Detailed Unit Price Analysis (DUPA) FORM POW-2015-01D-00
Detailed Unit Price Analysis (DUPA) FORM POW-2015-01D-00
Detailed Unit Price Analysis (DUPA) FORM POW-2015-01D-00
No. of No. of
Designation Hourly Rates Amount (Php)
Person Hours
A.1 Labor
a. Construction Foreman 1.00 1.00 116.45 116.45
b. Unskilled Laborer 3.00 1.00 64.95 194.85
Sub-Total for A.1 As Submitted 311.30
A.2 Labor
NAME
Engineer I (PRC # 164038)
Planning and Design Section
NAME NAME
Engineer II Engineer III
Planning and Design Section Planning and Design Section