Rfi
Rfi
Date Over-due
Description
Submitted
by
Submitted on
Target Date
on
Replied on
Status
QJI-TS-RFI-ME-001
CNQC
5-Mar-14
7-Mar-14
10-Mar-14
Closed
QJI-TS-RFI-ME-002
CNQC
5-Mar-14
7-Mar-14
10-Mar-14
Closed
QJI-TS-RFI-ME-003
CNQC
31-Mar-14
4-Apr-14
8-Apr-14
Closed
QJI-TS-RFI-ME-PS-004
CNQC
5-Apr-14
9-Apr-14
15-Apr-14
Closed
QJI-TS-RFI-ME-PS-005
CNQC
30-Jun-14
11-Jul-14
14-Jul-14
Closed
QJI-TS-RFI-ME-PS-006
CNQC
4-Jul-14
11-Jul-14
14-Jul-14
Closed
QJI-SS-RFI-ME-PS-007 R1
(QJI-SS-RFI-ME-PS-007)
CNQC
29-Jul-14
14-Aug-14
4-Aug-14
Closed
QJI-SS-RFI-ME-PS-008
CNQC
2-Jan-15
19-Jan-15
9-Jan-15
Closed
QJI-SS-RFI-ME-PS-009(Rev-1)
CNQC
26-Mar-15
9-Apr-15
30-Mar-15
Closed
10
QJI-SS-RFI-ME-PS-010
CNQC
31-Mar-15
14-Apr-15
8-Apr-15
Closed
11
QJI-SS-RFI-ME-PS-011
Information avout the relocation of the floor trap crash with the post
tension beam @ Level 2
CNQC
4-Apr-15
18-Apr-15
6-Apr-15
Closed
12
QJI-SS-RFI-ME-PS-012
Information about the required make up water flow rate & water
quality
CNQC
9-Apr-15
23-Apr-15
4-May-15
Closed
13
QJI-SS-RFI-ME-PS-013 (R1)
CNQC
19-May-15
29-May-15
25-May-15
Closed
14
QJI-SS-RFI-ME-PS-014
CNQC
25-Apr-15
9-May-15
15-May-15
Closed
15
QJI-SS-RFI-ME-PS-015
CNQC
5-May-15
19-May-15
5-May-15
Closed
16
QJI-SS-RFI-ME-PS-016
CNQC
14-May-15
29-May-15
17
QJI-SS-RFI-ME-PS-017
CNQC
25-May-15
9-Jun-15
1/5
Closed
26-May-15
Closed
25-Jul-15
Remarks
18
QJI-SS-RFI-ME-PS-018
CNQC
9-Jun-15
23-Jun-15
10-Jun-15
Closed
19
QJI-SS-RFI-ME-PS-019 (Rev-2)
Information about Details of Gully Trap and Request for the size of
Gully Trap
CNQC
3-Jul-15
17-Jul-15
6-Jul-15 /
15-Jul-15
Closed
20
QJI-SS-RFI-ME-PS-020
CNQC
13-Jun-15
27-Jun-15
17-Jun-15
Closed
DPA Commented /
Updated date:
Date Over-due
25-Jul-15
Description
Submitted
by
Submitted on
Target Date
on
Replied on
Status
QJI-SS-RFI-ME-EL-001
CNQC
24-Jun-14
8-Jun-14
4Jun14
Closed
QJI-SS-RFI-ME-EL-002
CNQC
26-May-14
8-Jun-14
4Jun14
Closed
QJI-SS-RFI-ME-EL-003
CNQC
26-May-14
8-Jun-14
4Jun14
Closed
QJI-SS-RFI-ME-EL-004
CNQC
29-May-14
12-Jun-14
4Jun14
Closed
QJISSRFIMEEL005
CNQC
11-Jun-14
25-Jun-14
14-Jul-14
Closed
QJISSRFIMEEL006
CNQC
11-Jul-14
14-Jul-14
Closed
QJISSRFIMEEL007
CNQC
27-Jun-14
15-Jul-14
16Aug14
Closed
QJISSRFIMEEL008
CNQC
1-Jul-14
18-Jul-14
21-Aug-14
Closed
QJI-SS-RFI-ME-EL-009
CNQC
1-Jul-14
18-Jul-14
21-Aug-14
Closed
10
QJI-SS-RFI-ME-EL-010
CNQC
4-Jul-14
21-Jul-14
15-Jul-14
Closed
11
QJISSRFIMEEL011
CNQC
17-Jul-14
4-Aug-14
21-Aug-14
Closed
12
QJISSRFIMEEL012
CNQC
25-Jul-14
14-Aug-14
3-Sep-15
Closed
13
QJISSRFIMEEL013
CNQC
5-Aug-14
20-Aug-14
3-Sep-15
Closed
14
CNQC
25-Aug-14
10-Sep-14
3-Sep-15
Closed
CNQC
29-Aug-14
12-Sep-14
18-Mar-15
Closed
16
QJISSRFIMEEL014
QJISSRFIMEEL015
QJISSRFIMEEL016
CNQC
4-Sep-14
19-Sep-14
11-Sep-14
17
QJISSRFIMEEL017
CNQC
8-Sep-14
22-Sep-14
Closed
18
QJI-SS-RFI-ME-EL-018
CNQC
8-Sep-14
22-Sep-14
Closed
19
QJI-SS-RFI-ME-EL-019
CNQC
8-Sep-14
22-Sep-14
Closed
15
2/5
Closed
Remarks
20
QJI-SS-RFI-ME-EL-020
CNQC
8-Sep-14
22-Sep-14
Closed
21
QJI-SS-RFI-ME-EL-021
CNQC
8-Sep-14
22-Sep-14
22
QJI-SS-RFI-ME-EL-022
CNQC
12-Dec-14
26-Dec-14
3-Feb-15
Closed
23
QJI-SS-RFI-ME-EL-023 A
CNQC
6-Mar-15
27-Mar-15
27-Jun-15
Closed
24
QJI-SS-RFI-ME-EL-024
CNQC
5-Mar-15
19-Mar-15
11-Mar-15
Closed
25
QJI-SS-RFI-ME-EL-025
CNQC
11-Apr-15
24-Apr-15
23-Apr-15
Closed
26
QJI-SS-RFI-ME-EL-026
CNQC
13-Apr-15
20-Apr-15
15-Apr-15
Closed
27
QJI-SS-RFI-ME-EL-027
CNQC
23-Apr-15
7-Apr-15
25-May-15
Closed
28
QJI-SS-RFI-ME-EL-028
CNQC
23-Apr-15
7-Apr-15
3-Jun-15
Closed
29
QJI-SS-RFI-ME-EL-029
CNQC
23-Apr-15
7-Apr-15
3-Jun-15
Closed
30
QJI-SS-RFI-ME-EL-030
CNQC
23-Apr-15
7-Apr-15
3-Jun-15
Closed
CNQC
27-Apr-15
11-May-15
28-May-15
Closed
CNQC
5-May-15
19-May-15
Closed
31
QJI-SS-RFI-ME-EL-031
32
QJI-SS-RFI-ME-EL-032
33
QJI-SS-RFI-ME-EL-033
CNQC
21-May-15
4-Jun-15
16-Jul-15
34
QJI-SS-RFI-ME-EL-034
CNQC
25-May-15
8-Jun-15
26-May-15
Closed
35
QJI-SS-RFI-ME-EL-035
CNQC
8-Jun-15
22-Jun-15
22-Jun-15
Closed
36
QJI-SS-RFI-ME-EL-036
RFI for how to rectify the lightning tape (copper Tape) at Level 3
the existing Shangrila Hotel
CNQC
16-Jun-15
30-Jun-15
37
QJI-SS-RFI-ME-EL-037
CNQC
23-Jun-15
Urgent
26-Jun-15
38
QJI-SS-RFI-ME-EL-038
CNQC
2-Jul-15
16-Jul-15
3-Jul-15
Closed
39
QJI-SS-RFI-ME-EL-039
CNQC
2-Jul-15
16-Jul-15
3-Jul-15
Closed
40
QJI-SS-RFI-ME-EL-040
CNQC
3-Jul-15
10-Jul-15
6-Jul-15
3/5
41
QJI-SS-RFI-ME-EL-041
CNQC
6-Jul-15
20-Jul-15
9-Jul-15
42
QJI-SS-RFI-ME-EL-042
CNQC
8-Jul-15
22-Jul-15
16-Jul-15
43
QJI-SS-RFI-ME-EL-043
CNQC
15-Jul-15
29-Jul-15
Updated date:
Description
Submitted
by
Submitted on
Target Date
on
Replied on
Status
QJI-SS-RFI-ME-PLD-001
CNQC
11-Apr-15
27-Apr-15
27-May-15 Closed
QJI-SS-RFI-ME-PLD-002
CNQC
9-May-15
25-May-15
27-May-15 Closed
QJI-SS-RFI-ME-PLD-003
RFI on confirm for Lighting quantity and lighting type for UFO F07
CNQC
15-Jun-15
29-Jun-15
QJI-SS-RFI-ME-PLD-004
CNQC
8-Jul-15
22-Jul-15
Updated date:
Date Over-due
25-Jul-15
Remarks
Date Over-due
25-Jul-15
Description
Submitted
by
Submitted on
Target Date
on
Replied on
Status
Remarks
To submit the bridge structure
drawing/ sketch details to
illustrate.
QJISSRFIMEACMV001
CNQC
31-Jul-14
15-Aug-14
10Oct14
Resubmit
QJISSRFIMEACMV002
CNQC
27-Aug-14
15-Sep-14
10-Apr-15
Closed
QJI-SS-RFI-ME-ACMV-003
CNQC
7-Jan-14
22-Jan-14
8-Jan-14
Closed
Closed
Closed
QJI-SS-RFI-ME-ACMV-004
QJI-SS-RFI-ME-ACMV-005 B
CNQC
CNQC
28-Jan-15
8-May-15
4/5
11-Feb-15
22-May-15
3-Feb-14
29-May-15
QJI-SS-RFI-ME-ACMV-006
CNQC
24-Feb-15
10-Mar-15
10-Apr-15
Closed
ACE:
1.No Objection on the proposed
size of 1200x800;
2. The location can be shifted a bit
towards GL Y8.
3. To seek approval from architect
and structure Engineer.
QJI-SS-RFI-ME-ACMV-007 A
CNQC
12-Mar-15
26-Mar-15
1-Apr-15
Closed
By Mail: To proceed.
QJI-SS-RFI-ME-ACMV-008
CNQC
25-Mar-15
8-Apr-15
9-Apr-15
Closed
QJI-SS-RFI-ME-ACMV-009
CNQC
4-May-15
18-May-15
10
QJI-SS-RFI-ME-ACMV-010
CNQC
13-May-15
27-May-15
14-May-15
Closed
11
QJI-SS-RFI-ME-ACMV-011
CNQC
14-May-15
21-May-15
15-May-15
Closed
12
QJI-SS-RFI-ME-ACMV-012
CNQC
22-May-15
5-Jun-15
13
QJI-SS-RFI-ME-ACMV-013
CNQC
24-Jun-15
8-Jul-15
26-Jun-15
Closed
14
QJI-SS-RFI-ME-ACMV-014
CNQC
24-Jun-15
8-Jul-15
20-Jun-15
Closed
15
QJI-SS-RFI-ME-ACMV-015
CNQC
16-Jul-15
30-Jul-15
Closed
Updated date:
Description
Submitted
by
Submitted on
Target Date
on
Replied on
18-Aug-14
QJISSRFIMELES001
CNQC
12-Aug-14
1-Sep-14
QJISSRFIMELES002
CNQC
25-Aug-14
17-Sep-14
Status
Closed
Closed
QJI-SS-RFI-ME-LES-006A
CNQC
11-Mar-15
25-Mar-15
11-Mar-15
QJI-SS-RFI-ME-LES-007
CNQC
26-Feb-15
12-Mar-15
3-Mar-15
Closed
QJI-SS-RFI-ME-LES-008
CNQC
10-Mar-15
24-Mar-15
10-Mar-15
Closed
QJI-SS-RFI-ME-LES-009
10mm protrusion for Lift Wall finishes for Lift No. PL01-PL08,
FL01-02 and PD01-04
CNQC
23-May-15
4-Jun-15
25-May-15
Closed
QJISSRFIMELES003
QJI-SS-RFI-ME-LES-004
QJI-SS-RFI-ME-LES-005
CNQC
24-Sep-14
10-Oct-14
CNQC
25-Sep-14
9-Oct-14
CNQC
23-Jan-15
5/5
16-Sep-14
Closed
6-Feb-15
26-Jan-15
Closed
Closed
Date Over-due
25-Jul-15
Remarks
Kindly take note the repeater
is not required.