15cm 3.5cm 1.6cm 1.6cm 8.2cm 8.2cm 25cm 27.4cm

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1.6cm 1.

6cm 15cm

3.5cm
8.2cm 8.2cm 25cm 8cm 3.5cm 27.4cm
2cm CHAMFER
(TYP)

9cm

10cm
9cm
5cm
Ø1.8cm (TYP) 10mm
13mm

R22.5cm
13mm

8" PIPE (219 O.D. / 203 I.D.)


700cm

700cm

m
20cm 10cm

1c
R1

4cm
12cm 4cm 5cm

YP m
.8 c
)
R0
6cm
4cm

4cm
180°

(T
Ø2.1cm (TYP)

5cm
(TYP) Ø2.1cm

10cm

10cm
m
1c
6mm 6mm

R1
36.8cm
TRIM TAPER
3.5cm
(TYP)

5cm
42cm
80cm

24cm
14cm

10cm
6mm

Ø2.1cm 6mm
(TYP)

8" PIPE (219 O.D. / 203 I.D.)


374.2cm
3.5cm 187.1cm
(TYP)

Ø2.1cm (TYP)
3.5cm
(TYP)

(3 TOTAL) 76x76x6

273.1cm
50.9cm
43.3cm

3.5cm 136.6cm
(TYP)

8" PIPE (219 O.D. / 203 I.D.)

Ø2.1cm (TYP)
3.5cm
(TYP)

(3 TOTAL) 76x76x6

PREPARED BY: SHEET CONTENTS:


PROJECT & LOCATION: CHECKED BY: REVIEWED BY : RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

ALBERT C. ARUJ III TOWER DETAILS REPUBLIC OF THE PHILIPPINES


PROPRIETOR / GEN. MANAGER AS STAKED PLAN FOR THE
CITY GOVERMENT OF BUTUAN
RAMISES CONSTRUCTION CONSTRUCTION OF FOOTBRIDGE, BRGY. MANILA DE BUGABUS OFFICE OF THE CITY ENGINEER T-03
General Engineering General Building J.Rosales Ave., Brgy. Doongan, Butuan City ROCKY JOHN E. MONTENEGRO BOYD JACINTO R. BAHAN ARMANDO A. ABADAY RONNIE VICENTE C.LAGNADA
Project Engineer OIC Chief, Construction Division OIC, City Engineer City Mayor
BRGY. MANILA DE BUGABUS, BUTUAN CITY