22 88.12 33,593.16
b. Unskilled Laborer 6 381.22 49.20 112,536.33
Sub - Total for A 580,775.46
Daily Rental
Name and Capacity Quantity No. of Day/s Amount (PhP)
Rate
B. Equipment

Area= 205.01 m2
a. H-Frame 1.7 m x 1.2m, set 40 9,582.00 6.08 2,330,342.40
- 2 pcs H-frames
- 4 pcs diagonal cross braces
- 4 pcs horizontal braces
- 8 pcs joint pins
b. Shoring Jack, 3.8 m full extension 62 9,582.00 4.50 2,673,378.00
c. Adjustable, U-head Jack, 0.6m 80 9,582.00 0.85 651,576.00
d. Adjustable, Base Jack, 0.6m 80 9,582.00 0.85 651,576.00
e.1-1/2" GI Pipe x 6m 62 9,582.00 2.50 1,485,210.00
f.1-1/2" GI Pipe x 3m 16 9,582.00 1.25 191,640.00
g.1-1/2" GI Pipe x 4m 32 9,582.00 1.75 536,592.00
h.1-1/2" GI Pipe x 1m 216 9,582.00 0.50 1,034,856.00
i.Tie Rod x 0.6m 278 9,582.00 1.00 2,663,796.00
j.Round Wing Nut 558 9,582.00 0.15 802,013.40

Sub - Total for B 13,020,979.80


C. Sub-Total for C (B/Area) 63,513.88
D. Output per Hour = 1 l.s
E. Direct Unit Cost (A ÷ D) + C 644,289.33
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Phenolic Board (019x1.2x2.4) - 5 uses pc 1,063.000 1,450.00 308,270.00


c. Good Lumber - 3 uses bd ft 14,480.600 48.00 231,689.60
b. Consumables (5% of Materials Cost) 26,998.00

Sub - Total for F 566,957.60


G. Direct Unit Cost (E + F) 1,211,246.93
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 145,349.63
I. Contractor's Profit (CP) 10% of G 121,124.69
J. Value Added Tax (VAT) 5% of (G + H + I) 73,886.06
K. Total Unit Cost (G + H + I + J) 1,551,607.32
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1000(1) Soil Poisoning


Unit of Measurement : L
Output per hour : 5.40

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 2 1.00 49.20 98.40

Sub - Total for A 250.31


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 25.03

Sub - Total for B 25.03


C. Total (A + B) 275.34
D. Output per Hour = 5.40 L
E. Direct Unit Cost (C ÷ D) 50.99
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Soil Poisoning L 1.00 330.00 330.00

Sub - Total for F 330.00


G. Direct Unit Cost (E + F) 380.99
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 45.72
I. Contractor's Profit (CP) 10% of G 38.10
J. Value Added Tax (VAT) 5% of (G + H + I) 23.24
K. Total Unit Cost (G + H + I + J) 488.05
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1046(2)a1 CHB Non Load Bearing Wall (including Reinforcing Steel), 100 mm
Unit of Measurement : m2
Output per hour : 3.825

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 2 1.00 63.79 127.58
c. Unskilled Laborer 3 1.00 49.20 147.60

Sub - Total for A 363.30


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. One-bagger mixer 1 1.00 172.00 172.00


Minor Tools (10% of Labor Cost) 36.33

Sub - Total for B 208.33


C. Total (A + B) 571.63
D. Output per Hour = 3.825 m2
E. Direct Unit Cost (C ÷ D) 149.45
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 100 mm thk CHB (Non-Load Bearing) pc 13.00 10.00 130.00


b. Cement bag 0.525 272.00 142.80
c. Sand cu.m 0.04 1,045.00 45.98
d. Reinforcing Steel kg 3.24 45.00 145.80
e. #16 Tie wire kg 0.05 70.00 3.50

Sub - Total for F 468.08


G. Direct Unit Cost (E + F) 617.53
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 74.10
I. Contractor's Profit (CP) 10% of G 61.75
J. Value Added Tax (VAT) 5% of (G + H + I) 37.67
K. Total Unit Cost (G + H + I + J) 791.05
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1046(2)a2 CHB Non Load Bearing Wall (including Reinforcing Steel), 150 mm
Unit of Measurement : m2
Output per hour : 3.18

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 2 1.00 63.79 127.58
c. Unskilled Laborer 3 1.00 49.20 147.60

Sub - Total for A 363.30


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. One-bagger mixer 1 1.00 172.00 172.00


Minor Tools (10% of Labor Cost) 36.33

Sub - Total for B 208.33


C. Total (A + B) 571.63
D. Output per Hour = 3.180 m2
E. Direct Unit Cost (C ÷ D) 179.76
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 150 mm thk CHB (Non-Load Bearing) pc 13.00 14.00 182.00


b. Cement bag 1.500 272.00 408.00
c. Sand cu.m 0.04 1,045.00 45.98
d. Reinforcing Steel kg 3.24 45.00 145.80
e. #16 Tie wire kg 0.05 70.00 3.50

Sub - Total for F 785.28


G. Direct Unit Cost (E + F) 965.04
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 115.80
I. Contractor's Profit (CP) 10% of G 96.50
J. Value Added Tax (VAT) 5% of (G + H + I) 58.87
K. Total Unit Cost (G + H + I + J) 1,236.21
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1003(17) Carpentry and Joinery Works (Blackboard)


Unit of Measurement : l.s.
Output per hour : 1.00

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

Installation
a. Construction Foreman 1 60.00 88.12 5,287.20
b. Skilled Laborer 1 80.00 63.79 5,103.20
c. Unskilled Laborer 1 80.00 49.20 3,936.00

Sub - Total for A 14,326.40


No. of Daily Rental
Name and Capacity Quantity Amount (PhP)
Day/s Rate
B. Equipment

Minor Tools (10 % of Labor Cost) 1,432.64

Sub - Total for B 1,432.64


C. Sub - Total for C (B ÷ Area) 15,759.04
D. Output = 1.00 l.s.
E. Direct Unit Cost (A ÷ D) + C 15,759.04
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Blackboard set 20.000 3,100.00 62,000.00

Sub - Total for F 62,000.00


G. Direct Unit Cost (E + F) 77,759.04
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 9,331.08
I. Contractor's Profit (CP) 10% of G 7,775.90
J. Value Added Tax (VAT) 5% of (G + H + I) 4,743.30
K. Total Unit Cost (G + H + I + J) 99,609.33
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1004(2) Finishing Hardware


Unit of Measurement : l.s
Output : 1.00

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

(Labor cost for these items are to be considered/included in the installation of doors, windows, and other fabricated materials.)

Sub - Total for A


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Sub - Total for B


C. Total (A + B)
D. Output = 1.00 l.s
E. Direct Unit Cost (C ÷ D)
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Lockset set 77.00 900.00 69,300.00


b. Hinges set 290.00 150.00 43,500.00

Sub - Total for F 112,800.00


G. Direct Unit Cost (E + F) 112,800.00
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 13,536.00
I. Contractor's Profit (CP) 10% of G 11,280.00
J. Value Added Tax (VAT) 5% of (G + H + I) 6,880.80
K. Total Unit Cost (G + H + I + J) 144,496.80
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1005(1) Case Steel Window


Unit of Measurement : m2
Output : 0.18

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

Installation
a. Construction Foreman 1 1.00 88.12 88.12
b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of Daily Rental
Name and Capacity Quantity Amount (PhP)
Day/s Rate
B. Equipment

a. Welding Machine 1 0.25 391.00 97.75


Minor Tools (10% of Labor Cost) 20.11

Sub - Total for B 117.86


C. Sub - Total for C (B ÷ Area) 318.97
D. Output = 0.18 m2
E. Direct Unit Cost (C ÷ D) 1,772.06
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Steel Casement Window m2 1.000 1,870.00 1,870.00

b. Consumables (5% of Materials Cost) 93.50

Sub - Total for F 1,963.50


G. Direct Unit Cost (E + F) 3,735.56
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 448.27
I. Contractor's Profit (CP) 8% of G 298.84
J. Value Added Tax (VAT) 5% of (G + H + I) 224.13
K. Total Unit Cost (G + H + I + J) 4,706.81
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1005(5) Steel Window (Window Grills)


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 76.50 88.12 6,741.18


b. Skilled Laborer 1 76.50 63.79 4,879.94
c. Unskilled Laborer 1 76.50 49.20 3,763.80

Sub - Total for A 15,384.92


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Welding Machine 1 19.13 391.00 7,477.88


Minor Tools (10% of Labor Cost) 1,538.49

Sub - Total for B 9,016.37


C. Total (A + B) 24,401.28
D. Output per Hour = 1 l.s.
E. Direct Unit Cost (C ÷ D) 24,401.28
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 12 mm x 12 mm square bar kg 1,746.42 45.00 78,589.03


b. Consumables (3% of Materials Cost) 2,357.67

Sub - Total for F 80,946.70


G. Direct Unit Cost (E + F) 105,347.98
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 12,641.76
I. Contractor's Profit (CP) 10% of G 10,534.80
J. Value Added Tax (VAT) 5% of (G + H + I) 6,426.23
K. Total Unit Cost (G + H + I + J) 134,950.76
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1006(6) Steel Doors and Frames


Unit of Measurement : l.s.
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 8.00 88.12 704.96


b. Skilled Laborer 1 8.00 63.79 510.32
c. Unskilled Laborer 1 8.00 49.20 393.60

Sub - Total for A 1,608.88


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 160.89

Sub - Total for B 160.89


C. Total (A + B) 1,769.77
D. Output per Hour = 1 l.s.
E. Direct Unit Cost (C ÷ D) 1,769.77
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Steel Doors and Frames set 2.00 10,500.00 21,000.00


b. Consumbale (5% of Material Cost ) 1,050.00

Sub - Total for F 22,050.00


G. Direct Unit Cost (E + F) 23,819.77
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 2,858.37
I. Contractor's Profit (CP) 10% of G 2,381.98
J. Value Added Tax (VAT) 5% of (G + H + I) 1,453.01
K. Total Unit Cost (G + H + I + J) 30,513.12
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1008(1)c Aluminum Glass Window (Awning Type)


Unit of Measurement : m2
Output : 0.36

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Welding Machine 1 0.25 391.00 97.75


Minor Tools (10% of Labor Cost) 20.11

Sub - Total for B 117.86


C. Total (A + B) 318.97
D. Output per Hour = 0.36 m2
E. Direct Unit Cost (C ÷ D) 886.03
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Aluminum Glass Window (Awning Type) m2 1.00 1,820.00 1,820.00


b. Consumbale (5% of Material Cost ) 91.00

Sub - Total for F 1,911.00


G. Direct Unit Cost (E + F) 2,797.03
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 335.64
I. Contractor's Profit (CP) 10% of G 279.70
J. Value Added Tax (VAT) 5% of (G + H + I) 170.62
K. Total Unit Cost (G + H + I + J) 3,583.00
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1009(1)a Jalousie Window (Glass)


Unit of Measurement : m2
Output per hour : 0.27

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output per Hour = 0.27 m2
E. Direct Unit Cost (C ÷ D) 819.34
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Jalousie Window (Glass) m2 1.00 680.00 680.00


b. Consumables (3% of Materials Cost) 20.40

Sub - Total for F 700.40


G. Direct Unit Cost (E + F) 1,519.74
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 182.37
I. Contractor's Profit (CP) 10% of G 151.97
J. Value Added Tax (VAT) 5% of (G + H + I) 92.70
K. Total Unit Cost (G + H + I + J) 1,946.78
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1010(4) Wooden Doors


Unit of Measurement : l.s.
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 600.00 88.12 52,872.00


b. Skilled Laborer 1 600.00 63.79 38,274.00
c. Unskilled Laborer 1 600.00 49.20 29,520.00

Sub - Total for A 120,666.00


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 12,066.60

Sub - Total for B 12,066.60


C. Total (A + B) 132,732.60
D. Output per Hour = 1 l.s.
E. Direct Unit Cost (C ÷ D) 132,732.60
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Wood Panel Doors (w/ Transom Fixed Glass) m2 75.60 4,500.00 340,200.00
b. Hallow Core Flush Door m2 43.44 650.00 28,236.00
c. Door Frames set 75.00 2,000.00 150,000.00
d. Consumbale (5% of Material Cost of Door 7,500.00
Frames)

Sub - Total for F 525,936.00


G. Direct Unit Cost (E + F) 658,668.60
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 79,040.23
I. Contractor's Profit (CP) 10% of G 65,866.86
J. Value Added Tax (VAT) 5% of (G + H + I) 40,178.78
K. Total Unit Cost (G + H + I + J) 843,754.48
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1003(1)a1 Ceiling (4.5mm Fiber Cement Board on Metal Frame)
Unit of Measurement : m2
Output per hour : 1.243

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 2 1.00 49.20 98.40

Sub - Total for A 250.31


No of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 25.03

Sub - Total for B 25.03


C. Total (A + B) 275.34
D. Output per Hour = 1.243 m2
E. Direct Unit Cost (C ÷ D) 221.51
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 4.5mm Fiber Cement Board pc 0.365 450.00 164.25


b. Metal Furring pc 1.131 130.00 147.03
and specifications
c. Carrying ) 3m length
Channels pc 0.357 150.00 53.55
d. Hanger Bars/Rod pc 1 80.00 80.00
e. Channel clip pc 6 20.00 120.00
f. Wall Angle pc 0.238 100.00 23.80
g. Rivets pc 14 1.50 21.00
h. 1" Metal Screw pc 4 3.00 12.00

Sub - Total for F 621.63


G. Direct Unit Cost (E + F) 843.14
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 101.18
I. Contractor's Profit (CP) 10% of G 84.31
J. Value Added Tax (VAT) 5% of (G + H + I) 51.43
K. Total Unit Cost (G + H + I + J) 1,080.07
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1003(15)c Moulding (Pre-cast)


Unit of Measurement : m.
Output per hour : 1.00

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

Installation
a. Construction Foreman 1 0.30 88.12 26.44
b. Skilled Laborer 1 0.30 63.79 19.14

Sub - Total for A 45.57


No. of Daily Rental
Name and Capacity Quantity Amount (PhP)
Day/s Rate
B. Equipment

Sub - Total for B 0.00


C. Sub - Total for C (B ÷ Area) 45.57
D. Output = 1.00 l.s.
E. Direct Unit Cost (A ÷ D) + C 45.57
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Pre-cast Moulding m 1.00 190.00 190.00

Sub - Total for F 190.00


G. Direct Unit Cost (E + F) 235.57
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 28.27
I. Contractor's Profit (CP) 10% of G 23.56
J. Value Added Tax (VAT) 5% of (G + H + I) 14.37
K. Total Unit Cost (G + H + I + J) 301.77
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1016(1)a Waterproofing (Cement-Base)


Unit of Measurement : m2
Output per hour : 1.875

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost)

Sub - Total for B 0.00


C. Total (A + B) 201.11
D. Output per Hour = 1.875 m2
E. Direct Unit Cost (C ÷ D) 107.26
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Cement Based Waterproofing m2 1.050 438.00 459.90

Sub - Total for F 459.90


G. Direct Unit Cost (E + F) 567.16
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 68.06
I. Contractor's Profit (CP) 10% of G 56.72
J. Value Added Tax (VAT) 5% of (G + H + I) 34.60
K. Total Unit Cost (G + H + I + J) 726.53
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1018(1) Glazed Tiles and Trims


Unit of Measurement : m2
Output per hour : 1.365

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 5 1.00 63.79 318.95
c. Unskilled Laborer 5 1.00 49.20 246.00

Sub - Total for A 653.07


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 65.31

Sub - Total for B 65.31


C. Total (A + B) 718.38
D. Output per Hour = 1.365 m2
E. Direct Unit Cost (C ÷ D) 526.28
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Glazed Tiles m2 1.050 468.00 491.40


b. Cement bags 0.325 272.00 88.40
c. Sand m3 0.026 1,045.00 27.43
d. Tile Grout bags 0.125 250.00 31.25
e. Tile Adhesive (25 kg) bags 0.143 250.00 35.75
f. Consumables (3% of Materials Cost) 20.23

Sub - Total for F 694.46


G. Direct Unit Cost (E + F) 1,220.74
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 146.49
I. Contractor's Profit (CP) 10% of G 122.07
J. Value Added Tax (VAT) 5% of (G + H + I) 74.47
K. Total Unit Cost (G + H + I + J) 1,563.77
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1018(2) Unglazed Tiles


Unit of Measurement : m2
Output per hour : 1.95

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 5 1.00 63.79 318.95
c. Unskilled Laborer 5 1.00 49.20 246.00

Sub - Total for A 653.07


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 65.31

Sub - Total for B 65.31


C. Total (A + B) 718.38
D. Output per Hour = 1.95 m2
E. Direct Unit Cost (C ÷ D) 368.40
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Unglazed Tiles m2 1.050 459.00 481.95


b. Cement bags 0.325 272.00 88.40
c. Sand m3 0.026 1,045.00 27.43
d. Tile Grout bags 0.125 250.00 31.25
e. Tile Adhesive (25 kg) bags 0.125 250.00 31.25
f. Consumable (3% of Materials Cost) 19.81

Sub - Total for F 680.09


G. Direct Unit Cost (E + F) 1,048.49
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 125.82
I. Contractor's Profit (CP) 10% of G 104.85
J. Value Added Tax (VAT) 5% of (G + H + I) 63.96
K. Total Unit Cost (G + H + I + J) 1,343.11
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1021(1)c Cement Floor Finish with Floor Hardener


Unit of Measurement : m2
Output per hour : 5.95

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 3 1.00 49.20 147.60

Sub - Total for A 299.51


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 29.95

Sub - Total for B 29.95


C. Total (A + B) 329.46
D. Output per Hour = 5.95 m2
E. Direct Unit Cost (C ÷ D) 55.37
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Cement bags 0.726 272.00 197.47


b. Sand m3 0.055 1,045.00 57.48
c. Floor Hardener bags 0.050 250.00 12.50

Sub - Total for F 267.45


G. Direct Unit Cost (E + F) 322.82
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 38.74
I. Contractor's Profit (CP) 10% of G 32.28
J. Value Added Tax (VAT) 5% of (G + H + I) 19.69
K. Total Unit Cost (G + H + I + J) 413.53
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1027(1) Cement Plaster Finish


Unit of Measurement : m2
Output per hour : 7.125

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 2 1.00 63.79 127.58
c. Unskilled Laborer 4 1.00 49.20 196.80

Sub - Total for A 412.50


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 41.25

Sub - Total for B 41.25


C. Total (A + B) 453.75
D. Output per Hour = 7.125 m2
E. Direct Unit Cost (C ÷ D) 63.68
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Cement bag 0.330 272.00 89.76


b. Sand cu.m 0.027 1,045.00 27.69

Sub - Total for F 117.45


G. Direct Unit Cost (E + F) 181.14
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 21.74
I. Contractor's Profit (CP) 10% of G 18.11
J. Value Added Tax (VAT) 5% of (G + H + I) 11.05
K. Total Unit Cost (G + H + I + J) 232.04
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1038(1) Reflective Insulation


Unit of Measurement : m2
Output per hour : 5.56

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 2 1.00 49.20 98.40

Sub - Total for A 250.31


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 25.03

Sub - Total for B 25.03


C. Total (A + B) 275.34
D. Output per Hour = 7.125 m2
E. Direct Unit Cost (C ÷ D) 49.52
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Reflective Insulation, 10 mm thck m2 1.000 135.00 135.00


b. Consumables (5% of Materials Cost) 6.75

Sub - Total for F 141.75


G. Direct Unit Cost (E + F) 191.27
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 22.95
I. Contractor's Profit (CP) 10% of G 19.13
J. Value Added Tax (VAT) 5% of (G + H + I) 11.67
K. Total Unit Cost (G + H + I + J) 245.02
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1051(6) Railings


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 65.11 88.12 5,737.49


b. Skilled Laborer 1 65.11 63.79 4,153.37
c. Unskilled Laborer 2 65.11 49.20 6,406.82

Sub - Total for A 16,297.68


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Welding Machine 1 48.83 391.00 19,092.53


b. Cutting Outfit 1 16.28 45.45 739.93
Minor Tools (10% of labor cost) 1,629.77

Sub - Total for B 21,462.22


C. Total (A + B) 37,759.91
D. Output per Hour = 1 l.s
E. Direct Unit Cost (C ÷ D) 37,759.91
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 50 mm Ø G.I. Pipe pc 64.00 2,300.00 147,200.00


b. Square Bar, 19mm kg 5499.23 45.00 247,465.24
c. Square Bar, 12mm kg 197.16 45.00 8,872.40
d. Welding Rod kg 169.00 160.00 27,040.00
e. Consumables (5% of material cost) 21,528.88

Sub - Total for F 452,106.52


G. Direct Unit Cost (E + F) 489,866.43
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 58,783.97
I. Contractor's Profit (CP) 10% of G 48,986.64
J. Value Added Tax (VAT) 5% of (G + H + I) 29,881.85
K. Total Unit Cost (G + H + I + J) 627,518.90
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1032(1)a Painting Works (Masonry/Concrete)


Unit of Measurement : m2
Output per hour : 2.10

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 2 1.00 63.79 127.58
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 264.90


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 26.49

Sub - Total for B 26.49


C. Total (A + B) 291.39
D. Output per Hour = 2.10 m2
E. Direct Unit Cost (C ÷ D) 138.76
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Concrete Neutralizer gal 0.08 412.32 32.99


b. Concrete Sealer/Primer gal 0.04 749.00 29.96
c. Patching Compound gal 0.05 550.00 27.50
d. Semi Gloss Latex (two coats) gal 0.08 900.00 72.00
e. Consumables (5% of Materials Cost) 8.12

Sub - Total for F 170.57


G. Direct Unit Cost (E + F) 309.33
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 37.12
I. Contractor's Profit (CP) 10% of G 30.93
J. Value Added Tax (VAT) 5% of (G + H + I) 18.87
K. Total Unit Cost (G + H + I + J) 396.25
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1032(1)b Painting Works (Wood)


Unit of Measurement : m2
Output per hour : 1.89

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 2 1.00 63.79 127.58
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 264.90


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 26.49

Sub - Total for B 26.49


C. Total (A + B) 291.39
D. Output per Hour = 1.89 m2
E. Direct Unit Cost (C ÷ D) 154.17
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Glazzing Putty gal 0.05 550.00 27.50


b. Flat Wall Enamel gal 0.04 908.00 36.32
c. Enamel Quick Dry gal 0.04 908.00 36.32
d. Paint Thinner gal 0.01 500.00 5.00
e. Consumables (5% of Materials Cost) 5.26

Sub - Total for F 110.40


G. Direct Unit Cost (E + F) 264.57
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 31.75
I. Contractor's Profit (CP) 10% of G 26.46
J. Value Added Tax (VAT) 5% of (G + H + I) 16.14
K. Total Unit Cost (G + H + I + J) 338.92
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1032(1)c Painting Works (Steel)


Unit of Measurement : m2
Output per hour : 2.00

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 2 1.00 63.79 127.58
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 264.90


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 26.49

Sub - Total for B 26.49


C. Total (A + B) 291.39
D. Output per Hour = 2.00 m2
E. Direct Unit Cost (C ÷ D) 145.70
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Red Oxide Primer gal 0.04 618.00 24.72


b. Enamel Paint gal 0.10 908.00 90.80
c. Paint thinner L 0.25 125.00 31.25
d. Consumables (5% of Materials Cost) 7.34

Sub - Total for F 154.11


G. Direct Unit Cost (E + F) 299.80
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 35.98
I. Contractor's Profit (CP) 10% of G 29.98
J. Value Added Tax (VAT) 5% of (G + H + I) 18.29
K. Total Unit Cost (G + H + I + J) 384.05
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1014(1)b1 Prepainted Metal Sheets, Long Span, Corrugated, 0.4 mm thk
Unit of Measurement : m2
Output per hour : 2.076

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 2 1.00 49.20 98.40

Sub - Total for A 250.31


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 25.03

Sub - Total for B 25.03


C. Total (A + B) 275.34
D. Output per Hour = 2.076 m2
E. Direct Unit Cost (C ÷ D) 132.63
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Prepainted Metal Sheets ( Corrugated, Long


m2 1.05 494.00 518.70
Span,0.4mm thk)
b. J-bolt with washers pc 10 4.50 45.00
c. Consumables (3% of Materials Cost) 16.91

Sub - Total for F 580.61


G. Direct Unit Cost (E + F) 713.24
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 85.59
I. Contractor's Profit (CP) 10% of G 71.32
J. Value Added Tax (VAT) 5% of (G + H + I) 43.51
K. Total Unit Cost (G + H + I + J) 913.66
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1013(2)a1 Fabricated Metal Roofing Accessory (Ridge Roll, 0.5 mm thk.)
Unit of Measurement : l.m.
Output per hour : 10.00

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output per Hour = 10.00 l.m.
E. Direct Unit Cost (C ÷ D) 22.12
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Ridge Roll m 1.05 250.00 262.50


b. Blind Rivets pc 19.00 1.50 28.50
c. Consumables (3% of Materials Cost) 8.73

Sub - Total for F 299.73


G. Direct Unit Cost (E + F) 321.85
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 38.62
I. Contractor's Profit (CP) 10% of G 32.19
J. Value Added Tax (VAT) 5% of (G + H + I) 19.63
K. Total Unit Cost (G + H + I + J) 412.29
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1013(2)a2 Fabricated Metal Roofing Accessory (Flashing, 0.6 mm thk.)
Unit of Measurement : l.m.
Output per hour : 10.00

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output per Hour = 10.00 l.m.
E. Direct Unit Cost (C ÷ D) 22.12
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Flashing m 1.05 395.00 414.75


b. Blind Rivets pc 19.00 1.50 28.50
c. Consumables (3% of Materials Cost) 13.30

Sub - Total for F 456.55


G. Direct Unit Cost (E + F) 478.67
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 57.44
I. Contractor's Profit (CP) 10% of G 47.87
J. Value Added Tax (VAT) 5% of (G + H + I) 29.20
K. Total Unit Cost (G + H + I + J) 613.18
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1013(2)b1 Fabricated Metal Roofing Accessory (Gutter, 0.6 mm thk.)
Unit of Measurement : l.m.
Output per hour : 11.80

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output per Hour = 11.80 l.m.
E. Direct Unit Cost (C ÷ D) 18.75
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Gutter (0.6 mm) m 1.00 434.00 434.00


b. 12" x 1" Plain GI Strap pc 3.00 40.00 120.00
b. Blind Rivets pc 16.00 1.50 24.00
c. Consumables (3% of Materials Cost) 17.34

Sub - Total for F 595.34


G. Direct Unit Cost (E + F) 614.09
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 73.69
I. Contractor's Profit (CP) 10% of G 61.41
J. Value Added Tax (VAT) 5% of (G + H + I) 37.46
K. Total Unit Cost (G + H + I + J) 786.65
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1047(2)a Structural Steel, Trusses


Unit of Measurement : kg
Output per hour : 85.00

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

Fabrication
a. Construction Foreman 1 1.00 88.12 88.12
b. Skilled Laborer 2 1.00 63.79 127.58
c. Unskilled Laborer 2 1.00 49.20 98.40

Erection
a. Skilled Laborer 3 0.50 63.79 95.69
b. Unskilled Laborer 3 0.50 49.20 73.80

Sub - Total for A 483.59


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Welding Machine 1 0.75 391.00 293.25


b. Cutting Outfit 1 0.25 45.45 11.36
Minor Tools (10 % of Labor Cost) 48.36

Sub - Total for B 352.97


C. Total (A + B) 836.56
D. Output per Hour = 85.00 kg
E. Direct Unit Cost (C ÷ D) 9.84
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Structural Steel Truss kg 1.00 75.00 75.00


b. Acetylene kg 0.011 150.00 1.65
c. Oxygen kg 0.022 120.00 2.64
d. Welding Rod kg 0.020 160.00 3.20
e. Consumables (5% of Materials Cost) 0.00

Sub - Total for F 82.49


G. Direct Unit Cost (E + F) 92.33
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 11.08
I. Contractor's Profit (CP) 10% of G 9.23
J. Value Added Tax (VAT) 5% of (G + H + I) 5.63
K. Total Unit Cost (G + H + I + J) 118.28
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1047(2)b Structural Steel Purlins


Unit of Measurement : kg
Output per hour : 90.45

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 2 1.00 63.79 127.58
c. Unskilled Laborer 4 1.00 49.20 196.80

Sub - Total for A 412.50


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Welding Machine 2 1.00 391.00 782.00


Minor Tools (10% of Labor Cost) 41.25

Sub - Total for B 823.25


C. Total (A + B) 1,235.75
D. Output per Hour = 90.45 kg
E. Direct Unit Cost (C ÷ D) 13.66
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Structural Steel Purlins kg 1.05 75.00 78.75


b. Welding Rod kg 0.02 160.00 3.20
c. Consumables (5% of Materials Cost) 0.00

Sub - Total for F 81.95


G. Direct Unit Cost (E + F) 95.61
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 11.47
I. Contractor's Profit (CP) 10% of G 9.56
J. Value Added Tax (VAT) 5% of (G + H + I) 5.83
K. Total Unit Cost (G + H + I + J) 122.48
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1047(3)a Bolts


Unit of Measurement : kg
Output per hour : 7.87

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (1% of Labor Cost) 0.20

Sub - Total for B 0.20


C. Total (A + B) 201.31
D. Output = 7.87 kg
E. Direct Unit Cost (C ÷ D) 25.58
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Bolts pc 1.00 144.00 144.00

Sub - Total for F 144.00


G. Direct Unit Cost (E + F) 169.58
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 20.35
I. Contractor's Profit (CP) 10% of G 16.96
J. Value Added Tax (VAT) 5% of (G + H + I) 10.34
K. Total Unit Cost (G + H + I + J) 217.23
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1047(6) Metal Structure Accessories (Steel Plates)


Unit of Measurement : kg
Output per hour : 12.995

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output per Hour = 12.995 kg
E. Direct Unit Cost (C ÷ D) 17.02
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Steel Plates kg 1.05 50.00 52.50


b. Consumables (3% of Materials Cost) 1.58

Sub - Total for F 54.08


G. Direct Unit Cost (E + F) 71.10
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 8.53
I. Contractor's Profit (CP) 10% of G 7.11
J. Value Added Tax (VAT) 5% of (G + H + I) 4.34
K. Total Unit Cost (G + H + I + J) 91.08
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1047(7)b Metal Structure Accessories (Sagrods)


Unit of Measurement : kg
Output : 12.995

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output per Hour = 12.995 kg
E. Direct Unit Cost (C ÷ D) 17.02
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Sagrod with nuts and bolts kg 1.05 45.00 47.25

Sub - Total for F 47.25


G. Direct Unit Cost (E + F) 64.27
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 7.71
I. Contractor's Profit (CP) 10% of G 6.43
J. Value Added Tax (VAT) 5% of (G + H + I) 3.92
K. Total Unit Cost (G + H + I + J) 82.33
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1047(4) Metal Structure Accessories (Cross Bracing)


Unit of Measurement : kg
Output per hour : 12.995

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output per Hour = 12.995 kg
E. Direct Unit Cost (C ÷ D) 17.02
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Cross Bracing kg 1.05 45.00 47.25


b. Consumables (3% of Material Cost) 1.42

Sub - Total for F 48.67


G. Direct Unit Cost (E + F) 65.69
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 7.88
I. Contractor's Profit (CP) 10% of G 6.57
J. Value Added Tax (VAT) 5% of (G + H + I) 4.01
K. Total Unit Cost (G + H + I + J) 84.15
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1047(3)c Metal Structure Accessories (Turnbuckle)


Unit of Measurement : ea.
Output per hour : 1.00

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 0.15 88.12 13.22


b. Skilled Laborer 1 0.15 63.79 9.57
c. Unskilled Laborer 1 0.15 49.20 7.38

Sub - Total for A 30.17


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 3.02

Sub - Total for B 3.02


C. Total (A + B) 33.18
D. Output = 1 ea
E. Direct Unit Cost (C ÷ D) 33.18
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Standard Turnbuckle pc 1.00 190.00 190.00

Sub - Total for F 190.00


G. Direct Unit Cost (E + F) 223.18
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 26.78
I. Contractor's Profit (CP) 10% of G 22.32
J. Value Added Tax (VAT) 5% of (G + H + I) 13.61
K. Total Unit Cost (G + H + I + J) 285.90
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(5)a Catch Basin


Unit of Measurement : ea.
Output per hour : 1.00

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.17 88.12 103.10


b. Skilled Laborer 1 1.17 63.79 74.63
c. Unskilled Laborer 1 1.17 49.20 57.56

Sub - Total for A 235.30


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 23.53

Sub - Total for B 23.53


C. Total (A + B) 258.83
D. Output = 1 ea
E. Direct Unit Cost (C ÷ D) 258.83
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Concrete m3 0.07 4,505.50 315.39


b. Reinforcement kg 10.16 48.35 491.26
c. Masonry m2 1.94 468.08 908.08
d. Finishing Works m2 2.30 117.45 270.14

Sub - Total for F 1,984.86


G. Direct Unit Cost (E + F) 2,243.69
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 269.24
I. Contractor's Profit (CP) 10% of G 224.37
J. Value Added Tax (VAT) 5% of (G + H + I) 136.87
K. Total Unit Cost (G + H + I + J) 2,874.17
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(8) Sewer Line Works


Unit of Measurement : l.s.
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 62.00 88.12 5,463.44


b. Skilled Laborer 1 62.00 63.79 3,954.98
c. Unskilled Laborer 2 62.00 49.20 6,100.80

Sub - Total for A 15,519.22


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment
Minor Tools (10% of labor cost) 1,551.92
Sub - Total for B 1,551.92
C. Total (A + B) 17,071.14
D. Output = 1
E. Direct Unit Cost (C ÷ D) 17,071.14
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. uPVC pipe, 150mm dia.x3m, S-1000 lengths 37.00 1,975.29 73,085.73


b. uPVC pipe, 100mm dia.x3m, S-1000 lengths 9.00 798.00 7,182.00
c. uPVC pipe, 50mm dia.x3m, S-1000 lengths 16.00 250.00 4,000.00
d. uPVC, 150mm Coupling pcs 34.00 358.79 12,198.86
e. uPVC, 100mm Coupling pcs 6.00 200.00 1,200.00
f. uPVC, 50mm Coupling pcs 10.00 45.00 450.00
g. Elbow, 100mm dia-90 degr bend pcs 4.00 95.00 380.00
h. Elbow, 50mm dia-90 deg bend pcs 8.00 48.00 384.00
i.Wye, 100mm dia. pcs 20.00 150.00 3,000.00
j. Wye Reducer, 100mm dia.-50mm dia pcs 8.00 130.00 1,040.00
k. uPVC Tee 100mm dia.x 100mm dia. pcs 20.00 480.00 9,600.00
l. Clean out with cover, 100mm dia. pcs 14.00 100.00 1,400.00
m. uPVC P-trap, 50mm dia. pcs 24.00 170.00 4,080.00
n. PVC cement cans 6.00 150.00 900.00
o. Consumables (5% of Pipe) 4,213.39
Sub - Total for F 123,113.98
G. Direct Unit Cost (E + F) 140,185.12
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 16,822.21
I. Contractor's Profit (CP) 10% of G 14,018.51
J. Value Added Tax (VAT) 5% of (G + H + I) 8,551.29
K. Total Unit Cost (G + H + I + J) 179,577.14
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(9) Storm Drainage and Downsprout


Unit of Measurement : l.s.
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 121.00 88.12 10,662.52


b. Skilled Laborer 2 121.00 63.79 15,437.18
c. Unskilled Laborer 4 121.00 49.20 23,812.80

Sub - Total for A 49,912.50


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 4,991.25

Sub - Total for B 4,991.25


C. Total (A + B) 54,903.75
D. Output = 1
E. Direct Unit Cost (C ÷ D) 54,903.75
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. PVC Drain Pipe, 75mm dia.x3m pcs 4.00 400.00 1,600.00


b. PVC Drain Pipe, 100mm dia.x3m pcs 89.00 798.00 71,022.00
c. PVC Drain Pipe, 150mm dia.x3m pcs 28.00 1,975.29 55,308.12
d. Roof Drain (Dome-type strainer) pcs 26.00 1,500.00 39,000.00
e.Coupling, 100mm dia. pcs 48.00 200.00 9,600.00
f.Elbow, 100mm dia.-45 deg bend pcs 52.00 61.00 3,172.00
g. PVC solvent, 400cc cans 2.00 150.00 300.00
h. Consumables 5% 6,396.51

Sub - Total for F 186,398.63


G. Direct Unit Cost (E + F) 241,302.38
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 28,956.29
I. Contractor's Profit (CP) 10% of G 24,130.24
J. Value Added Tax (VAT) 5% of (G + H + I) 14,719.44
K. Total Unit Cost (G + H + I + J) 309,108.34
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(11) Septic Vault


Unit of Measurement : l.s.
Output per hour : 1.00

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 61.25 88.12 5,396.93


b. Skilled Laborer 2 61.25 63.79 7,813.66
c. Unskilled Laborer 4 61.25 49.20 12,053.06

Sub - Total for A 25,263.65


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 2,526.37

Sub - Total for B 2,526.37


C. Total (A + B) 27,790.02
D. Output per Hour = 1 l.s.
E. Direct Unit Cost (C ÷ D) 27,790.02
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Concrete m3 13.38 4,505.50 60,270.07


b. Reinforcement Steel Bars kgs 1098.52 48.35 53,116.19
c. Plaster Finish m2 0.00 117.45 0.00
d. Cement-Base Waterproofing-Sahara bags 200.00 85.00 17,000.00

Sub - Total for F 130,386.26


G. Direct Unit Cost (E + F) 158,176.28
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 18,981.15
I. Contractor's Profit (CP) 10% of G 15,817.63
J. Value Added Tax (VAT) 5% of (G + H + I) 9,648.75
K. Total Unit Cost (G + H + I + J) 202,623.81
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1002(4) Plumbing Fixtures


Unit of Measurement : l.s.
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 163.25 88.12 14,385.59


b. Skilled Laborer 1 163.25 63.79 10,413.72
c. Unskilled Laborer 1 163.25 49.20 8,031.90

Sub - Total for A 32,831.21


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 3,283.12

Sub - Total for B 3,283.12


C. Total (A + B) 36,114.33
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 36,114.33
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Water Closet complete w/ fittings & accs. sets 20.00 7,500.00 150,000.00
b. Wall Hung Lavatory, complete w/ fittings & accs. sets 2.00 6,550.00 13,100.00
c. Concrete Counter Sink (3 Faucet) sets 8.00 6,028.00 48,224.00
d. Trough Urinal sets 4.00 9,500.00 38,000.00
e. Gate Valve, 50mm dia pcs 4.00 980.00 3,920.00
f. Gate Valve 32mm dia pcs 16.00 627.00 10,032.00
g. Check Valve, 50mm dia. pcs 1.00 954.00 954.00
h. S.S. Floor Drain 4'x4'' pcs 39.00 250.00 9,750.00
i. S.S. Sink Drain 4'x4'' pcs 15.00 250.00 3,750.00
j. S.S. Flip Up Down Grab Rail 1-1/2" dia. pcs 2.00 1,200.00 2,400.00
k. S.S. L-Type Grab Rail 1-1/2" dia. pcs 2.00 2,500.00 5,000.00
l. Mirror ft2 100.71 650.00 65,463.84
m. Faucet pcs 49.00 180.00 8,820.00
n. Consumables 5% 17,970.69

Sub - Total for F 377,384.53


G. Direct Unit Cost (E + F) 413,498.86
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 49,619.86
I. Contractor's Profit (CP) 10% of G 41,349.89
J. Value Added Tax (VAT) 5% of (G + H + I) 25,223.43
K. Total Unit Cost (G + H + I + J) 529,692.04
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1002(24) Cold Water Lines


Unit of Measurement : l.s.
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 45.00 88.12 3,965.40


b. Skilled Laborer 1 45.00 63.79 2,870.55
c. Unskilled Laborer 2 45.00 49.20 4,428.00

Sub - Total for A 11,263.95


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 1,126.40

Sub - Total for B 1,126.40


C. Total (A + B) 12,390.35
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 12,390.35
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. PPRC Pipe, 32mm dia. X 4m, PN 16 length 30.00 736.28 22,088.40


b. PPRC Pipe, 50mm dia. X 4m, PN 16 length 15.00 2,300.00 34,500.00
c. PP-R Coupling 32mm dia. pcs 31.00 19.75 612.25
d. PP-R Coupling 50mm dia. pcs 16.00 30.81 492.96
e. PP-R Elbow 32mm dia.- 90 deg pcs 75.00 31.60 2,370.00
f. PP-R Elbow 50mm dia.- 90 deg pcs 4.00 53.91 215.64
g. PP-R Tee 32mm dia. pcs 94.00 43.42 4,081.48
h. PP-R Tee 50mm dia. pcs 4.00 72.34 289.36
i.PP-R Elbow Reducer 50mmx32mm pcs 2.00 53.91 107.82
j. Consumables (5% of Pipe) 2,829.42

Sub - Total for F 67,587.33


G. Direct Unit Cost (E + F) 79,977.68
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 9,597.32
I. Contractor's Profit (CP) 10% of G 7,997.77
J. Value Added Tax (VAT) 5% of (G + H + I) 4,878.64
K. Total Unit Cost (G + H + I + J) 102,451.40
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1002(26) Cistern


Unit of Measurement : l.s.
Output : 1.00

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 410.67 88.12 36,188.24


b. Skilled Laborer 1 410.67 63.79 26,196.64
c. Unskilled Laborer 1 410.67 49.20 20,204.96

Sub - Total for A 82,589.84


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 8,258.98

Sub - Total for B 8,258.98


C. Total (A + B) 90,848.83
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 90,848.83
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Concrete length 75.76 4,505.50 341,336.68


b. Reinforcement length 3,708.43 48.35 179,311.86
c. Masonry pcs 81.01 468.08 37,919.16
d. Finishing Works pcs 81.01 117.45 9,514.83
e. Cement-based Waterproofing-Sahara pcs 129.01 459.90 59,331.70
f. .60 x .60 Manhole pcs 2.00 21,000.00 42,000.00

Sub - Total for F 669,414.23


G. Direct Unit Cost (E + F) 760,263.06
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 91,231.57
I. Contractor's Profit (CP) 10% of G 76,026.31
J. Value Added Tax (VAT) 5% of (G + H + I) 46,376.05
K. Total Unit Cost (G + H + I + J) 973,896.98
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1202(1) Fire Protection System


Unit of Measurement : l.s.
Output per hour : 1

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


A. Labor

a. Construction Foreman 1 172.25 88.12 15,178.67


b. Skilled Laborer 2 172.25 63.79 21,975.66
c. Unskilled Laborer 4 172.25 49.20 33,898.80

Sub - Total for A 71,053.13


Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment

Minor Tools (10% of labor cost) 7,105.31

Sub - Total for B 7,105.31


C. Total (A + B) 78,158.44
D. Output per Hour = 1 l.s.
E. Direct Unit Cost (C ÷ D) 78,158.44
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. G.I. Pipe 50mm dia sched. 40 length 6 2,300.00 13,800.00


b. G.I. Pipe 65mm dia sched. 40 length 7 3,000.00 21,000.00
c. Fittings (Elbow, Tee, Reducer, etc) l.s. 1 1,380.00 1,380.00
d. Fire Hose Cabinet with Fire
set 8 24,000.00 192,000.00
Extinguisher
e. Fire Extinguisher, 10 lbs Capacity,
set 28 6,825.00 191,100.00
Wall Mounted, HCFC 123
f. FDC Siamese Twin: Two-Way unit 1 6,500.00 6,500.00
g. Manual Pull Switch unit 8 1,500.00 12,000.00
h. Pull Box unit 8 1,250.00 10,000.00
i. Vibrating Bell outlet 230mm dia.,
unit 8 4,950.00 39,600.00
230V, 60Hz
j. Fire Alarm Control Panel set 1 14,584.00 14,584.00
k. Smoke Detector set 15 2,047.00 30,705.00

Sub - Total for F 532,669.00


G. Direct Unit Cost (E + F) 610,827.44
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 73,299.29
I. Contractor's Profit (CP) 10% of G 61,082.74
J. Value Added Tax (VAT) 5% of (G + H + I) 37,260.47
K. Total Unit Cost (G + H + I + J) 782,469.95
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1201(1) Water Pumping System


Unit of Measurement : l.s.
Output per hour : 1

No. of
No. of
Designation Person/ Hourly Rate Amount (PhP)
Hour/s
s
A. Labor

a. Construction Foreman 1 55 88.12 4,846.60


b. Skilled Laborer 2 55 63.79 7,016.90
c. Unskilled Laborer 4 55 49.20 10,824.00

Sub - Total for A 22,687.50


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of labor cost) 2,268.75

Sub - Total for B 2,268.75


C. Total (A + B) 24,956.25
D. Output per Hour = 1 l.s.
E. Direct Unit Cost (C ÷ D) 24,956.25
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. G.I. Pipe 75mm dia sched. 40 length 10 4,100.00 41,000.00


b. Fittings (Elbow, Tee, Reducer, etc) l.s. 1 4,100.00 4,100.00
c. Overhead Water Tank 1500 US Gal unit 2 120,000.00 240,000.00
d. End-Suction Centrifugal Water Pump, TDH 10m,
unit 2 31,300.00 62,600.00
1.5HP, 80GPM
e. Booster Pump, TDH 25m, 3HP, 80GPM unit 1 41,265.00 41,265.00

Sub - Total for F 388,965.00


G. Direct Unit Cost (E + F) 413,921.25
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 49,670.55
I. Contractor's Profit (CP) 10% of G 41,392.13
J. Value Added Tax (VAT) 5% of (G + H + I) 25,249.20
K. Total Unit Cost (G + H + I + J) 530,233.12
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1200(14) Ventilation


Unit of Measurement : l.s.
Output per hour : 1

No. of
No. of Amount
Designation Person/ Hourly Rate
Hour/s (PhP)
s
A. Labor

a. Construction Foreman 1 104 88.12 9,164.48


b. Skilled Laborer 2 104 63.79 13,268.32
c. Unskilled Laborer 4 104 49.20 20,467.20

Sub - Total for A 42,900.00


No. of No. of Amount
Name and Capacity Hourly Rate
Unit/s Hour/s (PhP)
B. Equipment

Minor Tools (10% of labor cost) 4,290.00

Sub - Total for B 4,290.00


C. Total (A + B) 47,190.00
D. Output per Hour = 1 l.s.
E. Direct Unit Cost (C ÷ D) 47,190.00
Amount
Name and Specification Unit Quantity Unit Cost
(PhP)
F. Materials

a. Fan outlet unit 97 280.00 27,160.00


b. Ceiling Fan with control switch, 60w, 230v, 60Hz unit 80 4,000.00 320,000.00
c. Exhaust Fan, grounding type, 15A, 230V unit 17 2,800.00 47,600.00
d. Air vent (Cost/area incorporated in item 1003(1)a1,
unit 48
ceiling)

Sub - Total for F 394,760.00


G. Direct Unit Cost (E + F) 441,950.00
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 53,034.00
I. Contractor's Profit (CP) 10% of G 44,195.00
J. Value Added Tax (VAT) 5% of (G + H + I) 26,958.95
K. Total Unit Cost (G + H + I + J) 566,137.95
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1100(10) Conduits, Boxes, and Fittings


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 40.01 88.12 3,525.68


b. Skilled Laborer 1 40.01 63.79 2,552.24
c. Unskilled Laborer 1 40.01 49.20 1,968.49

Sub - Total for A 8,046.41


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 804.64

Sub - Total for B 804.64


C. Total (A + B) 8,851.05
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 8,851.05

Name and Specification Unit Quantity Unit Cost Amount (PhP)

F. Materials

a. 15mmØ PVC conduit length 623.00 80.00 49,840.00


a. 20mmØ PVC conduit length 3.00 96.00 288.00
a. 40mmØ PVC conduit length 4.00 265.00 1,060.00
d. 50mmØ RSC conduit length 6.00 1,426.00 8,556.00
g. 15mmØ PVC adapter pc 524.00 8.00 4,192.00
g. 20mmØ PVC adapter pc 2.00 8.00 16.00
g. 40mmØ PVC adapter pc 4.00 20.00 80.00
g. 50mmØ RSC adapter pc 2.00 40.00 80.00
g. 15mmØ PVC elbow pc 220.00 30.00 6,600.00
g. 20mmØ PVC elbow pc 4.00 35.00 140.00
g. 40mmØ PVC elbow pc 4.00 48.00 192.00
d. 50mmØ RSC elbow p 2.00 483.70 967.40
j. 15mmØ locknut and bushing pc 170.00 45.00 7,650.00
k. 20mmØ locknut and bushing pc 4.00 45.00 180.00
k. 40mmØ locknut and bushing pc 2.00 30.70 61.40
k. 50mmØ locknut and bushing pc 2.00 36.15 72.30
o. Ulitiity box, deep type pc 114.00 65.00 7,410.00
p. junction box, deep type pc 271.00 75.00 20,325.00
r. 50mmØ entrance cap pc 2.00 380.00 760.00
r. 100mmØ entrance cap pc 4.00 684.00 2,736.00
r. 175mmØ entrance cap pc 1.00 900.00 900.00
s. 16mmØx2.4m ground rod pc 2.00 1,200.00 2,400.00

Sub - Total for F 114,506.10


G. Direct Unit Cost (E + F) 123,357.15
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 14,802.86
I. Contractor's Profit (CP) 10% of G 12,335.72
J. Value Added Tax (VAT) 5% of (G + H + I) 7,524.79
K. Total Unit Cost (G + H + I + J) 158,020.51
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1101(33) Wires and Wiring Devices


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 81.67 88.12 7,196.76


b. Skilled Laborer 1 81.67 63.79 5,209.73
c. Unskilled Laborer 1 81.67 49.20 4,018.16

Sub - Total for A 16,424.65


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 1,642.47

Sub - Total for B 1,642.47


C. Total (A + B) 18,067.12
D. Output = 1 l.s. .
E. Direct Unit Cost (C ÷ D) 18,067.12
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 2.0 mm2 THHN wire, stranded m 50.00 30.00 1500.00


a. 3.5mm2 THHN wire,stranded m 4407.00 35.00 154,245.00
b. 5.5mm2 THHN wire,stranded m 150.00 65.00 9,750.00
c. 8mm2 THHN wire,stranded m 432.00 65.00 28,080.00
d.22mm2 THHN wire,stranded m 42.00 156.00 6,552.00
e.30mm2 THHN wire,stranded m 300.00 210.00 63,000.00
f.60mm2 THHN wire,stranded m 100.00 462.00 46,200.00
g. one gang switch set 29.00 85.00 2,465.00
h. two gang switch set 35.00 98.00 3,430.00
i. three gang switch set 4.00 320.00 1,280.00
j. Three-way switch set 24.00 180.00 4,320.00
k. WP Duplex C.O. grounding type, 20A, 250V set 6.00 367.00 2,202.00
l. Duplex C.O. grounding type, 15A, 230V set 30.00 180.00 5,400.00
m. KWHR meter set 1.00 2,200.00 2,200.00
n. Tape, bolt&nut, mica tube, terminal lugs, JB lot 1.00 16,456.20 16,456.20
cover clamps, screw and anchors
Sub - Total for F 347,080.20
G. Direct Unit Cost (E + F) 365,147.32
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 43,817.68
I. Contractor's Profit (CP) 10% of G 36,514.73
J. Value Added Tax (VAT) 5% of (G + H + I) 22,273.99
K. Total Unit Cost (G + H + I + J) 467,753.72
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1102(1) Panel Boards with Main and Branch Breakers
Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 22.00 88.12 1,938.64


b. Skilled Laborer 1 22.00 63.79 1,403.38
c. Unskilled Laborer 2 22.00 49.20 2,164.80

Sub - Total for A 5,506.82


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 550.68

Sub - Total for B 550.68


C. Total (A + B) 6,057.50
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 6,057.50
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a.Distribution PanelBoard set 2.00 31,600.00 63,200.00


Main: 100at, 100af, 2p, 230v, 18 KAIC
Br.: 12 - 20at, 50af, 2p, 230v
a.Power PanelBoard set 1.00 11,450.00 11,450.00
Main: 30at, 50af, 2p, 230v, 18 KAIC
Br.: 3 - 30at, 50af, 2p, 230v
a.Main Distribution PanelBoard set 1.00 18,700.00 18,700.00
Main: 100at, 250af, 2p, 230v, 18 KAIC
Br.: 2 - 100at, 225af, 2p, 230v
3 - 30at, 50af, 2p, 230v

Sub - Total for F 93,350.00


G. Direct Unit Cost (E + F) 99,407.50
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 11,928.90
I. Contractor's Profit (CP) 10% of G 9,940.75
J. Value Added Tax (VAT) 5% of (G + H + I) 6,063.86
K. Total Unit Cost (G + H + I + J) 127,341.01
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1103(1) Lighting Fixtures and Lamps


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 50.75 88.12 4,472.09


b. Skilled Laborer 1 50.75 63.79 3,237.34
c. Unskilled Laborer 1 50.75 49.20 2,496.90

Sub - Total for A 10,206.33


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 1,020.63

Sub - Total for B 1,020.63


C. Total (A + B) 11,226.97
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 11,226.97
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 1 x 28, 230V Flourescent Lighting set 90.00 546.00 49,140.00


Fixture,
a. Box
2 x 28, Type
230V Flourescent Lighting set 120.00 980.00 117,600.00
Fixture,
d. 1 - 18Box Type
watts CFL w/ medium base set 9.00 320.00 2,880.00
keyless type porcelain receptacle

Sub - Total for F 169,620.00


G. Direct Unit Cost (E + F) 180,846.97
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 21,701.64
I. Contractor's Profit (CP) 10% of G 18,084.70
J. Value Added Tax (VAT) 5% of (G + H + I) 11,031.66
K. Total Unit Cost (G + H + I + J) 231,664.96
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 506(1) Stone Masonry


Unit of Measurement : cu.m
Output per hour : 1.6

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1 88.12 88.12


b. Skilled Laborer 2 1 63.79 127.58
c. Unskilled Laborer 8 1 49.20 393.60

Sub - Total for A 609.30


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. One Bagger Mixer 1 1 172.00 172.00


b. Water Truck/Pump (All Models, 1600L) 1 0.05 2,450.00 122.50
c. Backhoe, Wheel Mounted (0.28 m3) 1 0.1 922.00 92.20
d. Minor Tools (10% of Labor) 60.93

Sub - Total for B 447.63


C. Total (A + B) 1,056.93
D. Output per Hour = 1.6 cu.m
E. Direct Unit Cost (C ÷ D) 660.58
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

Cement bag 5.5 272.00 1,496.00


Sand cu.m. 0.3 1,045.00 313.50
Gravel Fill cu.m. 0.02 1,127.00 22.54
Weep Holes (PVC) l.m. 0.3 108.33 32.50
Filter Cloth sq.m. 0.015 160.00 2.40
Boulders cu.m. 1.05 1,065.00 1,118.25
Miscellaneous (1% of Materials) 29.85

Sub - Total for F 3,015.04


G. Direct Unit Cost (E + F) 3,675.62
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 441.07
I. Contractor's Profit (CP) 8% of G 294.05
J. Value Added Tax (VAT) 5% of (G + H + I) 220.54
K. Total Unit Cost (G + H + I + J) 4,631.28
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1013(2)b1 Fabricated Metal Roofing Accessory (Gutter, 0.6 mm thk.)
Unit of Measurement : l.m.
Output per hour : 11.8

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1 88.12 88.12


b. Skilled Laborer 1 1 63.79 63.79
c. Unskilled Laborer 1 1 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output per Hour = 11.80 l.m.
E. Direct Unit Cost (C ÷ D) 18.75
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Gutter (0.6 mm) m 1 434.00 434.00


b. 12" x 1" Plain GI Strap pc 3 40.00 120.00
c. Blind Rivets pc 16 1.50 24.00
d. Consumables (3% of Materials Cost) 17.34

Sub - Total for F 595.34


G. Direct Unit Cost (E + F) 614.09
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 73.69
I. Contractor's Profit (CP) 10% of G 61.41
J. Value Added Tax (VAT) 5% of (G + H + I) 37.46
K. Total Unit Cost (G + H + I + J) 786.65
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1003(11)a1 Fascia Board (Fiber Cement Board)


Unit of Measurement : m
Output per hour : 3.6

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 0.5 88.12 44.06


b. Skilled Laborer 1 0.5 63.79 31.90

Sub - Total for A 75.96


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 7.60

Sub - Total for B 7.60


C. Total (A + B) 83.55
D. Output per Hour = 3.6 m
E. Direct Unit Cost (C ÷ D) 23.21
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 12 x 300mm Fiber Cement Board m 1 145.00 145.00


b. 1" Metal Screws pc. 12 3.00 36.00
c. Consumables (5% of Materials Cost) 9.05

Sub - Total for F 190.05


G. Direct Unit Cost (E + F) 213.26
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 25.59
I. Contractor's Profit (CP) 10% of G 21.33
J. Value Added Tax (VAT) 5% of (G + H + I) 13.01
K. Total Unit Cost (G + H + I + J) 273.18
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1202(1) Fire Protection System


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 163.25 88.12 14,385.59


b. Skilled Laborer 2 163.25 63.79 20,827.44
c. Unskilled Laborer 4 163.25 49.20 32,127.60

Sub - Total for A 67,340.63


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of labor cost) 6,734.06

Sub - Total for B 6,734.06


C. Total (A + B) 74,074.69
D. Output per Hour = 1 l.s.
E. Direct Unit Cost (C ÷ D) 74,074.69
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. G.I. Pipe 75mm dia sched. 40 length 9 4,100.00 36,900.00


b. G.I. Pipe 65mm dia sched. 40 length 4 3,000.00 12,000.00
c. G.I. Pipe 50mm dia sched. 40 length 2 2,300.00 4,600.00
d. Fittings (Elbow, Tee, Reducer, etc) l.s. 1 4,890.00 4,890.00
e. Fire Hose Cabinet with Fire Extinguisher set 4 24,000.00 96,000.00
f. Fire Extinguisher, 10 lbs Capacity, Wall Mounted, HCFC 123 set 8 6,825.00 54,600.00
g. FDC Siamese Twin: Two-Way unit 1 6,500.00 6,500.00
h. Overhead Water Tank 2000 US Gal unit 2 167,000.00 334,000.00
i. Concrete m³ 15.45 6,434.06 99,406.16
j. Rebar kg 648.9 57.98 37,621.47
k. Plaster Finish m² 66 181.14 11,955.02
l. Cement Based Waterproofing bag 159 50.00 7,950.00
m. .60 x .60 Manhole ea 2 21,000.00 42,000.00
n. End-Suction Centrifugal Water Pump, TDH 10m, 1.5HP, 80GPM unit 2 31,300.00 62,600.00
o. Booster Pump, TDH 25m, 3HP, 80GPM unit 1 41,265.00 41,265.00

Sub - Total for F 852,287.65


G. Direct Unit Cost (E + F) 926,362.34
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 111,163.48
I. Contractor's Profit (CP) 10% of G 92,636.23
J. Value Added Tax (VAT) 5% of (G + H + I) 56,508.10
K. Total Unit Cost (G + H + I + J) 1,186,670.16
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1208(1) Fire Alarm System


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Skilled Laborer 1 31 63.79 1,977.49


b. Unskilled Laborer 1 31 49.20 1,525.20

Sub - Total for A 3,502.69


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 350.27

Sub - Total for B 350.27


C. Total (A + B) 3,852.96
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 3,852.96
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Fire Alarm Control Panel set 1 14,584.00 14,584.00


b. Manual Pull Switch set 4 1,680.00 6,720.00
c. Bell, Vibrating Type set 4 1,470.00 5,880.00

Sub - Total for F 27,184.00


G. Direct Unit Cost (E + F) 31,036.96
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 3,724.44
I. Contractor's Profit (CP) 10% of G 3,103.70
J. Value Added Tax (VAT) 5% of (G + H + I) 1,893.25
K. Total Unit Cost (G + H + I + J) 39,758.34
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : II.7 Occupational Safety and Health (15 CL)


Unit of Measurement : lot
Output : 1

No. of
Designation No. of Person/s Daily Rate Amount (PhP)
Day/s
A. Labor

a. Part Time Safety Officer 1 12.00 510.32 6,123.84

Sub - Total for A 6,123.84


Name and Capacity Unit Quantity Daily Rate Amount (PhP)
B. Equipment

Sub - Total for B


C. Total (A + B) 6,123.84
D. Output = 1 mo.
E. Direct Unit Cost (C ÷ D) 6,123.84
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

First Aid Kit l.s. 1.00 1,000.00 1,000.00

Personal Protective Equipment(PPE)


a. Safety Helmet man-days 12,254.00 0.25 3,063.50
b. Safety Shoes man-days 12,254.00 2.77 33,943.58
c. Safety Gloves man-days 12,254.00 7.67 93,988.18

Signages and Barricades


a. PPE Signage (4' x 8') set 1.00 506.37 506.37
b. Safety First (4' x 4') set 1.00 270.87 270.87
c. Warning Signs (2' x 3') sets 28.00 123.68 3,463.04
d. Caution Tape, 100ft roll 1.00 800.00 800.00

Sub - Total for F 137,035.54


G. Direct Unit Cost (E + F) 143,159.38
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G 0.00
I. Contractor's Profit (CP) 8% of G 11,452.75
J. Value Added Tax (VAT) 5% of (G + H + I) 7,730.61
K. Total Unit Cost (G + H + I + J) 162,342.74
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : II.7 Occupational Safety and Health (10 CL)


Unit of Measurement : lot
Output : 1

No. of
Designation No. of Person/s Daily Rate Amount (PhP)
Day/s
A. Labor

a. Part Time Safety Officer 1 12.00 510.32 6,123.84

Sub - Total for A 6,123.84


Name and Capacity Unit Quantity Daily Rate Amount (PhP)
B. Equipment

Sub - Total for B


C. Total (A + B) 6,123.84
D. Output = 1 mo.
E. Direct Unit Cost (C ÷ D) 6,123.84
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

First Aid Kit l.s. 1.00 1,000.00 1,000.00

Personal Protective Equipment(PPE)


a. Safety Helmet man-days 11,066.00 0.25 2,766.50
b. Safety Shoes man-days 11,066.00 2.77 30,652.82
c. Safety Gloves man-days 11,066.00 7.67 84,876.22

Signages and Barricades


a. PPE Signage (4' x 8') set 1.00 506.37 506.37
b. Safety First (4' x 4') set 1.00 270.87 270.87
c. Warning Signs (2' x 3') sets 27.00 123.68 3,339.36
d. Caution Tape, 100ft roll 1.00 800.00 800.00

Sub - Total for F 124,212.14


G. Direct Unit Cost (E + F) 130,335.98
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G 0.00
I. Contractor's Profit (CP) 8% of G 10,426.88
J. Value Added Tax (VAT) 5% of (G + H + I) 7,038.14
K. Total Unit Cost (G + H + I + J) 147,801.00
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : II.7 Occupational Safety and Health (9 CL)


Unit of Measurement : lot
Output : 1

No. of
Designation No. of Person/s Daily Rate Amount (PhP)
Day/s
A. Labor

a. Part Time Safety Officer 1 10.00 510.32 5,103.20

Sub - Total for A 5,103.20


Name and Capacity Unit Quantity Daily Rate Amount (PhP)
B. Equipment

Sub - Total for B


C. Total (A + B) 5,103.20
D. Output = 1 mo.
E. Direct Unit Cost (C ÷ D) 5,103.20
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

First Aid Kit l.s. 1.00 1,000.00 1,000.00

Personal Protective Equipment(PPE)


a. Safety Helmet man-days 7,920.00 0.25 1,980.00
b. Safety Shoes man-days 7,920.00 2.77 21,938.40
c. Safety Gloves man-days 7,920.00 7.67 60,746.40

Signages and Barricades


a. PPE Signage (4' x 8') set 1.00 506.37 506.37
b. Safety First (4' x 4') set 1.00 270.87 270.87
c. Warning Signs (2' x 3') sets 24.00 123.68 2,968.32
d. Caution Tape, 100ft roll 0.50 800.00 400.00

Sub - Total for F 89,810.36


G. Direct Unit Cost (E + F) 94,913.56
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G 0.00
I. Contractor's Profit (CP) 8% of G 7,593.08
J. Value Added Tax (VAT) 5% of (G + H + I) 5,125.33
K. Total Unit Cost (G + H + I + J) 107,631.98
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : II.7 Occupational Safety and Health (6 CL)


Unit of Measurement : lot
Output : 1

No. of
Designation No. of Person/s Daily Rate Amount (PhP)
Day/s
A. Labor

a. Part Time Safety Officer 1 8.00 510.32 4,082.56

Sub - Total for A 4,082.56


Name and Capacity Unit Quantity Daily Rate Amount (PhP)
B. Equipment

Sub - Total for B


C. Total (A + B) 4,082.56
D. Output = 1 mo.
E. Direct Unit Cost (C ÷ D) 4,082.56
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

First Aid Kit l.s. 1.00 1,000.00 1,000.00

Personal Protective Equipment(PPE)


a. Safety Helmet man-days 6,776.00 0.25 1,694.00
b. Safety Shoes man-days 6,766.00 2.77 18,741.82
c. Safety Gloves man-days 6,766.00 7.67 51,895.22

Signages and Barricades


a. PPE Signage (4' x 8') set 1.00 506.37 506.37
b. Safety First (4' x 4') set 1.00 270.87 270.87
c. Warning Signs (2' x 3') sets 18.00 123.68 2,226.24
d. Caution Tape, 100ft roll 0.50 800.00 400.00

Sub - Total for F 76,734.52


G. Direct Unit Cost (E + F) 80,817.08
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G 0.00
I. Contractor's Profit (CP) 8% of G 6,465.37
J. Value Added Tax (VAT) 5% of (G + H + I) 4,364.12
K. Total Unit Cost (G + H + I + J) 91,646.57
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : II.7 Occupational Safety and Health (3 CL)


Unit of Measurement : lot
Output : 1

No. of
Designation No. of Person/s Daily Rate Amount (PhP)
Day/s
A. Labor

a. Part Time Safety Officer 1 8.00 510.32 4,082.56

Sub - Total for A 4,082.56


Name and Capacity Unit Quantity Daily Rate Amount (PhP)
B. Equipment

Sub - Total for B


C. Total (A + B) 4,082.56
D. Output = 1 lot
E. Direct Unit Cost (C ÷ D) 4,082.56
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

First Aid Kit l.s. 1.00 1,000.00 1,000.00

Personal Protective Equipment(PPE)


a. Safety Helmet man-days 5,610.00 0.25 1,402.50
b. Safety Shoes man-days 5,610.00 2.77 15,539.70
c. Safety Gloves man-days 5,610.00 7.67 43,028.70

Signages and Barricades


a. PPE Signage (4' x 8') set 1.00 506.37 506.37
b. Safety First (4' x 4') set 1.00 270.87 270.87
c. Warning Signs (2' x 3') sets 10.00 123.68 1,236.80
d. Caution Tape, 100ft roll 0.50 800.00 400.00

Sub - Total for F 63,384.94


G. Direct Unit Cost (E + F) 67,467.50
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G 0.00
I. Contractor's Profit (CP) 8% of G 5,397.40
J. Value Added Tax (VAT) 5% of (G + H + I) 3,643.25
K. Total Unit Cost (G + H + I + J) 76,508.15
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : II.9 Mobilization/Demobilization (15 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

Sub - Total for A -


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Mobilization/ Demobilization (0.75% of Civil Works) 191,307.32

Sub - Total for B 191,307.32


C. Total (A + B) 191,307.32
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 191,307.32
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

G. Direct Unit Cost (E + F) 191,307.32


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G -
I. Contractor's Profit (CP) 8% of G 15,304.59
J. Value Added Tax (VAT) 5% of (G + H + I) 10,330.60
K. Total Unit Cost (G + H + I + J) 216,942.50
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : II.9 Mobilization/Demobilization (12 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

Sub - Total for A -


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Mobilization/ Demobilization (0.75% of Civil Works) 166,546.33

Sub - Total for B 166,546.33


C. Total (A + B) 166,546.33
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 166,546.33
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

G. Direct Unit Cost (E + F) 166,546.33


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G -
I. Contractor's Profit (CP) 8% of G 13,323.71
J. Value Added Tax (VAT) 5% of (G + H + I) 8,993.50
K. Total Unit Cost (G + H + I + J) 188,863.54
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : II.9 Mobilization/Demobilization (12 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

Sub - Total for A 0.00


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Mobilization/ Demobilization (0.75% of Civil Works) 138,501.39

Sub - Total for B 138,501.39


C. Total (A + B) 138,501.39
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 138,501.39
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

G. Direct Unit Cost (E + F) 138,501.39


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G 0.00
I. Contractor's Profit (CP) 8% of G 11,080.11
J. Value Added Tax (VAT) 5% of (G + H + I) 7,479.08
K. Total Unit Cost (G + H + I + J) 157,060.58
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : II.9 Mobilization/Demobilization (12 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

Sub - Total for A 0.00


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Mobilization/ Demobilization (0.75% of Civil Works) 77,155.07

Sub - Total for B 77,155.07


C. Total (A + B) 77,155.07
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 77,155.07
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

G. Direct Unit Cost (E + F) 77,155.07


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G 0.00
I. Contractor's Profit (CP) 8% of G 6,172.41
J. Value Added Tax (VAT) 5% of (G + H + I) 4,166.37
K. Total Unit Cost (G + H + I + J) 87,493.85
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : II.9 Mobilization/Demobilization (12 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

Sub - Total for A 0.00


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Mobilization/ Demobilization (0.75% of Civil Works) 54,219.25

Sub - Total for B 54,219.25


C. Total (A + B) 54,219.25
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 54,219.25
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

G. Direct Unit Cost (E + F) 54,219.25


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 0% of G 0.00
I. Contractor's Profit (CP) 8% of G 4,337.54
J. Value Added Tax (VAT) 5% of (G + H + I) 2,927.84
K. Total Unit Cost (G + H + I + J) 61,484.63
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 900(1)c1 Structural Concrete (Ready Mix, Class A, 28 days)


Unit of Measurement : m3
Output per hour : 3.72

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 2 1.00 63.79 127.58
c. Unskilled Laborer 6 1.00 49.20 295.20

Sub - Total for A 510.90


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Concrete Vibrator 2 1.00 91.25 182.50


b. Pumpcrete 1 0.27 2,076.00 560.52
Minor Tools (10% of Labor Cost) 51.09

Sub - Total for B 794.11


C. Total (A + B) 1,305.01
D. Output per Hour = 0.27 m3
E. Direct Unit Cost (C ÷ D) 350.81
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Ready Mix, Class A, 28 Days m3 1.00 5,739.00 5,739.00

Sub - Total for F 5,739.00


G. Direct Unit Cost (E + F) 6,089.81
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 730.78
I. Contractor's Profit (CP) 8% of G 487.18
J. Value Added Tax (VAT) 5% of (G + H + I) 365.39
K. Total Unit Cost (G + H + I + J) 7,673.16
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1053(2)a1 38 mm Ø G.I. Pipe Railings


Unit of Measurement : m
Output per hour : 6.255

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1 88.12 88.12


b. Skilled Laborer 1 1 63.79 63.79
c. Unskilled Laborer 2 1 49.20 98.40

Sub - Total for A 250.31


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Welding Machine 1 0.75 391.00 293.25


b. Cutting Outfit 1 0.25 45.45 11.36
Minor Tools (10% of labor cost) 25.03

Sub - Total for B 329.64


C. Total (A + B) 579.95
D. Output per Hour = 6.255 m
E. Direct Unit Cost (C ÷ D) 92.72
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 38 mm Ø G.I. Pipe pc 0.33 1,230.00 405.90


c. Welding Rod kg 0.015 160.00 2.40
d. Consumables (5% of material cost) 20.42

Sub - Total for F 428.72


G. Direct Unit Cost (E + F) 521.43
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 62.57
I. Contractor's Profit (CP) 8% of G 41.71
J. Value Added Tax (VAT) 5% of (G + H + I) 31.29
K. Total Unit Cost (G + H + I + J) 657.01
DETAILED UNIT PRICE ANALYSIS (DUPA)

50 mm Ø G.l. Pipe Handrail Fully Welded on vertical Railing on


Item No./Description : 1051(1)
19 mm bar stiffener
Unit of Measurement : m
Output per hour : 6.255

No. of No. of Amount


Designation Hourly Rate
Person/s Hour/s (PhP)
A. Labor

a. Construction Foreman 1 1 88.12 88.12


b. Skilled Laborer 1 1 63.79 63.79
c. Unskilled Laborer 2 1 49.20 98.40

Sub - Total for A 250.31


No. of Amount
Name and Capacity No of Unit/s Hourly Rate
Hour/s (PhP)
B. Equipment

a. Welding Machine 1 0.75 391.00 293.25


b. Cutting Outfit 1 0.25 45.45 11.36
Minor Tools (10% of labor cost) 25.03

Sub - Total for B 329.64


C. Total (A + B) 579.95
D. Output per Hour = 6.255 m
E. Direct Unit Cost (C ÷ D) 92.72
Amount
Name and Specification Unit Quantity Unit Cost
(PhP)
F. Materials

a. 50 mm Ø G.I. Steel Pipe pc 1 1,740.00 1,740.00


b. 19 mm bar kg 6.61 45.00 297.55
c. Welding Rod kg 0.015 160.00 2.40
d. Consumables (5% of material cost) 102.00

Sub - Total for F 2,141.95


G. Direct Unit Cost (E + F) 2,234.67
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 268.16
I. Contractor's Profit (CP) 8% of G 178.77
J. Value Added Tax (VAT) 5% of (G + H + I) 134.08
K. Total Unit Cost (G + H + I + J) 2,815.68
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1005(5) Steel Window (Window Grills)


Unit of Measurement : m2
Output per hour : 1.6

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

a. Welding Machine 1 0.25 391.00 97.75


Minor Tools (10% of Labor Cost) 20.11

Sub - Total for B 117.86


C. Total (A + B) 318.97
D. Output per Hour = 1.6 m2
E. Direct Unit Cost (C ÷ D) 199.36
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 12 mm x 12 mm square bar kg 12.56 45.00 565.20


b. 25 x 4 mm flat bar kg 2.08 45.00 93.60
c. Consumables (3% of Materials Cost) 19.76

Sub - Total for F 678.56


G. Direct Unit Cost (E + F) 877.92
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 105.35
I. Contractor's Profit (CP) 8% of G 70.23
J. Value Added Tax (VAT) 5% of (G + H + I) 52.68
K. Total Unit Cost (G + H + I + J) 1,106.18
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1010(1) Frames (Jambs, Sill, Head, Transoms and Mullions)
Unit of Measurement : set
Output : 1

No. of Amount
Designation No. of Person/s Hourly Rate
Hour/s (PhP)
A. Labor

a. Construction Foreman 1 2 88.12 176.24


b. Skilled Laborer 1 2 63.79 127.58
c. Unskilled Laborer 1 2 49.20 98.40

Sub - Total for A 402.22


No. of Amount
Name and Capacity No of Unit/s Hourly Rate
Hour/s (PhP)
B. Equipment

Minor Tools (10% of Labor Cost) 40.22

Sub - Total for B 40.22


C. Total (A + B) 442.44
D. Output = 1 set
E. Direct Unit Cost (C ÷ D) 442.44
Amount
Name and Specification Unit Quantity Unit Cost
(PhP)
F. Materials

a. Door Jambs set 1 2,000.00 2,000.00


b. Consumables (5% of Materials Cost) 100.00

Sub - Total for F 2,100.00


G. Direct Unit Cost (E + F) 2,542.44
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 305.09
I. Contractor's Profit (CP) 8% of G 203.40
J. Value Added Tax (VAT) 5% of (G + H + I) 152.55
K. Total Unit Cost (G + H + I + J) 3,203.48
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1010(2)b Wooden Panel Door


Unit of Measurement : m2
Output : 0.36

No. of Amount
Designation No. of Person/s Hourly Rate
Hour/s (PhP)
A. Labor

a. Construction Foreman 1 1 88.12 88.12


b. Skilled Laborer 1 1 63.79 63.79
c. Unskilled Laborer 1 1 49.20 49.20

Sub - Total for A 201.11


No. of Amount
Name and Capacity No of Unit/s Hourly Rate
Hour/s (PhP)
B. Equipment

Minor Tools (10% of Labor Cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output = 1 set
E. Direct Unit Cost (C ÷ D) 614.50
Amount
Name and Specification Unit Quantity Unit Cost
(PhP)
F. Materials

a. Wooden Door Panels m2 1 4,500.00 4,500.00

Sub - Total for F 4,500.00


G. Direct Unit Cost (E + F) 5,114.50
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 613.74
I. Contractor's Profit (CP) 8% of G 409.16
J. Value Added Tax (VAT) 5% of (G + H + I) 306.87
K. Total Unit Cost (G + H + I + J) 6,444.27
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1010(2)a Hollow Core Flush Door


Unit of Measurement : m2
Output : 0.32

No. of Amount
Designation No. of Person/s Hourly Rate
Hour/s (PhP)
A. Labor

a. Construction Foreman 1 1 88.12 88.12


b. Skilled Laborer 1 1 63.79 63.79
c. Unskilled Laborer 1 1 49.20 49.20

Sub - Total for A 201.11


No. of Amount
Name and Capacity No of Unit/s Hourly Rate
Hour/s (PhP)
B. Equipment

Minor Tools (10% of Labor Cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output = 1 set
E. Direct Unit Cost (C ÷ D) 691.32
Amount
Name and Specification Unit Quantity Unit Cost
(PhP)
F. Materials

a. Hollow Core Flush Door m2 1 650.00 650.00

Sub - Total for F 650.00


G. Direct Unit Cost (E + F) 1,341.32
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 160.96
I. Contractor's Profit (CP) 8% of G 107.31
J. Value Added Tax (VAT) 5% of (G + H + I) 80.48
K. Total Unit Cost (G + H + I + J) 1,690.06
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1004(2)g Hinges


Unit of Measurement : set
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

(Labor cost for these items are to be considered/included in the installation of doors, windows, and other
fabricated materials.)

Sub - Total for A


No. of
Name and Capacity No of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Sub - Total for B


C. Total (A + B)
D. Output = 1 set
E. Direct Unit Cost (C ÷ D)
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Hinges set 1 150.00 150.00

Sub - Total for F 150.00


G. Direct Unit Cost (E + F) 150.00
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 18.00
I. Contractor's Profit (CP) 8% of G 12.00
J. Value Added Tax (VAT) 5% of (G + H + I) 9.00
K. Total Unit Cost (G + H + I + J) 189.00
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1003(9) Carpentry and Joinery Works


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

Installation
a. Construction Foreman 1 45 88.12 3,965.40
b. Skilled Laborer 1 60 63.79 3,827.40
c. Unskilled Laborer 1 60 49.20 2,952.00

Sub - Total for A 10,744.80


No. of Daily Rental
Name and Capacity Quantity Amount (PhP)
Day/s Rate
B. Equipment

Minor Tools (10 % of Labor Cost) 1,074.48

Sub - Total for B 1,074.48


C. Total (A + B) 11,819.28
D. Output = 1 ls
E. Direct Unit Cost (C ÷ D) 11,819.28
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Blackboard set 15 3,100.00 46,500.00

Sub - Total for F 46,500.00


G. Direct Unit Cost (E + F) 58,319.28
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 6,998.31
I. Contractor's Profit (CP) 8% of G 4,665.54
J. Value Added Tax (VAT) 5% of (G + H + I) 3,499.16
K. Total Unit Cost (G + H + I + J) 73,482.29
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1003(9) Carpentry and Joinery Works


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

Installation
a. Construction Foreman 1 36 88.12 3,172.32
b. Skilled Laborer 1 48 63.79 3,061.92
c. Unskilled Laborer 1 48 49.20 2,361.60

Sub - Total for A 8,595.84


No. of Daily Rental
Name and Capacity Quantity Amount (PhP)
Day/s Rate
B. Equipment

Minor Tools (10 % of Labor Cost) 859.58

Sub - Total for B 859.58


C. Total (A + B) 9,455.42
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 9,455.42
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Blackboard set 12 3,100.00 37,200.00

Sub - Total for F 37,200.00


G. Direct Unit Cost (E + F) 46,655.42
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 5,598.65
I. Contractor's Profit (CP) 8% of G 3,732.43
J. Value Added Tax (VAT) 5% of (G + H + I) 2,799.33
K. Total Unit Cost (G + H + I + J) 58,785.83
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1003(9) Carpentry and Joinery Works


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

Installation
a. Construction Foreman 1 27 88.12 2,379.24
b. Skilled Laborer 1 36 63.79 2,296.44
c. Unskilled Laborer 1 36 49.20 1,771.20

Sub - Total for A 6,446.88


No. of Daily Rental
Name and Capacity Quantity Amount (PhP)
Day/s Rate
B. Equipment

Minor Tools (10 % of Labor Cost) 644.69

Sub - Total for B 644.69


C. Total (A + B) 7,091.57
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 7,091.57
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Blackboard set 9 3,100.00 27,900.00

Sub - Total for F 27,900.00


G. Direct Unit Cost (E + F) 34,991.57
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 4,198.99
I. Contractor's Profit (CP) 8% of G 2,799.33
J. Value Added Tax (VAT) 5% of (G + H + I) 2,099.49
K. Total Unit Cost (G + H + I + J) 44,089.38
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1003(9) Carpentry and Joinery Works


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

Installation
a. Construction Foreman 1 18 88.12 1,586.16
b. Skilled Laborer 1 24 63.79 1,530.96
c. Unskilled Laborer 1 24 49.20 1,180.80

Sub - Total for A 4,297.92


No. of Daily Rental
Name and Capacity Quantity Amount (PhP)
Day/s Rate
B. Equipment

Minor Tools (10 % of Labor Cost) 429.79

Sub - Total for B 429.79


C. Total (A + B) 4,727.71
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 4,727.71
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Blackboard set 6 3,100.00 18,600.00

Sub - Total for F 18,600.00


G. Direct Unit Cost (E + F) 23,327.71
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 2,799.33
I. Contractor's Profit (CP) 8% of G 1,866.22
J. Value Added Tax (VAT) 5% of (G + H + I) 1,399.66
K. Total Unit Cost (G + H + I + J) 29,392.92
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1003(9) Carpentry and Joinery Works


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

Installation
a. Construction Foreman 1 9 88.12 793.08
b. Skilled Laborer 1 12 63.79 765.48
c. Unskilled Laborer 1 12 49.20 590.40

Sub - Total for A 2,148.96


No. of Daily Rental
Name and Capacity Quantity Amount (PhP)
Day/s Rate
B. Equipment

Minor Tools (10 % of Labor Cost) 214.90

Sub - Total for B 214.90


C. Total (A + B) 2,363.86
D. Output = 1 ls
E. Direct Unit Cost (C ÷ D) 2,363.86
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Blackboard set 3 3,100.00 9,300.00

Sub - Total for F 9,300.00


G. Direct Unit Cost (E + F) 11,663.86
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 1,399.66
I. Contractor's Profit (CP) 8% of G 933.11
J. Value Added Tax (VAT) 5% of (G + H + I) 699.83
K. Total Unit Cost (G + H + I + J) 14,696.46
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1047(6)-1 Metal Structure Accessories (Fire Escape)


Unit of Measurement : l.s.
Output per hour : 1

Amount
Designation No. of Person/s No. of Hour/s Hourly Rate
(PhP)
A. Labor

a. Construction Foreman 1 73.57 88.12 6,482.99


b. Skilled Laborer 1 73.57 63.79 4,693.03
c. Unskilled Laborer 1 73.57 49.20 3,619.64

Sub - Total for A 14,795.66


Amount
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate
(PhP)
B. Equipment

a. Welding Machine 1 73.57 371.00 27,294.47


Minor Tools (10% of Labor Cost) 14.80

Sub - Total for B 27,309.27


C. Total (A + B) 42,104.93
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 42,104.93
Amount
Name and Specification Unit Quantity Unit Cost
(PhP)
F. Materials

a. 4" G.I. Pipe pcs. 2.13 4,440.00 9,472.00


b. 65 x 65 x 6mm Angular Bar kgs. 113.47 75.00 8,510.40
c. 12mm Anchor Bolts with Nuts and Washer kgs. 1.64 110.00 180.40
d. C 8x13 (Stringer) kgs. 407.56 75.00 30,567.00
e. 50 x 50 x 6mm Angular Bar kgs. 74.20 75.00 5,565.00
f. 38 x 38 x 4.5mm Angular Bar kgs. 23.05 75.00 1,728.75
g. LC 255 x 90 x 2.5mm Stair Thread kgs. 163.98 75.00 12,298.50
h. Checkered Plate kgs. 136.56 52.00 7,100.91
i. 25 x 25 x 4.5mm Angular Bar kgs. 0.68 75.00 50.63
j. Gusset Plate kgs. 33.08 50.00 1,654.00
k. 12mm dia. Round Bar (Plain) kgs. 1.78 45.00 79.92
l. Welding Rod kgs. 19.12 160.00 3,059.20
m. Acetylene kgs. 10.52 150.00 1,578.00
n. Oxygen kgs. 21.03 120.00 2,523.60

Sub - Total for F 84,368.31


G. Direct Unit Cost (E + F) 126,473.24
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 15,176.79
I. Contractor's Profit (CP) 8% of G 10,117.86
J. Value Added Tax (VAT) 5% of (G + H + I) 7,588.39
K. Total Unit Cost (G + H + I + J) 159,356.28
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1010(4) Wooden Doors (for 15 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 368.81 88.12 32,499.54


b. Skilled Laborer 1 368.81 63.79 23,526.39
c. Unskilled Laborer 1 368.81 49.20 18,145.45

Sub - Total for A 74,171.38


No of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 7,417.14

Sub - Total for B 7,417.14


C. Total (A + B) 81,588.52
D. Output per Hour = 1 l.s.
E. Direct Unit Cost (C ÷ D) 81,588.52
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Wood Panel Doors m2 51.84 4,500.00 233,280.00


b. Hallow Core Flush Door m2 18.27 650.00 11,875.50
c. Door Frames set 43 2,000.00 86,000.00
d. Bar Door m2 5.76 650.00 3,744.00
d. Consumbale (5% of Material Cost of Door Frames) 4,300.00

Sub - Total for F 339,199.50


G. Direct Unit Cost (E + F) 420,788.02
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 50,494.56
I. Contractor's Profit (CP) 8% of G 33,663.04
J. Value Added Tax (VAT) 5% of (G + H + I) 25,247.28
K. Total Unit Cost (G + H + I + J) 530,192.90
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1010(4) Wooden Doors (for 12 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 320.81 88.12 28,269.78


b. Skilled Laborer 1 320.81 63.79 20,464.47
c. Unskilled Laborer 1 320.81 49.20 15,783.85

Sub - Total for A 64,518.10


No of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 6,451.81

Sub - Total for B 6,451.81


C. Total (A + B) 70,969.91
D. Output per Hour = 1 l.s.
E. Direct Unit Cost (C ÷ D) 70,969.91
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Wood Panel Doors m2 51.84 4,500.00 233,280.00


b. Hallow Core Flush Door m2 18.27 650.00 11,875.50
c. Door Frames set 43 2,000.00 86,000.00
d. Bar Door m2 5.76 650.00 3,744.00
d. Consumbale (5% of Material Cost of Door Frames) 4,300.00

Sub - Total for F 339,199.50


G. Direct Unit Cost (E + F) 410,169.41
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 49,220.33
I. Contractor's Profit (CP) 8% of G 32,813.55
J. Value Added Tax (VAT) 5% of (G + H + I) 24,610.16
K. Total Unit Cost (G + H + I + J) 516,813.46
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1010(4) Wooden Doors (for 9 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 272.81 88.12 24,040.02


b. Skilled Laborer 1 272.81 63.79 17,402.55
c. Unskilled Laborer 1 272.81 49.20 13,422.25

Sub - Total for A 54,864.82


No of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 5,486.48

Sub - Total for B 5,486.48


C. Total (A + B) 60,351.30
D. Output per Hour = 1 l.s.
E. Direct Unit Cost (C ÷ D) 60,351.30
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Wood Panel Doors m2 51.84 4,500.00 233,280.00


b. Hallow Core Flush Door m2 18.27 650.00 11,875.50
c. Door Frames set 43 2,000.00 86,000.00
d. Bar Door m2 5.76 650.00 3,744.00
d. Consumbale (5% of Material Cost of Door Frames) 4,300.00

Sub - Total for F 339,199.50


G. Direct Unit Cost (E + F) 399,550.80
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 47,946.10
I. Contractor's Profit (CP) 8% of G 31,964.06
J. Value Added Tax (VAT) 5% of (G + H + I) 23,973.05
K. Total Unit Cost (G + H + I + J) 503,434.01
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1010(4) Wooden Doors (for 6 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 177.91 88.12 15,677.43


b. Skilled Laborer 1 177.91 63.79 11,348.88
c. Unskilled Laborer 1 177.91 49.20 8,753.17

Sub - Total for A 35,779.48


No of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 3,577.95

Sub - Total for B 3,577.95


C. Total (A + B) 39,357.43
D. Output per Hour = 1 l.s.
E. Direct Unit Cost (C ÷ D) 39,357.43
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Wood Panel Doors m2 51.84 4,500.00 233,280.00


b. Hallow Core Flush Door m2 18.27 650.00 11,875.50
c. Door Frames set 43 2,000.00 86,000.00
d. Bar Door m2 5.76 650.00 3,744.00
d. Consumbale (5% of Material Cost of Door Frames) 4,300.00

Sub - Total for F 339,199.50


G. Direct Unit Cost (E + F) 378,556.93
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 45,426.83
I. Contractor's Profit (CP) 8% of G 30,284.55
J. Value Added Tax (VAT) 5% of (G + H + I) 22,713.42
K. Total Unit Cost (G + H + I + J) 476,981.73
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1010(4) Wooden Doors (for 3 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 129.91 88.12 11,447.67


b. Skilled Laborer 1 129.91 63.79 8,286.96
c. Unskilled Laborer 1 129.91 49.20 6,391.57

Sub - Total for A 26,126.20


No of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 2,612.62

Sub - Total for B 2,612.62


C. Total (A + B) 28,738.82
D. Output per Hour = 1 l.s.
E. Direct Unit Cost (C ÷ D) 28,738.82
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Wood Panel Doors m2 51.84 4,500.00 233,280.00


b. Hallow Core Flush Door m2 18.27 650.00 11,875.50
c. Door Frames set 43 2,000.00 86,000.00
d. Bar Door m2 5.76 650.00 3,744.00
d. Consumbale (5% of Material Cost of Door Frames) 4,300.00

Sub - Total for F 339,199.50


G. Direct Unit Cost (E + F) 367,938.32
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 44,152.60
I. Contractor's Profit (CP) 8% of G 29,435.07
J. Value Added Tax (VAT) 5% of (G + H + I) 22,076.30
K. Total Unit Cost (G + H + I + J) 463,602.28
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1100(19) Conduit, Boxes, and Fittings (15 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 66.00 88.12 5,815.92


b. Skilled Laborer 1 111.00 63.79 7,080.69
c. Unskilled Laborer 1 111.00 49.20 5,461.20

Sub - Total for A 18,357.81


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 1,835.78

Sub - Total for B 1,835.78


C. Total (A + B) 20,193.59
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 20,193.59
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 20mmØ PVC pipe length 560.00 96.00 53,760.00


b. 25mmØ PVC pipe length 40.00 180.00 7,200.00
c. 40mmØ PVC pipe length 2.00 265.00 530.00
d. 80mmØ RSC pipe length 12.00 2,961.70 35,540.40
e. 80mmØ RSC Elbow pc 2.00 1,483.35 2,966.70
f. 20mmØ PVC adapter pc 824.00 8.00 6,592.00
g. 32mmØ PVC Adapter pc 8.00 16.00 128.00
h. 40mmØ PVC Adapter pc 2.00 20.00 40.00
i. 20mmØ L&B pc 824.00 45.00 37,080.00
j. 25mmØ L&B pc 2.00 60.00 120.00
k. 40mmØ L&B pc 2.00 30.70 61.40
l. 20mmØ flexible metal conduit length 6.00 20.00 120.00
m. 20mmØ connector pc 4.00 10.00 40.00
n. utility box, deep type pc 131.00 65.00 8,515.00
o. junction box, deep type pc 198.00 75.00 14,850.00
p. 80mmØ entrance cap pc 1.00 608.00 608.00
q. 16mmØX2.4m ground rod w/ connector pc 2.00 1,200.00 2,400.00

Sub - Total for F 170,551.50


G. Direct Unit Cost (E + F) 190,745.09
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 22,889.41
I. Contractor's Profit (CP) 8% of G 15,259.61
J. Value Added Tax (VAT) 5% of (G + H + I) 11,444.71
K. Total Unit Cost (G + H + I + J) 240,338.81
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1100(18) Wires and Wiring Devices (15 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 93.00 88.12 8,195.16


b. Skilled Laborer 1 118.00 63.79 7,527.22
c. Unskilled Laborer 1 118.00 49.20 5,805.60

Sub - Total for A 21,527.98


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 2,152.80

Sub - Total for B 2,152.80


C. Total (A + B) 23,680.78
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 23,680.78
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 3.5mm2 THWN wire,stranded m 3,522.00 35.00 123,270.00


b. 8.0mm2 THWN wire,stranded m 30.00 65.00 1,950.00
c. 14mm2 THWN wire,stranded m 6.00 86.00 516.00
d. 22mm2 THWN wire,stranded m 37.00 156.00 5,772.00
e. 125mm2 THWN wire,stranded m 81.00 864.00 69,984.00
f. 150mm2 THWN wire,stranded m 39.00 1,031.04 40,210.56
g. 2.0mm2 TW wire,stranded m 288.00 30.00 8,640.00
h. 3.5mm2 TW wire,stranded m 1,756.00 35.00 61,460.00
i. 5.5mm2 TW wire,stranded m 18.00 65.00 1,170.00
j. 14mm2 TW wire,stranded m 24.00 86.00 2,064.00
k. one gang switch set 27.00 85.00 2,295.00
l. two gang switch set 21.00 98.00 2,058.00
m. one gang 3 way switch set 8.00 180.00 1,440.00
n. two gang 3 way switch set 6.00 180.00 1,080.00

o. duplex C.O. grounding type, 15A, 250V set 30.00 180.00 5,400.00
p. duplex C.O. grounding type, 15A, 250V, WP set 9.00 367.00 3,303.00
q. KWHR meter round with base set 1.00 2,200.00 2,200.00
r. Consumables (5% of Materials Cost) 1.00 16,640.63 16,640.63

Sub - Total for F 349,453.19


G. Direct Unit Cost (E + F) 373,133.97
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 44,776.08
I. Contractor's Profit (CP) 8% of G 29,850.72
J. Value Added Tax (VAT) 5% of (G + H + I) 22,388.04
K. Total Unit Cost (G + H + I + J) 470,148.80
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (15 CL)
Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 17.00 88.12 1,498.04


b. Skilled Laborer 1 17.00 63.79 1,084.43
c. Unskilled Laborer 2 17.00 49.20 1,672.80

Sub - Total for A 4,255.27


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 425.53

Sub - Total for B 425.53


C. Total (A + B) 4,680.80
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 4,680.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

MDP - Flush Mounted, NEMA 1 Enclosure w/ Ground Terminal set 1.00 115,731.20 115,731.20
Main: 700at, 800af, 3p, 240v, 65 kaic
Branches: 1 - 60at, 50af, 2p, 240v
2 - 50at, 50af, 2p, 240v
1 - 600at, 600af, 3p, 240v

FPP set 1.00 57,605.60 57,605.60


Main: 600at, 600af, 3p, 240v, 22KAIC
Branches: 2 - 40at, 50af, 2p, 240v
1 - 40at, 50af, 3p, 240v
1 - 600at, 600af, 3p, 240v

LPA set 1.00 14,008.80 14,008.80


Main: 60at, 2p LUGS ONLY
Branches: 3 - 15at, 50af, 2p, 240v
7 - 20at, 50af, 2p, 240v
2 - 40at, 50af, 2p, 240v

LPB &LPC set 1.00 14,346.80 14,346.80


Main: 50at, 50af, 2p, 240v, 10kaic
Branches: 3 - 15at, 50af, 2p, 240v
7 - 20at, 50af, 2p, 240v

Automatic Transfer Switch set 1.00 128,000.00 128,000.00


Main: 700at, 800af, 2p, 260v in nema 3R enclosure

40at, 50af, 2p, 240v in NEMA 3R enclosure set 2.00 1,200.00 2,400.00
40at, 50af, 3p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
20at, 50af, 2p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00

Sub - Total for F 334,492.40


G. Direct Unit Cost (E + F) 339,173.20
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 40,700.78
I. Contractor's Profit (CP) 8% of G 27,133.86
J. Value Added Tax (VAT) 5% of (G + H + I) 20,350.39
K. Total Unit Cost (G + H + I + J) 427,358.23
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1103(1) Lighting Fixtures (15 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 61.00 88.12 5,375.32


b. Skilled Laborer 1 61.00 63.79 3,891.19
c. Unskilled Laborer 2 61.00 49.20 6,002.40

Sub - Total for A 15,268.91


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 1,526.89

Sub - Total for B 1,526.89


C. Total (A + B) 16,795.80
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 16,795.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 2 x 36 watts FL fixture box type w/ canopy base and stem 1.5 ft.
set 60.00 1,800.00 108,000.00
(450mm) length similar to amco AP-113-1.5 or aproved equal.
b. 2 x 36 watts FL fixture. set 30.00 980.00 29,400.00
c. 1 x 36 watts FL fixture box type. set 58.00 546.00 31,668.00
d. 1 - 18 watts CFL w/ medium base keyless type porcelain receptacle. set 6.00 320.00 1,920.00
e. Wall Fan with control Switch set 30.00 1,200.00 36,000.00

Sub - Total for F 206,988.00


G. Direct Unit Cost (E + F) 223,783.80
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 26,854.06
I. Contractor's Profit (CP) 8% of G 17,902.70
J. Value Added Tax (VAT) 5% of (G + H + I) 13,427.03
K. Total Unit Cost (G + H + I + J) 281,967.59
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1208(1) Fire Alarm System (15 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Skilled Laborer 1 31.00 63.79 1,977.49


b. Unskilled Laborer 1 31.00 49.20 1,525.20

Sub - Total for A 3,502.69


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 350.27

Sub - Total for B 350.27


C. Total (A + B) 3,852.96
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 3,852.96
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Fire Alarm Control Panel set 1.00 14,584.00 14,584.00


b. Fire Alarm Bell set 6.00 1,470.00 8,820.00
c. Manual Pull Station Switch set 6.00 1,680.00 10,080.00

Sub - Total for F 33,484.00


G. Direct Unit Cost (E + F) 37,336.96
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 4,480.44
I. Contractor's Profit (CP) 8% of G 2,986.96
J. Value Added Tax (VAT) 5% of (G + H + I) 2,240.22
K. Total Unit Cost (G + H + I + J) 47,044.57
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(8) Sewer Line Works (15 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 76.25 88.12 6,719.15


b. Skilled Laborer 1 76.25 63.79 4,863.99
c. Unskilled Laborer 2 76.25 49.20 7,503.00

Sub - Total for A 19,086.14


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment
Minor Tools (10% of labor cost) 1,908.61

Sub - Total for B 1,908.61


C. Total (A + B) 20,994.75
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 20,994.75
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. uPVC pipe, 150mm dia. x 3m, S-1000 length 19.00 1,975.29 37,530.51
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 18.00 798.00 14,364.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 6.00 400.00 2,400.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 4.00 250.00 1,000.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 30.00 250.00 7,500.00
f. Elbow, 150mm dia. - 90 deg bend pc 5.00 538.33 2,691.65
g. Elbow, 50mm dia. - 90 deg bend pc 12.00 48.00 576.00
h. Wye, 150mm dia. pc 4.00 1,136.21 4,544.84
h. Wye, 100mm dia. pc 15.00 150.00 2,250.00
i. Wye, 50mm dia. pc 12.00 45.00 540.00
j. Wye Reducer, 150mm dia. - 100mm dia. pc 4.00 807.29 3,229.16
k.Wye, Reducer, 100mm dia. - 75mm dia. pc 2.00 180.00 360.00
m. uPVC Tee, 150mm dia. x 150mm dia. pc 4.00 926.89 3,707.56
n. uPVC Tee, 50mm dia. x 50mm dia. pc 36.00 50.00 1,800.00
o. Clean Out with cover, 150mm dia. pc 9.00 627.90 5,651.10
p. Clean Out with cover, 100mm dia. pc 4.00 100.00 400.00
q. Clean Out with cover, 50mm dia. pc 4.00 40.00 160.00
r. uPVC P-trap, 50mm dia. pc 59.00 170.00 10,030.00
s. PVC Cement can 8.00 150.00 1,200.00
t. Consumables (5% of Materials) 3,139.73

Sub - Total for F 103,074.55


G. Direct Unit Cost (E + F) 124,069.30
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 14,888.32
I. Contractor's Profit (CP) 8% of G 9,925.54
J. Value Added Tax (VAT) 5% of (G + H + I) 7,444.16
K. Total Unit Cost (G + H + I + J) 156,327.31
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1002(6) Waterline Works (15 CL)


Unit of Measurement : l.s.
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1.00 14.25 88.12 1,255.71


b. Skilled Laborer 1.00 14.25 63.79 909.01
c. Unskilled Laborer 2.00 14.25 49.20 1,402.20

Sub - Total for A 3,566.92


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 356.69

Sub - Total for B 356.69


C. Total (A + B) 3,923.61
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 3,923.61
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. PPRC Pipe, 38mm dia. x 4m, PN 16 length 15.00 1,117.85 16,767.75


a. PPRC Pipe, 32mm dia. x 4m, PN 16 length 2.00 736.28 1,472.56
b. PPRC Pipe, 25mm dia. x 4m, PN 16 length 9.00 425.92 3,833.28
c. PPRC Pipe, 20mm dia. x 4m, PN 16 length 8.00 275.50 2,204.00
d. PP-R Elbow, 38mm dia. - 90 deg pc 2.00 53.91 107.82
d. PP-R Elbow, 32mm dia. - 90 deg pc 2.00 31.60 63.20
e. PP-R Elbow, 25mm dia pc 4.00 20.54 82.16
f. PP-R Elbow, 20mm dia pc 12.00 12.64 151.68
g. PP-R Elbow Reducer, 38mm x 32mm dia. pc 2.00 53.91 107.82
h. PP-R Elbow Reducer, 32mm x 25mm dia. pc 2.00 50.00 100.00
h. PP-R Elbow Reducer, 25mm x 20mm dia. pc 6.00 163.07 978.42
i. PP-R Tee, 20mm dia. pc 15.00 14.80 222.00
j. Consumables (5% of Materials) 1,213.88

Sub - Total for F 27,304.57


G. Direct Unit Cost (E + F) 31,228.18
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 3,747.38
I. Contractor's Profit (CP) 8% of G 2,498.25
J. Value Added Tax (VAT) 5% of (G + H + I) 1,873.69
K. Total Unit Cost (G + H + I + J) 39,347.51
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(9) Storm Drainage and Downspout (15 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 79.50 88.12 7,005.54


b. Skilled Laborer 2 79.50 63.79 10,142.61
c. Unskilled Laborer 4 79.50 49.20 15,645.60

Sub - Total for A 32,793.75


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

a. Minor Tools (10% of labor cost) 3,279.38

Sub - Total for B 3,279.38


C. Total (A + B) 36,073.13
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 36,073.13
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. PVC Drain Pipe, 150mm dia. x 3m pc 42.00 1,975.29 82,962.18


b. Roof Drain (Dome-type strainer) pc 26.00 1,500.00 39,000.00
c. uPVC Sanitary Pipe,100mm dia. x 3m,S-1000 length 54.00 798.00 43,092.00
d. Elbow, 100mm dia. - 45 deg bend pc 36.00 61.00 2,196.00
e. PVC Solvent, 400cc can 6.00 150.00 900.00
f. Consumables 5% 6,302.71

Sub - Total for F 174,452.89


G. Direct Unit Cost (E + F) 210,526.01
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 25,263.12
I. Contractor's Profit (CP) 8% of G 16,842.08
J. Value Added Tax (VAT) 5% of (G + H + I) 12,631.56
K. Total Unit Cost (G + H + I + J) 265,262.78
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1002(5) Sanitary/Plumbing Fixtures (15 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 216.75 88.12 19,100.01


b. Skilled Laborer 1 216.75 63.79 13,826.48
c. Unskilled Laborer 1 216.75 49.20 10,664.10

Sub - Total for A 43,590.59


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of labor cost) 4,359.06

Sub - Total for B 4,359.06


C. Total (A + B) 47,949.65
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 47,949.65
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Water Closet - Complete w/ fittings and acc. set 15.00 7,500.00 112,500.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
d. Faucet, Hose Bibb, Brass 12mm dia. pc 18.00 180.00 3,240.00
e. Wall Hung Lavatory - Complete w/ fittings & acc. set 2.00 6,550.00 13,100.00
f. Gate Valve, 50mm dia. pc 3.00 980.00 2,940.00
g. Gate Valve, 32mm dia. pc 6.00 627.00 3,762.00
h. Gate Valve, 20mm dia. pc 3.00 650.00 1,950.00
i. Check Valve, 50mm dia. pc 1.00 954.00 954.00
j. S.S Floor Drain 4' x 4" pc 59.00 250.00 14,750.00
k. Mirror sq.ft. 36.00 650.00 23,400.00
l. Handrail (PWD) set 2.00 4,500.00 9,000.00
m. Consumables 12,513.20

Sub - Total for F 262,777.20


G. Direct Unit Cost (E + F) 310,726.85
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 37,287.22
I. Contractor's Profit (CP) 8% of G 24,858.15
J. Value Added Tax (VAT) 5% of (G + H + I) 18,643.61
K. Total Unit Cost (G + H + I + J) 391,515.83
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : SPL-2 Dry Stand Pipe System 15CL


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1.00 788.25 88.12 69,460.59


b. Skilled Laborer 2.00 788.25 63.79 100,564.94
c. Unskilled Laborer 4.00 788.25 49.20 155,127.60

Sub - Total for A 325,153.13


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of labor cost) 32,515.31

Sub - Total for B 32,515.31


C. Total (A + B) 357,668.44
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D) 357,668.44
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. B.I. Pipe 100mm dia lm 20.00 1,889.00 37,780.00


b. B.I. Pipe 75mm dia lm 150.00 984.00 147,600.00
c. B.I. Pipe 65mm dia lm 60.00 708.00 42,480.00
d. B.I. Pipe 50mm dia lm 20.00 425.00 8,500.00
e. B.I. Pipe 40mm dia lm 390.00 317.00 123,630.00
f. B.I. Pipe 25mm dia lm 68.00 192.00 13,056.00
g. Fittings (Elbow, Tee, Reducer, etc) l.s. 1.00 149,218.40 149,218.40
h. Pendent 12mm dia pc 130.00 503.00 65,390.00
i. Side Wall 12mm dia pc 6.00 518.00 3,108.00
j. Fire Hose Cabinet with Fire Extinguisher set 6.00 24,000.00 144,000.00
k. Fire Extinguisher, 10 lbs Capacity, Wall Mounted, HCFC 123 set 15.00 6,825.00 102,375.00
l. FP-1, Horizontal Split Case Centrifugal Pump with A.C. Motor &
assy 1.00 887,692.31 887,692.31
Controller, UL/FM Approved, 350 GPM, 100psi, 30 HP, 230/3/60
m. JP-1 Vertical In-Line Centrifugal Pump with AC Motor & Controller,
assy 1.00 180,000.00 180,000.00
UL/FM Approved, 10GPM, 3HP, 100psi, 230, 3/60
n. Gate Valve (OS & Y), 100mm dia unit 1.00 31,680.00 31,680.00
o. Y-Strainer unit 1.00 36,118.45 36,118.45
p.Check Valve unit 1.00 17,500.00 17,500.00
q. Alarm Check Valve Assembly unit 1.00 63,360.00 63,360.00
r. Globe Valve unit 1.00 9,114.00 9,114.00
s. Pressure Reducing Valve unit 1.00 104,099.33 104,099.33
t. Float Valve unit 1.00 77,396.68 77,396.68
u. Water Flow Switch unit 1.00 6,468.00 6,468.00
v.Floor Control Valve unit 1.00 8,303.00 8,303.00
w. Pressure Gauge unit 1.00 971.13 971.13
x. FDC Siamese Twin: Two-Way unit 1.00 6,500.00 6,500.00
y. Isolation Valve unit 1.00 18,000.00 18,000.00
z. Water Flow Meter unit 1.00 58,084.99 58,084.99
aa. Drain Off Valve unit 1.00 19,557.51 19,557.51
bb. Roof Manifold unit 1.00 16,199.14 16,199.14
cc. Hangers and Support l.s. 1.00 37,304.60 37,304.60
dd. Electrical Works for Pumps from Main Breaker l.s. 1.00 15,000.00 15,000.00
ee. Miscellaneous and Consumables l.s. 1.00 5,000.00 5,000.00
ff. Testing and Commissioning l.s. 1.00 91,266.55 91,266.55
gg. Overhead Water Tank 2000 US Gal unit 2.00 167,000.00 334,000.00
hh. Fire Reserve Tank 7000 US gal unit 1.00 103,703.70 103,703.70
ii. Concrete m³ 15.45 6,434.06 99,406.16
jj. Rebar kg 648.90 57.98 37,621.47
kk. Plaster Finish m² 66.00 181.14 11,955.02
ll. Cement Based Waterproofing bag 159.00 50.00 7,950.00
mm. .60 x .60 Manhole ea 2.00 21,000.00 42,000.00
nn. End-Suction Centrifugal Water Pump, TDH 22m, 2.0HP, 80GPM unit 2.00 36,780.00 73,560.00

Sub - Total for F 3,236,949.44


G. Direct Unit Cost (E + F) 3,594,617.88
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 431,354.15
I. Contractor's Profit (CP) 8% of G 287,569.43
J. Value Added Tax (VAT) 5% of (G + H + I) 215,677.07
K. Total Unit Cost (G + H + I + J) 4,529,218.53
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : SPL-3 Septic Vault Type E (15 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 51.00 88.12 4,494.12


b. Skilled Laborer 2 51.00 63.79 6,506.58
c. Unskilled Laborer 4 51.00 49.20 10,036.80

Sub - Total for A 21,037.50


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 2,103.75

Sub - Total for B 2,103.75


C. Total (A + B) 23,141.25
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D) 23,141.25
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

b. Concrete cu.m. 12.69 6,434.06 81,648.17


c. Reinforcement Steel Bars kg 896.70 57.98 51,988.25
d. Plaster Finish sq.m. 122.35 181.14 22,162.08
e. Cement-Based Waterproofing - Sahara bag 296.00 50.00 14,800.00
f. 6" CHB (150mm) sq.m. 7.00 175.00 1,225.00
g. 4" CHB (100mm) sq.m. 3.50 125.00 437.50

Sub - Total for F 172,260.99


G. Direct Unit Cost (E + F) 195,402.24
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 23,448.27
I. Contractor's Profit (CP) 8% of G 15,632.18
J. Value Added Tax (VAT) 5% of (G + H + I) 11,724.13
K. Total Unit Cost (G + H + I + J) 246,206.82
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(6)b1 Catch Basin -1 (15 CL)


Unit of Measurement : ea
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D) 221.22
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

b. Concrete cu.m. 0.07 6,434.06 450.38


c. Reinforcement Steel Bars kg 8.63 57.98 500.34
d. Masonry Units sq.m. 0.80 125.00 100.00
e. Plaster Finish sq.m. 1.76 181.14 318.80

Sub - Total for F 1,369.53


G. Direct Unit Cost (E + F) 1,590.75
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 190.89
I. Contractor's Profit (CP) 8% of G 127.26
J. Value Added Tax (VAT) 5% of (G + H + I) 95.44
K. Total Unit Cost (G + H + I + J) 2,004.34
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1100(19) Conduit, Boxes, and Fittings (12 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 66.00 88.12 5,815.92


b. Skilled Laborer 1 111.00 63.79 7,080.69
c. Unskilled Laborer 1 111.00 49.20 5,461.20

Sub - Total for A 18,357.81


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 1,835.78

Sub - Total for B 1,835.78


C. Total (A + B) 20,193.59
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 20,193.59
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 20mmØ PVC pipe length 560.00 96.00 53,760.00


b. 25mmØ PVC pipe length 40.00 180.00 7,200.00
c. 40mmØ PVC pipe length 2.00 265.00 530.00
d. 80mmØ RSC pipe length 12.00 2,961.70 35,540.40
e. 80mmØ RSC Elbow pc 2.00 1,483.35 2,966.70
f. 20mmØ PVC adapter pc 824.00 8.00 6,592.00
g. 32mmØ PVC Adapter pc 8.00 16.00 128.00
h. 40mmØ PVC Adapter pc 2.00 20.00 40.00
i. 20mmØ L&B pc 824.00 45.00 37,080.00
j. 25mmØ L&B pc 2.00 60.00 120.00
k. 40mmØ L&B pc 2.00 30.70 61.40
l. 20mmØ flexible metal conduit length 6.00 20.00 120.00
m. 20mmØ connector pc 4.00 10.00 40.00
n. utility box, deep type pc 131.00 65.00 8,515.00
o. junction box, deep type pc 198.00 75.00 14,850.00
p. 80mmØ entrance cap pc 1.00 608.00 608.00
q. 16mmØX2.4m ground rod w/ connector pc 2.00 1,200.00 2,400.00

Sub - Total for F 170,551.50


G. Direct Unit Cost (E + F) 190,745.09
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 22,889.41
I. Contractor's Profit (CP) 8% of G 15,259.61
J. Value Added Tax (VAT) 5% of (G + H + I) 11,444.71
K. Total Unit Cost (G + H + I + J) 240,338.81
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1100(18) Wires and Wiring Devices (12 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 93.00 88.12 8,195.16


b. Skilled Laborer 1 118.00 63.79 7,527.22
c. Unskilled Laborer 1 118.00 49.20 5,805.60

Sub - Total for A 21,527.98


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 2,152.80

Sub - Total for B 2,152.80


C. Total (A + B) 23,680.78
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 23,680.78
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 3.5mm2 THWN wire,stranded m 3,522.00 35.00 123,270.00


b. 8.0mm2 THWN wire,stranded m 30.00 65.00 1,950.00
c. 14mm2 THWN wire,stranded m 6.00 86.00 516.00
d. 22mm2 THWN wire,stranded m 37.00 156.00 5,772.00
e. 125mm2 THWN wire,stranded m 81.00 864.00 69,984.00
f. 150mm2 THWN wire,stranded m 39.00 1,031.04 40,210.56
g. 2.0mm2 TW wire,stranded m 288.00 30.00 8,640.00
h. 3.5mm2 TW wire,stranded m 1,756.00 35.00 61,460.00
i. 5.5mm2 TW wire,stranded m 18.00 65.00 1,170.00
j. 14mm2 TW wire,stranded m 24.00 86.00 2,064.00
k. one gang switch set 27.00 85.00 2,295.00
l. two gang switch set 21.00 98.00 2,058.00
m. one gang 3 way switch set 8.00 180.00 1,440.00
n. two gang 3 way switch set 6.00 180.00 1,080.00

o. duplex C.O. grounding type, 15A, 250V set 30.00 180.00 5,400.00
p. duplex C.O. grounding type, 15A, 250V, WP set 9.00 367.00 3,303.00
q. KWHR meter round with base set 1.00 2,200.00 2,200.00
r. Consumables (5% of Materials Cost) 1.00 16,640.63 16,640.63

Sub - Total for F 349,453.19


G. Direct Unit Cost (E + F) 373,133.97
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 44,776.08
I. Contractor's Profit (CP) 8% of G 29,850.72
J. Value Added Tax (VAT) 5% of (G + H + I) 22,388.04
K. Total Unit Cost (G + H + I + J) 470,148.80
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (12 CL)
Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 17.00 88.12 1,498.04


b. Skilled Laborer 1 17.00 63.79 1,084.43
c. Unskilled Laborer 2 17.00 49.20 1,672.80

Sub - Total for A 4,255.27


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 425.53

Sub - Total for B 425.53


C. Total (A + B) 4,680.80
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 4,680.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

MDP - Flush Mounted, NEMA 1 Enclosure w/ G set 1.00 115,731.20 115,731.20


Main: 700at, 800af, 3p, 240v, 65 kaic
Branches: 1 - 60at, 50af, 2p, 240v
2 - 50at, 50af, 2p, 240v
1 - 600at, 600af, 3p, 240v

FPP set 1.00 57,605.60 57,605.60


Main: 600at, 600af, 3p, 240v, 22KAIC
Branches: 2 - 40at, 50af, 2p, 240v
1 - 40at, 50af, 3p, 240v
1 - 600at, 600af, 3p, 240v

LPA set 1.00 14,008.80 14,008.80


Main: 60at, 2p LUGS ONLY
Branches: 3 - 15at, 50af, 2p, 240v
7 - 20at, 50af, 2p, 240v
2 - 40at, 50af, 2p, 240v

LPB &LPC set 1.00 14,346.80 14,346.80


Main: 50at, 50af, 2p, 240v, 10kaic
Branches: 3 - 15at, 50af, 2p, 240v
7 - 20at, 50af, 2p, 240v

Automatic Transfer Switch set 1.00 128,000.00 128,000.00


Main: 700at, 800af, 2p, 260v in nema 3R enclosure

40at, 50af, 2p, 240v in NEMA 3R enclosure set 2.00 1,200.00 2,400.00
40at, 50af, 3p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
20at, 50af, 2p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00

Sub - Total for F 334,492.40


G. Direct Unit Cost (E + F) 339,173.20
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 40,700.78
I. Contractor's Profit (CP) 8% of G 27,133.86
J. Value Added Tax (VAT) 5% of (G + H + I) 20,350.39
K. Total Unit Cost (G + H + I + J) 427,358.23
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1103(1) Lighting Fixtures (12 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 61.00 88.12 5,375.32


b. Skilled Laborer 1 61.00 63.79 3,891.19
c. Unskilled Laborer 2 61.00 49.20 6,002.40

Sub - Total for A 15,268.91


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 1,526.89

Sub - Total for B 1,526.89


C. Total (A + B) 16,795.80
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 16,795.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 2 x 36 watts FL fixture box type w/ canopy base and stem 1.5 ft.
set 60.00 1,800.00 108,000.00
(450mm) length similar to amco AP-113-1.5 or aproved equal.
b. 2 x 36 watts FL fixture. set 30.00 980.00 29,400.00
c. 1 x 36 watts FL fixture box type. set 58.00 546.00 31,668.00
d. 1 - 18 watts CFL w/ medium base keyless type porcelain receptacle. set 6.00 320.00 1,920.00
e. Wall Fan with control Switch set 30.00 1,200.00 36,000.00

Sub - Total for F 206,988.00


G. Direct Unit Cost (E + F) 223,783.80
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 26,854.06
I. Contractor's Profit (CP) 8% of G 17,902.70
J. Value Added Tax (VAT) 5% of (G + H + I) 13,427.03
K. Total Unit Cost (G + H + I + J) 281,967.59
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1208(1) Fire Alarm System (12 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Skilled Laborer 1 31.00 63.79 1,977.49


b. Unskilled Laborer 1 31.00 49.20 1,525.20

Sub - Total for A 3,502.69


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 350.27

Sub - Total for B 350.27


C. Total (A + B) 3,852.96
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 3,852.96
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Fire Alarm Control Panel set 1.00 14,584.00 14,584.00


b. Fire Alarm Bell set 6.00 1,470.00 8,820.00
c. Manual Pull Station Switch set 6.00 1,680.00 10,080.00

Sub - Total for F 33,484.00


G. Direct Unit Cost (E + F) 37,336.96
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 4,480.44
I. Contractor's Profit (CP) 8% of G 2,986.96
J. Value Added Tax (VAT) 5% of (G + H + I) 2,240.22
K. Total Unit Cost (G + H + I + J) 47,044.57
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(8) Sewer Line Works (12 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 76.25 88.12 6,719.15


b. Skilled Laborer 1 76.25 63.79 4,863.99
c. Unskilled Laborer 2 76.25 49.20 7,503.00

Sub - Total for A 19,086.14


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment
Minor Tools (10% of labor cost) 1,908.61

Sub - Total for B 1,908.61


C. Total (A + B) 20,994.75
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 20,994.75
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. uPVC pipe, 150mm dia. x 3m, S-1000 length 19.00 1,975.29 37,530.51
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 18.00 798.00 14,364.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 6.00 400.00 2,400.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 4.00 250.00 1,000.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 30.00 250.00 7,500.00
f. Elbow, 150mm dia. - 90 deg bend pc 5.00 538.33 2,691.65
g. Elbow, 50mm dia. - 90 deg bend pc 12.00 48.00 576.00
h. Wye, 150mm dia. pc 4.00 1,136.21 4,544.84
h. Wye, 100mm dia. pc 15.00 150.00 2,250.00
i. Wye, 50mm dia. pc 12.00 45.00 540.00
j. Wye Reducer, 150mm dia. - 100mm dia. pc 4.00 807.29 3,229.16
k.Wye, Reducer, 100mm dia. - 75mm dia. pc 2.00 180.00 360.00
m. uPVC Tee, 150mm dia. x 150mm dia. pc 4.00 926.89 3,707.56
n. uPVC Tee, 50mm dia. x 50mm dia. pc 36.00 50.00 1,800.00
o. Clean Out with cover, 150mm dia. pc 9.00 627.90 5,651.10
p. Clean Out with cover, 100mm dia. pc 4.00 100.00 400.00
q. Clean Out with cover, 50mm dia. pc 4.00 40.00 160.00
r. uPVC P-trap, 50mm dia. pc 59.00 170.00 10,030.00
s. PVC Cement can 8.00 150.00 1,200.00
t. Consumables (5% of Materials) 3,139.73

Sub - Total for F 103,074.55


G. Direct Unit Cost (E + F) 124,069.30
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 14,888.32
I. Contractor's Profit (CP) 8% of G 9,925.54
J. Value Added Tax (VAT) 5% of (G + H + I) 7,444.16
K. Total Unit Cost (G + H + I + J) 156,327.31
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1002(6) Waterline Works (12 CL)


Unit of Measurement : l.s.
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1.00 14.25 88.12 1,255.71


b. Skilled Laborer 1.00 14.25 63.79 909.01
c. Unskilled Laborer 2.00 14.25 49.20 1,402.20

Sub - Total for A 3,566.92


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 356.69

Sub - Total for B 356.69


C. Total (A + B) 3,923.61
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 3,923.61
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. PPRC Pipe, 38mm dia. x 4m, PN 16 length 15.00 1,117.85 16,767.75


a. PPRC Pipe, 32mm dia. x 4m, PN 16 length 2.00 736.28 1,472.56
b. PPRC Pipe, 25mm dia. x 4m, PN 16 length 9.00 425.92 3,833.28
c. PPRC Pipe, 20mm dia. x 4m, PN 16 length 8.00 275.50 2,204.00
d. PP-R Elbow, 38mm dia. - 90 deg pc 2.00 53.91 107.82
d. PP-R Elbow, 32mm dia. - 90 deg pc 2.00 31.60 63.20
e. PP-R Elbow, 25mm dia pc 4.00 20.54 82.16
f. PP-R Elbow, 20mm dia pc 12.00 12.64 151.68
g. PP-R Elbow Reducer, 38mm x 32mm dia. pc 2.00 53.91 107.82
h. PP-R Elbow Reducer, 32mm x 25mm dia. pc 2.00 50.00 100.00
h. PP-R Elbow Reducer, 25mm x 20mm dia. pc 6.00 163.07 978.42
i. PP-R Tee, 20mm dia. pc 15.00 14.80 222.00
j. Consumables (5% of Materials) 1,213.88

Sub - Total for F 27,304.57


G. Direct Unit Cost (E + F) 31,228.18
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 3,747.38
I. Contractor's Profit (CP) 8% of G 2,498.25
J. Value Added Tax (VAT) 5% of (G + H + I) 1,873.69
K. Total Unit Cost (G + H + I + J) 39,347.51
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(9) Storm Drainage and Downspout (12 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 79.50 88.12 7,005.54


b. Skilled Laborer 2 79.50 63.79 10,142.61
c. Unskilled Laborer 4 79.50 49.20 15,645.60

Sub - Total for A 32,793.75


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

a. Minor Tools (10% of labor cost) 3,279.38

Sub - Total for B 3,279.38


C. Total (A + B) 36,073.13
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 36,073.13
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. PVC Drain Pipe, 150mm dia. x 3m pc 42.00 1,975.29 82,962.18


b. Roof Drain (Dome-type strainer) pc 26.00 1,500.00 39,000.00
c. uPVC Sanitary Pipe,100mm dia. x 3m,S-1000 length 54.00 798.00 43,092.00
d. Elbow, 100mm dia. - 45 deg bend pc 36.00 61.00 2,196.00
e. PVC Solvent, 400cc can 6.00 150.00 900.00
f. Consumables 5% 6,302.71

Sub - Total for F 174,452.89


G. Direct Unit Cost (E + F) 210,526.01
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 25,263.12
I. Contractor's Profit (CP) 8% of G 16,842.08
J. Value Added Tax (VAT) 5% of (G + H + I) 12,631.56
K. Total Unit Cost (G + H + I + J) 265,262.78
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1002(5) Sanitary/Plumbing Fixtures (12 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 216.75 88.12 19,100.01


b. Skilled Laborer 1 216.75 63.79 13,826.48
c. Unskilled Laborer 1 216.75 49.20 10,664.10

Sub - Total for A 43,590.59


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of labor cost) 4,359.06

Sub - Total for B 4,359.06


C. Total (A + B) 47,949.65
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 47,949.65
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Water Closet - Complete w/ fittings and acc. set 15.00 7,500.00 112,500.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
e. Faucet, Hose Bibb, Brass 12mm dia. pc 18.00 180.00 3,240.00
f. Wall Hung Lavatory - Complete w/ fittings & acc. set 2.00 6,550.00 13,100.00
g. Gate Valve, 50mm dia. pc 3.00 980.00 2,940.00
h. Gate Valve, 32mm dia. pc 6.00 610.00 3,660.00
i. Gate Valve, 20mm dia. pc 3.00 650.00 1,950.00
j. Check Valve, 50mm dia. pc 1.00 954.00 954.00
k. S.S Floor Drain 4' x 4" pc 59.00 250.00 14,750.00
l. Mirror sq.ft. 36.00 650.00 23,400.00
m. Handrail (PWD) set 2.00 4,500.00 9,000.00
n. Consumables 12,508.10

Sub - Total for F 262,670.10


G. Direct Unit Cost (E + F) 310,619.75
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 37,274.37
I. Contractor's Profit (CP) 8% of G 24,849.58
J. Value Added Tax (VAT) 5% of (G + H + I) 18,637.19
K. Total Unit Cost (G + H + I + J) 391,380.89
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : SPL-2 Dry Stand Pipe System 12CL


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1.00 788.25 88.12 69,460.59


b. Skilled Laborer 2.00 788.25 63.79 100,564.94
c. Unskilled Laborer 4.00 788.25 49.20 155,127.60

Sub - Total for A 325,153.13


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of labor cost) 32,515.31

Sub - Total for B 32,515.31


C. Total (A + B) 357,668.44
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D) 357,668.44
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. B.I. Pipe 100mm dia lm 20.00 1,889.00 37,780.00


b. B.I. Pipe 75mm dia lm 150.00 984.00 147,600.00
c. B.I. Pipe 65mm dia lm 60.00 708.00 42,480.00
d. B.I. Pipe 50mm dia lm 20.00 425.00 8,500.00
e. B.I. Pipe 40mm dia lm 390.00 317.00 123,630.00
f. B.I. Pipe 25mm dia lm 68.00 192.00 13,056.00
g. Fittings (Elbow, Tee, Reducer, etc) l.s. 1.00 149,218.40 149,218.40
h. Pendent 12mm dia pc 130.00 503.00 65,390.00
i. Side Wall 12mm dia pc 6.00 518.00 3,108.00
j. Fire Hose Cabinet with Fire Extinguisher set 6.00 24,000.00 144,000.00
k. Fire Extinguisher, 10 lbs Capacity, Wall Mounted, HCFC 123 set 15.00 6,825.00 102,375.00
l. FP-1, Horizontal Split Case Centrifugal Pump with A.C. Motor &
assy 1.00 887,692.31 887,692.31
Controller, UL/FM Approved, 350 GPM, 100psi, 30 HP, 230/3/60
m. JP-1 Vertical In-Line Centrifugal Pump with AC Motor &
assy 1.00 180,000.00 180,000.00
Controller, UL/FM Approved, 10GPM, 3HP, 100psi, 230, 3/60
n. Gate Valve (OS & Y), 100mm dia unit 1.00 31,680.00 31,680.00
o. Y-Strainer unit 1.00 36,118.45 36,118.45
p.Check Valve unit 1.00 17,500.00 17,500.00
q. Alarm Check Valve Assembly unit 1.00 63,360.00 63,360.00
r. Globe Valve unit 1.00 9,114.00 9,114.00
s. Pressure Reducing Valve unit 1.00 104,099.33 104,099.33
t. Float Valve unit 1.00 77,396.68 77,396.68
u. Water Flow Switch unit 1.00 6,468.00 6,468.00
v.Floor Control Valve unit 1.00 8,303.00 8,303.00
w. Pressure Gauge unit 1.00 971.13 971.13
x. FDC Siamese Twin: Two-Way unit 1.00 6,500.00 6,500.00
y. Isolation Valve unit 1.00 18,000.00 18,000.00
z. Water Flow Meter unit 1.00 58,084.99 58,084.99
aa. Drain Off Valve unit 1.00 19,557.51 19,557.51
bb. Roof Manifold unit 1.00 16,199.14 16,199.14
cc. Hangers and Support l.s. 1.00 37,304.60 37,304.60
dd. Electrical Works for Pumps from Main Breaker l.s. 1.00 15,000.00 15,000.00
ee. Miscellaneous and Consumables l.s. 1.00 5,000.00 5,000.00
ff. Testing and Commissioning l.s. 1.00 91,266.55 91,266.55
gg. Overhead Water Tank 2000 US Gal unit 2.00 167,000.00 334,000.00
hh. Fire Reserve Tank 7000 US gal unit 1.00 103,703.70 103,703.70
ii. Concrete m³ 15.45 6,434.06 99,406.16
jj. Rebar kg 648.90 57.98 37,621.47
kk. Plaster Finish m² 66.00 181.14 11,955.02
ll. Cement Based Waterproofing bag 159.00 50.00 7,950.00
mm. .60 x .60 Manhole ea 2.00 21,000.00 42,000.00
nn. End-Suction Centrifugal Water Pump, TDH 22m, 2.0HP, 80GPM unit 2.00 36,780.00 73,560.00

Sub - Total for F 3,236,949.44


G. Direct Unit Cost (E + F) 3,594,617.88
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 431,354.15
I. Contractor's Profit (CP) 8% of G 287,569.43
J. Value Added Tax (VAT) 5% of (G + H + I) 215,677.07
K. Total Unit Cost (G + H + I + J) 4,529,218.53
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : SPL-3 Septic Vault Type E (12 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 51.00 88.12 4,494.12


b. Skilled Laborer 2 51.00 63.79 6,506.58
c. Unskilled Laborer 4 51.00 49.20 10,036.80

Sub - Total for A 21,037.50


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 2,103.75

Sub - Total for B 2,103.75


C. Total (A + B) 23,141.25
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D) 23,141.25
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

b. Concrete cu.m. 12.69 6,434.06 81,648.17


c. Reinforcement Steel Bars kg 896.70 57.98 51,988.25
d. Plaster Finish sq.m. 122.35 181.14 22,162.08
e. Cement-Based Waterproofing - Sahara bag 296.00 50.00 14,800.00
f. 6" CHB (150mm) sq.m. 7.00 175.00 1,225.00
g. 4" CHB (100mm) sq.m. 3.50 125.00 437.50

Sub - Total for F 172,260.99


G. Direct Unit Cost (E + F) 195,402.24
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 23,448.27
I. Contractor's Profit (CP) 8% of G 15,632.18
J. Value Added Tax (VAT) 5% of (G + H + I) 11,724.13
K. Total Unit Cost (G + H + I + J) 246,206.82
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(6)b1 Catch Basin -1 (12 CL)


Unit of Measurement : ea
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D) 221.22
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

b. Concrete cu.m. 0.07 6,434.06 450.38


c. Reinforcement Steel Bars kg 8.63 57.98 500.34
d. Masonry Units sq.m. 0.80 125.00 100.00
e. Plaster Finish sq.m. 1.76 181.14 318.80

Sub - Total for F 1,369.53


G. Direct Unit Cost (E + F) 1,590.75
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 190.89
I. Contractor's Profit (CP) 8% of G 127.26
J. Value Added Tax (VAT) 5% of (G + H + I) 95.44
K. Total Unit Cost (G + H + I + J) 2,004.34
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1100(19) Conduit, Boxes, and Fittings (9 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 66.00 100.36 6,623.76


b. Skilled Laborer 1 111.00 73.01 8,104.11
c. Unskilled Laborer 1 111.00 56.27 6,245.97

Sub - Total for A 20,973.84


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 2,097.38

Sub - Total for B 2,097.38


C. Total (A + B) 23,071.22
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 23,071.22
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 20mmØ PVC pipe length 560.00 96.00 53,760.00


b. 25mmØ PVC pipe length 40.00 180.00 7,200.00
c. 40mmØ PVC pipe length 2.00 265.00 530.00
d. 80mmØ RSC pipe length 12.00 2,961.70 35,540.40
e. 80mmØ RSC Elbow pc 2.00 1,483.35 2,966.70
f. 20mmØ PVC adapter pc 824.00 8.00 6,592.00
g. 32mmØ PVC Adapter pc 8.00 16.00 128.00
h. 40mmØ PVC Adapter pc 2.00 20.00 40.00
i. 20mmØ L&B pc 824.00 45.00 37,080.00
j. 25mmØ L&B pc 2.00 60.00 120.00
k. 40mmØ L&B pc 2.00 30.70 61.40
l. 20mmØ flexible metal conduit m 6.00 20.00 120.00
m. 20mmØ connector pc 4.00 10.00 40.00
n. utility box, deep type pc 131.00 65.00 8,515.00
o. junction box, deep type pc 198.00 75.00 14,850.00
p. 80mmØ entrance cap pc 1.00 608.00 608.00
q. 16mmØX2.4m ground rod w/ connector pc 2.00 1,200.00 2,400.00

Sub - Total for F 170,551.50


G. Direct Unit Cost (E + F) 193,622.72
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 23,234.73
I. Contractor's Profit (CP) 8% of G 15,489.82
J. Value Added Tax (VAT) 5% of (G + H + I) 11,617.36
K. Total Unit Cost (G + H + I + J) 243,964.63
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1100(18) Wires and Wiring Devices (9 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 93.00 88.12 8,195.16


b. Skilled Laborer 1 118.00 63.79 7,527.22
c. Unskilled Laborer 1 118.00 49.20 5,805.60

Sub - Total for A 21,527.98


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 2,152.80

Sub - Total for B 2,152.80


C. Total (A + B) 23,680.78
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 23,680.78
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 3.5mm2 THWN wire,stranded m 3,522.00 35.00 123,270.00


b. 8.0mm2 THWN wire,stranded m 30.00 65.00 1,950.00
c. 14mm2 THWN wire,stranded m 6.00 86.00 516.00
d. 22mm2 THWN wire,stranded m 37.00 156.00 5,772.00
e. 125mm2 THWN wire,stranded m 81.00 864.00 69,984.00
f. 150mm2 THWN wire,stranded m 39.00 1,031.04 40,210.56
g. 2.0mm2 TW wire,stranded m 288.00 30.00 8,640.00
h. 3.5mm2 TW wire,stranded m 1,756.00 35.00 61,460.00
i. 5.5mm2 TW wire,stranded m 18.00 65.00 1,170.00
j. 14mm2 TW wire,stranded m 24.00 86.00 2,064.00
k. one gang switch set 27.00 85.00 2,295.00
l. two gang switch set 21.00 98.00 2,058.00
m. one gang 3 way switch set 8.00 180.00 1,440.00
n. two gang 3 way switch set 6.00 180.00 1,080.00

o. duplex C.O. grounding type, 15A, 250V set 30.00 180.00 5,400.00
p. duplex C.O. grounding type, 15A, 250V, WP set 9.00 367.00 3,303.00
q. KWHR meter round with base set 1.00 2,200.00 2,200.00
r. Consumables (5% of Materials Cost) 1.00 16,640.63 16,640.63

Sub - Total for F 349,453.19


G. Direct Unit Cost (E + F) 373,133.97
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 44,776.08
I. Contractor's Profit (CP) 8% of G 29,850.72
J. Value Added Tax (VAT) 5% of (G + H + I) 22,388.04
K. Total Unit Cost (G + H + I + J) 470,148.80
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (9 CL)
Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 17.00 88.12 1,498.04


b. Skilled Laborer 1 17.00 63.79 1,084.43
c. Unskilled Laborer 2 17.00 49.20 1,672.80

Sub - Total for A 4,255.27


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 425.53

Sub - Total for B 425.53


C. Total (A + B) 4,680.80
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 4,680.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

MDP - Flush Mounted, NEMA 1 Enclosure w/ G set 1.00 115,731.20 115,731.20


Main: 700at, 800af, 3p, 240v, 65 kaic
Branches: 1 - 60at, 50af, 2p, 240v
2 - 50at, 50af, 2p, 240v
1 - 600at, 600af, 3p, 240v

FPP set 1.00 57,605.60 57,605.60


Main: 600at, 600af, 3p, 240v, 22KAIC
Branches: 2 - 40at, 50af, 2p, 240v
1 - 40at, 50af, 3p, 240v
1 - 600at, 600af, 3p, 240v

LPA set 1.00 14,008.80 14,008.80


Main: 60at, 2p LUGS ONLY
Branches: 3 - 15at, 50af, 2p, 240v
7 - 20at, 50af, 2p, 240v
2 - 40at, 50af, 2p, 240v

LPB &LPC set 1.00 14,346.80 14,346.80


Main: 50at, 50af, 2p, 240v, 10kaic
Branches: 3 - 15at, 50af, 2p, 240v
7 - 20at, 50af, 2p, 240v

Automatic Transfer Switch set 1.00 128,000.00 128,000.00


Main: 700at, 800af, 2p, 260v in nema 3R enclosure

40at, 50af, 2p, 240v in NEMA 3R enclosure set 2.00 1,200.00 2,400.00
40at, 50af, 3p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
20at, 50af, 2p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00

Sub - Total for F 334,492.40


G. Direct Unit Cost (E + F) 339,173.20
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 40,700.78
I. Contractor's Profit (CP) 8% of G 27,133.86
J. Value Added Tax (VAT) 5% of (G + H + I) 20,350.39
K. Total Unit Cost (G + H + I + J) 427,358.23
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1103(1) Lighting Fixtures (9 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 61.00 88.12 5,375.32


b. Skilled Laborer 1 61.00 63.79 3,891.19
c. Unskilled Laborer 2 61.00 49.20 6,002.40

Sub - Total for A 15,268.91


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 1,526.89

Sub - Total for B 1,526.89


C. Total (A + B) 16,795.80
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 16,795.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 2 x 36 watts FL fixture box type w/ canopy base and stem 1.5 ft.
set 60.00 1,800.00 108,000.00
(450mm) length similar to amco AP-113-1.5 or aproved equal.
b. 2 x 36 watts FL fixture. set 30.00 980.00 29,400.00
c. 1 x 36 watts FL fixture box type. set 58.00 546.00 31,668.00
d. 1 - 18 watts CFL w/ medium base keyless type porcelain receptacle. set 6.00 320.00 1,920.00
e. Wall Fan with control Switch set 30.00 1,200.00 36,000.00

Sub - Total for F 206,988.00


G. Direct Unit Cost (E + F) 223,783.80
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 26,854.06
I. Contractor's Profit (CP) 8% of G 17,902.70
J. Value Added Tax (VAT) 5% of (G + H + I) 13,427.03
K. Total Unit Cost (G + H + I + J) 281,967.59
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1208(1) Fire Alarm System (9 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Skilled Laborer 1 31.00 63.79 1,977.49


b. Unskilled Laborer 1 31.00 49.20 1,525.20

Sub - Total for A 3,502.69


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 350.27

Sub - Total for B 350.27


C. Total (A + B) 3,852.96
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 3,852.96
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Fire Alarm Control Panel set 1.00 14,584.00 14,584.00


b. Fire Alarm Bell set 6.00 1,470.00 8,820.00
c. Manual Pull Station Switch set 6.00 1,680.00 10,080.00

Sub - Total for F 33,484.00


G. Direct Unit Cost (E + F) 37,336.96
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 4,480.44
I. Contractor's Profit (CP) 8% of G 2,986.96
J. Value Added Tax (VAT) 5% of (G + H + I) 2,240.22
K. Total Unit Cost (G + H + I + J) 47,044.57
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(8) Sewer Line Works (9 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 76.25 88.12 6,719.15


b. Skilled Laborer 1 76.25 63.79 4,863.99
c. Unskilled Laborer 2 76.25 49.20 7,503.00

Sub - Total for A 19,086.14


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment
Minor Tools (10% of labor cost) 1,908.61

Sub - Total for B 1,908.61


C. Total (A + B) 20,994.75
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 20,994.75
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. uPVC pipe, 150mm dia. x 3m, S-1000 length 19.00 1,975.29 37,530.51
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 18.00 798.00 14,364.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 6.00 400.00 2,400.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 4.00 250.00 1,000.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 30.00 250.00 7,500.00
f. Elbow, 150mm dia. - 90 deg bend pc 5.00 538.33 2,691.65
g. Elbow, 50mm dia. - 90 deg bend pc 12.00 48.00 576.00
h. Wye, 150mm dia. pc 4.00 1,136.21 4,544.84
h. Wye, 100mm dia. pc 15.00 150.00 2,250.00
i. Wye, 50mm dia. pc 12.00 45.00 540.00
j. Wye Reducer, 150mm dia. - 100mm dia. pc 4.00 807.29 3,229.16
k.Wye, Reducer, 100mm dia. - 75mm dia. pc 2.00 180.00 360.00
m. uPVC Tee, 150mm dia. x 150mm dia. pc 4.00 926.89 3,707.56
n. uPVC Tee, 50mm dia. x 50mm dia. pc 36.00 50.00 1,800.00
o. Clean Out with cover, 150mm dia. pc 9.00 627.90 5,651.10
p. Clean Out with cover, 100mm dia. pc 4.00 100.00 400.00
q. Clean Out with cover, 50mm dia. pc 4.00 40.00 160.00
r. uPVC P-trap, 50mm dia. pc 59.00 170.00 10,030.00
s. PVC Cement can 8.00 150.00 1,200.00
t. Consumables (5% of Materials) 3,139.73

Sub - Total for F 103,074.55


G. Direct Unit Cost (E + F) 124,069.30
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 14,888.32
I. Contractor's Profit (CP) 8% of G 9,925.54
J. Value Added Tax (VAT) 5% of (G + H + I) 7,444.16
K. Total Unit Cost (G + H + I + J) 156,327.31
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1002(6) Waterline Works (9 CL)


Unit of Measurement : l.s.
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1.00 14.25 88.12 1,255.71


b. Skilled Laborer 1.00 14.25 63.79 909.01
c. Unskilled Laborer 2.00 14.25 49.20 1,402.20

Sub - Total for A 3,566.92


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 356.69

Sub - Total for B 356.69


C. Total (A + B) 3,923.61
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 3,923.61
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. PPRC Pipe, 38mm dia. x 4m, PN 16 length 15.00 1,117.85 16,767.75


a. PPRC Pipe, 32mm dia. x 4m, PN 16 length 2.00 736.28 1,472.56
b. PPRC Pipe, 25mm dia. x 4m, PN 16 length 9.00 425.92 3,833.28
c. PPRC Pipe, 20mm dia. x 4m, PN 16 length 8.00 275.50 2,204.00
d. PP-R Elbow, 38mm dia. - 90 deg pc 2.00 53.91 107.82
d. PP-R Elbow, 32mm dia. - 90 deg pc 2.00 31.60 63.20
e. PP-R Elbow, 25mm dia pc 4.00 20.54 82.16
f. PP-R Elbow, 20mm dia pc 12.00 12.64 151.68
g. PP-R Elbow Reducer, 38mm x 32mm dia. pc 2.00 53.91 107.82
h. PP-R Elbow Reducer, 32mm x 25mm dia. pc 2.00 50.00 100.00
h. PP-R Elbow Reducer, 25mm x 20mm dia. pc 6.00 163.07 978.42
i. PP-R Tee, 20mm dia. pc 15.00 14.80 222.00
j. Consumables (5% of Materials) 1,213.88

Sub - Total for F 27,304.57


G. Direct Unit Cost (E + F) 31,228.18
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 3,747.38
I. Contractor's Profit (CP) 8% of G 2,498.25
J. Value Added Tax (VAT) 5% of (G + H + I) 1,873.69
K. Total Unit Cost (G + H + I + J) 39,347.51
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(9) Storm Drainage and Downspout (9 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 79.50 88.12 7,005.54


b. Skilled Laborer 2 79.50 63.79 10,142.61
c. Unskilled Laborer 4 79.50 49.20 15,645.60

Sub - Total for A 32,793.75


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

a. Minor Tools (10% of labor cost) 3,279.38

Sub - Total for B 3,279.38


C. Total (A + B) 36,073.13
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 36,073.13
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. PVC Drain Pipe, 150mm dia. x 3m pc 42.00 1,975.29 82,962.18


b. Roof Drain (Dome-type strainer) pc 26.00 1,500.00 39,000.00
c. uPVC Sanitary Pipe,100mm dia. x 3m,S-1000 length 54.00 798.00 43,092.00
d. Elbow, 100mm dia. - 45 deg bend pc 36.00 61.00 2,196.00
e. PVC Solvent, 400cc can 6.00 150.00 900.00
f. Consumables 5% 6,302.71

Sub - Total for F 174,452.89


G. Direct Unit Cost (E + F) 210,526.01
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 25,263.12
I. Contractor's Profit (CP) 8% of G 16,842.08
J. Value Added Tax (VAT) 5% of (G + H + I) 12,631.56
K. Total Unit Cost (G + H + I + J) 265,262.78
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1002(5) Sanitary/Plumbing Fixtures (9 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 216.75 88.12 19,100.01


b. Skilled Laborer 1 216.75 63.79 13,826.48
c. Unskilled Laborer 1 216.75 49.20 10,664.10

Sub - Total for A 43,590.59


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of labor cost) 4,359.06

Sub - Total for B 4,359.06


C. Total (A + B) 47,949.65
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 47,949.65
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Water Closet - Complete w/ fittings and acc. set 15.00 7,500.00 112,500.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
e. Faucet, Hose Bibb, Brass 12mm dia. pc 18.00 180.00 3,240.00
f. Wall Hung Lavatory - Complete w/ fittings & acc. set 2.00 6,550.00 13,100.00
g. Gate Valve, 50mm dia. pc 3.00 980.00 2,940.00
h. Gate Valve, 32mm dia. pc 6.00 627.00 3,762.00
i. Gate Valve, 20mm dia. pc 3.00 650.00 1,950.00
j. Check Valve, 50mm dia. pc 1.00 954.00 954.00
k. S.S Floor Drain 4' x 4" pc 59.00 250.00 14,750.00
l. Mirror sq.ft. 36.00 650.00 23,400.00
m. Handrail (PWD) set 2.00 4,500.00 9,000.00
n. Consumables 12,513.20

Sub - Total for F 262,777.20


G. Direct Unit Cost (E + F) 310,726.85
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 37,287.22
I. Contractor's Profit (CP) 8% of G 24,858.15
J. Value Added Tax (VAT) 5% of (G + H + I) 18,643.61
K. Total Unit Cost (G + H + I + J) 391,515.83
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : SPL-2 Dry Stand Pipe System 9CL


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation
Person/s Hour/s
A. Labor

a. Construction Foreman 1.00 788.25


b. Skilled Laborer 2.00 788.25
c. Unskilled Laborer 4.00 788.25

Sub - Total for A


No. of No. of
Name and Capacity
Unit/s Hour/s
B. Equipment

Minor Tools (10% of labor cost)

Sub - Total for B


C. Total (A + B)
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D)
Name and Specification Unit Quantity
F. Materials

a. B.I. Pipe 100mm dia lm 20.00


b. B.I. Pipe 75mm dia lm 150.00
c. B.I. Pipe 65mm dia lm 60.00
d. B.I. Pipe 50mm dia lm 20.00
e. B.I. Pipe 40mm dia lm 390.00
f. B.I. Pipe 25mm dia lm 68.00
g. Fittings (Elbow, Tee, Reducer, etc) l.s. 1.00
h. Pendent 12mm dia pc 130.00
i. Side Wall 12mm dia pc 6.00
j. Fire Hose Cabinet with Fire Extinguisher set 6.00
k. Fire Extinguisher, 10 lbs Capacity, Wall Mounted, HCFC 123 set 15.00
l. FP-1, Horizontal Split Case Centrifugal Pump with A.C. Motor &
assy 1.00
Controller, UL/FM Approved, 350 GPM, 100psi, 30 HP, 230/3/60
m. JP-1 Vertical In-Line Centrifugal Pump with AC Motor &
assy 1.00
Controller, UL/FM Approved, 10GPM, 3HP, 100psi, 230, 3/60
n. Gate Valve (OS & Y), 100mm dia unit 1.00
o. Y-Strainer unit 1.00
p.Check Valve unit 1.00
q. Alarm Check Valve Assembly unit 1.00
r. Globe Valve unit 1.00
s. Pressure Reducing Valve unit 1.00
t. Float Valve unit 1.00
u. Water Flow Switch unit 1.00
v.Floor Control Valve unit 1.00
w. Pressure Gauge unit 1.00
x. FDC Siamese Twin: Two-Way unit 1.00
y. Isolation Valve unit 1.00
z. Water Flow Meter unit 1.00
aa. Drain Off Valve unit 1.00
bb. Roof Manifold unit 1.00
cc. Hangers and Support l.s. 1.00
dd. Electrical Works for Pumps from Main Breaker l.s. 1.00
ee. Miscellaneous and Consumables l.s. 1.00
ff. Testing and Commissioning l.s. 1.00
gg. Overhead Water Tank 2000 US Gal unit 2.00
hh. Fire Reserve Tank 7000 US gal unit 1.00
ii. Concrete m³ 15.45
jj. Rebar kg 648.90
kk. Plaster Finish m² 66.00
ll. Cement Based Waterproofing bag 159.00
mm. .60 x .60 Manhole ea 2.00
nn. End-Suction Centrifugal Water Pump, TDH 22m, 2.0HP, 80GPM unit 2.00

Sub - Total for F


G. Direct Unit Cost (E + F)
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12%
I. Contractor's Profit (CP) 8%
J. Value Added Tax (VAT) 5%
K. Total Unit Cost
UPA)

Hourly Rate Amount (PhP)

88.12 69,460.59
63.79 100,564.94
49.20 155,127.60

325,153.13
Hourly Rate Amount (PhP)

32,515.31

32,515.31
357,668.44

357,668.44
Unit Cost Amount (PhP)

1,889.00 37,780.00
984.00 147,600.00
708.00 42,480.00
425.00 8,500.00
317.00 123,630.00
192.00 13,056.00
149,218.40 149,218.40
503.00 65,390.00
518.00 3,108.00
24,000.00 144,000.00
6,825.00 102,375.00
887,692.31 887,692.31

180,000.00 180,000.00
31,680.00 31,680.00
36,118.45 36,118.45
17,500.00 17,500.00
63,360.00 63,360.00
9,114.00 9,114.00
104,099.33 104,099.33
77,396.68 77,396.68
6,468.00 6,468.00
8,303.00 8,303.00
971.13 971.13
6,500.00 6,500.00
18,000.00 18,000.00
58,084.99 58,084.99
19,557.51 19,557.51
16,199.14 16,199.14
37,304.60 37,304.60
15,000.00 15,000.00 Hangers and Support Unit Cost
5,000.00 5,000.00 Fittings Unit Cost
94,229.47 94,229.47
167,000.00 334,000.00
162,962.00 162,962.00
6,434.06 99,406.16 Testing and Commissioning
57.98 37,621.47
181.14 11,955.02
50.00 7,950.00
21,000.00 42,000.00
36,780.00 73,560.00

3,299,170.66
3,656,839.09
of G 438,820.69
of G 292,547.13
of (G + H + I) 219,410.35
(G + H + I + J) 4,607,617.26
373,046.00
37,304.60
149,218.40

1,884,589.31
94,229.47
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : SPL-3 Septic Vault Type E (9 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 51.00 88.12 4,494.12


b. Skilled Laborer 2 51.00 63.79 6,506.58
c. Unskilled Laborer 4 51.00 49.20 10,036.80

Sub - Total for A 21,037.50


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 2,103.75

Sub - Total for B 2,103.75


C. Total (A + B) 23,141.25
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D) 23,141.25
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

b. Concrete cu.m. 12.69 6,434.06 81,648.17


c. Reinforcement Steel Bars kg 896.70 57.98 51,988.25
d. Plaster Finish sq.m. 122.35 181.14 22,162.08
e. Cement-Based Waterproofing - Sahara bag 296.00 50.00 14,800.00
f. 6" CHB (150mm) sq.m. 7.00 175.00 1,225.00
g. 4" CHB (100mm) sq.m. 3.50 125.00 437.50

Sub - Total for F 172,260.99


G. Direct Unit Cost (E + F) 195,402.24
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 23,448.27
I. Contractor's Profit (CP) 8% of G 15,632.18
J. Value Added Tax (VAT) 5% of (G + H + I) 11,724.13
K. Total Unit Cost (G + H + I + J) 246,206.82
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(6)b1 Catch Basin -1 (9 CL)


Unit of Measurement : ea
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D) 221.22
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

b. Concrete cu.m. 0.07 6,434.06 450.38


c. Reinforcement Steel Bars kg 8.63 57.98 500.34
d. Masonry Units sq.m. 0.80 125.00 100.00
e. Plaster Finish sq.m. 1.76 181.14 318.80

Sub - Total for F 1,369.53


G. Direct Unit Cost (E + F) 1,590.75
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 190.89
I. Contractor's Profit (CP) 8% of G 127.26
J. Value Added Tax (VAT) 5% of (G + H + I) 95.44
K. Total Unit Cost (G + H + I + J) 2,004.34
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1100(19) Conduit, Boxes, and Fittings (6 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 66.00 88.12 5,815.92


b. Skilled Laborer 1 111.00 63.79 7,080.69
c. Unskilled Laborer 1 111.00 49.20 5,461.20

Sub - Total for A 18,357.81


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 1,835.78

Sub - Total for B 1,835.78


C. Total (A + B) 20,193.59
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 20,193.59
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 20mmØ PVC pipe length 560.00 96.00 53,760.00


b. 25mmØ PVC pipe length 40.00 180.00 7,200.00
c. 40mmØ PVC pipe length 2.00 265.00 530.00
d. 80mmØ RSC pipe length 12.00 2,961.70 35,540.40
e. 80mmØ RSC Elbow pc 2.00 1,483.35 2,966.70
f. 20mmØ PVC adapter pc 824.00 8.00 6,592.00
g. 32mmØ PVC Adapter pc 8.00 16.00 128.00
h. 40mmØ PVC Adapter pc 2.00 20.00 40.00
i. 20mmØ L&B pc 824.00 45.00 37,080.00
j. 25mmØ L&B pc 2.00 60.00 120.00
k. 40mmØ L&B pc 2.00 30.70 61.40
l. 20mmØ flexible metal conduit length 6.00 20.00 120.00
m. 20mmØ connector pc 4.00 10.00 40.00
n. utility box, deep type pc 131.00 65.00 8,515.00
o. junction box, deep type pc 198.00 75.00 14,850.00
p. 80mmØ entrance cap pc 1.00 608.00 608.00
q. 16mmØX2.4m ground rod w/ connector pc 2.00 1,200.00 2,400.00

Sub - Total for F 170,551.50


G. Direct Unit Cost (E + F) 190,745.09
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 22,889.41
I. Contractor's Profit (CP) 8% of G 15,259.61
J. Value Added Tax (VAT) 5% of (G + H + I) 11,444.71
K. Total Unit Cost (G + H + I + J) 240,338.81
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1100(18) Wires and Wiring Devices (6 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 93.00 88.12 8,195.16


b. Skilled Laborer 1 118.00 63.79 7,527.22
c. Unskilled Laborer 1 118.00 49.20 5,805.60

Sub - Total for A 21,527.98


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 2,152.80

Sub - Total for B 2,152.80


C. Total (A + B) 23,680.78
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 23,680.78
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 3.5mm2 THWN wire,stranded m 3,522.00 35.00 123,270.00


b. 8.0mm2 THWN wire,stranded m 30.00 65.00 1,950.00
c. 14mm2 THWN wire,stranded m 6.00 86.00 516.00
d. 22mm2 THWN wire,stranded m 37.00 156.00 5,772.00
e. 125mm2 THWN wire,stranded m 81.00 864.00 69,984.00
f. 150mm2 THWN wire,stranded m 39.00 1,031.04 40,210.56
g. 2.0mm2 TW wire,stranded m 288.00 30.00 8,640.00
h. 3.5mm2 TW wire,stranded m 1,756.00 35.00 61,460.00
i. 5.5mm2 TW wire,stranded m 18.00 65.00 1,170.00
j. 14mm2 TW wire,stranded m 24.00 86.00 2,064.00
k. one gang switch set 27.00 85.00 2,295.00
l. two gang switch set 21.00 98.00 2,058.00
m. one gang 3 way switch set 8.00 180.00 1,440.00
n. two gang 3 way switch set 6.00 180.00 1,080.00

o. duplex C.O. grounding type, 15A, 250V set 30.00 180.00 5,400.00
p. duplex C.O. grounding type, 15A, 250V,
set 9.00 367.00 3,303.00
WP
q. KWHR meter round with base set 1.00 2,200.00 2,200.00
r. Consumables (5% of Materials Cost) 1.00 16,640.63 16,640.63

Sub - Total for F 349,453.19


G. Direct Unit Cost (E + F) 373,133.97
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 44,776.08
I. Contractor's Profit (CP) 8% of G 29,850.72
J. Value Added Tax (VAT) 5% of (G + H + I) 22,388.04
K. Total Unit Cost (G + H + I + J) 470,148.80
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (6 CL)
Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 17.00 88.12 1,498.04


b. Skilled Laborer 1 17.00 63.79 1,084.43
c. Unskilled Laborer 2 17.00 49.20 1,672.80

Sub - Total for A 4,255.27


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 425.53

Sub - Total for B 425.53


C. Total (A + B) 4,680.80
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 4,680.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

MDP - Flush Mounted, NEMA 1 Enclosure w/ G set 1.00 115,731.20 115,731.20


Main: 700at, 800af, 3p, 240v, 65 kaic
Branches: 1 - 60at, 50af, 2p, 240v
2 - 50at, 50af, 2p, 240v
1 - 600at, 600af, 3p, 240v

FPP set 1.00 57,605.60 57,605.60


Main: 600at, 600af, 3p, 240v, 22KAIC
Branches: 2 - 40at, 50af, 2p, 240v
1 - 40at, 50af, 3p, 240v
1 - 600at, 600af, 3p, 240v

LPA set 1.00 14,008.80 14,008.80


Main: 60at, 2p LUGS ONLY
Branches: 3 - 15at, 50af, 2p, 240v
7 - 20at, 50af, 2p, 240v
2 - 40at, 50af, 2p, 240v

LPB &LPC set 1.00 9,677.20 9,677.20


Main: 50at, 50af, 2p, 240v, 10kaic
Branches: 3 - 15at, 50af, 2p, 240v
7 - 20at, 50af, 2p, 240v

Automatic Transfer Switch set 1.00 128,000.00 128,000.00


Main: 700at, 800af, 2p, 260v in nema 3R enclosure

40at, 50af, 2p, 240v in NEMA 3R enclosure set 2.00 1,200.00 2,400.00
40at, 50af, 3p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
20at, 50af, 2p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00

Sub - Total for F 329,822.80


G. Direct Unit Cost (E + F) 334,503.60
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 40,140.43
I. Contractor's Profit (CP) 8% of G 26,760.29
J. Value Added Tax (VAT) 5% of (G + H + I) 20,070.22
K. Total Unit Cost (G + H + I + J) 421,474.53
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1103(1) Lighting Fixtures (6 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 61.00 88.12 5,375.32


b. Skilled Laborer 1 61.00 63.79 3,891.19
c. Unskilled Laborer 2 61.00 49.20 6,002.40

Sub - Total for A 15,268.91


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 1,526.89

Sub - Total for B 1,526.89


C. Total (A + B) 16,795.80
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 16,795.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 2 x 36 watts FL fixture box type w/ canopy base and stem 1.5 ft.
set 60.00 1,800.00 108,000.00
(450mm) length similar to amco AP-113-1.5 or aproved equal.
b. 2 x 36 watts FL fixture. set 30.00 980.00 29,400.00
c. 1 x 36 watts FL fixture box type. set 58.00 546.00 31,668.00
d. 1 - 18 watts CFL w/ medium base keyless type porcelain receptacle. set 6.00 320.00 1,920.00
e. Wall Fan with control Switch set 30.00 1,200.00 36,000.00

Sub - Total for F 206,988.00


G. Direct Unit Cost (E + F) 223,783.80
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 26,854.06
I. Contractor's Profit (CP) 8% of G 17,902.70
J. Value Added Tax (VAT) 5% of (G + H + I) 13,427.03
K. Total Unit Cost (G + H + I + J) 281,967.59
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1208(1) Fire Alarm System (6 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Skilled Laborer 1 31.00 88.12 2,731.72


b. Unskilled Laborer 1 31.00 63.79 1,977.49

Sub - Total for A 4,709.21


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 470.92

Sub - Total for B 470.92


C. Total (A + B) 5,180.13
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 5,180.13
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Fire Alarm Control Panel set 1.00 14,584.00 14,584.00


b. Fire Alarm Bell set 6.00 1,470.00 8,820.00
c. Manual Pull Station Switch set 6.00 1,680.00 10,080.00

Sub - Total for F 33,484.00


G. Direct Unit Cost (E + F) 38,664.13
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 4,639.70
I. Contractor's Profit (CP) 8% of G 3,093.13
J. Value Added Tax (VAT) 5% of (G + H + I) 2,319.85
K. Total Unit Cost (G + H + I + J) 48,716.81
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(8) Sewer Line Works (6 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 76.25 88.12 6,719.15


b. Skilled Laborer 1 76.25 63.79 4,863.99
c. Unskilled Laborer 2 76.25 49.20 7,503.00

Sub - Total for A 19,086.14


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment
Minor Tools (10% of labor cost) 1,908.61

Sub - Total for B 1,908.61


C. Total (A + B) 20,994.75
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 20,994.75
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. uPVC pipe, 150mm dia. x 3m, S-1000 length 19.00 1,975.29 37,530.51
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 18.00 798.00 14,364.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 6.00 400.00 2,400.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 4.00 250.00 1,000.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 30.00 250.00 7,500.00
f. Elbow, 150mm dia. - 90 deg bend pc 5.00 538.33 2,691.65
g. Elbow, 50mm dia. - 90 deg bend pc 12.00 48.00 576.00
h. Wye, 150mm dia. pc 4.00 1,136.21 4,544.84
h. Wye, 100mm dia. pc 15.00 150.00 2,250.00
i. Wye, 50mm dia. pc 12.00 45.00 540.00
j. Wye Reducer, 150mm dia. - 100mm dia. pc 4.00 807.29 3,229.16
k.Wye, Reducer, 100mm dia. - 75mm dia. pc 2.00 180.00 360.00
m. uPVC Tee, 150mm dia. x 150mm dia. pc 4.00 926.89 3,707.56
n. uPVC Tee, 50mm dia. x 50mm dia. pc 36.00 50.00 1,800.00
o. Clean Out with cover, 150mm dia. pc 9.00 627.90 5,651.10
p. Clean Out with cover, 100mm dia. pc 4.00 100.00 400.00
q. Clean Out with cover, 50mm dia. pc 4.00 40.00 160.00
r. uPVC P-trap, 50mm dia. pc 59.00 170.00 10,030.00
s. PVC Cement can 8.00 150.00 1,200.00
t. Consumables (5% of Materials) 3,139.73

Sub - Total for F 103,074.55


G. Direct Unit Cost (E + F) 124,069.30
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 14,888.32
I. Contractor's Profit (CP) 8% of G 9,925.54
J. Value Added Tax (VAT) 5% of (G + H + I) 7,444.16
K. Total Unit Cost (G + H + I + J) 156,327.31
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1002(6) Waterline Works (6 CL)


Unit of Measurement : l.s.
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1.00 14.25 88.12 1,255.71


b. Skilled Laborer 1.00 14.25 63.79 909.01
c. Unskilled Laborer 2.00 14.25 49.20 1,402.20

Sub - Total for A 3,566.92


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 356.69

Sub - Total for B 356.69


C. Total (A + B) 3,923.61
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 3,923.61
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. PPRC Pipe, 38mm dia. x 4m, PN 16 length 15.00 1,117.85 16,767.75


a. PPRC Pipe, 32mm dia. x 4m, PN 16 length 2.00 736.28 1,472.56
b. PPRC Pipe, 25mm dia. x 4m, PN 16 length 9.00 425.92 3,833.28
c. PPRC Pipe, 20mm dia. x 4m, PN 16 length 8.00 275.50 2,204.00
d. PP-R Elbow, 38mm dia. - 90 deg pc 2.00 53.91 107.82
d. PP-R Elbow, 32mm dia. - 90 deg pc 2.00 31.60 63.20
e. PP-R Elbow, 25mm dia pc 4.00 20.54 82.16
f. PP-R Elbow, 20mm dia pc 12.00 12.64 151.68
g. PP-R Elbow Reducer, 38mm x 32mm dia. pc 2.00 53.91 107.82
h. PP-R Elbow Reducer, 32mm x 25mm dia. pc 2.00 50.00 100.00
h. PP-R Elbow Reducer, 25mm x 20mm dia. pc 6.00 163.07 978.42
i. PP-R Tee, 20mm dia. pc 15.00 14.80 222.00
j. Consumables (5% of Materials) 1,213.88

Sub - Total for F 27,304.57


G. Direct Unit Cost (E + F) 31,228.18
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 3,747.38
I. Contractor's Profit (CP) 8% of G 2,498.25
J. Value Added Tax (VAT) 5% of (G + H + I) 1,873.69
K. Total Unit Cost (G + H + I + J) 39,347.51
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(9) Storm Drainage and Downspout (6 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 79.50 88.12 7,005.54


b. Skilled Laborer 2 79.50 63.79 10,142.61
c. Unskilled Laborer 4 79.50 49.20 15,645.60

Sub - Total for A 32,793.75


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

a. Minor Tools (10% of labor cost) 3,279.38

Sub - Total for B 3,279.38


C. Total (A + B) 36,073.13
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 36,073.13
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. PVC Drain Pipe, 150mm dia. x 3m pc 42.00 1,975.29 82,962.18


b. Roof Drain (Dome-type strainer) pc 26.00 1,500.00 39,000.00
c. uPVC Sanitary Pipe,100mm dia. x 3m,S-1000 length 54.00 798.00 43,092.00
d. Elbow, 100mm dia. - 45 deg bend pc 36.00 61.00 2,196.00
e. PVC Solvent, 400cc can 6.00 150.00 900.00
f. Consumables 5% 6,302.71

Sub - Total for F 174,452.89


G. Direct Unit Cost (E + F) 210,526.01
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 25,263.12
I. Contractor's Profit (CP) 8% of G 16,842.08
J. Value Added Tax (VAT) 5% of (G + H + I) 12,631.56
K. Total Unit Cost (G + H + I + J) 265,262.78
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1002(5) Sanitary/Plumbing Fixtures (6 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 216.75 88.12 19,100.01


b. Skilled Laborer 1 216.75 63.79 13,826.48
c. Unskilled Laborer 1 216.75 49.20 10,664.10

Sub - Total for A 43,590.59


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of labor cost) 4,359.06

Sub - Total for B 4,359.06


C. Total (A + B) 47,949.65
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 47,949.65
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Water Closet - Complete w/ fittings and acc. set 15.00 7,500.00 112,500.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
e. Faucet, Hose Bibb, Brass 12mm dia. pc 18.00 180.00 3,240.00
f. Wall Hung Lavatory - Complete w/ fittings & acc. set 2.00 6,550.00 13,100.00
g. Gate Valve, 50mm dia. pc 3.00 980.00 2,940.00
h. Gate Valve, 32mm dia. pc 6.00 627.00 3,762.00
i. Gate Valve, 20mm dia. pc 3.00 650.00 1,950.00
j. Check Valve, 50mm dia. pc 1.00 954.00 954.00
k. S.S Floor Drain 4' x 4" pc 59.00 250.00 14,750.00
l. Mirror sq.ft. 36.00 650.00 23,400.00
m. Handrail (PWD) set 2.00 4,500.00 9,000.00
n. Consumables 12,513.20

Sub - Total for F 262,777.20


G. Direct Unit Cost (E + F) 310,726.85
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 37,287.22
I. Contractor's Profit (CP) 8% of G 24,858.15
J. Value Added Tax (VAT) 5% of (G + H + I) 18,643.61
K. Total Unit Cost (G + H + I + J) 391,515.83
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : SPL-2 Dry Stand Pipe System 6CL


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1.00 788.25 88.12 69,460.59


b. Skilled Laborer 2.00 788.25 63.79 100,564.94
c. Unskilled Laborer 4.00 788.25 49.20 155,127.60

Sub - Total for A 325,153.13


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of labor cost) 32,515.31

Sub - Total for B 32,515.31


C. Total (A + B) 357,668.44
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D) 357,668.44
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. B.I. Pipe 100mm dia lm 20.00 1,889.00 37,780.00


b. B.I. Pipe 75mm dia lm 150.00 984.00 147,600.00
c. B.I. Pipe 65mm dia lm 60.00 708.00 42,480.00
d. B.I. Pipe 50mm dia lm 20.00 425.00 8,500.00
e. B.I. Pipe 40mm dia lm 390.00 317.00 123,630.00
f. B.I. Pipe 25mm dia lm 68.00 192.00 13,056.00
g. Fittings (Elbow, Tee, Reducer, etc) l.s. 1.00 149,218.40 149,218.40
h. Pendent 12mm dia pc 130.00 503.00 65,390.00
i. Side Wall 12mm dia pc 6.00 518.00 3,108.00
j. Fire Hose Cabinet with Fire Extinguisher set 6.00 24,000.00 144,000.00
k. Fire Extinguisher, 10 lbs Capacity, Wall Mounted, HCFC 123 set 15.00 6,825.00 102,375.00
l. FP-1, Horizontal Split Case Centrifugal Pump with A.C. Motor &
assy 1.00 887,692.31 887,692.31
Controller, UL/FM Approved, 350 GPM, 100psi, 30 HP, 230/3/60
m. JP-1 Vertical In-Line Centrifugal Pump with AC Motor & Controller,
assy 1.00 180,000.00 180,000.00
UL/FM Approved, 10GPM, 3HP, 100psi, 230, 3/60
n. Gate Valve (OS & Y), 100mm dia unit 1.00 31,680.00 31,680.00
o. Y-Strainer unit 1.00 36,118.45 36,118.45
p.Check Valve unit 1.00 17,500.00 17,500.00
q. Alarm Check Valve Assembly unit 1.00 63,360.00 63,360.00
r. Globe Valve unit 1.00 9,114.00 9,114.00
s. Pressure Reducing Valve unit 1.00 104,099.33 104,099.33
t. Float Valve unit 1.00 77,396.68 77,396.68
u. Water Flow Switch unit 1.00 6,468.00 6,468.00
v.Floor Control Valve unit 1.00 8,303.00 8,303.00
w. Pressure Gauge unit 1.00 971.13 971.13
x. FDC Siamese Twin: Two-Way unit 1.00 6,500.00 6,500.00
y. Isolation Valve unit 1.00 18,000.00 18,000.00
z. Water Flow Meter unit 1.00 58,084.99 58,084.99
aa. Drain Off Valve unit 1.00 19,557.51 19,557.51
bb. Roof Manifold unit 1.00 16,199.14 16,199.14
cc. Hangers and Support l.s. 1.00 37,304.60 37,304.60
dd. Electrical Works for Pumps from Main Breaker l.s. 1.00 15,000.00 15,000.00
ee. Miscellaneous and Consumables l.s. 1.00 5,000.00 5,000.00
ff. Testing and Commissioning l.s. 1.00 91,266.55 91,266.55
gg. Overhead Water Tank 2000 US Gal unit 2.00 167,000.00 334,000.00
hh. Fire Reserve Tank 7000 US gal unit 1.00 103,703.70 103,703.70
ii. Concrete m³ 15.45 6,434.06 99,406.16
jj. Rebar kg 648.90 57.98 37,621.47
kk. Plaster Finish m² 66.00 181.14 11,955.02
ll. Cement Based Waterproofing bag 159.00 50.00 7,950.00
mm. .60 x .60 Manhole ea 2.00 21,000.00 42,000.00
nn. End-Suction Centrifugal Water Pump, TDH 22m, 2.0HP, 80GPM unit 2.00 36,780.00 73,560.00

Sub - Total for F 3,236,949.44


G. Direct Unit Cost (E + F) 3,594,617.88
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 431,354.15
I. Contractor's Profit (CP) 8% of G 287,569.43
J. Value Added Tax (VAT) 5% of (G + H + I) 215,677.07
K. Total Unit Cost (G + H + I + J) 4,529,218.53
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : SPL-3 Septic Vault Type E (6 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 51.00 88.12 4,494.12


b. Skilled Laborer 2 51.00 63.79 6,506.58
c. Unskilled Laborer 4 51.00 49.20 10,036.80

Sub - Total for A 21,037.50


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 2,103.75

Sub - Total for B 2,103.75


C. Total (A + B) 23,141.25
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D) 23,141.25
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

b. Concrete cu.m. 12.69 6,434.06 81,648.17


c. Reinforcement Steel Bars kg 896.70 57.98 51,988.25
d. Plaster Finish sq.m. 122.35 181.14 22,162.08
e. Cement-Based Waterproofing - Sahara bag 296.00 50.00 14,800.00
f. 6" CHB (150mm) sq.m. 7.00 175.00 1,225.00
g. 4" CHB (100mm) sq.m. 3.50 125.00 437.50

Sub - Total for F 172,260.99


G. Direct Unit Cost (E + F) 195,402.24
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 23,448.27
I. Contractor's Profit (CP) 8% of G 15,632.18
J. Value Added Tax (VAT) 5% of (G + H + I) 11,724.13
K. Total Unit Cost (G + H + I + J) 246,206.82
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(6)b1 Catch Basin -1 (6 CL)


Unit of Measurement : ea
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D) 221.22
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

b. Concrete cu.m. 0.07 6,434.06 450.38


c. Reinforcement Steel Bars kg 8.63 57.98 500.34
d. Masonry Units sq.m. 0.80 125.00 100.00
e. Plaster Finish sq.m. 1.76 181.14 318.80

Sub - Total for F 1,369.53


G. Direct Unit Cost (E + F) 1,590.75
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 190.89
I. Contractor's Profit (CP) 8% of G 127.26
J. Value Added Tax (VAT) 5% of (G + H + I) 95.44
K. Total Unit Cost (G + H + I + J) 2,004.34
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1100(19) Conduit, Boxes, and Fittings (3 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 66.00 88.12 5,815.92


b. Skilled Laborer 1 111.00 63.79 7,080.69
c. Unskilled Laborer 1 111.00 49.20 5,461.20

Sub - Total for A 18,357.81


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 1,835.78

Sub - Total for B 1,835.78


C. Total (A + B) 20,193.59
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 20,193.59
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 20mmØ PVC pipe length 560.00 96.00 53,760.00


b. 25mmØ PVC pipe length 40.00 180.00 7,200.00
c. 40mmØ PVC pipe length 2.00 265.00 530.00
d. 80mmØ RSC pipe length 12.00 2,961.70 35,540.40
e. 80mmØ RSC Elbow pc 2.00 1,483.35 2,966.70
f. 20mmØ PVC adapter pc 824.00 8.00 6,592.00
g. 32mmØ PVC Adapter pc 8.00 16.00 128.00
h. 40mmØ PVC Adapter pc 2.00 20.00 40.00
i. 20mmØ L&B pc 824.00 45.00 37,080.00
j. 25mmØ L&B pc 2.00 60.00 120.00
k. 40mmØ L&B pc 2.00 30.70 61.40
l. 20mmØ flexible metal conduit length 6.00 20.00 120.00
m. 20mmØ connector pc 4.00 10.00 40.00
n. utility box, deep type pc 131.00 65.00 8,515.00
o. junction box, deep type pc 198.00 75.00 14,850.00
p. 80mmØ entrance cap pc 1.00 608.00 608.00
q. 16mmØX2.4m ground rod w/ connector pc 2.00 1,200.00 2,400.00

Sub - Total for F 170,551.50


G. Direct Unit Cost (E + F) 190,745.09
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 22,889.41
I. Contractor's Profit (CP) 8% of G 15,259.61
J. Value Added Tax (VAT) 5% of (G + H + I) 11,444.71
K. Total Unit Cost (G + H + I + J) 240,338.81
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1100(18) Wires and Wiring Devices (3 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1 93.00 88.12 8,195.16


b. Skilled Laborer 1 118.00 63.79 7,527.22
c. Unskilled Laborer 1 118.00 49.20 5,805.60

Sub - Total for A 21,527.98


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 2,152.80

Sub - Total for B 2,152.80


C. Total (A + B) 23,680.78
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 23,680.78
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 3.5mm2 THWN wire,stranded m 3,522.00 35.00 123,270.00


b. 8.0mm2 THWN wire,stranded m 30.00 65.00 1,950.00
c. 14mm2 THWN wire,stranded m 6.00 86.00 516.00
d. 22mm2 THWN wire,stranded m 37.00 156.00 5,772.00
e. 125mm2 THWN wire,stranded m 81.00 864.00 69,984.00
f. 150mm2 THWN wire,stranded m 39.00 1,031.04 40,210.56
g. 2.0mm2 TW wire,stranded m 288.00 30.00 8,640.00
h. 3.5mm2 TW wire,stranded m 1,756.00 35.00 61,460.00
i. 5.5mm2 TW wire,stranded m 18.00 65.00 1,170.00
j. 14mm2 TW wire,stranded m 24.00 86.00 2,064.00
k. one gang switch set 27.00 85.00 2,295.00
l. two gang switch set 21.00 98.00 2,058.00
m. one gang 3 way switch set 8.00 180.00 1,440.00
n. two gang 3 way switch set 6.00 180.00 1,080.00

o. duplex C.O. grounding type, 15A, 250V set 30.00 180.00 5,400.00
p. duplex C.O. grounding type, 15A, 250V,
set 9.00 367.00 3,303.00
WP
q. KWHR meter round with base set 1.00 2,200.00 2,200.00
r. Consumables (5% of Materials Cost) 1.00 16,640.63 16,640.63

Sub - Total for F 349,453.19


G. Direct Unit Cost (E + F) 373,133.97
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 44,776.08
I. Contractor's Profit (CP) 8% of G 29,850.72
J. Value Added Tax (VAT) 5% of (G + H + I) 22,388.04
K. Total Unit Cost (G + H + I + J) 470,148.80
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (3 CL)
Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 17.00 88.12 1,498.04


b. Skilled Laborer 1 17.00 63.79 1,084.43
c. Unskilled Laborer 2 17.00 49.20 1,672.80

Sub - Total for A 4,255.27


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 425.53

Sub - Total for B 425.53


C. Total (A + B) 4,680.80
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 4,680.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

MDP - Flush Mounted, NEMA 1 Enclosure w/ G set 1.00 115,731.20 115,731.20


Main: 700at, 800af, 3p, 240v, 65 kaic
Branches: 1 - 60at, 50af, 2p, 240v
2 - 50at, 50af, 2p, 240v
1 - 600at, 600af, 3p, 240v

FPP set 1.00 57,605.60 57,605.60


Main: 600at, 600af, 3p, 240v, 22KAIC
Branches: 2 - 40at, 50af, 2p, 240v
1 - 40at, 50af, 3p, 240v
1 - 600at, 600af, 3p, 240v

LPA set 1.00 14,008.80 14,008.80


Main: 60at, 2p LUGS ONLY
Branches: 3 - 15at, 50af, 2p, 240v
7 - 20at, 50af, 2p, 240v
2 - 40at, 50af, 2p, 240v

LPB &LPC set 1.00 14,346.80 14,346.80


Main: 50at, 50af, 2p, 240v, 10kaic
Branches: 3 - 15at, 50af, 2p, 240v
7 - 20at, 50af, 2p, 240v

Automatic Transfer Switch set 1.00 128,000.00 128,000.00


Main: 700at, 800af, 2p, 260v in nema 3R enclosure

40at, 50af, 2p, 240v in NEMA 3R enclosure set 2.00 1,200.00 2,400.00
40at, 50af, 3p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
20at, 50af, 2p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00

Sub - Total for F 334,492.40


G. Direct Unit Cost (E + F) 339,173.20
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 40,700.78
I. Contractor's Profit (CP) 8% of G 27,133.86
J. Value Added Tax (VAT) 5% of (G + H + I) 20,350.39
K. Total Unit Cost (G + H + I + J) 427,358.23
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1103(1) Lighting Fixtures (3 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 61.00 88.12 5,375.32


b. Skilled Laborer 1 61.00 63.79 3,891.19
c. Unskilled Laborer 2 61.00 49.20 6,002.40

Sub - Total for A 15,268.91


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 1,526.89

Sub - Total for B 1,526.89


C. Total (A + B) 16,795.80
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 16,795.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. 2 x 36 watts FL fixture box type w/ canopy base and stem 1.5 ft.
set 60.00 1,800.00 108,000.00
(450mm) length similar to amco AP-113-1.5 or aproved equal.
b. 2 x 36 watts FL fixture. set 30.00 980.00 29,400.00
c. 1 x 36 watts FL fixture box type. set 58.00 546.00 31,668.00
d. 1 - 18 watts CFL w/ medium base keyless type porcelain receptacle. set 6.00 320.00 1,920.00
e. Wall Fan with control Switch set 30.00 1,200.00 36,000.00

Sub - Total for F 206,988.00


G. Direct Unit Cost (E + F) 223,783.80
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 26,854.06
I. Contractor's Profit (CP) 8% of G 17,902.70
J. Value Added Tax (VAT) 5% of (G + H + I) 13,427.03
K. Total Unit Cost (G + H + I + J) 281,967.59
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1208(1) Fire Alarm System (3 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Skilled Laborer 1 31.00 63.79 1,977.49


b. Unskilled Laborer 1 31.00 49.20 1,525.20

Sub - Total for A 3,502.69


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of Labor Cost) 350.27

Sub - Total for B 350.27


C. Total (A + B) 3,852.96
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 3,852.96
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Fire Alarm Control Panel set 1.00 14,584.00 14,584.00


b. Fire Alarm Bell set 6.00 1,470.00 8,820.00
c. Manual Pull Station Switch set 6.00 1,680.00 10,080.00

Sub - Total for F 33,484.00


G. Direct Unit Cost (E + F) 37,336.96
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 4,480.44
I. Contractor's Profit (CP) 8% of G 2,986.96
J. Value Added Tax (VAT) 5% of (G + H + I) 2,240.22
K. Total Unit Cost (G + H + I + J) 47,044.57
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(8) Sewer Line Works (3 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 76.25 88.12 6,719.15


b. Skilled Laborer 1 76.25 63.79 4,863.99
c. Unskilled Laborer 2 76.25 49.20 7,503.00

Sub - Total for A 19,086.14


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment
Minor Tools (10% of labor cost) 1,908.61

Sub - Total for B 1,908.61


C. Total (A + B) 20,994.75
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 20,994.75
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. uPVC pipe, 150mm dia. x 3m, S-1000 length 19.00 1,975.29 37,530.51
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 18.00 798.00 14,364.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 6.00 400.00 2,400.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 4.00 250.00 1,000.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 30.00 250.00 7,500.00
f. Elbow, 150mm dia. - 90 deg bend pc 5.00 538.33 2,691.65
g. Elbow, 50mm dia. - 90 deg bend pc 12.00 48.00 576.00
h. Wye, 150mm dia. pc 4.00 1,136.21 4,544.84
h. Wye, 100mm dia. pc 15.00 150.00 2,250.00
i. Wye, 50mm dia. pc 12.00 45.00 540.00
j. Wye Reducer, 150mm dia. - 100mm dia. pc 4.00 807.29 3,229.16
k.Wye, Reducer, 100mm dia. - 75mm dia. pc 2.00 180.00 360.00
m. uPVC Tee, 150mm dia. x 150mm dia. pc 4.00 926.89 3,707.56
n. uPVC Tee, 50mm dia. x 50mm dia. pc 36.00 50.00 1,800.00
o. Clean Out with cover, 150mm dia. pc 9.00 627.90 5,651.10
p. Clean Out with cover, 100mm dia. pc 4.00 100.00 400.00
q. Clean Out with cover, 50mm dia. pc 4.00 40.00 160.00
r. uPVC P-trap, 50mm dia. pc 59.00 170.00 10,030.00
s. PVC Cement can 8.00 150.00 1,200.00
t. Consumables (5% of Materials) 3,139.73

Sub - Total for F 103,074.55


G. Direct Unit Cost (E + F) 124,069.30
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 14,888.32
I. Contractor's Profit (CP) 8% of G 9,925.54
J. Value Added Tax (VAT) 5% of (G + H + I) 7,444.16
K. Total Unit Cost (G + H + I + J) 156,327.31
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1002(6) Waterline Works (3 CL)


Unit of Measurement : l.s.
Output : 1

No. of
Designation No. of Person/s Hourly Rate Amount (PhP)
Hour/s
A. Labor

a. Construction Foreman 1.00 14.25 88.12 1,255.71


b. Skilled Laborer 1.00 14.25 63.79 909.01
c. Unskilled Laborer 2.00 14.25 49.20 1,402.20

Sub - Total for A 3,566.92


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 356.69

Sub - Total for B 356.69


C. Total (A + B) 3,923.61
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 3,923.61
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. PPRC Pipe, 38mm dia. x 4m, PN 16 length 15.00 1,117.85 16,767.75


a. PPRC Pipe, 32mm dia. x 4m, PN 16 length 2.00 736.28 1,472.56
b. PPRC Pipe, 25mm dia. x 4m, PN 16 length 9.00 425.92 3,833.28
c. PPRC Pipe, 20mm dia. x 4m, PN 16 length 8.00 275.50 2,204.00
d. PP-R Elbow, 38mm dia. - 90 deg pc 2.00 53.91 107.82
d. PP-R Elbow, 32mm dia. - 90 deg pc 2.00 31.60 63.20
e. PP-R Elbow, 25mm dia pc 4.00 20.54 82.16
f. PP-R Elbow, 20mm dia pc 12.00 12.64 151.68
g. PP-R Elbow Reducer, 38mm x 32mm dia. pc 2.00 53.91 107.82
h. PP-R Elbow Reducer, 32mm x 25mm dia. pc 2.00 50.00 100.00
h. PP-R Elbow Reducer, 25mm x 20mm dia. pc 6.00 163.07 978.42
i. PP-R Tee, 20mm dia. pc 15.00 14.80 222.00
j. Consumables (5% of Materials) 1,213.88

Sub - Total for F 27,304.57


G. Direct Unit Cost (E + F) 31,228.18
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 3,747.38
I. Contractor's Profit (CP) 8% of G 2,498.25
J. Value Added Tax (VAT) 5% of (G + H + I) 1,873.69
K. Total Unit Cost (G + H + I + J) 39,347.51
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(9) Storm Drainage and Downspout (3 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 79.50 100.36 7,978.62


b. Skilled Laborer 2 79.50 73.01 11,608.59
c. Unskilled Laborer 4 79.50 56.27 17,893.86

Sub - Total for A 37,481.07


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

a. Minor Tools (10% of labor cost) 3,748.11

Sub - Total for B 3,748.11


C. Total (A + B) 41,229.18
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 41,229.18
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. PVC Drain Pipe, 150mm dia. x 3m pc 42.00 1,975.29 82,962.18


b. Roof Drain (Dome-type strainer) pc 26.00 1,500.00 39,000.00
c. uPVC Sanitary Pipe,100mm dia. x 3m,S-1000 length 54.00 715.00 38,610.00
d. Elbow, 100mm dia. - 45 deg bend pc 36.00 60.00 2,160.00
e. PVC Solvent, 400cc can 6.00 190.00 1,140.00
f. Consumables 5% 6,078.61

Sub - Total for F 169,950.79


G. Direct Unit Cost (E + F) 211,179.97
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 25,341.60
I. Contractor's Profit (CP) 8% of G 16,894.40
J. Value Added Tax (VAT) 5% of (G + H + I) 12,670.80
K. Total Unit Cost (G + H + I + J) 266,086.76
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1002(5) Sanitary/Plumbing Fixtures (3 CL)


Unit of Measurement : l.s.
Output : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 216.75 88.12 19,100.01


b. Skilled Laborer 1 216.75 63.79 13,826.48
c. Unskilled Laborer 1 216.75 49.20 10,664.10

Sub - Total for A 43,590.59


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of labor cost) 4,359.06

Sub - Total for B 4,359.06


C. Total (A + B) 47,949.65
D. Output = 1 l.s.
E. Direct Unit Cost (C ÷ D) 47,949.65
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. Water Closet - Complete w/ fittings and acc. set 15.00 7,500.00 112,500.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
e. Faucet, Hose Bibb, Brass 12mm dia. pc 18.00 180.00 3,240.00
f. Wall Hung Lavatory - Complete w/ fittings & acc. set 2.00 6,550.00 13,100.00
g. Gate Valve, 50mm dia. pc 3.00 980.00 2,940.00
h. Gate Valve, 32mm dia. pc 6.00 627.00 3,762.00
i. Gate Valve, 20mm dia. pc 3.00 650.00 1,950.00
j. Check Valve, 50mm dia. pc 1.00 954.00 954.00
k. S.S Floor Drain 4' x 4" pc 59.00 250.00 14,750.00
l. Mirror sq.ft. 36.00 650.00 23,400.00
m. Handrail (PWD) set 2.00 4,500.00 9,000.00
n. Consumables 12,513.20

Sub - Total for F 262,777.20


G. Direct Unit Cost (E + F) 310,726.85
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 37,287.22
I. Contractor's Profit (CP) 8% of G 24,858.15
J. Value Added Tax (VAT) 5% of (G + H + I) 18,643.61
K. Total Unit Cost (G + H + I + J) 391,515.83
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : SPL-2 Dry Stand Pipe System 3CL


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1.00 788.25 88.12 69,460.59


b. Skilled Laborer 2.00 788.25 63.79 100,564.94
c. Unskilled Laborer 4.00 788.25 49.20 155,127.60

Sub - Total for A 325,153.13


No. of No. of
Name and Capacity Hourly Rate Amount (PhP)
Unit/s Hour/s
B. Equipment

Minor Tools (10% of labor cost) 32,515.31

Sub - Total for B 32,515.31


C. Total (A + B) 357,668.44
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D) 357,668.44
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

a. B.I. Pipe 100mm dia lm 20.00 1,889.00 37,780.00


b. B.I. Pipe 75mm dia lm 150.00 984.00 147,600.00
c. B.I. Pipe 65mm dia lm 60.00 708.00 42,480.00
d. B.I. Pipe 50mm dia lm 20.00 425.00 8,500.00
e. B.I. Pipe 40mm dia lm 390.00 317.00 123,630.00
f. B.I. Pipe 25mm dia lm 68.00 192.00 13,056.00
g. Fittings (Elbow, Tee, Reducer, etc) l.s. 1.00 149,218.40 149,218.40
h. Pendent 12mm dia pc 130.00 503.00 65,390.00
i. Side Wall 12mm dia pc 6.00 518 3,108.00
j. Fire Hose Cabinet with Fire Extinguisher set 6.00 24,000.00 144,000.00
k. Fire Extinguisher, 10 lbs Capacity, Wall Mounted, HCFC 123 set 15.00 6,825.00 102,375.00
l. FP-1, Horizontal Split Case Centrifugal Pump with A.C. Motor &
assy 1.00 887,692.31 887,692.31
Controller, UL/FM Approved, 350 GPM, 100psi, 30 HP, 230/3/60
m. JP-1 Vertical In-Line Centrifugal Pump with AC Motor &
assy 1.00 180,000.00 180,000.00
Controller, UL/FM Approved, 10GPM, 3HP, 100psi, 230, 3/60
n. Gate Valve (OS & Y), 100mm dia unit 1.00 31,680.00 31,680.00
o. Y-Strainer unit 1.00 36,118.45 36,118.45
p.Check Valve unit 1.00 17,500.00 17,500.00
q. Alarm Check Valve Assembly unit 1.00 63,360.00 63,360.00
r. Globe Valve unit 1.00 9,114.00 9,114.00
s. Pressure Reducing Valve unit 1.00 104,099.33 104,099.33
t. Float Valve unit 1.00 77,396.68 77,396.68
u. Water Flow Switch unit 1.00 6,468.00 6,468.00
v.Floor Control Valve unit 1.00 8,303.00 8,303.00
w. Pressure Gauge unit 1.00 971.13 971.13
x. FDC Siamese Twin: Two-Way unit 1.00 6,500.00 6,500.00
y. Isolation Valve unit 1.00 18,000.00 18,000.00
z. Water Flow Meter unit 1.00 58,084.99 58,084.99
aa. Drain Off Valve unit 1.00 19,557.51 19,557.51
bb. Roof Manifold unit 1.00 16,199.14 16,199.14
cc. Hangers and Support l.s. 1.00 37,304.60 37,304.60
dd. Electrical Works for Pumps from Main Breaker l.s. 1.00 15,000.00 15,000.00
ee. Miscellaneous and Consumables l.s. 1.00 5,000.00 5,000.00
ff. Testing and Commissioning l.s. 1.00 91,266.55 91,266.55
gg. Overhead Water Tank 2000 US Gal unit 2.00 167,000.00 334,000.00
hh. Fire Reserve Tank 7000 US gal unit 1.00 103,703.70 103,703.70
ii. Concrete m³ 15.45 6,434.06 99,406.16
jj. Rebar kg 648.90 57.98 37,621.47
kk. Plaster Finish m² 66.00 181.14 11,955.02
ll. Cement Based Waterproofing bag 159.00 50.00 7,950.00
mm. .60 x .60 Manhole ea 2.00 21,000.00 42,000.00
nn. End-Suction Centrifugal Water Pump, TDH 22m, 2.0HP, 80GPM unit 2.00 36,780.00 73,560.00

Sub - Total for F 3,236,949.44


G. Direct Unit Cost (E + F) 3,594,617.88
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 431,354.15
I. Contractor's Profit (CP) 8% of G 287,569.43
J. Value Added Tax (VAT) 5% of (G + H + I) 215,677.07
K. Total Unit Cost (G + H + I + J) 4,529,218.53
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : SPL-3 Septic Vault Type E (3 CL)


Unit of Measurement : l.s.
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 51.00 100.36 5,118.36


b. Skilled Laborer 2 51.00 73.01 7,447.02
c. Unskilled Laborer 4 51.00 56.27 11,479.08

Sub - Total for A 24,044.46


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 2,404.45

Sub - Total for B 2,404.45


C. Total (A + B) 26,448.91
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D) 26,448.91
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

b. Concrete cu.m. 12.69 6,434.06 81,648.17


c. Reinforcement Steel Bars kg 896.70 57.98 51,988.25
d. Plaster Finish sq.m. 122.35 181.14 22,162.08
e. Cement-Based Waterproofing - Sahara bag 296.00 50.00 14,800.00
f. 6" CHB (150mm) sq.m. 7.00 175.00 1,225.00
g. 4" CHB (100mm) sq.m. 3.50 125.00 437.50

Sub - Total for F 172,260.99


G. Direct Unit Cost (E + F) 198,709.89
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 23,845.19
I. Contractor's Profit (CP) 8% of G 15,896.79
J. Value Added Tax (VAT) 5% of (G + H + I) 11,922.59
K. Total Unit Cost (G + H + I + J) 250,374.47
DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1001(6)b1 Catch Basin -1 (3 CL)


Unit of Measurement : ea
Output per hour : 1

No. of No. of
Designation Hourly Rate Amount (PhP)
Person/s Hour/s
A. Labor

a. Construction Foreman 1 1.00 88.12 88.12


b. Skilled Laborer 1 1.00 63.79 63.79
c. Unskilled Laborer 1 1.00 49.20 49.20

Sub - Total for A 201.11


No. of
Name and Capacity No. of Unit/s Hourly Rate Amount (PhP)
Hour/s
B. Equipment

Minor Tools (10% of labor cost) 20.11

Sub - Total for B 20.11


C. Total (A + B) 221.22
D. Output per Hour = 1 ea
E. Direct Unit Cost (C ÷ D) 221.22
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F. Materials

b. Concrete cu.m. 0.07 6,434.06 450.38


c. Reinforcement Steel Bars kg 8.63 57.98 500.34
d. Masonry Units sq.m. 0.80 125.00 100.00
e. Plaster Finish sq.m. 1.76 181.14 318.80

Sub - Total for F 1,369.53


G. Direct Unit Cost (E + F) 1,590.75
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 190.89
I. Contractor's Profit (CP) 8% of G 127.26
J. Value Added Tax (VAT) 5% of (G + H + I) 95.44
K. Total Unit Cost (G + H + I + J) 2,004.34