Structural Design
Of
SHOPPING & OFFICE
COMPLEX
Acknowledgment
Our greatest thanks from the depth of our heart is to God for endowing
us with the courage, strength as well as health through out our school time
and for the successful accomplishment of this project.
Next we would like to express deepest gratitude and respect to our project
advisor Ato hailu biyadegelegn for his valuable advice and in providing relevant
hint and his encouragement for the completion of this work from the bottom of
our heart. We also extend our thanks to all staff of civil engineering
department, librarians and administrative workers of the faculty.
Finally we would like to dedicate this project to our families whose moral
& material support kept us through the ups and downs of our academic life.
ABINET KIFLE
BINEYAM KEBEDE
SEIFUMIKAEL ERMIAS
ABDULHAKIM MUDESIER
ABIYE BEKELE
JUNE 2009
2
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Table of content
INTRODUCTION.1
CHAPTER ONE...2
GENERAL
STRUCTURAL LAYOUT ..5
CHAPTER TWO.15
ROOF ANALISIS AND DESIGN
CHAPTER THREE 30
SOLID SLAB DESIGN FOR THE ROOF SLAB
WIND LOAD ON THE ROOF SLAB..32
CHAPTER FOUR.74
DESIGN OF RIBBED SLABS
CHAPTER FIVE .103
DESIGN OF BASEMENT FLOOR SOLID SLAB
CHAPTER SIX 134
DESIGN OF STAIR CASE
DESIGN OF RAMP169
CHAPTER SEVEN.173
FRAME ANALYSIS
LATERAL LOAD ANALYSIS
Mass center of structure 1 177
Mass center of structure 2 ...192
CHAPTER EIGHT .235
FRAME ELEMENT DESIGN
BEAMS DESIGN236
COLUMN DESIGN.246
CHAPTER NINE.260
FOUNDATION DESIGN
APPENDIX268
ETABS OUTPUT
ARCITECTURAL & STRUCTURAL DRAWING
3
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
INTRODUCTION
The objective of this project is to examine the integrated techniques used
in the design of a building.
The structural design of this multipurpose building involves design of
floor slabs, stairs, beams, columns, foundation and analysis of frames.
The building is composed of ribbed slabs from the first floor to fifth floor
and solid slabs at roof, ground and basement floors. Live load and dead load
analysis is made according to EBCS-1, 1995. After the minimum depth of slab
for serviceability limit state were determined, the slabs were designed for
partition load, floor finish using self weight load and live loads according to
EBCS-1, 1995 The Ribbed slabs were analyzed using ETABSv9.2, using
different combinations and analyzed for the worst load condition. The ground
floor slab is designed using coefficient & strip method according to EBCS21995. Stairs and landings were designed as one-way slab.
For the analysis of frames, the restrained conditions at the foundation
level are assumed fixed. Loads acting on beams from slab reactions and walls
directly resting on beams were added to self-weight of beams to find total load
acting on beams. These were inserted and analyzed using ETABSv9.2 analysis
for five load combinations.
The design of beams and columns is done for the critical moments shears
and axial loads obtained from the live load combinations mentioned above of
the selected axis. Beams were designed according to EBCS-2, 1995 provisions.
To simplify the design procedure calculation is done using designed Excel
spread sheets.
The size of the footing was determined from the bearing capacity of the
soil; the thickness of the footing is determined from punching and wide beam
shear. Finally the footing was designed for flexure using design tables.
The limit state design method has been adopted for the design of the
components. The Ethiopian Building code of standards, EBCS-1, EBCS-2,
ESCP-2, ESCP-2 Part II, EBCS-7, and EBCS-8 1995 design charts are used.
4
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
CHAPTER ONE
GENERAL
1
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
GENERAL
Design data and material properties
Concrete
Class I workmanship and ordinary loading condition is used.
Sub structure
Concrete grade
C-25 Class I
f ck = 0.8 * 25 = 20Mpa
f cd =
0.8 * f ck
= 11.33Mpa
[Tension]
f ctk = 1.5Mpa
E cm = 29Gpa
f ctd =
f ctk
1.5
= 1.0Mpa
1.5
[EBCS -2, 1995 table 2.4 & 2.5]
2
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Superstructure
Concrete grade
c = 1.5
C-25
(Ordinary loading)
f ck = 0.8 * 25 = 20Mpa
f cd =
0.8 * Fck
= 11.33Mpa
f ctk = 1.5Mpa
E cm = 29Gpa
f ctd =
f ctk
1.5
= 1.0Mpa
1.5
[EBCS -2, 1995 table 2.4 & 2.5]
Reinforcement Steel
f yk = 300Mpa
s = 1.15
f yd =
f yk
300
= 260.87 Mpa
1.15
E s = 200Gpa
Design load
FD = f FK
Where: - Fk= Characteristic load
f = Partial safety factor for loads
1.6 For live load
1.3 For dead load
3
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
EBCS 1, 1995
EBCS 2,1995
EBCS 2,1995, part 2
ESCP 2,1983
ESCP 2,1983, part 2
EBCS 7,1995
EBCS 8,1995
4
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Structural Layout
5
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
6
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
7
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
8
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
9
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
10
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
11
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
12
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
13
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
14
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
CHAPTER TWO
ROOF ANALYSIS AND DESIGN
15
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Lattice
purlin
Beam support
3D section view
Live load
The roof is categorized as H roof not accessible except normal
maintenance, repair and painting.
There for the characteristic dead load is
Qk=1KN
, qk = 0.25KN/m2
16
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
qref =
2
Where: = air density in Kg/m3
Vref=refernce wind velocity
For Ethiopia Vref= 22m/s
Cdir=Ctemp=Calt=1
Vref=Cdir*Ctemp*Calt*Vref=22m/s
For altitude of 2200 m =0.94 Kg/m3 (Addis Ababa)
0.94
qref =
* 22 2 = 227 .48 N / m 2 = 0.22748 KPa
2
The exposure coefficients Ce(Z) can be simply read from table 3.5 of
EBCS 1.
Roof Over 5th Floor LEVEL @26.85m
e/10
e/4
Wind @ =0
e/10
b = 21.35m
= tan-1( 2/6.15)=180
F
12.30
ridge
17
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Reference height, ze
Ze= h =26.85
e=b or 2h whichever is smaller
e=min (21.35, 2*26.85) = min. (21.35, 53.7) =21.35m
= e = 21.35 = 5.337m
4
4
For Z= 21.35 m >Zmin = 16m for category- iv Urban Area from table
3.3[EBCS2], the roughness coefficient
Cr(Z) become
Cr
0.67
?
0.82
Z
16m
27.50
30m
0.82-0.67 = 0.82-x
30-16
30-26.85
x=0.7273
cr = 0.7273
Topography coeff. (Ct) becomes
Ct=1 for <0.05
For category iv building (table 3.5 of EBCS-1) for Ct=1
Ce= 1.56
for Z= 16m and
Z= 26.85
Ce=?
Ce =2.04
for Z=30m
2.04 -1.56 = 2.04 - x
30-16
30-26.85
Ce = 1.932 (by linear interpolation).
i.e.Ce (Z= 26.85)=1.932
Calculation of Cpe and Cpi
All zone areas are greater than 10 m2
CASE 1: Wind direction at = 00
Pitch
angle a
15
18.00
30
F
Cpe,10
-0.9
Cpe,1
-2
0.2
-0.82
-1.90
0.30
-0.5
-1.5
0.7
I
Cpe,10
J
Cpe,1
Cpe,10
Cpe,1
-0.4
-1
-1.5
-0.40
-0.90
-1.20
-0.4
-0.5
The pressure coefficients for each zone are given in Table A-4 EBCS-1, 1995
18
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
F
-0.82
0.30
Cpe
J
-0.90
Both +ve and -ve values are given for zones F,G and H, the most critical value should be selected when
considering combinations with internal pressure coefficients.
-0.28
-0.82
-0.90
0.24
0.30
-0.28
-0.40
H
-0.74
0.30
-0.90
0.24
-0.40
H
J
I
I
H
12.30
Wind
G
e/10
F
e/2
Pitch
angle a
15
18
30
ZONE
Cpe
F
Cpe,10
-1.3
-1.26
-1.1
F
-1.26
Cpe,1
-2
-1.90
-1.5
G
-1.32
H
-0.64
I
Cpe,10
Cpe,1
-0.5
-0.50
-0.5
I
-0.50
19
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
-1.32
-1.32
-1.26
-1.26
-0.64
-0.64
ZONE F & G
-0.50
ZONE H
-0.50
ZONE I
Internal pressure
For closed buildings with internal partitions and openings
Cpi = 0.8
or 0.5
Net pressure = Wnet= We-Wi
=qref*Ce(z)*[Cpe-Cpi]
=0.22748*1.932*(Cpe-Cpi)
= 0.439*(Cpe-Cpi)
Cpe-Cpi
NET P
-1.26
0.8
Cpe-Cpi
NET P
-0.28
0.8
I
0.24
-0.5
-0.4
0.8
J
0
-0.5
-0.9
0.8
0
-0.5
-1.62
0.80
-1.54
0.80
-1.08
0.74
-1.20
0.50
-1.70
0.50
-0.7112 0.3512 -0.6761 0.3512 -0.4741 0.32486 -0.5268 0.2195 -0.746 0.2195
Cpe
Cpi
-1.32
0.8
-0.64
0.8
-0.5
0.8
-2.06
-2.12
-1.44
-0.90434 -0.93068 -0.63216
-1.3
-0.5707
20
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Design load
Dead load transferred from the roof cover ( polycarbonated sheet in
aluminum framing )will be approximated as:
Polycarbonated sheet= 0.005*25 =0.125KN/m2
Aluminum framing =
[2(0.05+0.05)*0.004*1]*27/1m2=0.0216KN/m2
Total= 0.1466KN/m2
Load combinations
I. Distributed live load + dead load
1.3DL+1.6LL
II. Concentrated live load +dead load
1.3DL+1.6LL
III. Wind load + dead load
0.9DL +1.6 WL
IV. Wind load +concentrated live load +dead load
1.3DL +1.35(LL+WL)
V. Wind load +distributed live load +dead load
1.3DL +1.35(LL+WL)
In the above combinations wind load will be checked for both max
suction & positive pressure
Live load for sloping roof will be
Distributed live load =0.25KN/m2
Concentrated live load =1KN
(table 2.14of EBCS-1)
And Separated analysis should be carried for both cases.
Design of purlins
Purlin c/c spacing = 1.10m
Truss c/c spacing = 5.00m
Loading
Dead load of polycarbonated sheet in aluminum framing
=0.1466* purlin spacing
=0.1466*1.10m =0.1612 KN/m
DL &LL
WL
=180
21
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
After analyzing all load combination the max. moment & shear on the
purlin
become
From ETABS 9.2
(Combination 3)
Bending moment
diagram (KNm)
Shear force
diagram (KN)
22
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
200mm
250mm
5m
23
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
After analyzing all load combination the max. Axial force & shear on the
purlin
become
Shear force
diagram (KN)
For ST20
A=0.73cm2
Tf=1mm= tw
d=h-3t =20-3*1=17mm b=20mm
Internal element of compression flange: b/tf =20/1=2042e (42*1) class 1
Web subjected to compression only: d/tw=17/1=1733e (33*1) class 1
The section is class one (plastic) section.
24
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
1.10m
1.05m
4.30m
3.00m
2.40m
1.8m
8.40m
1.8m
25
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Max. Reaction
(Combination 3) in KN
2*3.65=7.3KN
7.3KN
7.3KN
7.3KN
7.3KN
7.3KN
0.02KN
7.3KN
7.3KN
7.3KN
7.3KN
7.3KN
7.3KN
7.3KN
gM1=1.1
For all cold formed RHS buckling curve b (table 4.11of EBCS-3) is used
Fyb =fy
Le (for the longest compressive member )=2.0m
Radius of gyration ( i ) =ry=16.2mm
l = Le /i
= 2000/16.2
=123.45
For Fe360, l1=93.3e=93.3
ly=(ly/l1)(bA)
=(123.45/93.3) (1)
=1.323
From table 4.9 of EBCS-3 the reduction factor X for curve b and
ly=1.323
X=0.4269 for l=1.3 and
X=?
for l=1.323
X=0.3817 for l=1.4
X=0.4165(after interpolation)
Nb,Rd=X* A* A* fy
gM1
=0.4165*1*374*235/1.1
=40.267KN > 22.61KN safe!
For Fe360 steel grade fy=235N/mm2. Thus
e=sqrt(235/fy)=sqrt(235/235)=1
For RT53 (50x30x2)
Sy=2.86cm3
Sx=3.81cm3
d=h-3t =50-3*2=44mm b=30mm
Tf=2mm= tw
Internal element of compression flange: b/tf =30/2=15 42e (42*1) class 1
Web subjected to compression only: d/tw=44/2=2233e (33*1) class 1
The section is class one (plastic) section.
28
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
29
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
CHAPTER THREE
SOLID SLAB DESIGN FOR THE ROOF SLAB
30
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Cantilever Slabs
Slab No
Le
Span ratio
S4
5000
1.68
128.01
S5
S6 & S9
7500
6150
1.12
1.22
164.30
138.29
S8
7500
1.12
End span
38.80
164.30
S11
4500
1.52
End span
34.80
109.91
S12
6600
1.04
End span
39.60
141.67
S13
6850
1.23
154.44
4500
1.67
6600
1.14
S26
6600
1.14
S21
6000
1.25
S15,S23
&S25
S16 ,S24,
S28&S18
Span type
End span
Effective depth
33.30
114.86
145.34
End span
38.60
145.34
136.00
d=0.85 Le
a
USE D=190mm
dx=190-15-4=171mm
dy=190-15-8-4=163mm
31
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
= 0.1*23 = 2.30
= 0.19*25 = 4.75
ii)
iii)
Wind load : (W.L)
According to EBCS1, Art 3.5.2, the wind pressure acting on the external
surface of a structure shall be:
We=qref*Ce(Ze)*Cpe
And the internal pressure acting on the internal surfaces becomes,
Wi=qref*Ce(Zi)*Cpi
Where:
qref =
Vref 2
2
Where: = air density in Kg/m3
Vref=refernce wind velocity
For Ethiopia Vref= 22m/s
Cdir=Ctemp=Calt=1
Vref=Cdir*Ctemp*Calt*Vref=22m/s
For altitude of 2200 m =0.94 Kg/m3 (Addis Ababa)
0.94
qref =
* 22 2 = 227 .48 N / m 2 = 0.22748 KPa
2
The exposure coefficients Ce(Z) can be simply read from table 3.5 of
EBCS 1.
32
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
3
4
Duopitch roof
PANEL 1
G
F
HHHH
Reference height, ze
Ze= h =22.35m
e=b or 2h whichever is smaller
e=min (21.75, 2*22.35) = min. (21.75, 44.7) =21.75m
= e = 21.75 = 5.4375m
4
4
For Z= 22.35 m >Zmin = 16m for category- iv Urban Area from table
3.3[EBCS2], the roughness coefficient
33
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Cr(Z) become
Cr
0.67
?
0.82
Z
16m
22.35
30m
0.82-0.67 = 0.82-x
30-16
30-22.35
x=0.738
cr = 0.738
Topography coeff.(CT) becomes
Ct=1 for <0.05
For category iv building (table 3.5 of EBCS-1) for Ct=1
Ce= 1.56
for Z= 16m and
Z= 22.35
Ce=?
Ce =2.04
for Z=30m
2.04 -1.56 = 2.04 - x
30-16
30-22.35
Ce = 1.778 (by linear interpolation).
i.e.Ce (Z= 22.35)=1.778
Calculation of Cpe and Cpi
For this flat slab Hp = 1m(parapet ht)
h = 22.35m
Hp = 1.00 = 0.0447
h
22.35
Zone
Cpe
F
-1.2457
G
-0.942
H
-0.70
We = qref Ce(ze)*cpe
-0.5038
-0.3810
- 0.2831
I
+/- 0.20
+/- 0.0809
Internal pressure
Wi = qref * Ce( Zi ) * Cpi
For closed buildings with internal partitions and openings
Cpi = 0.8
or 0.5
Wi = 0.22748 * 1.778*0.8 = 0.32357 kpa
Or Wi = 0.22748 * 1.778* (-0.5) = - 0.20223kpa
34
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
PANEL 2
Z
16m
22.35
30m
0.82-0.67 = 0.82-x
30-16
30-22.35
x=0.738
cr = 0.738
Topography coeff.(Ct) becomes
Ct=1 for <0.05
For category iv building (table 3.5 of EBCS-1) for Ct=1
for Z= 16m and
Ce= 1.56
Ce=?
Z= 22.35
for Z=30m
Ce =2.04
2.04 -1.56 = 2.04 - x
30-16
30-22.35
Ce = 1.778 (by linear interpolation).
35
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
F
-1.2457
-0.5038
Cpe
We = qref * Ce ( Ze)*Cpe
G
H
-0.942
-0.7
-0.3810 -0.2831
Internal pressure
Wi= qref * Ce(zi)*Cpi
For closed buildings with internal partitions & openings
Cpi = 0.8 or -0.5
Wi = 0.22748 * 1.778*0.8 = 0.32357 kpa
Or Wi=0.22748 * 1.778* -0.5 = - 0.20223kpa
PANEL 3
Cr
0.67
?
0.82
Z
16m
27.50
30m
0.82-0.67 = 0.82-x
30-16
30-22.35
x=0.738
cr = 0.738
Topography coeff.(Ct) becomes
Ct=1 for <0.05
For category iv building (table 3.5 of EBCS-1) for Ct=1
Ce= 1.56
for Z= 16m and
Z= 22.35
Ce=?
for Z=30m
Ce =2.04
2.04 -1.56 = 2.04 - x
30-16
30-22.35
Ce = 1.778 (by linear interpolation).
i.e.Ce (Z= 22.35)=1.778
Calculation of Cpe and Cpi
For Panel 2, Hp=1m
h = 22.35
Hp = 1 = 0.0447
h
22.35
Zone
Cpe
We = qref * Ce ( Ze)*Cpe
F
-1.2457
-0.5038
G
-0.942
-0.3810
H
-0.7
-0.2831
Internal pressure
Wi= qref * ce( zi)* cpi
For closed buildings with internal partitions and openings
Cpi=0.8
or -0.5
Wi = 0.22748 * 1.778*0.8 = 0.32357 kpa
Or Wi=0.22748 * 1.778* -0.5 = - 0.20223kpa
37
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
H
F
F
FF
Cr
0.67
?
0.82
Z
16m
27.50
30m
0.82-0.67 = 0.82-x
30-16
30-22.35
x=0.738
cr = 0.738
Topography coeff.(Ct) becomes
Ct=1 for <0.05
For category iv building (table 3.5 of EBCS-1) for Ct=1
for Z= 16m and
Ce= 1.56
Z= 22.35
Ce=?
Ce =2.04
for Z=30m
2.04 -1.56 = 2.04 - x
30-16
30-22.35
Ce = 1.778 (by linear interpolation).
38
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
F
-1.7914
G
-1.6424
H
-0.7
We = qref * Ce ( Ze)*Cpe
-0.7245
-0.6643
-0.2831
I
+/- 0.20
+/- 0.0809
For F
A=2.62
Cpe = Cpe,1+(Cpe10-Cpe1)log10 A
= -2.0424 +(-1.4424-(-2.0424))log10 2.62
= -1.7914
Internal pressure
Wi= qref * ce( zi)* cpi
For closed buildings with internal partitions and openings
Cpi=0.8
or -0.5
Wi = 0.22748 * 1.778*0.8 = 0.32357 kpa
Or Wi=0.22748 * 1.778* -0.5 = - 0.20223kpa
PANEL 5
H
F
F
F
39
Reference height, Ze
Ze= h =22.35
e=b or 2h whichever is smaller
e=min (17.663, 2*22.35)= min.( 17.663, 44.7)=17.663m
e = 17.663 = 4.416m
4
4
For Z= 22.35 m >Zmin = 16m for category-iv, the roughness coefficient
Cr(Z) become
Cr
0.67
?
0.82
cr = 0.738
Z
16m
27.50
30m
0.82-0.67 = 0.82-x
30-16
30-22.35
x=0.738
40
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Zone
Cpe
F
-1.902
G
-1.533
H
-0.7
I
+/- 0.20
We = qref Ce(ze)*cpe
-0.7693
-0.620
- 0.2831
+/- 0.0809
For F
Cpe = Cpe,1+(Cpe10-Cpe1)log10 A
= -2.0424 +(-1.4424+2.0424))log101.7144
= -1.902
For G
Cpe = Cpe1 +( Cpe10 - Cpe1)Log10A
= -1.6424 +(-0.9424+1.6424) Log101.4316
=-1.533
Internal pressure
Wi= qref * ce( zi)* cpi
For closed buildings with internal partitions and openings
Cpi=0.8
or -0.5
Wi = 0.22748 * 1.778*0.8 = 0.32357 kpa
Or Wi=0.22748 * 1.778* -0.5 = - 0.20223kpa
Max-ve pressure
(kpa)
External Internal
(1)
Over
Fifth
(2)
(3)
(4)
-0.7693
-0.20223
+0.0809
Resultant pressure
(kpa)
Acting up Acting
down
(5)
(6)=(7)=(2)+(5)
(3)+(4)
0.32357 1.09287
0.28213
41
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
LOAD COMBINATIONS
Flat Roof at elevation +22.35m
Gk=7.51 KN/m2
Qk=0.5 KN/m2
WL=-1.09287 or 0.28213 KN/m2
COMB 1:
qd=1.3GK+1.6QK=10.56kN/m2
COMB 2:
qd=0.9GK+1.6 WL=5.01kN/m2
Panel S2
5.00
2.60
42
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Panel S4
8.40
5.00
Panel S5
Ly = 8.40 = 1.12
Lx 7.50
ys = 0.032
yf = 0.024
8.40
Mxs
Mys
Mxf
Myf
=
=
=
=
0.039*10.56*7.52
0.032*10.56*7.52
0.029*10.56*7.52
0.024*10.56*7.52
23.17
19.01
17.23
14.26
KNm/m
KNm/m
KNm/m
KNm/m
7.50
Panel S6 & S9
7.50
KNm/m
KNm/m
KNm/m
KNm/m
6.15
43
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Panel S8
8.40
KNm/m
KNm/m
KNm/m
KNm/m
7.50
Panel S11
6.85
4.50
4.50
7.50
44
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Panel S12
6.60
=
=
=
=
0.044*10.56*6.602
0.037*10.56*6.602
0.033*10.56*6.602
0.028*10.56*6.602
=
=
=
=
18.40
17.02
13.80
12.88
KNm/m
KNm/m
KNm/m
KNm/m
6.85
Panel S13
Ly = 8.40 = 1.23 Two way slab
Lx 6.85
ys = 0.037
xs = 0.057
xf = 0.043
yf = 0.028
8.40
7.50
6.60
45
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Panel S26
7.50
6.60
Panel S30
Approximated as rectangular
6.95
3.55
Panel S35
2.70
=
=
=
=
0.065*10.56*1.402
0.037*10.56*1.402
0.049*10.56*1.402
0.028*10.56*1.402
= 1.35 KNm/m
= 0.77 KNm/m
= 1.01 KNm/m
=0.58 KNm/m
1.40
46
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Panel S17
Ly = 8.40 = 2.43 one way slab
Lx 3.45
10.56KN/m
8.40
3.45m
R1
R2
14.16KNm
3.45
9.25KN/m
R1DL=15.87KN
R2DL=10.04KN
Panel S37
R1LL=1.06KN
R2LL=0.67KN
R1LL=0.76KN
R2LL=0.76KN
8.40
R1
3.05m
R2
R1DL=11.45KN
R2DL=11.45KN
3.05
Panel S36
3.10m
7.70m
47
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
7.55KN/m
R1DL=14.2KN
R2DL=9.08KN
R1LL=0.95KN
R2LL=0.6KN
Cantilever slabs
Panel S1 &S38
Support Condition
Ly = 11.25 = 5.77
Lx
1.95
S1
11.25
Cantilever
Ba =10
d=.85*(1.95/10)*1000=165.75mm
D=165.75+15+10/2 =185.75
Take D=190mm
2.05
2.5KN
2.00m
0.05m
R
Mxs = (2.5*2) + (10.56*2.052 /2) = 27.18 KNm/m
RDL=17.9KN
RLL=1.03KN
2.5KN
RDL=13.77KN
RLL=0.75KN
R
1.45m
0.05m
48
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Panel S3&S7
10.56KN/m
2.5KN
0.95m
RDL=10.01KN
RLL=0.5KN
0.05m
2.5KN
RDL=13.85KN
RLL=0.76KN
1.506m
0.05m
2.65
Unsupported edge
1m
(1+K2) w
0.6m
-K2w
b
(1-K1)w
K1 w
w
K1w=0.45*10.56KN/m2
=4.752KN/m2
(1-K1)w=(1-0.45)10.56KN/m2
=5.808KN/m2
49
Mys=0.25*4.752*2.052=4.992KNm (-ve)
K2=K1(1-)2 +2mys/wb2
(2-)
=0.45(1-0.22)2-(2*4.992)/10.56*2.652
0.22(2-0.22)
=0.353
14.28
Strip 1-1
4.752
-3.727
3.727
R1
2.05
5.808
0.6
Mxs=4.73KNm
4.75
RDL1=5.29KN
RLL1=0.35KN
4
Strip 2-2
From ETABS 9.2 the value for
the moments and reaction become
5.808
W1
1m
R=W1*1
4.325m
R1
Mys = 15.66KNm
Myf = 9.52KNm
R = 8KN
W1 = 8KN/m
RDL1=12.18KN
RLL1=0.81KN
Strip 3-3
14.28*0.6=8.568KN/m
W2
R1
4.325m
1m
R=W2*1
Mys = 23.11KNm
Myf = 14.40KNm
R = 11.81KN
W2 = 11.81KN/m
RDL1=17.94KN
RLL1=1.19KN
50
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Strip 4-4
w1*1 + w =18.56
W2*1=11.81KN
W=10.5
6
RDL=39.58KN
RLL=2.66KN
2.05m
R
Mxs = 81.46KNm
0.6m
Panel S19&S20
7.50m
6.60m
Tan =7.5/6.6
= tan-1(7.5/6.6) =48.650
2
w/2
3
w
4
4
w
b/4 =6.6/4=1.65
2
1
51
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Strip 1-1
W/2
W/2
1.65
R1DL=6.2KN
R2DL=6.2KN
R1
1.65
3.30m
R1LL=0.41KN
R2LL=0.41KN
Mys=5.99KNm
R2
Myf=1.20KNm
Strip2-2
W sin
Tan48.650=(7.5-1.65)/y
=5.148
5.148m
R2
R1
R1DL=14.49KN
R2DL=14.49KN
R1LL=0.97KN
R2LL=0.97KN
Mys=17.51KNm
Myf=8.48KNm
Strip3-3
W cos
W/2
32.36KNm
5.85m
R1DL=18.5KN
R2DL=16.71KN
R1
31.0KNm
1.65
R1LL=1.23KN
R2LL=1.11KN
R2
15.93KNm
Strip4-4
W cos
4m
R1
Tan48.650=(6.6-1.65)/x
19.23KNm
1.62
21.30KNm
9.63KNm
R2
R1DL=14.39KN
R2DL=17.96KN
R1LL=0.96KN
R2LL=1.2KN
=5.62
52
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Panel 22
7.50m
6.60m
Since panel 19&20 are similar in dimension with panel 22 we use the same
strips except for strip 1-1&2-2.
Strip 1-1
W/2
Mys=8.72 KNm
W/2
Myf=5.07KNm
1.65
1.65
3.30m
R1
R1DL=5.26KN
R2DL=7.14KN
Strip2-2
R2
R1LL=0.35KN
R2LL=0.48KN
W sin
Tan48.650=(7.5-1.65)/y
=5.148
5.148m
R2
R1
R1DL=11.04KN
R2DL=17.94KN
R1LL=0.74KN
R2LL=1.2KN
Mys=25.03KNm
Myf=15.00KNm
53
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Panel 29
9.312m
8.40m
w/2
3
w
4
4
w
Tan = 9.321/8.4
=tan-1(1.1096)
=47.970
b/4 =8.40/4=2.1
2
1
Strip 1-1
W/2
W/2
Mys=9.70KNm
Myf=1.94KNm
2.1
R1
4.2m
2.10
R2
R1DL=7.89KN
R2DL=7.89KN
R1LL=0.53KN
R2LL=0.53KN
54
Strip2-2
Tan47.940=(9.31-2.1)/y
W sin
=6.50m
6.50m
R2
R1
R1DL=18.3KN
R2DL=18.3KN
Mys=27.60KNm
R1LL=1.22KN
R2LL=1.22KN
Myf=13.56KNm
Strip3-3
W cos
W/2
7.212m
R1
Mxs=72.63KNm
2.1m
R2
R1DL=28.34KN
R2DL=15.26KN
Mxf=41.16KNm
R1LL=1.89KN
R2LL=1.02KN
Strip4-4
W cos
4.48
m
2.1m
R1DL=21.46KN
R2DL=16.38KN
R1LL=1.43KN
R2LL=1.09KN
R2
R1
Tan47.940= (8.40-2.1)/x
=5.68m
Mxs=40.10KNm
Mxf=25.15KNm
55
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Panel S27
3.54m
3.96m
4.50m
7.50m
= tan-1(4.50/3.96) =48.650
b/4=4.50/4=1.12
W
W/2
3
Strip1-1
W sin
W/2
Mxs=24.55KNm
1.12
R1
2.42
R1DL=12.8KN
R2DL=14KN
3.96
R1LL=0.85KN
R2LL=0.93KN
Mxf=29.1 KNm
R2
56
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Strip2-2
W sin
1.12
2.42
2.97
Tan48.650= (4.50-1.12)/x
R2
R1
R1DL=13.73KN
R2DL=11.43KN
Mxs=20.79KNm
Mxf=16.25KNm
=2.97m
R1LL=0.91KN
R2LL=0.76KN
Strip3-3
W/2
W/2
Mys=3.92KNm
Myf=2.43KNm
1.12
2.26
R2
R1
Strip4-4
1.12
R1DL=3.6KN
R2DL=4.84KN
R1LL=0.24KN
R2LL=0.32KN
Mys=25.11KNm
4.50
Myf=15.39KNm
R2
R1
Strip5-5
R1DL=12.93KN
R2DL=20.87KN
R1LL=0.86KN
R2LL=1.39KN
W cos
Mys=16.57KNm
Myf=10.16KNm
4.50
R1
R2
R1DL=8.54KN
R2DL=13.78KN
R1LL=0.57KN
R2LL=0.92KN
57
Panel S34
Unsupported edge
ms
mf
ms
1.95
mf
By equilibrium method
1.95m
58
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
V i = vi q k L xi
S2
S4
S5
S6&S9
S8
S11
vcx =
vdx =
vcy =
vdy =
vcx =
vdx =
vcy =
vdy =
vcx =
vdx =
vcy =
vdy =
vcx =
vdx =
vcy =
vdy =
vcx =
vdx =
vcy =
vdy =
vcx =
vdx =
vcy =
vdy =
0.49
0
0.33
0
0.47
0
0.33
0
0.37
0
0.33
0
0.39
0
0.33
0
0.45
0.29
0.4
0.26
0.54
0.35
0.4
0.26
V i = vi g k L xi
0.64
0.43
1.18
0.83
1.37
1.24
1.21
1.01
1.67
1.1
1.5
0.98
1.22
0.79
0.9
0.59
9.64
6.44
17.71
12.39
20.61
18.59
18.2
15.24
25.12
16.56
22.53
14.64
18.33
11.91
13.52
8.79
59
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Vi = vi q k L xi
S15,S23
&S25
S12
S13
S16,S24
&S28
S26
S18&S21
vcx =
vdx =
vcy =
vdy =
vcx =
vdx =
vcy =
vdy =
vcx =
vdx =
vcy =
vdy =
vcx =
vdx =
vcy =
vdy =
vcx =
vdx =
vcy =
vdy =
vcx =
vdx =
vcy =
vdy =
0.54
0.35
0.36
0
0.37
0
0.36
0.24
0.45
0.29
0.36
0
0.37
0
0.33
0
0.42
0.28
0.36
0
0.37
0
0.33
0
Vi = vi g k L xi
1.21
0.8
0.81
1.23
1.19
0.79
1.54
0.99
1.23
1.23
1.09
1.39
0.92
1.19
1.23
1.09
-
18.15
11.95
12.17
18.44
17.84
11.9
23.1
14.92
18.52
18.44
16.36
20.82
13.78
17.84
18.44
16.36
-
The shear force for the rest of the slabs will be equal to the reactions
calculated from the stripes.
60
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Relative stiffness
K
s4=
I/Lx =I/5
Ks5= I/Lx=I/7.5
Distribution factors
For S4 DF= I/5
=0.60
((I/5)+(I/7.5))
For S5 DF= I/7.5
=0.40
((I/5)+(I/7.5))
61
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
0.6
15.05
S5
0.4
-23.17
0.6*(23.17-15.05) =4.875
+19.922
0.4*(23.17-15.05) =3.248
-19.922
Balanced moment
Panel No
Length
S4&S5
S5&S6
S8&S9
S5&S8
S6&S9
S11&S15
S11&S12
S12&S13
S12&S16
S4
S5
S5
S6
S8
S9
S5
S8
S6
S9
S11
S15
S11
S12
S12
S13
S12
S16
5.00
7.50
8.40
6.15
8.40
6.15
7.50
7.50
7.50
7.50
6.85
7.50
4.50
6.60
6.60
8.40
7.50
2.30
K
0.20
0.13
0.12
0.16
0.12
0.16
0.13
0.13
0.13
0.13
0.15
0.13
0.22
0.15
0.15
0.12
0.13
0.43
DF
0.60
0.40
0.42
0.58
0.42
0.58
0.50
0.50
0.50
0.50
0.52
0.48
0.59
0.41
0.56
0.44
0.23
0.77
Unbalan
ced
Moment
15.05
23.17 Use Distribution
19.01
17.18 Take Average
26.74
17.18 Use Distribution
23.17
33.87 Use Distribution
12.78
12.78 Take Average
9.63
7.91 Take Average
16.90
18.40 Take Average
18.40
18.34 Take Average
17.02
17.02 Take Average
Balance
Adjusted span
d
Moment
Moment Mxf
Myf
11.62
6.41
19.924
19.924
18.096
18.096
22.697
22.697
28.520
28.520
12.785
12.785
8.770
8.770
17.652
17.652
18.372
18.372
17.025
17.025
18.27
15.47
28.68
23.041
13.02
12.88
9.17
7.35
13.81
12.89
18.35
13.87
62
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Panel NoLength
S15&S16
S16&S24
S23&S24
S24&S26
S26&S28
S18&S21
S15&S23
S25&S26
S2&S4
S30&S6
S30&S2
S13&S17
S6&S2
S13&S14
S25&S27
S18&S19
S15
S16
S16
S24
S23
S24
S24
S26
S26
S28
S18
S21
S15
S23
S25
S26
S2
S4
S30
S6
S2
S30
S13
S17
S2
S6
S13
S14
S25
S27
S18
S19
4.50
6.60
7.50
7.50
4.50
6.60
7.50
7.50
7.50
7.50
7.50
7.50
7.50
7.50
4.50
6.60
2.60
8.40
6.95
7.50
2.60
3.55
6.85
3.45
5.00
7.50
8.40
2.65
7.50
6.51
6.60
5.15
Unbala
nced
DF Moment
0.22
0.15
0.13
0.13
0.22
0.15
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.22
0.15
0.38
0.12
0.14
0.13
0.38
0.28
0.15
0.29
0.20
0.13
0.12
0.38
0.13
0.15
0.15
0.19
0.59
0.41
0.50
0.50
0.59
0.41
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.59
0.41
0.76
0.24
0.52
0.48
0.58
0.42
0.33
0.67
0.60
0.40
0.24
0.76
0.46
0.54
0.44
0.56
16.90
23.47 Use Distribution
17.02
17.02 Take Average
16.90
23.47 Use Distribution
17.02
17.02 Take Average
17.02
14.72 Take Average
17.02
17.02 Take Average
7.91
7.91 Take Average
16.90
23.47 Use Distribution
4.50
8.45 Use Distribution
5.99
12.78 Use Distribution
4.50
12.25 Use Distribution
28.25
14.16 Use Distribution
2.28
12.78 Use Distribution
18.34
4.73 Use Distribution
7.91
20.79 Use Distribution
23.47
17.51 Use Distribution
Balance
Adjusted span
d
Moment
Moment Mxf
Myf
20.804
20.804
17.025
17.025
20.804
20.804
17.025
17.025
15.874
15.874
17.025
17.025
7.914
7.914
20.804
20.804
7.516
7.516
9.517
9.517
8.971
8.971
23.532
23.532
8.585
8.585
15.075
15.075
13.897
13.897
20.856
20.856
18.35
13.87
18.75
14.1
13.96
11.4
10.77
5.34
25.57
16.86
63
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Panel No
Length K
S18&S14
S28&S29
S27&S28
S28&S36
S36&S35
S18
S14
S28
S29
S27
S28
S28
S36
S36
S35
7.50
6.85
6.60
6.50
4.50
6.60
7.50
3.10
3.10
2.70
0.13
0.15
0.15
0.15
0.22
0.15
0.13
0.32
0.32
0.37
DF
0.48
0.52
0.50
0.50
0.59
0.41
0.29
0.71
0.47
0.53
Unbala
nced
Momen
t
17.02 Use Distribution
15.66
17.94 Use Distribution
27.60
25.11 Use Distribution
17.94
14.72 Use Distribution
11.17
11.17 Use Distribution
0.77
Balance
Adjusted span
d
Moment
Moment Mxf
Myf
16.342
16.342
22.736
22.736
20.850
20.850
13.685
13.685
6.327
6.327
18.46
13.99
64
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Unbalanced Field
Moment
Balanced field
moment
Un Balanced support
moment
Balanced support
moment
Adjusted Span
Moments
Un Balanced support
moment
Myf =20.20
Mys =22.70
Reinforcement calculations
fyk = 300Mpa, c = 1.15
fyd = fyk = 300 = 260.87 Mpa
c
1.15
As min = min bd
66
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Smax = 2D
350
y - direction
min = 0.5
fyx
= 163
= 0.5 = 0.00167
300
= [ 1 ( 1- 2Mmax ) ] * f cd
fyd
bd2*f cd
= [ 1 - ( 1- 2*18.7*106
1000*1712*11.33
) ] * 11.33
260.87
= 0.0025
As = bd
As = 0.0025* 1000*171 = 427.5mm2
Using F8 bar
Spacing
S = as * b
As
67
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
S = 50.265*1000 = 117.579mm
427.5
Spacing provided 115mm
Use F 8 bars c/c 115mm
As provided = 437.087mm2
y - direction
= [ 1 ( 1- 2Mmax ) ] * f cd
fyd
bd2*f cd
= [ 1 - ( 1- 2*15.47*106
1000*1632*11.33
= 0.0024
) ] * 11.33
260.87
As = bd
As = 0.0024* 1000*160 = 380.59mm2
Using F8 bar
Spacing
S = as * b
As
S = 50.265*1000 = 132.07mm
380.59
Spacing provided 130mm
Use F 8 bars c/c 130mm
As provided = 386.65mm2
Reinforcement Calculations for the rest of the Slab is done in the spread
sheet. See the spread sheets below for the reinforcement calculation.
68
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
S2
span moment
support moment
S4
span moment
support moment
S5
span moment
support moment
S6
span moment
support moment
S8
span moment
support moment
S9
span moment
support moment
S11
span moment
support moment
S12
span moment
support moment
S30
span moment
support moment
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
3.360
1.170
7.516
8.585
11.620
6.410
26.120
8.450
18.270
15.450
19.924
19.010
12.780
9.590
18.096
12.785
28.680
23.041
28.520
22.690
13.020
9.710
17.180
26.588
12.880
7.350
17.650
8.770
13.810
12.890
17.133
17.025
10.770
5.340
8.971
9.517
min
0.0004
0.0002
0.0010
0.0013
0.0016
0.0010
0.0036
0.0013
0.0025
0.0024
0.0027
0.0029
0.0017
0.0015
0.0025
0.0020
0.0040
0.0036
0.0040
0.0035
0.0018
0.0015
0.0023
0.0042
0.0017
0.0011
0.0024
0.0013
0.0019
0.0020
0.0023
0.0026
0.0015
0.0008
0.0012
0.0014
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
660
1790
290
240
190
320
80
240
120
130
110
110
170
220
120
160
70
90
70
90
170
210
130
80
170
280
120
240
160
160
130
120
200
390
250
220
S.final [mm]
69
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
S13
span moment
support moment
span moment
support moment
S18
span moment
support moment
S21
span moment
support moment
S25
span moment
support moment
S26
span moment
support moment
S34
span moment
support moment
S37
span moment
support moment
S28
span moment
support moment
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
Mxf=
Myf=
Mxs=
Mys=
25.570
16.860
23.532
15.075
12.620
5.990
20.804
7.914
18.350
13.870
20.804
17.025
9.250
0.0035
0.0026
0.0032
0.0023
0.0017
0.0009
0.0029
0.0012
0.0025
0.0021
0.0029
0.0026
0.0012
minAscal [sq.mm]
Amin[sq.mm]
S.calc[mm]S.min [mm]
S.final [mm]
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
601.064
416.429
551.218
371.093
290.285
145.029
485.060
192.273
426.084
340.664
485.060
420.636
211.619
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
130
120
90
140
170
350
100
260
120
150
100
120
240
551.218
283.33
90
18.460
13.990
20.850
17.025
18.460
13.990
20.850
18.862
12.620
5.990
20.804
13.897
18.750
14.100
20.804
15.874
10.000
10.000
15.000
15.000
21.706
0.0025
0.0021
0.0029
0.0026
0.0025
0.0021
0.0029
0.0029
0.0017
0.0009
0.0029
0.0021
0.0026
0.0022
0.0029
0.0024
0.0013
0.0015
0.0020
0.0023
0.0030
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
428.716
343.688
486.170
420.636
428.716
343.688
486.170
467.654
290.285
145.029
485.060
341.344
435.662
346.461
485.060
391.348
229.051
243.871
346.372
369.195
506.864
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
283.33
120
150
100
120
120
150
100
110
170
350
100
150
120
150
100
130
220
210
150
140
100
13.960
11.400
22.736
13.685
0.0019
0.0017
0.0031
0.0021
0.0017
0.0017
0.0017
0.0017
321.809
278.725
531.848
336.005
283.33
283.33
283.33
283.33
160
180
90
150
70
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
strip
span moment
span moment
S29
support moment
span moment
S22
support moment
span moment
S27
support moment
span moment
support moment
strong band
S14
3-3
2-2
3-3
4-4
2-2
3-3
4-4
2-2
3-3
4-4
2-2
3-3
2-2
3-3
4-4
1-1
2-2
4-4
1-1
2-2
4-4
5-5
3-3
2-2
3-3
4-4
15.93
17.51
32.36
19.23
13.56
41.64
25.43
27.6
73.33
41.89
15
15.93
25.03
32.36
19.23
29.1
16.25
15.39
24.53
20.79
25.11
16.57
14.4
15.66
23.11
81.46
0.0022
0.0027
0.0045
0.0030
0.0021
0.0059
0.0040
0.0044
0.0112
0.0068
0.0023
0.0022
0.0039
0.0045
0.0030
0.0040
0.0025
0.0021
0.0034
0.0032
0.0035
0.0026
0.0020
0.0021
0.0036
0.0126
min
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
0.0017
S.final [mm]
210use 10 c/c
180use 10 c/c
100use 10 c/c
160use 10 c/c
240use 10 c/c
80use 10 c/c
120use 10 c/c
110use 10 c/c
80use 14 c/c
70use 10 c/c
210use 10 c/c
210use 10 c/c
130use 10 c/c
100use 10 c/c
160use 10 c/c
110use 10 c/c
200use 10 c/c
220use 10 c/c
140use 10 c/c
150use 10 c/c
130use 10 c/c
190use 10 c/c
240use 10 c/c
220use 10 c/c
140use 10 c/c
70use 14 c/c
210.000
180.000
100.000
160.000
240.000
80.000
120.000
110.000
80.000
70.000
210.000
210.000
130.000
100.000
160.000
110.000
200.000
220.000
140.000
150.000
130.000
190.000
240.000
220.000
140.000
70.000
For the rest field and support moments Use minimum reinforcement i.e use 8c/c180
S1
S38,S31,S32,S33
S7,S3
S10
Mxs=
Mxs=
Mxs=
Mxs=
27.180
15.500
7.650
15.820
0.0038
0.0021
0.0010
0.0022
min
71
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Vc = 0.25 f ctd K1 K2
Where K 1 = (1 + 50 ) 2.0
K 2 = (1.6 d ) 1.0
(Where d in meter)
As
381 .08
=
= 0.002
bd 1000 *170
K1 = (1 + 50 * 0.002) = 1.112 < 2
= 1.112
f ctm = 0.3 f ck 3
f ctd =
2
3
0.3 * 25 * 0.7
1.5
= 1.032 Mpa
Vc = 0.25 * 1.112 * 1.43 * 1000 * 170 = 67.581 KN
Vn = 32.49 KN
Vc >> Vn The slab resist shear force with out reinforcement!
Development length for longitudinal reinforcement
All reinforcement shall be properly anchored for each end with due
consideration for the effect of arch action and shear cracks. To prevent
bond failure the tension or compression in any bar at any section due to
ultimate loads shall be developed on each side of the section by an
appropriate embedment length or end anchorage or a combination. There
fore hooks may be used in developing bars in tension.
The basic anchorage length lb for a bar of diameter F
f yd
l b =
4 f bd
72
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
f bd = 2 f ctd
= 2 * 1.0 = 2.0 Mpa
260.87
lb =
= 32.61
4 2.0
F 8 is used lb = 32.61 * 8 = 260.87 mm
Required anchorage length
l bnet = al b
Ascal
l b min
Aseff
l b , net = 1 * 260.87 *
l b , net = 260.87 *
As ,cal
As ,eff
As ,cal
As ,eff
200mm
200mm
76.16
200mm
283.33
= 116.01mm 200mm
l b , net = 260.87 *
l b , net
73
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
CHAPTER FOUR
DESIGN OF RIBBED SLABS
74
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
RIBBED SLABS
According to EBCS 2, 1995, ribs shall not be less than 70 mm in width;
and shall have a depth excluding any topping, of not more than 4 times
the minimum width of the rib.
The ribs spacing shall not exceed one meter. Thickness of topping shall
not be less than 40 mm, nor less than one tenth of the clear distance
between ribs.
Use c/c distance between ribs equal to 400mm (for use of standard
HCB)
LOADING:
Dead loads for ribbed floors are calculated as follows:
Dead loads: (G.K) floors 4 & 5
PVC Tiles
0.002x0.4x16=0.0128 KN/m
Cement Screed
0.048x0.4x23=0.044KN/ m
Topping
0.06x0.4x25=0.6 KN/m
Joist
0.21x0.08x25=0.42 KN/m2
HCB
(0.03x0.4+0.3x0.21) x14= 1.05 KN/m
Plastering
(0.02x0.4)x23=0.184
Total Dead load without partitions
2.71 KN/m
Dead loads: (G.K) floors at +0.00, +1.40, and 1st, 2nd, 3rd floors
Total
Granite Tiles
0.015x0.4x27=0.162 KN/m
Cement Screed
0.035x0.4x23=0.332 KN/ m
Topping
0.06x0.4x25=0.6 KN/m
Joist
0.21x0.08x25=0.42 KN/m2
HCB
(0.03x0.4+0.3x0.21) x14= 1.05 KN/m
Plastering
(0.02x0.4)x23=0.184
Dead load without partitions
2.74 KN/m
Partition loads:(G.K)
In ribbed slabs the topping is assumed that it will not distribute partition
loads. Therefore, ribs carrying partition loads are specially designed to
carry the wall loads.
Dead load for internal walls
HCB
0.15x14=2.1KN/m2
Cement screed 2x0.015x23=0.69KN/m2
Total dead load of partition
2.79 KN/m2
Dead load for external walls
HCB
0.2x14=2.8KN/m2
Cement screed 2x0.015x23=0.69KN/m2
Total dead load of partition
3.49KN/m2
Live loads (Q.K)
Live loads for office floors (4th and 5th floor) =3KN/m2
Live loads for floors (remaining ribbed floors) = 5KN/m2
Distributing live loads over the rib length: 3KN/m2*0.4m=1.2KN/m
5KN/m2*0.4m=2KN/m
76
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Arrangement of ribs
The arrangement of ribs shown below is selected because of two reasons:
1. The ribs will have many spans which will reduce the span & support
Moments
2. Wall loads will be acting transversely to the ribs which will reduce wall
load effect on single rib
Analysis of the ribs is performed by ETABS v 9.2.0. Live loads were
alternately loaded on spans, in order to obtain maximum span and
support moments.
Floor plans and rib layouts for floors at +0.00 and +1.40 and 1st, 2nd,
4th and 5th floors are shown in the following pages
3rd,
77
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
78
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
79
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
80
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
81
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Structure1, Rib2
= 0.0089
As= b d= 0.0089*80*243= 172.5mm2
Use 2 12mm rods at the top of support
Shear reinforcement
13.65KN
11.23KN
2.057m
2.5m
83
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
= 1.03MPa
= 2542.4mm
84
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
SPECIAL RIBS
Ribs carrying partition loads often have relatively large bending
moments. Design of such kinds of ribs results in a doubly reinforced
section. Such ribs are referred in this project as special ribs.
Structure2, Rib11, Special
85
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
= 0.0156
Ast1=
b d= 0.0156*80*243= 303.95mm2
86
=49.17
Where x=0.45d=0.45*243=109.35mm
fsc= 200*103
*0.0035=571.97MPa
571.97>260.87,
Asb=
=49.17mm2
30.05KN
22.95KN
1.432m
1.875m
87
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
=0.0206
Fctd=
= 1.03MPa
= 383.43mm
88
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Material properties-fcd=11.33MPa
fyd=260.87MPa
Section dimensions-d=243mm
be =400mm
bw =80mm
Design of mid span section
Mid span section is designed as a T-beam
Assuming the NA fall in the flange,
Mu=0.8 x be fcd (d-0.4 x)
Mmax (at mid span section) =7.07KNm
7.07*106=0.8 x (400) (11.33) (243-0.4*x)
X= 8.134mm
Therefore NA falls in flange
As= (0.8 x be fcd)/fyd
= (0.8*8.134*400*11.33)/260.87
=113.023mm2
Number of 14mm diameter rods= 113.023/ (*102/4) =1.44
Use 2 10mm rods at mid span section.
Design of support section
In case of ribs with cantilever end we have to consider two sections in
designing the support reinforcement to make the design economical.
90
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Section1
Mmax (at support section) = 8.75KNm
Mumax=0.2952 fcd bwd2, where bw =80mm
=0.2952*11.33*80*2432*10-6= 15.8KNm
15.8KNm > 8.75KNm,
The section is under reinforced
= 0.0078
As= b d= 0.0089*80*243= 151.7mm2
Use 2 10mm rods at the top of support
Section2
Mmax (at support section) = 41.57KNm
Mumax=0.2952 fcd bwd2, where bw =80mm
=0.2952*11.33*80*2432*10-6= 15.8KNm
15.8KNm < 41.57KNm, the section is over reinforced.
The section has to be designed as doubly reinforced.
= 0.0156
Ast1=
b d= 0.0156*80*243= 303.95mm2
=443mm2
91
Where x=0.45d=0.45*243=109.35mm
fsc= 200*103
*0.0035=571.97MPa
571.97>260.87,
Asb=
=443mm2
41.06KN
32.08KN
1.582m
2.025m
92
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
=0.072
Fctd=
= 1.03MPa
= 193.98mm
93
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
94
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
LOAD TRANSFER
Load transfer to beams and transverse beams is done by taking the
support reactions of the ribs and distributing the reaction over the length
of the beams. Support reactions for dead, live and partition loads are
separately distributed over the length of the transverse. To illustrate the
load transfer mechanism lets take S1Rib1.
95
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Transverse Beams
Transverse beams are provided when the span of ribs is greater than 6m.
In special cases, transverse beams are provided when there are large
partition loads on the spans. Transverse beams provide additional
support for the ribs.
Analysis of the transverse beams is performed on Etabs model. Live loads
were alternately loaded on spans, in order to obtain maximum span and
support moments.
Reinforcements of transverse beams are calculated using design tables
as shown hereunder.
Structure2, Transverse1
Gk1
Qk
Gk2
96
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
S1
S2
Span1
S3
Span2
S4
Span3
S5
Span4
=30.26
= 690.4mm2
=25.91
Ks=4.0
As =
= 499.613mm2
Span3
Md=284.87KNm
Km=
=57.39
= 2628.115mm2
=37.04
As =
= 1051.087mm2
=63.33
= 3173.758mm2
= 1296.063mm2
=43.12
= 1471.518mm2
Shear reinforcement
276.98KN
233.52KN
3.154m
4.2m
Shear force at critical section (Vsd) =233.52KN
Vrd =0.25*fcdbwd
=0.25*11.33*400*459*10-3
=520.2KN > 233.52KN
OK
At the support there are 1124mm rods
Fctd=
= 1.03MPa
= 53.94mm
101
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
102
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
CHAPTER FIVE
DESIGN OF BASEMENT FLOOR SOLID SLAB
EXCEL SPREAD SHEETS
In the design of basement slab we have
repeated design stages of the roof floor
slab since they are designed as solid slab.
The details of the calculations are shown
on the spread sheet shown below.
103
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
20.00
Fcd
11.33
Fyk
300.00
Fyd
260.87
S-1
4.00
a for 2:1
a for 1:1
Rat io calc.
a calc
30.00
40.00
1.14
38.60
Pan e l #
S-1
De pth
Lx [m]
0
1 -C on ti n u ou s
0 -Di scon ti n ou s
D [mm]
Ly [m]
6.60
D-Load
7.50
W al l Load
0.41
0.81
L1
L2
5.13
3.60
a cal c
d [mm]
170.00
38.60
145.34
180.00
W e i gh t
C e i l i n g Pl aste r
4.50
0.46
W al l He i gh t W al l u n i t we i gh t
2.60
2.79
7.45
C ove r [mm]
Li ve Load
5.00
15.00
De si gn l oad
17.68
Total de ad l oad
r val u e s
Al ph a val u e s
r1
r2
r3
r4
nd
1.33
0.00
1.33
0.00
2.00
xs
ys
xf
yf
0.059
0.045
0.044
0.034
Mome n t
Mxs
Mys
Mxf
Myf
45.45
34.66
33.89
26.19
Adjusted Moment
45.09
30.24
Lx
FINAL MOMENT
Cx
0.349
1.54
45.09
0.0074
0.28
Ly
Cy
0.201
0.89
30.24
0.0055
Cx
0.326
0.12
35.55
0.0057
Cy
0.370
0.13
27.21
0.0049
Amin[sq.mm]
267
267
267
267
Ascal [sq.mm]
1180.42
825.10
911.55
737.09
Asfinal [sq.mm]
1180.42
825.10
911.55
737.09
# of bars
# of bars
# of bars
# of bars
10.00
18
13
14
12
S.calc[mm]
60.00
90.00
80.00
100.00
S.final [mm]
60.00
90.00
80.00
100.00
vcx
vdx
vcy
vdy
0.45
0.30
0.40
0.26
Rcx
Rdx
Rcy
Rdy
Total de si gn l oad
52.75
34.78
46.68
30.34
Li ve Load
14.92
9.83
13.20
8.58
De ad Load
22.22
14.65
19.66
12.78
104
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Fck
20.00
Fcd
11.33
Fyk
300.00
Fyd
260.87
S-2
3.00
a for 2:1
30.00
a for 1:1
40.00
Pane l #
S-2
De pth
Lx [m]
Ly [m]
6.60
7.50
D-Load
Ratio calc.
1.14
0
1 -C on tin uous
0 -Discon tinous
D [mm]
Wall Load
a calc
38.60
a calc
38.60
d [mm]
170.00
145.34
180.00
W e ight
C e ilin g Plaste r
0.41
0.81
4.50
L1
L2
W all He ight
0.00
0.00
0.46
W all un it we igh t distribute d wall load
0.00
0.00
Total de ad load
6.17
C ove r [mm]
Live Load
5.00
15.00
De sign load
16.02
r value s
Alph a value s
Mome nt
Adjusted Moment
r1
r2
r3
r4
nd
1.33
1.33
1.33
0.00
1.00
xs
0.051
0.037
ys
Mxs
Mys
Mxf
Myf
25.82
26.52
19.54
0.24
28.88
Lx
Cx
0.349
0.00
31.61
0.0050
yf
0.028
35.59
31.61
FINAL MOMENT
xf
0.038
Ly
Cy
0.201
0.00
28.88
0.0052
Cx
0.326
1.30
27.82
0.0044
Cy
0.370
1.47
21.01
0.0037
Amin[sq.mm]
267
267
267
267
Ascal [sq.mm]
803.82
785.36
701.90
561.18
Asfinal [sq.mm]
803.82
785.36
701.90
561.18
# of bars
# of bars
# of bars
# of bars
10.00
13
12
11
S.calc[mm]
90.00
100.00
110.00
130.00
S.final [mm]
90.00
100.00
110.00
130.00
vdx
vcy
vdy
0.42
0.28
0.36
0.00
Rcx
Rdx
Rcy
Rdy
44.41
29.61
38.07
N.A.
Live Load
13.86
9.24
11.88
N.A.
De ad Load
17.10
11.40
14.66
N.A.
S he ar coe ffcie nt
Load on Be ams
Note :-
basement floor
105
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
6.60m
Tan =7.5/6.6
= tan-1(7.5/6.6) =48.650
2
w/2
3
w
4
4
w
b/4 =6.6/4=1.65
2
1
Strip 1-1
W=18.87KN/m2 (including distributed wall load)
W/2
W/2
1.65
R1
3.30m
Mxf=9.05KNm
1.65
R2
R1LL=4.75KN
R2LL=3.51KN
R1DL=7.95KN
R2DL=5.86KN
106
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Strip2-2
W sin
Tan48.650=(7.5-1.65)/y
=5.148
5.148m
R2
R1
R1LL=11.95KN
R2LL=7.35KN
Mxs=44.72KNm
Mxf=26.80KNm
R1DL=20.02KN
R2DL=12.32KN
Strip3-3
W cos
W/2
5.85m
1.65
Mys=88.81KNm
Myf=53.92KNm
R2
R1
R1DL=15.61KN
R2DL=23.63KN
R1LL=11.22KN
R2LL=16.19KN
Strip4-4
R1
4m
Tan48.650=(6.6-1.65)/x
Mys=55.09KNm
Myf=31.53KNm
W cos
1.62
R2
R1DL=11.96KN
R2DL=22.8KN
R1LL=8.58KN
R2LL=15.18KN
=5.62
Panel S5
7.50m
6.60m
Tan =7.5/6.6
= tan-1(7.5/6.6) =48.650
107
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Strip 1-1
W/
2
R1
W/2
1.6
5
1.65
3.30m
Mxs=9.08KNm
R2
Mxf=1.82KNm
R1DL=5.08KN
R2DL=5.08KN
Strip2-2
W sin
R1LL=4.13KN
R2LL=4.13KN
Tan48.650=(7.5-1.65)/y
=5.148
5.148m
R2
R1
R1DL=11.92KN
R2DL=11.92KN
Mxs=26.54KNm
Mxf=12.78KNm
R1LL=9.65KN
R2LL=9.65KN
Strip3-3
W cos
W/2
49.03KNm
5.85m
R1
1.65
R1DL=15.18KN
R2DL=13.71KN
R2
R1LL=12.31KN
R2LL=11.12KN
Strip4-4
W cos
4m
R1
47.08KNm
24.14KNm
29.60KNm
1.62
Tan48.650=(6.6-1.65)/x
=5.62
R2
R1DL=11.81KN
R2DL=14.75KN
32.9KNm
14.84KNm
R1LL=9.57KN
R2LL=11.95KN
108
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Panel 3
7.50m
6.60m
W=16.02KN/m2
Since panel 5 is similar in dimension with panel 3 we use the same strips
except for strip 1-1&2-2.
Strip 1-1
W/2
Mxs=13.22 KNm
W/2
Mxf=7.68KNm
1.65
1.65
3.30m
R2
R1
R1DL=4.31KN
R2DL=5.85KN
R1LL=3.5KN
R2LL=4.75KN
Strip2-2
W sin
Tan48.650=(7.5-1.65)/y
=5.148
5.148m
R1
Mxs=37.95KNm
R2
Mxf=22.74KNm
R1DL=9.08KN
R2DL=14.76KN
R1LL=7.35KN
R2LL=11.95KN
109
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Panel S6
WKN/m
9.25KN
RDL=18.51KN
RLL=7.5KN
1.45m
0.05m
panel no
strip
support moment 1-1
2-2
3-3
4-4
S4
span moment
1-1
2-2
3-3
4-4
support moment 1-1
2-2
3-3
4-4
S5
span moment
1-1
2-2
3-3
4-4
support moment 1-1
2-2
3-3
4-4
S3
span moment
1-1
2-2
3-3
4-4
S6 support moment
15.58
44.72
88.81
55.09
9.05
26.8
53.92
31.33
9.08
26.54
49.03
29.6
1.82
12.78
24.14
14.84
13.22
37.96
49.03
29.6
7.68
22.74
24.14
14.84
35.75
0.0024
0.0073
0.0195
0.0107
0.0014
0.0042
0.0104
0.0057
0.0014
0.0042
0.0094
0.0054
0.0003
0.0020
0.0043
0.0026
0.0020
0.0061
0.0094
0.0054
0.0012
0.0036
0.0043
0.0026
0.0057
min
S.final [mm]
use 10 c/c 200
use 10 c/c 70
use 10 c/c 30
use 10 c/c 50
use 10 c/c 280
use 10 c/c 120
use 10 c/c 50
use 10 c/c 90
use 10 c/c 280
use 10 c/c 120
use 10 c/c 60
use 10 c/c 100
use 10 c/c 280
use 10 c/c 250
use 10 c/c 120
use 10 c/c 200
use 10 c/c 240
use 10 c/c 80
use 10 c/c 60
use 10 c/c 100
use 10 c/c 280
use 10 c/c 140
use 10 c/c 120
use 10 c/c 200
use 10 c/c 80
110
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Vc = 0.25 f ctd K1 K2
Where K 1 = (1 + 50 ) 2.0
K 2 = (1.6 d ) 1.0
=
(Where d in meter)
As
2927 .3
=
= 0 .018
bd 1000 * 160
f ctm = 0.3 f ck 3
[EBCS-2, 1995 Art2.4]
f ctd =
2
3
0.3 * 25 * 0.7
1.5
= 1.032 Mpa
Vc = 0.25 * 1.92 * 1.44 * 1000 * 160 = 110.59 KN
Vn = (1.3*23.63)+(1.6*16.19)=56.623 KN
Vc >> Vn The slab resist shear force with out reinforcement!
111
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Fck
20.00
Fcd
11.33
Fyk
300.00
Fyd
260.87
S-1
4.00
a for 2:1
a for 1:1
Rat io calc.
a calc
30.00
40.00
1.67
33.30
Pan e l #
S-1
De pth
Lx [m]
Ly [m]
4.50
7.50
0
1 -C onti nu ous
0 -Di scon ti n ous
D-Load
W al l Load
D [mm]
Fl oor fi n i sh
S cre e d
a cal c
d [mm]
140.00
33.30
114.86
200.00
W e i gh t
C e il i n g Pl aste r
0.00
0.00
5.00
L1
L2
Wal l He i gh t
0.00
0.00
0.46
W al l u ni t we i ght di stri bute d wal l load
0.00
0.00
0.00
5.46
C ove r [mm]
Li ve Load
5.00
15.00
De si gn load
15.10
Total de ad l oad
r val ue s
Al pha val ue s
Mome n t
Adjusted Moment
r1
r2
r3
r4
nd
1.33
0.00
1.33
0.00
2.00
xs
0.084
0.045
ys
xf
0.063
yf
0.034
Mxs
Mys
Mxf
Myf
25.68
13.76
19.26
10.39
32.49
12.29
Lx
Ly
Cx
0.288
0.42
32.49
0.0052
Cy
0.077
0.11
12.29
0.0021
Cx
0.456
0.00
19.68
0.0031
Cy
0.277
0.00
10.51
0.0018
Amin[sq.mm]
267
267
267
267
274.30
FINAL MOMENT
Ascal [sq.mm]
827.70
322.08
488.78
Asfinal [sq.mm]
827.70
322.08
488.78
274.30
# of bars
# of bars
# of bars
# of bars
10.00
0.40
13
S.calc[mm]
90.00
240.00
160.00
280.00
S.final [mm]
90.00
240.00
160.00
280.00
0.56
0.37
0.40
0.26
Rcx
Rdx
Rcy
Rdy
Total de si gn l oad
38.07
25.17
27.18
17.66
Li ve Load
12.61
8.33
9.00
5.85
De ad Load
13.77
9.10
9.83
6.39
S he ar coe ffci e nt
Load on Be ams
112
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
20.00
Fcd
11.33
Fyk
300.00
Fyd
260.87
S-2
4.00
a for 2:1
a for 1:1
Rat io calc.
a calc
30.00
40.00
1.14
38.60
0
1 -C on ti n u ou s
0 -Di scon ti n ou s
Pan e l #
S-2
De pth
Lx [m]
Ly [m]
6.60
7.50
D-Load
D [mm]
Fl oor fi n i sh
S cre e d
0.00
0.00
L1
L2
0.00
0.00
W al l Load
a cal c
d [mm]
170.00
38.60
145.34
180.00
W e i gh t
C e i l i n g Pl aste r
4.50
0.46
0.00
0.00
Total de ad l oad
4.96
C ove r [mm]
Li ve Load
5.00
15.00
De si gn l oad
14.45
r val u e s
r1
r2
r3
r4
nd
1.33
0.00
1.33
0.00
2.00
xs
Al ph a val u e s
ys
xf
yf
0.059
0.045
0.044
0.034
Mome n t
Mxs
Mys
Mxf
Myf
37.13
28.32
27.69
21.40
Adjusted Moment
32.49
25.80
Lx
Ly
Cx
0.349
0.88
32.49
0.0052
Cy
0.201
0.51
25.80
0.0046
Cx
0.326
1.51
30.08
0.0048
Cy
0.370
1.72
23.62
0.0042
Amin[sq.mm]
267
267
267
267
Ascal [sq.mm]
827.70
696.67
762.58
634.55
Asfinal [sq.mm]
827.70
696.67
762.58
634.55
# of bars
# of bars
# of bars
# of bars
10.00
13
11
12
10
S.calc[mm]
90.00
110.00
100.00
120.00
S.final [mm]
90.00
110.00
100.00
120.00
FINAL MOMENT
0.28
vdx
vcy
vdy
0.45
0.30
0.40
0.26
Rcx
Rdx
Rcy
Rdy
Total de si gn l oad
43.10
28.42
38.14
24.79
Li ve Load
14.92
9.83
13.20
8.58
De ad Load
14.80
9.76
13.09
8.51
S h e ar coe ffci e n t
Load on Be ams
Note :-
basement floor
113
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Fck
20.00
Fcd
11.33
Fyk
300.00
Fyd
260.87
S-3
3.00
a for 2:1
a for 1:1
Ratio calc.
a calc
30.00
40.00
1.67
33.30
0
1 -C ontinuous
0 -Discontinous
Pane l #
S-3
De pth
Lx [m]
Ly [m]
a calc
d[mm]
140.00
4.50
7.50
33.30
114.86
180.00
D-Load
D [mm]
Floor finish
We ight
Ce iling Plaste r
0.00
4.50
0.46
L1
L2
Wall He ight
0.00
0.00
0.00
0.00
0.00
Wall Load
Scre e d
4.96
Cove r [mm]
Live Load
5.00
15.00
De sign load
14.45
Total de ad load
r value s
Alpha value s
Mome nt
Adjusted Moment
r1
r2
r3
r4
nd
1.33
1.33
1.33
0.00
1.00
xs
0.079
0.037
ys
xf
0.059
yf
0.028
Mxs
Mys
Mxf
Myf
23.11
10.83
17.26
8.19
28.45
10.83
Lx
Ly
Cx
0.288
0.00
28.45
0.0045
Cy
0.077
0.00
10.83
0.0019
Cx
0.456
0.00
17.26
0.0027
Cy
0.277
0.00
8.19
0.0014
Amin[sq.mm]
267
267
267
267
Ascal [sq.mm]
718.92
282.78
426.66
212.83
Asfinal [sq.mm]
718.92
282.78
426.66
267.00
# of bars
# of bars
# of bars
# of bars
10.00
12
S.calc[mm]
100.00
270.00
180.00
290.00
S.final [mm]
100.00
270.00
180.00
290.00
FINAL MOMENT
0.38
vdx
vcy
vdy
0.54
0.35
0.36
0.00
Rcx
Rdx
Rcy
Rdy
34.93
22.76
23.41
N.A.
Live Load
12.09
7.88
8.10
N.A.
De ad Load
11.99
7.81
8.04
N.A.
Load on Be ams
Note :-
basement floor
114
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Fck
20.00
Fcd
11.33
Fyk
300.00
Fyd
260.87
S-4
3.00
a for 2:1
a for 1:1
Ratio calc.
a calc
30.00
40.00
1.14
38.60
Pane l #
S-4
De pth
Lx [m]
Ly [m]
a calc
d[mm]
170.00
6.60
7.50
38.60
145.34
180.00
We ight
C e iling Plaste r
4.50
0.46
0
1 -C ontinuous
0 -Di scontinous
D-Load
Wall Load
D [mm]
Floor finish
Scre e d
0.00
0.00
L1
L2
0.00
0.00
0.00
Total de ad load
4.96
C ove r [mm]
Live Load
5.00
15.00
De sign load
14.45
r value s
Alpha value s
Mome nt
Adjusted Moment
r1
r2
r3
r4
nd
1.33
1.33
1.33
0.00
1.00
xs
0.051
0.037
ys
xf
0.038
yf
0.028
Mxs
Mys
Mxf
Myf
32.10
23.29
23.92
17.62
28.45
23.29
Lx
Ly
Cx
0.349
0.00
28.45
0.0045
Cy
0.201
0.00
23.29
0.0042
Cx
0.326
1.19
25.10
0.0039
Cy
0.370
1.35
18.97
0.0034
Amin[sq.mm]
267
267
267
267
Ascal [sq.mm]
718.92
625.08
629.98
504.29
Asfinal
718.92
625.08
629.98
504.29
# of bars
# of bars
# of bars
# of bars
10.00
12
10
10
S.calc [mm]
100.00
120.00
120.00
150.00
S.final [mm]
100.00
120.00
120.00
150.00
FINAL MOMENT
0.24
vdx
vcy
vdy
0.42
0.28
0.36
0.00
Rcx
Rdx
Rcy
Rdy
40.05
26.70
34.33
N.A.
Live Load
13.86
9.24
11.88
N.A.
De ad Load
13.75
9.17
11.78
N.A.
Load on Be ams
Note :-
basement floor
115
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Fck
20.00
Fcd
11.33
Fyk
300.00
Fyd
260.87
S-5
3.00
a for 2:1
a for 1:1
Ratio calc.
a calc
30.00
40.00
1.67
33.30
Pane l #
S-5
De pth
Lx [m]
Ly [m]
a calc
d [mm]
140.00
4.50
7.50
33.30
114.86
180.00
We ight
C e iling Plaste r
4.50
0.46
0
1 -C ontinuous
0 -Discontinous
D-Load
D [mm]
Floor finish
Scre e d
0.00
W all Load
0.00
L1
L2
0.00
0.00
0.00
Total de ad load
4.96
C ove r [mm]
Live Load
5.00
15.00
De sign load
14.45
r value s
Alpha value s
Mome nt
Adjusted Moment
r1
r2
r3
r4
nd
1.33
1.33
1.33
0.00
1.00
xs
0.079
0.037
ys
xf
0.059
0.028
Mxs
Mys
Mxf
Myf
23.11
10.83
17.26
8.19
28.45
17.44
Lx
FINAL MOMENT
yf
Cx
0.288
0.00
28.45
0.0045
0.38
Ly
Cy
0.077
0.00
17.44
0.0031
Cx
0.456
0.00
17.26
0.0027
Cy
0.277
0.00
8.19
0.0014
Amin[sq.mm]
267
267
267
267
Ascal [sq.mm]
718.92
462.07
426.66
212.83
Asfinal [sq.mm]
718.92
462.07
426.66
267.00
# of bars
# of bars
# of bars
# of bars
10.00
12
S.calc[mm]
100.00
160.00
180.00
290.00
S.final [mm]
100.00
160.00
180.00
290.00
Load on Be ams
vcx
vdx
vcy
vdy
0.54
0.35
0.36
0.00
Rcx
Rdx
Rcy
Rdy
34.93
22.76
23.41
N.A.
Live Load
12.09
7.88
8.10
N.A.
De ad Load
11.99
7.81
8.04
N.A.
Note :-
basement floor
116
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Fck
20.00
Fcd
11.33
Fyk
300.00
Fyd
260.87
S-6
3.00
a for 2:1
a for 1:1
Rat io calc.
a calc
30.00
40.00
1.14
38.60
Pan e l #
S-6
De pth
Lx [m ]
D-Load
Fl oor fin i sh
0
1 -C on ti nu ou s
0 -Di sconti n ou s
D [m m ]
Ly [m ]
6.60
W al l Load
7.50
S cre e d
0.00
0.00
L1
L2
0.00
0.00
cal c
38.60
W e i gh t
d [m m ]
170.00
145.34
180.00
C e i l i ng Pl aste r
4.50
0.46
0.00
0.00
Total de ad l oad
4.96
C ove r [m m]
Li ve Load
5.00
15.00
De si gn l oad
r val ue s
Al ph a val u e s
14.45
r1
r2
r3
r4
nd
1.33
1.33
1.33
0.00
1.00
xs
0.051
Mom e n t
Adjusted Moment
ys
0.037
xf
0.038
yf
0.028
Mxs
Mys
Mxf
Myf
32.10
23.29
23.92
17.62
28.45
25.49
Lx
Cx
0.349
0.00
FINAL MOMENT 28.45
0.0045
Ly
Cy
0.201
0.00
25.49
0.0046
Cx
0.326
1.19
25.10
0.0039
Cy
0.370
1.35
18.97
0.0034
Amin[sq.mm]
267
267
267
267
Ascal [sq.mm]
718.92
687.71
629.98
504.29
Asfinal [sq.mm]
718.92
687.71
629.98
504.29
# of bars
# of bars
# of bars
# of bars
10.00
0.24
12
11
10
S.calc[mm]
100.00
110.00
120.00
150.00
S.final [mm]
100.00
110.00
120.00
150.00
vdx
vcy
vdy
0.42
0.28
0.36
0.00
Rcx
Rdx
Rcy
Rdy
Total de si gn l oad
40.05
26.70
34.33
N.A.
Li ve Load
13.86
9.24
11.88
N.A.
De ad Load
13.75
9.17
11.78
N.A.
S h e ar coe ffcie n t
Load on Be ams
Note :-
basement floor
117
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Fck
Fyk
20.00
Fcd
11.33
300.00
Fyd
260.87
S-8
1.00
a for 2:1
a for 1:1
Rat io calc.
a calc
30.00
40.00
1.14
38.60
1
1 -C onti nuous
0 -Disconti nous
Pane l #
S-8
De pth
Lx [m]
Ly [m]
a calc
d[mm]
170.00
6.60
7.50
38.60
145.34
180.00
W e ight
C e ili ng Pl aste r
0.00
4.50
0.46
L1
L2
W all He ight
W al l uni t we ight
0.00
3.51
2.60
3.49
D-Load
D [mm]
Floor finish
Scre e d
0.00
W al l Load
9.13
C ove r [mm]
Live Load
5.00
15.00
De si gn load
19.87
Total de ad load
r val ue s
Alpha val ue s
Mome nt
Adjusted Moment
r1
r2
r3
r4
nd
1.33
1.33
1.33
1.33
0.00
xs
0.039
0.032
ys
yf
0.024
Mxs
Mys
Mxf
Myf
33.75
27.69
25.10
20.77
34.06
Cx
0.349
1.27
34.06
0.0054
0.27
24.06
Lx
FINAL MOMENT
xf
0.029
Ly
Cy
0.201
0.73
24.06
0.0043
Cx
0.326
0.00
26.36
0.0041
Cy
0.370
0.00
21.50
0.0038
Amin[sq.mm]
267
267
267
267
Ascal [sq.mm]
870.44
647.09
663.29
574.79
Asfinal
870.44
647.09
663.29
574.79
# of bars
# of bars
# of bars
# of bars
10.00
13
10
11
S.calc [mm]
90.00
120.00
110.00
130.00
S.final [mm]
90.00
120.00
110.00
130.00
vdx
vcy
vdy
0.37
0.00
0.33
0.00
Rcx
Rdx
Rcy
Rdy
48.78
N.A.
43.27
N.A.
Live Load
12.28
N.A.
10.89
N.A.
De ad Load
22.41
N.A.
19.88
N.A.
Load on Be ams
Note :-
basement floor
118
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Fck
20.00
Fcd
11.33
Fyk
300.00
Fyd
260.87
S-11
3.00
a for 2:1
a for 1:1
Ratio calc.
a calc
30.00
40.00
1.93
30.70
Pan e l #
S-11
De pth
Lx [m]
Ly [m]
a cal c
d [mm]
40.00
1.40
2.70
30.70
19.61
180.00
W e i ght
C e i l i ng Pl aste r
4.50
0.46
0
1 -C onti nuous
0 -Disconti nous
D-Load
D [mm]
Fl oor fi ni sh
0.00
W al l Load
Scre e d
0.00
L1
L2
0.00
0.00
0.00
0.00
Total de ad l oad
4.96
C ove r [mm]
Li ve Load
5.00
15.00
De si gn l oad
r val ue s
Alpha valu e s
Mome nt
Adjusted Moment
14.45
r1
r2
r3
r4
nd
1.33
0.00
1.33
0.00
2.00
xs
0.092
0.045
ys
xf
0.069
yf
0.034
Mxs
Mys
Mxf
Myf
2.61
1.27
1.95
0.96
2.61
8.76
Lx
Ly
Cx
0.252
0.00
2.61
0.0004
Cy
0.059
0.00
8.76
0.0015
Cx
0.482
0.00
1.95
0.0003
Cy
0.250
0.00
0.96
0.0002
Amin[sq.mm]
268
268
268
268
Ascal [sq.mm]
62.82
227.85
46.97
24.65
Asfinal [sq.mm]
268.00
268.00
268.00
268.00
# of bars
# of bars
# of bars
# of bars
8.00
S.calc[mm]
180.00
180.00
180.00
180.00
S.final [mm]
180.00
180.00
180.00
180.00
FINAL MOMENT
0.44
Load on Be ams
vcx
vdx
vcy
vdy
0.58
0.37
0.36
0.00
Rcx
Rdx
Rcy
Rdy
11.71
7.48
7.28
N.A.
Live Load
4.05
2.59
2.52
N.A.
De ad Load
4.02
2.57
2.50
N.A.
Note :-
basement floor
119
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Irregular slabs
Panel S7
3.54m
3.96m
4.50m
7.50m
Tan =4.50/3.96
5
= tan-1(4.50/3.96) =48.650
b/4=4.50/4=1.12
W
W/2
3
Strip1-1
W sin
W/2
1.12
R1
2.42
R1DL=8.30KN
R2DL=9.18KN
3.96
R1LL=8.37KN
R2LL=9.26KN
Mxf=33.0 KNm
R2
120
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Strip2-2
W sin
1.12
2.42
2.97
Tan48.650= (4.50-1.12)/x
R2
R1
=2.97m
Mxs=25.06KNm
R1DL=6.53KN
R2DL=7.52KN
Mxf=21.99KNm
R1LL=6.58KN
R2LL=7.58KN
Strip3-3
W/2
W/2
Mys=5.37KNm
Myf=3.32KNm
1.12
2.26
R2
R1
Strip4-4
1.12
R1DL=2.38KN
R2DL=3.2KN
R1LL=2.4KN
R2LL=3.23KN
Mys=34.36KNm
4.50
Myf=21.06KNm
R2
R1
R1DL=8.54KN
R2DL=13.78KN
R1LL=8.61KN
R2LL=13.89KN
Strip5-5
W cos
Mys=22.66KNm
Myf=13.89KNm
4.50
R1
R2
R1DL=5.63KN
R2DL=9.09KN
R1LL=5.68KN
R2LL=9.17KN
121
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Panel S9
9.312m
8.40m
w/2
3
w
4
4
w
Tan = 9.321/8.4
=tan-1(1.1096)
=47.970
b/4 =8.40/4=2.1
2
1
Strip 1-1
W/2
2.1
R1
W/2
4.2m
Mys=13.27KNm R1DL=5.21KN
Myf=2.65KNm R2DL=5.21KN
2.10
R2
R1LL=5.25KN
R2LL=5.25KN
122
Strip2-2
W sin
Tan47.940=(9.31-2.1)/y
=6.50m
Mys=38.15KNm
6.50m
Myf=18.74KNm
R2
R1
R1DL=12.09KN
R2DL=12.09KN
R1LL=12.19KN
R2LL=12.19KN
Strip3-3
W cos
6.2m
W/2
Mxs=78.00KNm
2.1m
Mxf=44.24KNm
R2
R1
R1DL=16.57KN
R2DL=8.86KN
R1LL=16.72KN
R2LL=8.94KN
Strip4-4
W cos
4.48
m
2.1m
R2
R1
R1DL=14.15KN
R2DL=10.81KN
R1LL=14.28KN
R2LL=10.9KN
Tan47.940= (8.40-2.1)/x
=5.68m
Mxs=54.80KNm
Mxf=34.88KNm
123
Panel S12
3.10m
7.70m
R1DL=9.38KN
R2DL=6KN
3.10m
R1LL=9.46KN
R2LL=6.04KN
R2
R1
Panel S10
WKN/m
2.5KN
RDL=7.44KN
RLL=7.5KN
1.50m
0.05m
Mxs =16.25KNm
124
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Reinforcement Calculations for S7, S10, S9&S12 Slab is done in the spread sheet.
S7
S9
S12
S10
strip
1-1
2-2
3-3
4-4
span moment 5-5
1-1
2-2
3-3
4-4
support moment 5-5
1-1
2-2
3-3
span moment 4-4
1-1
2-2
3-3
support moment 4-4
span moment
support moment
cantiliver slab
min
panel no
33
21.99
3.32
21.06
13.89
39.13
25.06
5.37
34.36
22.66
2.65
18.74
44.24
34.88
13.27
38.15
78
54.8
10.45
15.28
16.25
0.0053
0.0034
0.0006
0.0038
0.0024
0.0063
0.0039
0.0009
0.0063
0.0040
0.0004
0.0029
0.0083
0.0064
0.0020
0.0061
0.0164
0.0106
0.0016
0.0024
0.0025
Amin[sq.mm]
S.calc[mm]
S.min [mm] S.final [mm]
Ascal [sq.mm]
0.0017
841.617 283.33
90
280 use 10 c/c 90
0.0017
548.510 283.33
140
280 use 10 c/c 140
0.0017
85.407 283.33
920
280 use 10 c/c 280
0.0017
562.503 283.33
140
280 use 10 c/c 140
0.0017
365.216 283.33
220
280 use 10 c/c 220
0.0017 1011.076 283.33
80
280 use 10 c/c 80
0.0017
628.872 283.33
120
280 use 10 c/c 120
0.0017
138.715 283.33
570
280 use 10 c/c 280
0.0017
946.939 283.33
80
280 use 10 c/c 80
0.0017
607.427 283.33
130
280 use 10 c/c 130
0.0017
63.785 283.33
1230
280 use 10 c/c 280
0.0017
464.521 283.33
170
280 use 10 c/c 170
0.0017 1250.662 283.33
60
280 use 10 c/c 60
0.0017
962.510 283.33
80
280 use 10 c/c 80
0.0017
325.565 283.33
240
280 use 10 c/c 240
0.0017
983.662 283.33
80
280 use 10 c/c 80
0.0017 2456.536 283.33
50
400 use 12 c/c 50
0.0017 1595.980 283.33
50
280 use 10 c/c 50
0.0017
255.054 283.33
310
280 use 10 c/c 280
0.0017
376.284 283.33
210
280 use 10 c/c 210
0.0017
400.901 283.33
200
280 use 10 c/c 200
125
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Vc = 0.25 f ctd K1 K2
Where K 1 = (1 + 50 ) 2.0
K 2 = (1.6 d ) 1.0
=
(Where d in meter)
As
2456 .536
=
= 0 .015
bd 1000 * 160
f ctm = 0.3 f ck 3
[EBCS-2, 1995 Art2.4]
f ctd =
2
3
0.3 * 25 * 0.7
1.5
= 1.032 Mpa
Vc = 0.25 * 1.77 * 1.44 * 1000 * 160 = 101.952 KN
Vn = (1.3*16.57)+(1.6*16.72)=48.293 KN
Vc >> Vn The slab resist shear force with out reinforcement!
126
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
20.00
Fcd
11.33
Fyk
300.00
Fyd
260.87
S-1
4.00
a for 2:1
a for 1:1
Ratio calc.
a calc
30.00
40.00
1.14
38.60
Pane l #
S-1
De pth
Lx [m]
Ly [m]
a calc
d [m m]
170.00
6.60
7.50
38.60
145.34
180.00
W e ight
C e iling Plaste r
0
1 -C ontinuous
0 -Discontinous
D-Load
W al l Load
Floor finish
D [mm ]
Scre e d
0.00
0.00
4.50
0.46
L1
L2
W all He ight
0.00
0.00
0.00
0.00
0.00
Total de ad load
4.96
C ove r [mm]
Live Load
5.00
15.00
De sign load
r value s
14.45
r1
r2
r3
r4
nd
1.33
0.00
1.33
0.00
2.00
xs
0.059
0.045
0.044
0.034
Mome nt
Mxs
Mys
Mxf
Myf
37.13
28.32
27.69
21.40
Adjusted Moment
35.67
25.80
Alpha value s
FINAL MOMENT
ys
Lx
Cx
Cy
0.349
0.201
0.88
0.51
35.67
25.80
0.0057
0.0046
xf
yf
Ly
Cx
0.326
0.48
29.05
0.0046
Cy
0.370
0.54
22.44
0.0040
Amin[sq.mm]
267
267
267
267
601.32
Ascal [sq.mm]
914.83
696.67
734.73
Asfinal [sq.mm]
914.83
696.67
734.73
601.32
# of bars
# of bars
# of bars
# of bars
10.00
0.28
14
11
12
S.calc[mm]
80.00
110.00
100.00
130.00
S.final [mm]
80.00
110.00
100.00
130.00
vdx
vcy
vdy
0.45
0.30
0.40
0.26
Rcx
Rdx
Rcy
Rdy
Total de si gn load
43.10
28.42
38.14
24.79
Live Load
14.92
9.83
13.20
8.58
De ad Load
14.80
9.76
13.09
8.51
Load on Be ams
127
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Fck
20.00
Fcd
11.33
Fy k
300.00
Fyd
260.87
S-2
3.00
a for 2:1
a for 1:1
Rat io calc.
a calc
30.00
40.00
1.14
38.60
Pan e l #
S-2
De pth
Lx [m ]
0
1 -C on ti n u ou s
0 -Di scon ti nou s
D [mm ]
Ly [m]
6.60
D-Load
W al l Load
7.50
Fl oor fi n i sh
S cre e d
0.00
0.00
L1
L2
0.00
0.00
a cal c
d[mm]
170.00
38.60
145.34
180.00
W e i gh t
C e i l i n g Pl aste r
4.50
0.46
0.00
0.00
4.96
C ove r [mm]
Li ve Load
5.00
15.00
De si gn l oad
14.45
Total de ad l oad
r val ue s
Al ph a val u e s
Mome nt
Adjusted Moment
r1
r2
r3
r4
nd
1.33
1.33
1.33
0.00
1.00
xs
ys
yf
0.051
0.037
0.038
0.028
Mxs
Mys
Mxf
Myf
32.10
23.29
23.92
17.62
33.15
0.24
31.20
Lx
FINAL MOMENT
xf
Cx
0.349
0.00
33.15
0.0053
Ly
Cy
0.201
0.00
31.20
0.0057
Cx
0.326
0.00
23.92
0.0037
Cy
0.370
0.00
17.62
0.0031
Amin[sq.mm]
467.08
Ascal [sq.mm]
845.77
853.26
598.77
Asfinal [sq.mm]
845.77
853.26
598.77
467.08
# of bars
# of bars
# of bars
# of bars
10.00
13
13
S.calc[mm]
90.00
90.00
130.00
160.00
S.final [mm]
90.00
90.00
130.00
160.00
vdx
vcy
vdy
0.42
0.28
0.36
0.00
Rcx
Rdx
Rcy
Rdy
Total de si gn l oad
40.05
26.70
34.33
N.A.
Li ve Load
13.86
9.24
11.88
N.A.
De ad Load
13.75
9.17
11.78
N.A.
S h e ar coe ffci e n t
Load on Be am s
Note :-
basement floor
128
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Triangular slabs
Panel 3
7.50m
6.60m
w/2
3
w
4
4
w
b/4 =6.6/4=1.65
Since panel 5 is similar in dimension with panel 3 we use the 1same strips
except for strip 1-1&2-2.
Strip 1-1
W/2
W/2
Mxf=9.83KNm
1.65
R1
3.30m
1.65
R2
R1DL=4.09KN
R2DL=4.09KN
R1LL=4.13KN
R2LL=4.13KN
129
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Strip2-2
W sin
Tan48.650=(7.5-1.65)/y
=5.148
5.148m
Mxf=35.45KNm
R2
R1
R1DL=9.58KN
R2DL=9.58KN
Strip3-3
W cos
W/2
5.85m
1.65
R1LL=9.65KN
R2LL=9.65KN
Mys=63.06KNm
Myf=37.98KNm
R2
R1
R1DL=9.23KN
R2DL=13.99KN
R1LL=9.32KN
R2LL=14.11KN
Strip4-4
W cos
Mys=41.71KNm
Myf=22.84KNm
R1
4m
Tan48.650=(6.6-1.65)/x
1.65
R2
=5.62
R1DL=7.16KN
R2DL=14.27KN
R1LL=7.23KN
R2LL=14.39KN
Panel S4 & S5
7.50m
Tan =7.5/6.6
= tan-1(7.5/6.6) =48.650
6.60m
130
Strip 1-1
W/
2
W/2
Mxs=11.93KNm
R1
1.6
5
Mxf=6.93KNm
1.65
3.30m
R2
R1LL=4.75KN
R2LL=3.5KN
R1DL=4.71KN
R2DL=3.47KN
Strip2-2
W sin
Tan48.650= (7.5-1.65)/y
=5.148
5.148m
Mxs=34.21KNm
R2
R1
Mxf=20.50KNm
R1LL=11.95KN
R2LL=7.35KN
R1DL=11.86KN
R2DL=7.29KN
The rest of stripes 3-3 & 4-4 are similar to that of panel S3
Reinforcement Calculations for S4&S5 Slab is done in the spread sheet.
panel no
S4
S5
strip
3-3
support moment 4-4
1-1
2-2
3-3
span moment 4-4
1-1
support moment 2-2
1-1
span moment 2-2
63.1
41.7
9.81
35.4
38
22.8
11.9
34.2
6.93
20.5
0.0126
0.0078
0.0015
0.0057
0.0070
0.0041
0.0018
0.0055
0.0011
0.0032
min
Amin[sq.mm]
S.calc[mm]
S.min [mm] S.final [mm]
Ascal [sq.mm]
0.0017 1883.999 283.33
40
280use 10 c/c 40
0.0017 1171.242 283.33
70
280use 10 c/c 70
0.0017 239.155 283.33
330
280use 10 c/c 280
0.0017 908.224 283.33
90
280use 10 c/c 90
0.0017 1056.260 283.33
70
280use 10 c/c 70
0.0017 612.502 283.33
130
280use 10 c/c 130
0.0017 291.967 283.33
270
280use 10 c/c 270
0.0017 874.692 283.33
90
280use 10 c/c 90
0.0017 168.070 283.33
470
280use 10 c/c 280
0.0017 509.868 283.33
150
280use 10 c/c 150
131
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Vc = 0.25 f ctd K1 K2
Where K 1 = (1 + 50 ) 2.0
K 2 = (1.6 d ) 1.0
(Where d in meter)
As
1883 .99
=
= 0.012
bd 1000 * 160
K1 = (1 + 50 * 0.012) = 1.59 < 2
= 1.59
f ctm = 0.3 f ck 3
[EBCS-2, 1995 Art2.4]
f ctd =
2
3
0.3 * 25 * 0.7
1.5
= 1.032 Mpa
Vc = 0.25 * 1.59 * 1.44* 1000 * 160 = 91.584 KN
Vn = (1.3*13.99)+(1.6*14.11)=40.763 KN
Vc >> Vn The slab resist shear force with out reinforcement!
132
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
min =
0.5
f yk
[EBCS-2, 1995] Art 7.2.2.2]
0 .5
300
= 0.00167
Use D = 100mm
F8 diameter reinforcement
25 mm clear cover
d = 100-25-4
= 71 mm
As min = minbd
= 0.00167 * 1000 * 71
= 118.3mm 2
Spacing (s)
as * b
As min
* 82
* 1000
=
118.3
2 D = 200mm
= 424.8 <
[EBCS-2, 1995 Art 7.2.2.2]
350mm
Use F8 c/c 200mm in both directions.
133
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
CHAPTER SIX
DESIGN OF STAIR CASE
134
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
8 x 1 7 5 /2 8 0
0 .0 0
F .F .L .
8 x 1 7 5 /2 8 0
Sectional view
135
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
0.28
0.17
0.175
from ETABS
136
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
=27.14
4.02 is from table
<
Vc = 0.25 f ctd K1 K 2 bw d
Art4.5.3.1] K1 = (1 + 50 ) 2.0
[EBCS-2, 1995
As
124.35
=
bd 1000 * 150
= 0.000829
= (1 + 50 * 0.000829) 2.0
=1.0414 < 2
=1.0414
K 2 = 1.6 d 1.0
137
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
f ctm = 0.3 f ck 3
[EBCS-2, 1995 Art2.4]
f ctd =
2
3
0.3 * 25 * 0.7
= 1.032 Mpa
1 .5
138
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
8 x 1 7 5 /2 8 0
Sectional view
= tan 1
1400
= 32 0
2240
139
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Ly
Lx
2240
= 1.12
2000
Depth
f yk Le
d = 0.4 + 0.6
400 a
300 2240
d = 0 .4 + 0 .6
400 38.8
= 49.07 mm
Using F 12 reinforcement bar and concrete cover of 20 mm
D = 49.07 + 20 + 6= 75.07
Use D = 100 mm
d = 100 20 - 6 = 74 mm
2.4 Stair dimension
Thread = 280mm
Riser = 175mm
Flight length = 280 + 175
= 330.2cm
2.5 Load on stair
i) Dead load on flight
a. Own weight of concrete
2
0.1 * 25
= 2.948 KN m 2
cos 32
b. Steps
1
* 0.175 * 25
2
=
= 2.579 KN / m 2
cos 32
0.02 * 23
= 0.54 KN m 2
c. Base mortar plaster =
cos 32
d. Mortar for thread = 0.02*23 = 0.46 KN/m2
0.03 * 0.175 * 8 * 23
= 0.43125 KN m 2
2.24
0.03 * 0.28 * 8
* 27 = 0.81 KN m 2
f. Marble thread =
2.24
0.02 * (0.175 0.03) * 8
g. Marble riser =
* 27 = 0.2796 KN m 2
2.24
e. mortar for riser =
TOTAL = 8.05KN/m2
ii) Live load
According to EBCS-2, 1995 stairs are classified as category A
Live load taken as 3.0KN/m2
140
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
M = wl2/8
d=
d=
M sd , s
0.295 f cd b
9.19 * 10 6
0.295 * 11.33 * 1000
= 52.383 < 74 mm
OK!
iii) Reinforcement
a. Longitudinal reinforcement
M max = 9.19 KN m / m
0.5
min =
f yk
0 .5
min =
= 0.00167
300
= 517.76mm2
141
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
1000 * 113.1
= 218.44mm
517.76
Spacing =
1000 * 78.54
105.21
= 746.51mm
2 D = 2 * 190 = 380
S max =
350mm
Use F 10 c/c 350 mm
Vu = 12.92KN
The shear force Vc carries the concrete in members with out significant
axial forces shall be taken as
Vc = 0.25 f ctd K1 K 2 bw d
[EBCS-2, 1995 Art4.5.3.1]
K1 = (1 + 50 ) 2.0
As
526.04
=
bd 1000 * 74
= 0.00712
= (1 + 50 * 0.00712) 2.0
=1.355 < 2
=1.355
K 2 = 1.6 d 1.0
= 1.6 0.074 1.0
= 1.526 1
= 1.526
142
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
f ctd =
f ctk
[EBCS-2,1995 Art3.5.3.1]
f ctm = 0.3 f ck 3
[EBCS-2, 1995 Art2.4]
f ctd =
2
3
0.3 * 25 * 0.7
1 .5
= 1.032 Mpa
Vc = 0.25 * 1.032 * 1.355 * 1.526* 1000 * 74
= 39.5 KN
Because Vc > Vu, no shear reinforcement is required. But it is recommended to
use F 8 c/c 300 mm to hold the main reinforcement.
143
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
8 x 1 7 5 /2 8 0
Sectional view
= tan 1
1400
2240
= 32 0
144
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
f yk Le
d = 0.4 + 0.6
400 a
L y 2240
=
= 1.4
L x 1600
d = 0 .4 + 0 .6
400 31
= 61.45mm
Using F 12 reinforcement bar and concrete cover of 20 mm
D = 61.45+ 20 + 6
= 87.45
Use D = 100 mm
d = 100 20 - 6 = 74 mm
3.3 Stair dimension
Thread = 280mm
Riser = 175mm
A=1.365m2
KN/m2
from ETABS
Maximum support moment is 7.04 KN-m/m
Maximum span moment is 3.10 KN-m/m
ii. Check adequacy of the section for flexure
M sd , s
d=
0.295 f cd b
7.04 * 10 6
d=
0.295 * 11.33 * 1000
= 45.89 < 74 mm
OK!
iii) Reinforcement
a. Longitudinal reinforcement
Support moment
Mmax = 7.04KNm
146
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
0.5
f yk
0 .5
=
300
min =
min
= 384.8
1000 * 78.54
= 204.1mm
384.8
Spacing provided 200mm
Use F 10 bars c/c 200mm
As provided = 392.7mm2
Span moment
Mmax = 3.10KNm
0.5
min =
f yk
Spacing =
min =
0 .5
300
= 0.00167
= 164.81
As min = 0.00167 *1000 * 74
= 123.58mm2
Using F 8 bar
147
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Spacing
1000 * 50.26
= 304.99mm
164.81
Spacing provided 300mm
Use F 8 bars c/c300mm
As provided = 167.533mm2
b. Transverse reinforcement
Transverse reinforcement must be provided to account for shrinkage. The
ratio of secondary reinforcement to the main reinforcement shall be at
least equal to 0.2
At the support
[EBCS-2, 1995 Art
As min = 0.2 As , main
Spacing =
7.2.2.2]
= 0.2 *392.7= 78.54 mm2
Using F 8 bar
1000 * 50..27
= 640.0mm
Spacing =
78.54
2 D = 2 * 100 = 200
S max =
350mm
7.2.2.2]
Use F 8 c/c 350 mm
At the span
As min = 0.2 As , main
7.2.2.2]
= 0.2 *167.533= 33.51 mm2
Using F 8 bar
1000 * 50.27
= 1500mm
Spacing =
33.51
2 D = 2 * 100 = 200
S max =
[EBCS-2, 1995 Art
350mm
7.2.2.2]
Use F 8 c/c 350 mm
3.6Shear reinforcement
Checking flexural shear at a distance d from the face of the support
148
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Vu = 14.25KN
The shear force Vc carries the concrete in members with out significant
axial forces shall be taken as
Vc = 0.25 f ctd K1 K 2 bw d
[EBCS-2, 1995 Art4.5.3.1]
A
392.7
= s =
K1 = (1 + 50 ) 2.0
bd 1000 * 74
= 0.00531
= (1 + 50 * 0.00531) 2.0
=1.265 < 2
=1.265
K 2 = 1.6 d 1.0
= 1.6 0.074 1.0
= 1.526 1
= 1.526
f
f ctd = ctk
[EBCS-2,1995
Art3.5.3.1]
f ctk = 0.7 * f ctm
2
f ctm = 0.3 f ck 3
Art2.4]
[EBCS-2, 1995
2
3
0.3 * 25 * 0.7
= 1.032 Mpa
1 .5
Vc = 0.25 * 1.032 * 1.265 * 1.526 * 1000 * 74
f ctd =
= 36.86KN
Because Vc > Vu, no shear reinforcement is required. But it is
recommended to use F 8 c/c 300 mm to hold the main reinforcement.
149
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Section A-A
Depth
f yk Le
d = 0.4 + 0.6
400
a
300 2240
d = 0 . 4 + 0 .6
400 32 .77
= 58.10 mm
Using F 12 reinforcement bar and concrete cover of 20 mm
D = 58.10 + 20 + 6
= 84.10
Use D = 100 mm
d = 100 20 - 6 = 74 mm
4.4 Stair dimension
Thread = 280mm
Riser = 175mm
= 4.8KN/m2
= 10.46KN/m2
15.26KN/m2
151
from ETABS
Maximum support moment is 10.86 KN-m/m
Maximum span moment is 9.68 KN-m/m
ii. Check adequacy of the section for flexure
d=
M sd , s
0.295 f cd b
10.86 * 10 6
0.295 * 11.33 * 1000
= 57 < 74 mm
OK!
iii) Reinforcement
a. Longitudinal reinforcement
Support moment
M max = 10.86 KN m / m
0.5
min =
f yk
d=
min =
0 .5
300
= 0.00167
152
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
= 622.94
As min = 0.00167 *1000 * 74
= 123.58mm2
Using F 12 bar
1000 * 113.1
Spacing =
= 181.56mm
622.58
Spacing provided 180 mm
Use F 12 bars c/c 180mm
As provided = 628.33mm2
Span moment
M max = 9.68KN m / m
0.5
min =
f yk
0 .5
min =
= 0.00167
300
= 548.2
As min = 0.00167 *1000 * 74
= 123.58mm2
Using F 12 bar
1000 * 113.1
Spacing =
= 206.31mm
548.2
Spacing provided 200 mm
Use F 12 bars c/c 200mm
As provided = 565.5mm2
b. Transverse reinforcement
Transverse reinforcement must be provided to account for
shrinkage. The ratio of secondary reinforcement to the main
reinforcement shall be at least equal to 0.2
At Support
[EBCS-2, 1995 Art
As min = 0.2 As , main
7.2.2.2]
= 0.2 *628.33
= 125.67 mm2
153
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Using F 10 bar
1000 * 78.54
Spacing =
125.67
= 624.97mm
2 D = 2 * 100 = 200
S max =
350mm
Use F 10 c/c 350 mm
At Span
As min = 0.2 As , main
= 0.2 *565.5
= 113.1mm2
Using F 8 bar
1000 * 50.27
Spacing =
113.1
= 444.47mm
2 D = 2 * 100 = 200
S max =
[EBCS-2, 1995 Art 7.2.2.2]
350mm
Use F 8 c/c 350 mm
4.7 Design of landing
Considering a 1 m length of the landing along, the load on the landing is
as shown below.
wl 2
8
12.84 * 2.9 2
=
8
= 13.5KN-m/m
Because the bars in the landing will be placed on top of the main stairs
reinforcement
d = 100 20 6 12
= 62 mm
M max =
154
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
= 1032.70mm2
As min = 0.00167 *1000 * 62
=103.54
Using F 12 bar
Spacing
Vu = 20.49KN
The shear force Vc carries the concrete in members with out
significant axial forces shall be taken as
Vc = 0.25 f ctd K1 K 2 bw d
[EBCS-2, 1995
Art4.5.3.1]
A
628.33
= s =
K1 = (1 + 50 ) 2.0
bd 1000 * 74
= 0.00849
= (1 + 50 * 0.00849) 2.0
=1.425 < 2
=1.425
K 2 = 1.6 d 1.0
= 1.6 0.074 1.0
= 1.526 1
= 1.526
155
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
f ctd =
f ctk
[EBCS-2,1995
Art3.5.3.1]
f ctk = 0.7 * f ctm
2
f ctm = 0.3 f ck 3
[EBCS-2, 1995
Art2.4]
2
0.3 * 25 3 * 0.7
f ctd =
1 .5
= 1.032 Mpa
Vc = 0.25 * 1.032 * 1.425 * 1.526* 1000 * 74
= 41.51 KN
Because Vc > Vu, no shear reinforcement is required. But it is
recommended to use F 8 c/c 300 mm to hold the main reinforcement.
156
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
1 0 x 1 7 5 /2 8 0
Sectional view
157
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
= tan 1
1750
= 32 0
2800
Span ratio
Ly
Lx
4400
= 2.75 > 2
1600
Oneway slab
f yk Le
d = 0.4 + 0.6
400 a
[EBCS-2, 1995
Art5.2.3]
a = 25
300 4400
= 149.6 mm
d = 0 .4 + 0 .6
400 25
0.18 * 25
= 5.3 KN m 2
cos 32
1
* 0.175 * 25
= 2.579 KN / m 2
b. Steps = 2
cos 32
0.02 * 23
= 0.54 KN m 2
c. Base mortar plaster =
cos 32
d. Mortar for thread = 0.02*23 = 0.46 KN/m2
0.03 * 0.175 * 10 * 23
= 0.43125 KN m 2
2 .8
0.03 * 0.28 * 10
* 27 = 0.81 KN m 2
f. Marble thread =
2 .8
0.02 * (0.175 0.03) * 10
g. Marble riser =
* 27 = 0.2796 KN m 2
2 .8
e. mortar for riser =
TOTAL = 10.4KN/m2
158
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
0.8m
1.6m
A1=2.236m
159
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
d=
d=
M sd , s
0.295 f cd b
43.16 * 10 6
= 113.64 < 154 mm
0.295 * 11.33 * 1000
OK
iii) Reinforcement
a) Longitudinal reinforcement
Support moment
Mmax = 43.16KNm
0.5
f yk
0 .5
=
300
min =
min
= 1178.1mm2
As min = 0.00167 *1000 *154
= 257.18mm2
Using F 14 bar
1000 * 153.94
Spacing =
= 130.67 mm
1178.1
Spacing provided 130mm
Use F 14 bars c/c 130mm
As provided = 1184.15mm2
160
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
0.5
f yk
0 .5
=
300
min =
min
= 672.53mm2
As min = 0.00167 *1000 *154
= 257.18mm2
Using F 12 bar
1000 * 113.1
Spacing =
= 168.2mm
672.53
Spacing provided 165mm
Use F 12 bars c/c 165mm
As provided = 685.45mm2
b. Transverse reinforcement
Transverse reinforcement must be provided to account for shrinkage. The ratio
of secondary reinforcement to the main reinforcement shall be at least equal to
0.2
At the support
[EBCS-2, 1995 Art 7.2.2.2]
As min = 0.2 As , main
= 0.2 *1184.15 = 236.83 mm2
Using F 10 bar
Spacing =
1000 * 78.54
= 331.63mm
236.83
2 D = 2 * 180 = 380
S max =
350mm
7.2.2.2]
Use F 10 c/c 330 mm
At the span
161
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Spacing =
S max
7.2.2.2]
Use F 10 c/c 350 mm
If the slab will be cast monolithically with its supporting beams, additional
reinforcement must be provided at the top of the upper and lower landings.
5.6 Shear reinforcement
Checking flexural shear at a distance d from the face of the support
Vu = 46.05KN
The shear force Vc carries the concrete in members with out significant axial
forces shall be taken as
Vc = 0.25 f ctd K1 K 2 bw d
[EBCS-2, 1995 Art4.5.3.1]
K1 = (1 + 50 ) 2.0
As
1184.15
=
bd 1000 *154
= 0.00769
= (1 + 50 * 0.00789) 2.0
=1.384 < 2
=1.384
K 2 = 1.6 d 1.0
= 1.6 0.154 1.0
= 1.446 1
= 1.446
f
f ctd = ctk
c
f ctk = 0.7 * f ctm
[EBCS-2,1995 Art3.5.3.1]
f ctm = 0.3 f ck 3
2
f ctd
0.3 * 25 3 * 0.7
=
1 .5
= 1.032 Mpa
Vc = 0.25 * 1.032 * 1.384 * 1.446 * 1000 * 154
= 79.51 KN
Because Vc > Vu, no shear reinforcement is required. But it is recommended to
use F 8 c/c 300 mm to hold the main reinforcement.
162
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
163
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
= tan 1
1750
= 32 0
2800
Span ratio
Ly
Lx
4400
= 2.75 > 2
Oneway slab
1600
f yk Le
d = 0.4 + 0.6
400 a
a = 25
300 4400
= 149.6 mm
d = 0 .4 + 0 .6
400 25
164
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
0.18 * 25
= 5.3 KN m 2
cos 32
b. Steps
1
* 0.175 * 25
= 2
= 2.579 KN / m 2
cos 32
0.02 * 23
= 0.54 KN m 2
c. Base mortar plaster =
cos 32
d. Mortar for thread = 0.02*23 = 0.46 KN/m2
0.03 * 0.175 * 10 * 23
= 0.43125 KN m 2
2 .8
0.03 * 0.28 * 10
* 27 = 0.81 KN m 2
f. Marble thread =
2 .8
0.02 * (0.175 0.03) * 10
g. Marble riser =
* 27 = 0.2796 KN m 2
2 .8
TOTAL = 10.4KN/m2
ii) Dead load on landing
a. Concrete slab = 0.18 * 25 = 4.5 KN/m2
b. Cement screed = 0.03 * 23 = 0.69 KN/m2
c. Marble
= 0.02 * 27 = 0.54 KN/m2
d. Plastering
= 0.02 * 23 = 0.46 KN/m2
TOTAL
6.19KN/m2
iii) Live load
According to EBCS-2, 1995 stairs are classified as category A
Live load taken as 3.0KN/m2
iv) Design load
Live load on flight = 1.6 * 3.0 = 4.8KN/m2
Dead load on flight = 1.3 *10.4 = 13.52KN/m2
Total=18.32 KN/m2
Live load on landing = 1.6 * 3.0 = 4.8KN/m2
Dead load on landing = 1.3 * 6.19 = 8.047KN/m2
Total=12.85 KN/m2
6.5 Moment determination and steel reinforcement
i) Maximum bending moment
165
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
d=
d=
M sd , s
0.295 f cd b
35.97 * 10 6
0.295 * 11.33 * 1000
= 103.74< 154 mm
iii) Reinforcement
a. Longitudinal reinforcement
Mmax = 35.97KNm
0.5
f yk
0 .5
=
300
min =
min
OK!
= 964.96mm2
As min = 0.00167 *1000 *154
= 257.18mm2
Using F 12 bar
1000 * 113.1
Spacing =
= 117.21mm
964.96
Spacing provided 115mm
Use F 12 bars c/c 115mm
As provided = 983.48mm2
b. Transverse reinforcement
Transverse reinforcement must be provided to account for shrinkage. The ratio
of secondary reinforcement to the main reinforcement shall be at least equal to
166
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
7.2.2.2]
= 0.2 *983.48= 196.69 mm2
Using F 10 bar
1000 * 78.54
= 399.31mm
196.69
2 D = 2 * 180 = 360
=
350mm
Spacing =
S max
7.2.2.2]
Use F 10 c/c 350 mm
If the slab will be cast monolithically with its supporting beams, additional
reinforcement must be provided at the top of the upper and lower landings.
6.6 Design of landing
Considering a 1 m length of the landing along, the load on the landing is as
shown below.
wl 2
8
12.84 * 2.9 2
= 13.51KN-m/m
=
8
M max =
Because the bars in the landing will be placed on top of the main stairs
reinforcement
d = 180 20 6 12= 142 mm
= 344.88mm2
As min = 0.00167 *1000 *154
= 257.18mm2
Using F 10bar
1000 * 78.54
Spacing =
= 227.73mm
344.88
Spacing provided 225mm
167
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Vu = 29.94 KN
The shear force Vc carries the concrete in members with out significant axial
forces shall be taken as
Vc = 0.25 f ctd K1 K 2 bw d
[EBCS-2, 1995 Art4.5.3.1]
K1 = (1 + 50 ) 2.0
As
983.43
=
bd 1000 *154
= 0.00639
= (1 + 50 * 0.00639) 2.0
=1.319 < 2
=1.319
K 2 = 1.6 d 1.0
= 1.6 0.154 1.0
= 1.446 1
= 1.446
f
f ctd = ctk
c
f ctk = 0.7 * f ctm
[EBCS-2,1995 Art3.5.3.1]
f ctm = 0.3 f ck 3
[EBCS-2,
Art2.4] f ctd =
1995
2
3
0.3 * 25 * 0.7
= 1.032 Mpa
1 .5
168
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
DESIGN OF RAMP
1.40m
8.40m
Material properties
Steel grade fyk=300Mpa
Concrete class fck = 25Mpa
Depth determination
1.40
= 9.46 0
8.4
f yk Le
d = 0.4 + 0.6
400 a
= tan 1
a = 25
300 8400
= 285.6 mm
d = 0 .4 + 0 .6
400 25
d=
d=
M sd , s
0.295 f cd b
113.47 * 10 6
0.295 * 11.33 * 1000
= 184.25< 289 mm
iii) Reinforcement
a) Longitudinal reinforcement
Support moment
Mmax = 113.47KNm
0.5
f yk
0 .5
=
300
min =
min
OK!
= 1606.84mm2
170
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Using F 14 bar
1000 * 153.94
Spacing =
= 95.80mm
1606.84
Spacing provided 95mm
Use F 14 bars c/c 95mm
As provided = 1620.42mm2
Span moment
Mmax = 56.14KNm
0.5
f yk
0 .5
=
300
min =
min
= 768.15mm2
Using F 12 bar
1000 * 113.1
Spacing =
= 147.23mm
768.15
Spacing provided 145mm
Use F 12 bars c/c 145mm
As provided = 780mm2
b. Transverse reinforcement
Transverse reinforcement must be provided to account for shrinkage. The ratio
of secondary reinforcement to the main reinforcement shall be at least equal to
0.2
At the support
[EBCS-2, 1995 Art 7.2.2.2]
As min = 0.2 As , main
= 0.2 *1620.42 = 324.054 mm2
Using F 10 bar
Spacing =
1000 * 78.54
= 242.3mm
324.08
2 D = 2 * 310 = 620
S max =
350mm
Use F 10 c/c 240 mm
At the span
171
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
1000 * 78.54
= 503.46mm
156
2 D = 2 * 310 = 620
=
350mm
Spacing =
S max
Vu = 81.05KN
The shear force Vc carries the concrete in members with out significant axial
forces shall be taken as
Vc = 0.25 f ctd K1 K 2 bw d
[EBCS-2, 1995 Art4.5.3.1]
K1 = (1 + 50 ) 2.0
As
1620.42
=
bd 1000 * 289
= 0.00561
= (1 + 50 * 0.00561) 2.0
=1.280 < 2
=1.280
K 2 = 1.6 d 1.0
= 1.6 0.289 1.0
= 1.311 1
= 1.311
f
f ctd = ctk
c
f ctk = 0.7 * f ctm
2
f ctm = 0.3 f ck 3
f ctd =
2
3
0.3 * 25 * 0.7
= 1.032 Mpa
1 .5
172
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
CHAPTER SEVEN
FRAME ANALYSIS
173
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
FRAME ANALYSIS
LATERAL LOAD ANALYSIS
The building is to be constructed in Addis Ababa, which is located in
latitude 090-02 N and 380-43 E .It, is categorized seismic hazard zone
two. The wind load is negligible when compare to earthquake load.
EARTHQUAKE ANALYSIS
The seismic base shear force Fb for each main direction can be computed
from
Fb = S d (T1 )W
Where
S d (T1 ) =
The parameter in the above expression is the ratio of the design bed rock
acceleration to the acceleration of gravity g and is given by
= o I
Where
174
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Where
b is the coefficient for soil characteristics given in table 1.2,
S = 1.
For building with height up to 80 m to a value of T, may be
Approximated by
T1 = CH
3
4
Where
T1 = Fundamental period of building, in second
H = height of building above the basin in meters
C1 = 0.075 (for reinforced concrete moment resisting frames
and eccentrically braced steel frame)
H1 = 25.3 m
1 .2 S
2
3
2 .5
1 .2 * 1
2
3
= 1.341 2.5
ok!
(0.846)
(T1 )
The behavior factor to account for energy dissipation:
= o K D K R KW 0.70
where
S d (T1 ) =
=0.0251
The effect of the seismic action shall be evaluating using seismic dead
load.
Fb = S d (T )W
= 0.0251 * Wi
= 0.0251 * 27938.09 =701.24KN
Ft = 0.07 * T1* Fb
175
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
(Fb Ft )wi hi
w h
i
FLOOR
WEIGHT (KN)
LEVEL
Floor at -1.40
Floor at +1.40
First
Second
Third
Fourth
Fifth
Roof
1311.38
3459.48
4063.12
4020.36
4020.36
3891.26
3891.26
3280.88
1.50
4.30
7.80
11.30
14.80
18.30
21.80
25.27
1967.07
14875.77
31692.31
45430.08
59501.34
71210.03
84829.44
82907.80
27938.09
2 .5
2
3
Ybar
-19.91
-9.27
-18.17
-18.18
-18.18
-17.47
-17.47
-17.55
-0.13
0.34
0.80
0.79
0.79
0.83
0.83
1.06
H2 = 29.50 m
3.31
25.01
53.28
76.38
100.03
119.72
142.61
139.38
Xbar
392413.84
3
4
= 0.949 sec
1 .2 * 1
2
3
= 1.242 2.5
ok!
(0.949)
(T1 )
The behavior factor to account for energy dissipation:
= o K D K R KW 0.70
S d (T1 ) =
=0.0232
The effect of the seismic action shall be evaluating using seismic dead
load.
Fb = S d (T )W
= 0.0232 * Wi
= 0.0232 * 87220.08 =2023.50 KN
Ft = 0.07 * T1* Fb
= 0.07 * 0.949 * 2023.50 =134.42KN
Fi =
(Fb Ft )wi hi
w h
i
176
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
WEIGHT (KN)
Floor at -5.60
Floor at -4.20
Floor at -2.85
Floor at -1.40
Floor at 0.00
Floor at +1.40
First
Second
Third
Fourth
Fifth
Roof
2255.09
1826.61
4091.92
3218.12
5570.64
5279.04
11805.73
11698.11
11698.11
10681.19
10681.19
8414.34
LEVEL
WiHi (KNm)
1.50
2.90
4.30
5.70
7.10
8.50
12.00
15.50
19.00
22.50
26.50
29.50
87220.08
3382.63
5297.16
17595.26
18343.28
39551.57
44871.84
141668.71
181320.75
222264.14
240326.67
283051.41
248222.98
4.42
6.92
22.99
23.97
51.67
58.63
185.09
236.90
290.39
313.99
369.81
324.31
Ybar
16.16
10.69
12.47
6.37
17.25
4.11
10.79
10.81
10.81
11.38
11.38
11.16
9.66
-3.95
9.24
-1.13
12.46
1.77
6.80
6.78
6.78
6.13
6.13
6.37
1445896.41
The story shears are applied at mass center of each floor. For this
purpose mass centers are calculated and tabulated in the following
pages.
Item
Area
Mx(KNm)
S1
22.55
7.51
169.35
-27.85
2.90
-4716.41
491.12
S2
13.00
7.51
97.63
-24.35
-1.30
-2377.29
-126.92
S3
13.60
7.51
102.14
-21.00
8.90
-2144.86
909.01
S4
42.00
7.51
315.42
-24.35
4.20
-7680.48
1324.76
S5
63.00
7.51
473.13
-18.10
4.20
-8563.65
1987.15
S6
46.12
7.51
346.36
-18.10
-3.08
-6269.14
-1065.06
S7
5.02
7.51
37.70
-17.42
-6.51
-656.74
-245.43
S8
57.75
7.51
433.70
-10.91
4.10
-4732.56
1778.18
S9
42.28
7.51
317.52
-10.91
-3.07
-3464.81
-975.43
-447.72
My(KNm)
S10
8.78
7.51
65.94
-10.74
-6.79
-708.17
S38
12.71
7.51
95.45
-6.46
-3.24
-616.81
-308.88
S30
25.13
7.51
188.73
-25.27
-4.39
-4769.11
-828.51
-46700.03
2492.27
2643.07
177
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
depth
0.40
Area
B1
Length
2.05
Uniformuly
distributed
Weight
0.82
10.00
8.20
X
-27.88
B2
8.40
0.50
4.20
10.00
42.00
B3
2.50
0.40
1.00
10.00
10.00
B4
5.00
0.40
2.00
10.00
B5
5.00
0.40
2.00
10.00
B6
7.50
0.40
3.00
B7
8.40
0.50
B8
6.15
0.40
Item
Weight
My
Y
8.40
Mx
-228.58
68.88
-26.85
4.20
-1127.70
176.40
-26.85
-1.25
-268.50
-12.50
20.00
-24.35
8.40
-487.00
168.00
20.00
-24.35
0.00
-487.00
0.00
10.00
30.00
-18.10
8.40
-543.00
252.00
4.20
10.00
42.00
-21.85
4.20
-917.70
176.40
2.46
10.00
24.60
-21.85
-3.08
-537.51
-75.65
B8'
1.45
0.40
0.58
10.00
5.80
-22.78
-2.60
-132.12
-15.08
B9
7.50
0.40
3.00
10.00
30.00
-18.10
-6.15
-543.00
-184.50
B9'
2.13
0.40
0.85
10.00
8.52
-22.92
-6.15
-195.31
-52.40
B10
7.50
0.40
3.00
10.00
30.00
-18.10
0.00
-543.00
0.00
B11
8.40
0.50
4.20
10.00
42.00
-14.35
4.20
-602.70
176.40
B12
6.15
0.40
2.46
10.00
24.60
-14.35
-3.07
-353.01
-75.50
B13
6.88
0.40
2.75
10.00
27.53
-10.91
8.40
-300.39
231.24
B14
6.88
0.40
2.75
10.00
27.53
-10.91
0.00
-300.39
0.00
B15
6.88
0.40
2.75
10.00
27.53
-10.91
-6.15
-300.39
-169.30
B16'
8.40
0.50
4.20
10.00
42.00
-7.48
4.20
-313.95
176.40
B17
6.15
0.40
2.46
10.00
24.60
-7.48
-3.08
-184.01
-75.77
-8365.25
765.03
486.90
parapet Wall
Length
Area
Uniformuly
distributed
WEIGHT(KN/m2)
Weight
Mx
My
P1
1.80
1.80
2.50
4.50
-28.00
8.80
-126.00
39.60
P2
13.00
13.00
2.50
32.50
-2.70
9.40
-87.75
305.50
P3
0.65
0.65
2.50
1.63
-14.25
9.08
-23.16
14.75
P3'
P4
0.65
0.65
2.50
1.63
-27.15
9.08
-44.12
14.76
7.15
7.15
2.50
17.88
-10.68
8.65
-190.82
154.62
P5
14.70
14.70
2.50
36.75
-28.80
1.47
-1058.40
54.02
P6a
11.34
11.34
2.50
28.36
-23.25
-6.31
-659.23
-178.84
p6b
P7
9.37
9.37
2.50
23.43
-12.94
-7.23
-303.22
-169.47
1.697
1.697
2.50
4.24
-7.612
-7.121
-32.29391
-30.210843
-2524.98
204.72
Item
150.91
178
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
Area
Uniformuly
Distributed
WEIGHT(KN/m2)
S1
22.55
4.75
13.00
13.60
42.00
63.00
46.12
6.77
6.77
6.77
6.77
6.77
6.77
6.77
161.23
32.16
88.01
92.07
284.34
426.51
312.23
-27.85
-27.80
-24.35
-21.00
-24.35
-18.10
-18.10
2.90
-1.25
-1.30
8.90
4.20
4.20
-3.08
-4490.26
-893.98
-2143.04
-1933.51
-6923.68
-7719.83
-5651.41
467.57
-40.20
-114.41
819.44
1194.23
1791.34
-960.11
5.02
7.51
37.70
-17.42
-6.51
-656.74
-245.43
57.75
42.28
6.77
6.77
390.97
286.24
-10.91
-10.91
4.10
-3.07
-4266.24
-3123.40
1602.97
-879.32
8.78
7.59
7.51
65.94
-10.74
-6.79
-708.17
-447.72
6.85
51.99
2229.39
-6.30
-4.48
-327.55
-38510.26
-232.92
3188.36
'
S2
S3
S4
S5
S6
S7
S8
S9
S10
S38
Item
SW5
SW6
SW7
Weight(KN)
Mx(KNm)
My(KNm)
Length
5.40
3.16
4.92
Height
3.50
3.50
3.50
Area
18.90
11.07
17.21
Uniformuly
distributed
Weight
5.69
5.69
5.69
Weight
107.54
63.01
97.90
268.45
X
-26.20
-28.80
-26.35
y
-2.60
-4.28
-5.95
Mx
My
-2817.57 -279.61
-1814.72 -269.56
-2579.43 -582.13
-7211.72 -1131.29
Beams
Length
depth
Area
Uniformuly
distributed
Weight
B1
2.05
0.50
1.03
10.00
B1'
B2
1.95
0.50
0.98
10.00
9.75
-27.85
0.00
-271.54
0.00
8.40
0.50
4.20
10.00
42.00
-26.85
4.20
-1127.70
176.40
B3
2.50
0.50
1.25
10.00
12.50
-26.85
-1.25
-335.63
-15.63
B4
5.00
0.50
2.50
10.00
25.00
-24.35
8.40
-608.75
210.00
B5
5.00
0.50
2.50
10.00
25.00
-24.35
0.00
-608.75
0.00
B6
7.50
0.50
3.75
10.00
37.50
-18.10
8.40
-678.75
315.00
B7
8.40
0.50
4.20
10.00
42.00
-21.85
4.20
-917.70
176.40
B8
6.15
0.50
3.08
10.00
30.75
-21.85
-3.08
-671.89
-94.56
B8'
1.45
0.50
0.73
10.00
7.25
-22.78
-2.60
-165.16
-18.85
Item
Weight
Mx
My
10.25
-27.88
8.40
-285.72
86.10
179
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Length
depth
Area
Uniformuly
distributed
Weight
Weight
Mx
My
B9
7.50
0.50
3.75
10.00
37.50
-18.10
-6.15
-678.75
-230.63
B9'
2.13
0.50
1.07
10.00
10.65
-22.92
-6.15
-244.14
-65.50
B10
7.50
0.50
3.75
10.00
37.50
-18.10
0.00
-678.75
0.00
B11
8.40
0.50
4.20
10.00
42.00
-14.35
4.20
-602.70
176.40
B12
6.15
0.50
3.08
10.00
30.75
-14.35
-3.07
-441.26
-94.37
B13
6.88
0.50
3.44
10.00
34.41
-10.91
8.40
-375.48
289.04
B14
6.88
0.50
3.44
10.00
34.41
-10.91
0.00
-375.48
0.00
B15
6.88
0.50
3.44
10.00
34.41
-10.91
-6.15
-375.48
-211.62
B16'
8.40
0.50
4.20
10.00
42.00
-7.48
4.20
-313.95
176.40
B17
6.15
0.50
3.08
10.00
30.75
-7.48
-3.08
-230.01
-94.71
-9987.58
779.89
Item
576.38
External Wall
Item
Length
Area
W1
6.90
1.85
15.09
21.39
5.92
48.25
W2
W3
Uniformuly
distributed
WEIGHT
Area to be
deducted Net area
9.94
3.41
26.72
11.45
2.51
21.53
Weight
Mx
My
49.85
-10.60
-23.07
-14.07
8.60
-6.27
-7.01
-528.33
428.69
-252.20
-68.55
-1319.34
-657.61
-2099.87
-297.47
4.36
4.36
4.36
10.93
93.78
154.56
Columns
Item
Area
Weight
Mx
My
C1
0.16
14.00
-26.85
8.40
-375.90
117.60
C2
0.13
11.00
-26.85
0.00
-295.23
0.00
C3
0.16
14.00
-21.85
8.40
-305.90
117.60
C4
0.13
11.00
-21.85
0.00
-240.25
0.00
C5
0.16
14.00
-21.85
-6.15
-305.90
-86.10
C6
0.16
14.00
-14.35
8.40
-200.90
117.60
C7
0.13
11.00
-14.35
0.00
-157.79
0.00
C8
0.13
11.00
-14.35
-6.15
-157.79
-67.62
C9
0.13
11.00
-7.48
-6.15
-82.25
-67.62
C11'
0.13
11.00
-7.48
8.40
-82.19
92.36
C10'
0.13
11.00
-7.48
0.00
-82.19
0.00
-2286.29
223.82
132.97
180
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Curtain Walls
Item
Length
Area
Uniformuly
distributed
WEIGHT
Mx
My
CW1
13.28
46.47
0.81
37.64
-28.69
3.94
-1080.09
148.31
CW2
14.08
49.26
0.81
39.90
-20.53
9.35
-819.08
373.13
-1899.18
521.44
77.55
Partitions
Item
Length
Area
0.60
7.80
4.16
7.81
4.55
0.52
0.70
7.81
1.86
24.18
12.88
24.21
14.11
1.60
2.17
24.21
P1
P2
P3
P4
P5
P6
P7
P8
Area to be
Uniformuly
deducted Net area distributed
0.00
1.86
2.79
0.00
24.18
2.79
0.00
12.88
0.00
24.21
0.00
14.11
0.00
1.60
0.00
2.17
0.00
24.21
2.79
2.79
2.79
2.79
2.79
2.79
Weight
5.18
X
-21.85
Y
9.00
Mx
-113.20
My
46.63
67.45
-21.85
4.20
-1473.86
282.97
35.94
-21.89
-3.94
-786.62
-141.52
67.55
-14.35
4.20
-969.32
283.37
39.35
-14.35
-3.72
-564.71
-146.20
4.46
-14.35
-6.70
-64.04
-29.90
66.60
6.05
-6.60
11.00
-39.96
67.55
-6.85
4.20
-462.71
283.37
-4474.42
645.31
293.54
S
St3
St3'
L
L3
L3'
Uniformuly
distributed Weight
2.80
2.80
i
15.08
15.08
42.22
42.22
84.45
-25.75
-25.81
-3.43
-5.20
-1087.27
-1089.76
-2177.03
-144.62
-219.40
-364.01
2.90
3.20
1.55
2.33
4.50
7.46
Uniformuly
distributed
6.19
6.19
27.82
46.15
73.98
-27.50
-23.21
-3.43
-5.20
-765.16
-1071.11
-1836.27
-95.30
-239.81
-335.11
181
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Partitions
Item
Length
Area
Area to be
deducted
0.47
7.81
4.16
9.30
7.81
4.36
0.60
8.55
1.47
24.21
12.88
28.83
24.21
13.52
1.85
26.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
P1
P2
P3
P4
P5
P6
P7
P8
Uniformuly
distributed
Net area
1.47
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
24.21
12.88
28.83
24.21
13.52
1.85
26.51
Weight
4.09
X
-21.85
Y
8.94
Mx
-89.39
67.55
-21.85
4.19
-1475.94
283.03
35.94
-21.89
-3.94
-786.62
-141.52
80.44
-18.10
4.53
-1455.89
363.97
67.55
-14.35
4.20
-969.32
283.37
37.71
-14.35
-3.72
-541.13
-140.09
-34.84
5.17
-14.35
-6.74
-74.22
73.97
-10.60
4.30
-784.04
318.05
-6176.55
968.54
372.41
R
Area
S1
22.55
4.75
13.00
13.60
42.00
63.00
46.12
4.60
57.75
42.28
8.78
'
S2
S3
S4
S5
S6
S7
S8
S9
S10
S38
Uniformuly
Distributed
WEIGHT(KN/m2) Weight(KN)
Item
S
W1
W2
W3
6.85
6.85
6.85
6.85
6.85
6.85
6.85
7.51
6.85
6.85
7.51
6.85
7.59
My
36.57
154.47
32.54
89.05
93.16
287.70
431.55
315.92
34.55
395.59
289.62
65.94
51.99
2242.07
Mx(KNm)
My(KNm)
-27.85
-27.80
-24.35
-21.00
-24.35
-18.10
-18.10
-17.42
-10.91
-10.91
-10.59
-6.30
2.90
-1.25
-1.30
8.90
4.20
4.20
-3.08
-6.50
4.10
-3.07
-6.79
-4.48
-4301.92
-904.54
-2168.37
-1956.36
-7005.50
-7811.06
-5718.19
-601.79
-4316.65
-3160.31
-698.35
-327.55
-38970.58
447.96
-40.67
-115.77
829.12
1208.34
1812.51
-971.46
-224.55
1621.91
-889.71
-447.52
-232.92
2997.24
6.90
1.85
15.09
21.39
5.92
48.25
9.94
3.41
26.72
11.45
2.51
21.53
Uniformuly
distributed
Weight
4.36
4.36
4.36
49.85
10.93
93.78
154.56
-10.60
-23.07
-14.07
8.60
-6.27
-7.01
-528.33 428.69
-252.20 -68.55
-1319.34 -657.61
-2099.87 -297.47
182
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Beams
depth
0.50
Area
B1
Length
2.05
Uniformuly
distributed
Weight
1.03
10.00
B1'
1.95
0.50
0.98
10.00
B2
8.40
0.50
4.20
B3
2.50
0.50
B4
5.00
B5
B6
Item
Weight
My
10.25
X
-27.88
Y
8.40
Mx
-285.72
86.10
9.75
-27.85
0.00
-271.54
0.00
10.00
42.00
-26.85
4.20
-1127.70
176.40
1.25
10.00
12.50
-26.85
-1.25
-335.63
-15.63
0.50
2.50
10.00
25.00
-24.35
8.40
-608.75
210.00
5.00
0.50
2.50
10.00
25.00
-24.35
0.00
-608.75
0.00
7.50
0.50
3.75
10.00
37.50
-18.10
8.40
-678.75
315.00
B7
8.40
0.50
4.20
10.00
42.00
-21.85
4.20
-917.70
176.40
B8
6.15
0.50
3.08
10.00
30.75
-21.85
-3.08
-671.89
-94.56
B8'
1.45
0.40
0.58
10.00
5.80
-22.78
-2.60
-132.12
-15.08
B9
7.50
0.50
3.75
10.00
37.50
-18.10
-6.15
-678.75
-230.63
B9'
2.13
0.40
0.85
10.00
8.52
-22.92
-6.15
-195.31
-52.40
B10
7.50
0.50
3.75
10.00
37.50
-18.10
0.00
-678.75
0.00
B11
8.40
0.50
4.20
10.00
42.00
-14.35
4.20
-602.70
176.40
B12
6.15
0.50
3.08
10.00
30.75
-14.35
-3.07
-441.26
-94.37
B13
6.88
0.50
3.44
10.00
34.41
-10.91
8.40
-375.48
289.04
B14
6.88
0.50
3.44
10.00
34.41
-10.91
0.00
-375.48
0.00
B15
6.88
0.50
3.44
10.00
34.41
-10.91
-6.15
-375.48
-211.62
B16'
8.40
0.50
4.20
10.00
42.00
-7.48
4.20
-313.95
176.40
B17
6.15
0.50
3.08
10.00
30.75
-7.48
-3.08
572.80
C
C1
0.30
C2
0.24
C3
0.30
C4
0.24
C5
0.30
C6
0.30
C7
0.24
C8
0.24
C9
0.24
C11'
0.24
C10'
0.24
26.25
20.79
26.25
20.79
26.25
26.25
20.79
20.79
20.79
20.79
20.79
250.52
-230.01
-94.71
-9905.72
796.76
-26.85
8.40
-26.85
0.00
-21.85
8.40
-21.85
0.00
-21.85
-6.15
-14.35
8.40
-14.35
0.00
-14.35
-6.15
-7.48
-6.15
-7.48
8.40
-7.48
0.00
-704.81
-558.17
-573.56
-454.23
-573.56
-376.69
-298.32
-298.32
-155.50
-155.39
-155.39
-4303.94
220.50
0.00
220.50
0.00
-161.44
220.50
0.00
-127.85
-127.85
174.62
0.00
418.99
183
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
&
C2
0.20
C3
0.25
C4
0.20
C5
0.25
C6
0.25
C7
0.20
C8
0.20
C9
0.20
C11'
0.20
C10'
0.20
3.50
3.50
3.50
-26.85
8.40
-26.85
0.00
-21.85
8.40
-21.85
0.00
-21.85
-6.15
-14.35
8.40
-14.35
0.00
-14.35
-6.15
-7.48
-6.15
-7.48
8.40
-7.48
0.00
Uniformuly
distributed
Weight
18.90
11.07
17.21
CW1
CW2
15.08
15.08
2.90
3.20
-587.34
-461.30
-477.97
-375.40
-477.97
-313.91
-246.54
-246.54
-128.51
-128.42
-128.42
-3572.33
183.75
0.00
183.75
0.00
-134.53
183.75
0.00
-105.66
-105.66
144.32
0.00
349.71
5.69
5.69
5.69
107.54
63.01
97.90
268.45
-26.20
-28.80
-26.35
-2.60
-4.28
-5.95
-2817.57 -279.61
-1814.72 -269.56
-2579.43 -582.13
-7211.72 -1131.29
42.22
42.22
84.45
-25.75
-25.81
-3.43
-5.20
-1087.27
-1089.76
-2177.03
-144.62
-219.40
-364.01
2.80
2.80
L3
L3'
'
St3
S
21.88
17.18
21.88
17.18
21.88
21.88
17.18
17.18
17.18
17.18
17.18
207.76
5.40
3.16
4.92
SW5
SW6
SW7
0.25
C1
1.55
2.33
Uniformuly
distributed
Weight
4.50
7.46
6.19
6.19
27.82
46.15
73.98
-27.50
-23.21
-3.43
-5.20
-765.16
-1071.11
-1836.27
-95.30
-239.81
-335.11
13.28
2.20
46.47
7.70
U.D Weight
0.81
0.81
37.64
6.24
43.88
-28.69
-7.22
3.94
9.80
-1080.09
-45.06
-1125.15
148.31
61.12
209.44
184
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
W1
W2
W3
W4
W5
W6
W7
2.9
6.9
6.3
1.9
13.3
1.8
4.8
Area to be
deducted
9.0
21.4
19.4
5.9
42.7
5.6
15.4
0
9.94
12.77
0
26.73
3.41
0
9.0
11.5
6.6
5.9
16.0
2.2
15.4
Uniformuly
distributed
Weight
4.36
4.36
4.36
4.36
4.36
4.36
4.36
39.15
49.86
28.90
25.78
69.52
9.54
67.17
289.93
-23.6
-18.1
-10.91
-23.1
-14.93
-7.61
-5.74
8.6
8.6
8.6
-6.27
-7
-7.06
-4.72
-924.0
-902.6
-315.3
-595.6
-1037.9
-72.6
-385.56
-4233.44
336.7
428.8
248.5
-161.7
-486.6
-67.3
-317.05
-18.59
Uniformuly
distributed
Weight
B2
8.40
0.50
4.20
10.00
42.00
-26.85
4.20
-1127.70
176.40
B3
2.50
0.50
1.25
10.00
12.50
-26.85
-1.25
-335.63
-15.63
B4
5.00
0.50
2.50
10.00
25.00
-24.35
8.40
-608.75
210.00
B5
5.00
0.50
2.50
10.00
25.00
-24.35
0.00
-608.75
0.00
B6
7.50
0.50
3.75
10.00
37.50
-18.10
8.40
-678.75
315.00
B7
8.40
0.50
4.20
10.00
42.00
-21.85
4.20
-917.70
176.40
B8
6.15
0.50
3.08
10.00
30.75
-21.85
-3.08
-671.89
-94.56
B8'
B9
1.45
0.40
0.58
10.00
5.80
-22.78
-2.60
-132.12
-15.08
7.50
0.50
3.75
10.00
37.50
-18.10
-6.15
-678.75
-230.63
B9'
B10
2.13
0.40
0.85
10.00
8.52
-22.92
-6.15
-195.31
-52.40
7.50
0.50
3.75
10.00
37.50
-18.10
0.00
-678.75
0.00
B11
8.40
0.50
4.20
10.00
42.00
-14.35
4.20
-602.70
176.40
B12
6.15
0.50
3.08
10.00
30.75
-14.35
-3.07
-441.26
-94.37
B13
6.88
0.50
3.44
10.00
34.41
-10.91
8.40
-375.48
289.04
B14
6.88
0.50
3.44
10.00
34.41
-10.91
0.00
-375.48
0.00
B15
6.88
0.50
3.44
10.00
34.41
-10.91
-6.15
-375.48
-211.62
B16'
8.40
0.50
4.20
10.00
42.00
-7.48
4.20
-313.95
176.40
B17
6.15
0.50
3.08
10.00
30.75
-7.48
-3.08
-230.01
-94.71
-9348.47
710.66
552.80
185
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
P1
P2
P3
Length
3.96
1.20
1.90
Area
C1
0.24
C2
0.24
C3
0.30
C4
0.24
C5
0.30
C6
0.30
C7
0.24
C8
0.24
C9
0.24
C11'
0.24
C10'
0.24
S2
S4
S5
S6
S7
S8
S9
S10
S38
Weight
25.75
7.81
12.37
45.93
2.10
2.10
2.10
X
-21.89
-14.95
-6.50
Y
-3.94
-2.60
2.60
Mx
-563.58
-116.79
-80.40
-760.77
My
-101.42
-20.31
32.16
-89.57
Item
Area
12.26
3.72
5.89
Uniformuly
distributed
Weight
Weight
20.79
20.79
26.25
20.79
26.25
26.25
20.79
20.79
20.79
20.79
20.79
245.06
-26.85
8.40
-26.85
0.00
-21.85
8.40
-21.85
0.00
-21.85
-6.15
-14.35
8.40
-14.35
0.00
-14.35
-6.15
-7.48
-6.15
-7.48
8.40
-7.48
0.00
Mx
-558.17
-558.17
-573.56
-454.23
-573.56
-376.69
-298.32
-298.32
-155.50
-155.39
-155.39
-4157.30
My
174.62
0.00
220.50
0.00
-161.44
220.50
0.00
-127.85
-127.85
174.62
0.00
373.11
13.00
42.00
63.00
46.12
4.60
57.75
42.28
8.78
7.59
Uniformuly
distributed
Weight
6.85
6.85
6.85
6.85
7.51
6.85
6.85
7.51
6.85
89.05
287.70
431.55
315.92
34.55
395.59
289.62
65.94
51.99
1961.90
-24.35
-24.35
-18.10
-18.10
-17.42
-10.91
-10.91
-10.59
-6.30
-1.30
4.20
4.20
-3.08
-6.50
4.10
-3.07
-6.79
-4.48
-2168.37
-7005.50
-7811.06
-5718.19
-601.79
-4316.65
-3160.31
-698.35
-327.55
-31807.75
-115.77
1208.34
1812.51
-971.46
-224.55
1621.91
-889.71
-447.52
-232.92
1760.84
186
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
SW5
SW7
Length
5.40
4.92
Height
3.50
3.50
Area
18.90
17.21
Length
2.80
2.80
WeightTotal Weight X
15.08
42.22
-25.75
15.08
42.22
-25.81
84.45
5.69
5.69
2.90
3.20
1.55
2.33
4.50
7.46
6.19
6.19
y
-2.60
-5.95
Mx
-2817.57
-2579.43
-5397.00
My
-279.61
-582.13
-861.73
Mx
-1087.27
-1089.76
-2177.03
My
-144.62
-219.40
-364.01
27.82
46.15
73.98
-27.50
-23.21
-3.43
-5.20
-765.16
-1071.11
-1836.27
-95.30
-239.81
-335.11
Y
-3.43
-5.20
Uniformuly
distributed
Weight
X
-26.20
-26.35
L3
L3'
Weight
107.54
97.90
205.44
Item
St3
St3'
L
Uniformuly
distributed
Weight
Item
Area
C1
0.36
C2
0.28
C3
0.36
C4
0.28
C5
0.36
C6
0.36
C7
0.28
C8
0.28
C9
0.28
C11'
0.28
C10'
0.28
Weight
31.50
24.74
31.50
24.74
31.50
31.50
24.74
24.74
24.74
24.74
24.74
299.18
-26.85
8.40
-26.85
0.00
-21.85
8.40
-21.85
0.00
-21.85
-6.15
-14.35
8.40
-14.35
0.00
-14.35
-6.15
-7.48
-6.15
-7.48
8.40
-7.48
0.00
Mx
-845.78
-664.27
-688.28
-540.57
-688.28
-452.03
-355.02
-355.02
-185.06
-184.93
-184.93
-5144.15
My
264.60
0.00
264.60
0.00
-193.73
264.60
0.00
-152.15
-152.15
207.82
0.00
503.59
187
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Uniformuly
distributed
Weight
B2
8.40
0.50
4.20
10.00
42.00
-26.85
4.20
-1127.70
176.40
B3
2.50
0.50
1.25
10.00
12.50
-26.85
-1.25
-335.63
-15.63
B4
5.00
0.50
2.50
10.00
25.00
-24.35
8.40
-608.75
210.00
B5
5.00
0.50
2.50
10.00
25.00
-24.35
0.00
-608.75
0.00
B6
7.50
0.50
3.75
10.00
37.50
-18.10
8.40
-678.75
315.00
B7
8.40
0.50
4.20
10.00
42.00
-21.85
4.20
-917.70
176.40
B8
6.15
0.50
3.08
10.00
30.75
-21.85
-3.08
-671.89
-94.56
B8'
B9
1.45
0.40
0.58
10.00
5.80
-22.78
-2.60
-132.12
-15.08
7.50
0.50
3.75
10.00
37.50
-18.10
-6.15
-678.75
-230.63
B9'
2.13
0.40
0.85
10.00
8.52
-22.92
-6.15
-195.31
-52.40
B10
7.50
0.50
3.75
10.00
37.50
-18.10
0.00
-678.75
0.00
B11
8.40
0.50
4.20
10.00
42.00
-14.35
4.20
-602.70
176.40
B12
6.15
0.50
3.08
10.00
30.75
-14.35
-3.07
-441.26
-94.37
B13
6.88
0.50
3.44
10.00
34.41
-10.91
8.40
-375.48
289.04
B14
6.88
0.50
3.44
10.00
34.41
-10.91
0.00
-375.48
0.00
B15
6.88
0.50
3.44
10.00
34.41
-10.91
-6.15
-375.48
-211.62
B16'
B17
8.40
0.50
4.20
10.00
42.00
-7.48
4.20
-313.95
176.40
6.15
0.50
3.08
10.00
30.75
-7.48
-3.08
552.80
4.90
3.90
1.90
e
Item
SW5
SW7
-94.71
710.66
P1
P2
P3
S
-230.01
-9348.47
15.68
12.48
6.08
Uniformuly
distributed
Weight
2.79
2.79
2.79
43.75
34.82
16.96
95.53
-24.25
-21.73
-22.60
3.37
2.25
-2.60
-1060.87
-756.62
-383.37
-2200.86
147.43
78.34
-44.10
181.67
Length
5.40
4.92
Height
3.50
3.50
Area
18.90
17.21
Uniformuly
distributed
Weight
5.69
5.69
Weight
107.54
97.90
205.44
X
-26.20
-26.35
y
-2.60
-5.95
Mx
-2817.57
-2579.43
-5397.00
My
-279.61
-582.13
-861.73
188
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
St3
St3'
L
Item
L3
L3'
Uniformuly
distributed
Weight
2.80
2.80
i
15.08
15.08
42.22
42.22
84.45
-25.75
-25.81
-3.43
-5.20
Weight
27.82
46.15
73.98
X
-27.50
-23.21
-1087.27
-1089.76
-2177.03
-144.62
-219.40
-364.01
Width
2.90
3.20
Length
1.55
2.33
Uniformuly
distributed
Weight
Area
4.50
7.46
6.19
6.19
Y
-3.43
-5.20
Mx
-765.16
-1071.11
-1836.27
My
-95.30
-239.81
-335.11
SOLID SLAB
BEAMS
PARAPET
Weight(KN)
Mx (KNm)
My (KNm)
2643.07
486.90
150.91
-46700.03
-8365.25
-2524.98
2492.27
765.03
204.72
3280.88
-57590.26
3462.02
-17.55
1.06
&
DESCRIPTION
RIBBED SLAB
EXT WALLS
CURTAIN WALLS
PARTITIONS
BEAMS
COLUMNS
SHEAR WALLS
STAIRS
LANDING
Weight(KN)
Mx (KNm)
My (KNm)
2229.39
154.56
77.55
293.54
576.38
132.97
268.45
84.45
-38510.26
-2099.87
-1899.18
-4474.42
-9987.58
-2286.29
-7211.72
-2177.03
3188.36
-297.47
521.44
645.31
779.89
223.82
-1131.29
-364.01
73.98
663.73
-335.11
3891.26
-67982.62
3230.93
-17.47
0.83
189
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Weight(KN)
Mx (KNm)
My (KNm)
RIBBED SLAB
2242.07
43.88
154.56
372.41
572.80
207.76
268.45
84.45
-38970.58
-1125.15
-2099.87
-6176.55
-9905.72
-3572.33
-7211.72
-2177.03
2997.24
209.44
-297.47
968.54
796.76
349.71
-1131.29
-364.01
73.98
-1836.27
-335.11
4020.36
-73075.22
3193.81
-18.18
0.79
CURTAIN WALLS
EXT WALLS
PARTITIONS
BEAMS
COLUMNS
SHEAR WALLS
STAIRS
LANDING
DESCRIPTION
Weight(KN)
Mx (KNm)
My (KNm)
RIBBED SLAB
2242.07
43.88
154.56
372.41
572.80
250.52
268.45
84.45
-38970.58
-1125.15
-2099.87
-6176.55
-9905.72
-4303.94
-7211.72
-2177.03
2997.24
209.44
-297.47
968.54
796.76
418.99
-1131.29
-364.01
73.98
-1836.27
-335.11
4063.12
-73806.83
3263.08
-18.17
0.80
CURTAIN WALLS
EXT WALLS
PARTITIONS
BEAMS
COLUMNS
SHEAR WALLS
STAIRS
LANDING
DESCRIPTION Weight(KN)
Mx (KNm)
My (KNm)
RIBBED SLAB
-31807.75
-4233.44
-760.77
-9348.47
-4157.30
-5397.00
-2177.03
1760.84
-18.59
-89.57
710.66
373.11
-861.73
-364.01
EXT WALLS
PARTITIONS
BEAMS
COLUMNS
SHEAR WALLS
STAIRS
LANDING
1961.90
289.93
45.93
552.80
245.06
205.44
84.45
73.98
-1836.27
-335.11
3459.48
-59718.03
1175.59
X
Y
-17.26
0.34
190
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
DESCRIPTION
Weight(KN)
Mx (KNm)
My (KNm)
PARTITIONS
BEAMS
COLUMNS
SHEAR WALLS
STAIRS
LANDING
95.53
552.80
299.18
205.44
84.45
-2200.86
-9348.47
-5144.15
-5397.00
-2177.03
181.67
710.66
503.59
-861.73
-364.01
73.98
-1836.27
-335.11
1311.38
-26103.78
-164.94
-19.91
-0.13
&
ROOF
WEIGHT
Mx (KNm)
My (KNm)
Xbar
Ybar
1311.38
3459.48
4063.12
4020.36
3891.26
3280.88
-26103.78
-59718.03
-73806.83
-73075.22
-67982.62
-57590.26
-164.94
1175.59
3263.08
3193.81
3230.93
3462.02
-19.91
-0.13
-17.26
0.34
-18.17
0.80
-18.18
0.79
-17.47
0.83
-17.55
1.06
191
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Uniformly Distributed
WEIGHT(KN/m2)
Weight(KN)
30.82
45.87
57.54
14.24
33.75
49.50
28.98
49.50
24.75
24.75
49.50
24.75
33.75
49.50
33.75
49.50
24.84
51.64
40.10
8.79
26.76
7.51
231.46
7.51
344.48
7.51
432.13
7.51
106.94
7.51
253.46
7.51
371.75
7.51
217.64
7.51
371.75
7.51
185.87
7.51
185.87
7.51
371.75
7.51
185.87
7.51
253.46
7.51
371.75
7.51
253.46
7.51
371.75
7.51
186.55
7.51
387.82
7.51
301.15
7.51
66.01
7.51
200.98
10.18
7.51
76.45
7.22
7.51
54.22
-3.43
-3.48
-3.48
-2.69
3.75
3.75
17.25
3.75
5.00
10.00
11.25
17.50
11.25
11.25
18.75
18.75
25.38
26.42
25.68
4.24
13.76
27.78
23.05
31.47
32.11
9.02
17.25
11.70
4.20
-1.33
17.30
11.70
4.20
-3.30
-8.80
-8.80
-3.30
-2.20
17.30
11.70
17.30
11.70
17.02
11.59
5.60
-11.02
-8.64
3.71
-0.71
6.90
10.70
4.20
Item
Area
S11
S12
S13
S14
S15
S16
S17
S18
S19
S20
S21
S22
S23
S24
S25
S26
S27
S28
S29
S31
S32
S33
S34
S35
S36
S37
4.05
7.51
30.42
18.85
7.51
141.56
26.73
7.51
200.74
6155.29
C
CW1
CW2
Mx(KNm)
My(KNm)
-793.90
3992.65
-1198.80
4030.46
-1503.80
1814.93
-287.46
-142.45
950.48
4384.90
1394.04
4349.42
3754.29
914.09
1394.04
-1226.76
929.36
-1635.68
1858.73
-1635.68
4182.13
-1226.76
3252.77
-408.92
2851.45
4384.90
4182.13
4349.42
4752.68
4384.90
6970.59
4349.42
4734.60
3175.05
10246.11
4494.79
7733.56
1686.45
280.03
-727.46
2765.52
-1737.29
2123.53
283.79
1249.82
-38.61
957.21
209.71
4545.60
1514.73
1810.70
843.12
69135.40
40383.12
5.25
5.25
10.36
10.36
Uniformly
distributed
WEIGHT(KN/m2)
0.81
0.81
4.25
8.39
-2.83
23.39
-2.60
-0.93
-12.01
196.30
-11.06
-7.80
192
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
Length
depth
Area
Uniformly
distributed
Weight
B16
8.40
0.50
4.20
10.00
42.00
-6.95
4.10
-291.90
172.20
B18
4.50
0.40
1.80
10.00
18.00
-6.95
17.30
-125.10
311.40
B19
6.60
0.40
2.64
10.00
26.40
-6.95
11.70
-183.48
308.88
B20
6.85
0.40
2.74
10.00
27.40
-3.48
19.60
-95.22
537.04
B21
6.85
0.40
2.74
10.00
27.40
-3.48
15.00
-95.22
411.00
B22
6.85
0.40
2.74
10.00
27.40
-3.48
8.40
-95.35
230.16
B23
6.85
0.40
2.74
10.00
27.40
-3.48
0.00
-95.35
0.00
B24
4.50
0.40
1.80
10.00
18.00
0.00
17.30
0.00
311.40
B25
6.60
0.40
2.64
10.00
26.40
-6.00
11.70
-158.40
308.88
B26
8.40
0.50
4.20
10.00
42.00
0.00
4.20
0.00
176.40
B27
6.15
0.40
2.46
10.00
24.60
0.00
-3.30
0.00
-81.18
B28
7.50
0.40
3.00
10.00
30.00
3.75
19.60
112.50
588.00
B29
7.50
0.40
3.00
10.00
30.00
3.75
15.00
112.50
450.00
B30
7.50
0.50
3.75
10.00
37.50
3.75
8.40
140.63
315.00
B31
8.40
0.50
4.20
10.00
42.00
3.45
4.20
144.94
176.40
B32
7.50
0.50
3.75
10.00
37.50
3.75
0.00
140.63
0.00
B33
7.50
0.40
3.00
10.00
30.00
3.75
-6.60
112.50
-198.00
B34
9.99
0.50
5.00
10.00
49.95
3.74
-9.90
187.01
-494.31
B35
4.50
0.40
1.80
10.00
18.00
7.50
17.30
135.00
311.40
B36
6.60
0.40
2.64
10.00
26.40
7.50
11.70
198.00
308.88
B37
8.40
0.50
4.20
10.00
42.00
7.50
4.20
315.00
176.40
B38
6.15
0.40
2.46
10.00
24.60
7.50
-3.30
184.50
-81.18
B39
6.65
0.40
2.66
10.00
26.60
7.50
-9.89
199.50
-263.18
B40
7.50
0.40
3.00
10.00
30.00
11.25
19.60
337.50
588.00
B41
7.50
0.40
3.00
10.00
30.00
11.25
15.00
337.50
450.00
B42
7.50
0.50
3.75
10.00
37.50
11.25
8.40
421.88
315.00
B43
8.40
0.50
4.20
10.00
42.00
10.55
4.20
443.10
176.40
B44
7.50
0.50
3.75
10.00
37.50
11.25
0.00
421.88
0.00
B45
7.50
0.40
3.00
10.00
30.00
11.25
-6.60
337.50
-198.00
B46
9.99
0.50
5.00
10.00
49.95
11.25
-9.90
561.94
-494.51
B47
0.40
0.40
1.80
10.00
18.00
15.00
17.30
270.00
311.40
B48
4.50
6.60
2.64
10.00
26.40
15.00
11.70
396.00
308.88
B49
6.15
0.40
2.46
10.00
24.60
15.00
-3.29
369.00
-81.03
B50
7.50
0.40
3.00
10.00
30.00
18.75
19.60
562.50
588.00
B51
7.50
0.40
3.00
10.00
30.00
18.75
15.00
562.50
450.00
B52
0.50
3.75
10.00
37.50
18.75
8.40
703.13
315.00
B53
7.50
7.50
0.50
3.75
10.00
37.50
18.75
0.00
703.13
0.00
B54
9.99
0.50
5.00
10.00
49.95
18.75
-3.30
936.56
-164.84
B55
4.50
0.40
1.80
10.00
18.00
22.50
17.30
405.00
311.40
Weight
Mx
My
193
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
Length
depth
Area
Uniformly
distributed
Weight
Weight
Mx
My
B56
6.60
0.40
2.64
10.00
26.40
22.50
11.70
594.00
308.88
B57
8.40
0.40
3.36
10.00
33.60
22.50
4.20
756.00
141.12
B58
1.95
0.40
0.78
10.00
7.80
22.50
-0.98
175.50
-7.61
B59
3.54
0.40
1.42
10.00
14.16
24.27
19.60
343.66
277.54
B60
7.50
0.40
3.00
10.00
30.00
23.25
15.00
697.50
450.00
B61
9.58
0.40
3.83
10.00
38.31
27.29
8.40
1045.53
321.78
B62
12.74
0.50
6.37
10.00
63.70
27.28
4.21
1737.86
268.18
B63
1.95
0.40
0.78
10.00
7.80
23.48
0.00
183.11
0.00
B64
5.99
0.40
2.40
10.00
23.98
28.02
17.25
671.81
413.59
B65
3.11
0.40
1.24
10.00
12.42
31.06
13.82
385.84
171.70
B66
6.60
0.40
2.64
10.00
26.40
30.00
11.70
792.00
308.88
B67
2.90
0.40
1.16
10.00
11.60
31.17
11.63
361.57
134.91
B68
1.95
0.40
0.78
10.00
7.80
23.48
0.00
183.11
0.00
1534.42
16539.28 9640.27
parapet Wall
Length
Area
Uniformly
distributed
WEIGHT(KN/m2)
P8
11.10
11.10
2.50
27.75
-7.10
14.25
-197.03
395.44
P9
6.85
6.85
2.50
17.13
-3.58
19.75
-61.22
338.22
P10
15.00
15.00
2.50
37.50
7.50
19.75
281.25
740.63
P11
11.18
11.18
2.50
27.94
20.58
19.50
574.92
544.83
P12
13.94
13.94
2.50
34.84
30.73
14.55
1070.70
506.78
P14
10.53
10.53
2.50
26.31
23.34
-0.93
614.11
-24.52
P13
12.14
12.14
2.50
30.35
30.78
5.36
934.25
162.54
P15
17.91
17.91
2.50
44.78
14.01
-9.40
627.39
-420.93
P16
11.52
11.52
2.50
28.81
3.53
-10.99
101.78
-316.71
P17
4.06
4.06
2.50
10.16
-0.25
-4.67
-2.54
-47.46
P19
2.75
2.75
2.50
6.87
-5.40
-4.01
-37.07
-27.54
P20
2.03
2.03
2.50
5.07
-6.17
-5.98
-31.25
-30.29
3875.29
1820.98
Item
Weight
Mx
My
297.49
Item
Area
S1
7.56
7.51
56.78
6.45
3.20
366.20
181.68
S2
7.56
7.51
56.78
6.45
5.20
366.20
295.23
732.41
476.92
113.55
Mx(KNm) My(KNm)
194
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
Length
Height
Area
Uniformly
distributed
WEIGHT(KN/m2)
SW1
SW2
4.20
2.10
2.10
2.10
0.65
1.10
0.65
4.10
4.10
4.10
4.10
4.10
4.10
4.10
17.22
8.61
8.61
8.61
2.67
4.51
2.67
5.69
5.69
5.69
5.69
5.69
5.69
5.69
SW3
SW4
SW5
SW6
SW7
Weight
Mx
My
97.98
48.99
48.99
48.99
15.16
25.66
15.16
5.30
6.45
6.45
6.45
7.60
7.60
7.60
4.20
2.20
4.20
6.20
5.98
4.20
2.43
519.30
315.99
315.99
315.99
115.25
195.03
115.25
411.52
107.78
205.76
303.74
90.68
107.78
36.85
1892.80
1264.12
Mx
269.99
My
125.89
300.94
4
External Wall
Item
Length
Area
Area to be
deducted
W4
1.69
3.90
6.25
6.90
6.90
6.90
2.94
5.74
1.69
1.30
7.91
19.44
11.27
3.80
4.82
5.25
12.09
19.38
21.39
21.39
21.39
9.11
17.81
5.25
4.03
24.52
60.27
34.95
11.78
14.95
3.24
6.29
0.00
12.76
12.76
12.76
0.00
4.40
0.00
1.29
5.00
28.19
17.02
0.00
0.00
W5
W6
W7
W8
W9
W10
W11
W12
W13
W14
W15
W16
W17
W18
Uniformly
distributed
WEIGHT(KN/m2
)
Net area
2.01
5.80
19.38
8.63
8.63
8.63
9.11
13.41
5.25
2.74
19.52
32.08
17.93
11.78
14.95
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
Weight
8.76
25.26
84.38
37.58
37.58
37.58
39.69
58.39
22.86
11.94
85.01
139.72
78.08
51.30
65.11
30.82
-7.05
-3.43
3.75
11.25
18.75
24.27
28.17
30.82
31.91
27.82
14.53
3.63
-0.20
-5.74
14.37
17.25
19.70
19.70
19.70
19.70
19.70
17.38
14.37
13.14
2.99
-8.81
-11.02
-4.40
-4.72
783.25
-178.09
435.74
-289.00
1662.25
140.94
740.40
422.82
740.40
704.69
740.40
963.31
781.92
1644.89
1014.98
704.50
328.49
380.83
156.82
2365.43
254.02
2030.06
-1230.33
283.13
-860.78
-10.26
-225.73
-373.68
-307.33
9059.56
4357.14
Curtain Walls
Uniformly
distributed
WEIGHT(KN/m2)
Item
Length
CW3
2.20
7.70
0.81
6.24
-7.22
9.80
-45.06
61.12
CW4
5.00
7.16
17.50
0.81
0.81
14.18
-2.85
23.49
-2.58
-1.20
-40.40
-36.50
476.88
-24.40
391.43
0.22
CW5
Area
25.06
WEIGHT
20.30
40.71
Mx
My
195
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Area
Weight
Mx
My
C10
0.13
14.00
-6.85
0.00
-95.90
0.00
C11
0.16
14.00
-6.95
8.40
-97.30
117.60
C12
0.16
14.00
-6.90
15.00
-96.60
210.00
C13
0.16
14.00
-6.90
19.55
-96.60
273.70
C14
0.16
14.00
0.00
19.60
0.00
274.40
C15
0.16
14.00
0.00
15.00
0.00
210.00
C16
0.16
14.00
0.00
8.40
0.00
117.60
C17
0.16
14.00
0.00
0.00
0.00
0.00
C18
0.16
14.00
0.00
-6.60
0.00
-92.40
C19
0.16
14.00
7.50
-13.20
105.00
-184.80
C20
0.16
14.00
7.50
-6.60
105.00
-92.40
C21
0.13
14.00
7.50
0.00
105.00
0.00
C22
0.13
14.00
7.50
8.40
105.00
117.60
C23
0.16
14.00
7.50
15.00
105.00
210.00
C24
0.16
14.00
7.50
19.60
105.00
274.40
C25
0.16
14.73
15.00
19.60
220.89
288.63
C26
0.16
12.00
15.00
15.00
180.00
180.00
C27
0.13
12.00
15.00
8.40
180.00
100.80
C28
0.13
12.00
15.00
0.00
180.00
0.00
C29
0.13
12.00
15.00
-6.60
180.00
-79.20
C30
0.13
12.00
22.50
0.00
270.00
0.00
C31
0.13
14.73
22.50
8.40
331.34
123.70
C32
0.16
14.73
22.50
15.00
331.34
220.89
C33
0.16
14.73
22.50
19.60
331.34
288.63
C34
0.16
14.73
26.04
19.60
383.47
288.63
C35
0.16
14.73
30.00
15.00
358.36
441.79
220.89
3273.77
3068.69
Beams
depth
0.50
Area
B16
Length
8.40
Uniformly
distributed
WEIGHT(KN/m2)
4.20
10.00
42.00
X
-7.48
Y
4.20
Mx
-313.95
B17
6.15
0.50
3.08
10.00
30.75
-7.48
-3.08
-229.86
B18
4.50
0.50
2.25
10.00
22.50
-6.95
17.30
-156.38
B19
6.60
0.50
3.30
10.00
33.00
-6.95
11.70
-229.35
B20
6.85
0.50
3.43
10.00
34.25
-3.48
19.60
-119.02
B21
6.85
0.50
3.43
10.00
34.25
-3.48
15.00
-119.02
B22
6.85
0.50
3.43
10.00
34.25
-3.48
8.40
-119.19
B23
6.85
0.50
3.43
10.00
34.25
-3.48
0.00
-119.19
B24
4.50
0.50
2.25
10.00
22.50
0.00
17.30
0.00
B25
6.60
0.50
3.30
10.00
33.00
-6.00
11.70
-198.00
Item
Weight
196
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
depth
0.50
Area
B26
Length
8.40
Uniformly
distributed
WEIGHT(KN/m2)
4.20
10.00
B27
6.15
0.50
3.08
10.00
B28
7.50
0.50
3.75
B29
7.50
0.50
3.75
B30
7.50
0.50
B31
8.40
0.50
B32
7.50
B33
7.50
B34
B35
Item
Weight
My
42.00
X
0.00
Y
4.20
Mx
0.00
176.40
30.75
0.00
-3.30
0.00
-101.48
10.00
37.50
3.75
19.60
140.63
735.00
10.00
37.50
3.75
15.00
140.63
562.50
3.75
10.00
37.50
3.75
8.40
140.63
315.00
4.20
10.00
42.00
3.45
4.20
144.94
176.40
0.50
3.75
10.00
37.50
3.75
0.00
140.63
0.00
0.50
3.75
10.00
37.50
3.75
-6.60
140.63
-247.50
9.99
0.50
5.00
10.00
49.95
3.74
-9.90
187.01
-494.31
4.50
0.50
2.25
10.00
22.50
7.50
17.30
168.75
389.25
B36
6.60
0.50
3.30
10.00
33.00
7.50
11.70
247.50
386.10
B37
8.40
0.50
4.20
10.00
42.00
7.50
4.20
315.00
176.40
B38
6.15
0.50
3.08
10.00
30.75
7.50
-3.30
230.63
-101.48
B39
6.65
0.50
3.33
10.00
33.25
7.50
-9.89
249.38
-328.98
B40
7.50
0.50
3.75
10.00
37.50
11.25
19.60
421.88
735.00
B41
7.50
0.50
3.75
10.00
37.50
11.25
15.00
421.88
562.50
B42
7.50
0.50
3.75
10.00
37.50
11.25
8.40
421.88
315.00
B43
8.40
0.50
4.20
10.00
42.00
10.55
4.20
443.10
176.40
B44
7.50
0.50
3.75
10.00
37.50
11.25
0.00
421.88
0.00
B45
7.50
0.50
3.75
10.00
37.50
11.25
-6.60
421.88
-247.50
B46
9.99
0.50
5.00
10.00
49.95
11.25
-9.90
561.94
-494.51
B47
4.50
6.60
0.50
2.25
10.00
22.50
15.00
17.30
337.50
389.25
B48
0.50
3.30
10.00
33.00
15.00
11.70
495.00
386.10
B49
6.15
0.50
3.08
10.00
30.75
15.00
-3.29
461.25
-101.29
B50
7.50
0.50
3.75
10.00
37.50
18.75
19.60
703.13
735.00
B51
7.50
0.50
3.75
10.00
37.50
18.75
15.00
703.13
562.50
B52
0.50
3.75
10.00
37.50
18.75
8.40
703.13
315.00
B53
7.50
7.50
0.50
3.75
10.00
37.50
18.75
0.00
703.13
0.00
B54
9.99
0.50
5.00
10.00
49.95
18.75
-3.30
936.56
-164.84
B55
4.50
0.50
2.25
10.00
22.50
22.50
17.30
506.25
389.25
B56
6.60
0.50
3.30
10.00
33.00
22.50
11.70
742.50
386.10
B57
8.40
0.50
4.20
10.00
42.00
22.50
4.20
945.00
176.40
B58
1.95
0.50
0.98
10.00
9.75
22.50
-0.98
219.38
-9.51
B59
3.54
0.50
1.77
10.00
17.70
24.27
19.60
429.58
346.92
B60
7.50
0.50
3.75
10.00
37.50
23.25
15.00
871.88
562.50
B61
9.58
0.50
4.79
10.00
47.89
27.29
8.40
1306.92
402.23
B62
12.74
0.50
6.37
10.00
63.70
27.28
4.21
1737.86
268.18
B63
1.95
0.50
0.98
10.00
9.75
23.48
0.00
228.88
0.00
B64
5.99
0.50
3.00
10.00
29.97
28.02
17.25
839.76
516.98
B65
3.11
0.50
1.55
10.00
15.53
31.06
13.82
482.30
214.62
B66
6.60
0.50
3.30
10.00
33.00
30.00
11.70
990.00
386.10
B67
2.90
0.50
1.45
10.00
14.50
31.17
11.63
451.97
168.64
B68
1.95
0.50
0.98
10.00
9.75
23.48
0.00
228.88
0.00
18780.75
11725.64
1786.64
197
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
P9
P10
P11
P12
P13
P14
P15
P16
P17
P18
P19
P20
P21
P22
P23
P24
P25
P26
P27
P28
P29
P30
P31
P32
P33
P34
P35
P36
P37
P38
P39
P40
P41
P42
P43
P44
P45
Length
Area
2.10
3.90
5.40
1.00
1.60
1.60
5.00
4.10
9.00
3.95
2.10
0.70
4.62
1.60
1.00
1.60
3.90
5.55
11.10
1.84
1.84
5.50
5.89
3.90
5.50
17.00
18.95
5.50
0.93
1.05
3.90
5.50
6.39
1.00
4.49
2.76
1.20
7.14
13.26
18.36
3.40
5.44
5.44
17.00
13.94
30.60
13.43
7.14
2.38
15.71
5.45
3.40
5.44
13.26
18.87
37.74
6.26
6.26
18.70
20.04
11.12
15.68
48.45
54.01
15.68
2.65
2.99
11.12
15.68
18.21
2.85
12.80
7.87
3.42
Uniformly
Area to be
distributed
deducted Net area WEIGHT(KN/m2) Weight
0.00
7.14
19.92
2.79
0.00
0.00
0.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.26
18.36
2.60
5.44
5.44
17.00
13.94
30.60
13.43
7.14
2.38
15.71
5.45
2.60
5.44
13.26
18.87
37.74
6.26
6.26
18.70
20.04
11.12
15.68
48.45
54.01
15.68
2.65
2.99
11.12
15.68
18.21
2.85
12.80
7.87
3.42
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
Mx
My
-6.40
-2.60
-127.49
-51.79
638.17
37.00
-0.20
17.25
-7.40
51.22
0.14
-2.33
7.12
-119.35
7.25
-0.80
8.60
-5.80
62.38
-72.09
-92.89
15.18
-0.37
-4.75
-5.62
15.18
0.63
-6.12
9.56
47.43
1.61
-6.12
76.31
-290.27
38.89
-0.28
-8.76
-10.93
-340.70
85.37
-1.40
-8.76
-119.52
-747.88
37.47
0.16
15.26
6.07
571.79
19.92
-0.25
12.62
-4.98
251.40
6.64
0.65
2.05
4.32
13.61
43.83
1.59
0.76
69.59
33.18
15.20
-0.37
1.67
-5.62
25.38
7.25
-0.80
-0.20
-5.80
-1.45
-30.73
15.18
0.03
-2.03
0.38
37.00
7.50
17.25
277.47
638.17
52.65
7.50
11.94
394.85
628.61
442.24
105.29
4.68
4.20
492.36
17.45
7.35
7.22
128.29
126.02
17.45
7.35
1.18
128.29
20.60
-184.69
52.17
7.50
-3.54
391.30
55.90
9.70
-9.09
542.13
-508.03
31.01
15.00
17.25
465.16
534.94
522.18
567.74
43.73
7.50
11.94
328.00
135.18
12.67
4.20
1712.40
150.69
17.81
4.20
2683.17
632.44
43.73
15.00
-3.54
656.00
-154.99
7.40
15.60
-7.28
115.48
-53.91
8.35
20.26
-1.90
169.13
-15.86
31.01
22.50
17.25
697.74
534.94
43.73
22.50
11.94
984.00
522.18
50.82
29.61
11.86
1504.62
602.70
7.95
27.85
10.30
221.43
81.90
35.71
26.15
8.27
933.93
295.43
21.96
29.01
7.71
637.05
169.31
9.54
24.40
1.92
232.82
18.30
13703.29
5320.73
1401.75
198
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Uniformly
distributed
WEIGHT(KN/m2) Weight(KN)
Item
Area
S11
S12
30.82
45.87
57.54
19.12
33.75
49.50
28.98
49.50
24.75
24.75
49.50
24.75
33.75
49.50
33.75
49.50
24.84
51.64
40.10
8.79
26.76
S13
S14
S15
S16
S17
S18
S19
S20
S21
S22
S23
S24
S25
S26
S27
S28
S29
S31
S32
S33
S34
S35
S36
S37
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
6.77
10.18
7.22
4.05
4.81
26.73
208.65
310.54
400.88
129.44
228.49
335.12
196.19
335.12
167.56
167.56
335.12
167.56
228.49
335.12
228.49
335.12
168.17
349.60
271.48
59.51
181.18
68.92
48.88
27.42
32.56
180.96
Mx(KNm)
My(KNm)
-3.43
-3.48
-3.48
-3.59
3.75
3.75
17.25
3.75
5.00
10.00
11.25
17.50
11.25
11.25
18.75
18.75
25.38
26.42
25.68
4.24
13.76
27.78
23.05
31.47
30.73
9.02
17.25
11.70
4.20
-1.33
17.30
11.70
4.20
-3.30
-8.80
-8.80
-3.30
-2.20
17.30
11.70
17.30
11.70
17.02
11.59
5.60
-11.02
-8.64
3.71
-0.71
6.90
12.70
4.20
-715.67
-1080.68
-1395.07
-464.70
856.83
1256.68
3384.36
1256.68
837.79
1675.58
3770.04
2932.26
2570.48
3770.04
4284.37
6283.74
4268.07
9236.51
6971.53
252.43
2493.02
1914.28
1126.67
862.89
1000.68
1632.28
3599.24
3633.32
1683.71
-172.42
3952.83
3920.85
824.02
-1105.88
-1474.51
-1474.51
-1105.88
-368.63
3952.83
3920.85
3952.83
3920.85
2862.20
4051.90
1520.27
-655.78
-1566.11
255.83
-34.80
189.05
413.56
760.04
58981.09
35455.65
5498.09
Item
SW1
SW2
SW3
SW4
SW5
SW6
SW7
4.20
2.10
2.10
2.10
0.65
1.10
0.65
Height
3.50
Area
14.70
3.50
Uniformly
distributed
WEIGHT(KN/m2)
5.69
Weight
83.64
X
5.30
7.35
5.69
41.82
6.45
3.50
7.35
5.69
41.82
6.45
3.50
7.35
5.69
41.82
6.45
3.50
2.28
5.69
12.94
7.60
3.50
3.85
5.69
21.91
7.60
3.50
2.28
5.69
12.94
7.60
256.90
4.20
2.20
4.20
6.20
5.98
4.20
2.43
443.31
269.75
269.75
269.75
98.38
166.49
98.38
1615.80
351.30
92.01
175.65
259.29
77.41
92.01
31.46
1079.12
199
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
SW1
4.70
6.00
4.50
1.66
SW2
SW3
SW4
Height
3.50
Area
16.45
3.50
Uniformly
distributed
WEIGHT(KN/m2)
5.69
Weight
93.60
X
33.76
21.00
5.69
119.49
33.06
3.50
15.75
5.69
89.62
31.36
3.50
5.81
5.69
33.06
30.41
11.04
7.43
9.06
6.06
335.77
3159.48 1032.98
3950.82 887.93
2810.49 812.29
1005.16 200.44
10925.95 2933.63
Stairs
Item
st1
2.80
2.80
2.80
2.80
st1'
St2
St2'
Mx
13.52
37.86
32.70
11.10
1237.74
13.52
37.86
31.50
10.05
1192.27
15.60
43.68
12.05
5.05
526.34
15.60
43.68
12.05
3.35
526.34
163.07
L
Item
L1
420.35
380.34
220.58
146.33
1167.60
2.90
3.20
L2
3482.70
Length
1.50
Area
4.35
1.50
4.80
Uniformly
distributed
WEIGHT(KN/m2)
6.19
Weight
26.93
X
33.52
6.19
29.71
14.20
8.96
4.20
56.64
1
902.47
421.91
1324.38
241.29
124.79
366.08
Partitions
Item
P9
P10
P11
P12
P13
P13a
P14
P15
P16
P17
P18
P19
Length
Area
7.81
2.10
3.90
5.40
3.80
0.40
4.50
1.00
5.00
1.60
1.60
4.10
24.21
6.72
12.09
16.74
12.16
1.28
14.40
3.20
16.00
5.12
5.12
13.12
Area to
Uniformly
be
distributed
deducted Net area WEIGHT(KN/m2)
24.21
0.00
2.79
0.00
0.00
0.00
0.00
0.00
0.00
0.80
0.00
0.00
0.00
0.00
6.72
12.09
16.74
12.16
1.28
14.40
2.40
16.00
5.12
5.12
13.12
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
Weight
67.55
X
-6.85
Y
4.20
Mx
-462.71
My
283.37
18.75
-6.40
-2.60
-119.99
-48.75
33.73
-0.20
17.25
-6.75
581.86
567.97
376.58
46.70
-0.14
12.16
-6.49
33.93
-13.44
11.10
-455.97
3.57
-0.38
11.10
-1.34
39.64
40.18
-21.01
7.25
-844.10
291.24
6.70
-0.80
8.60
-5.36
57.59
334.31
91.14
44.64
1.61
7.49
71.83
14.28
-0.37
6.38
-5.29
14.28
0.63
6.38
9.00
91.14
36.60
-0.28
5.45
-10.29
199.61
200
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
Length
Area
P20
9.00
3.95
2.10
1.60
0.70
4.50
1.00
1.75
9.43
14.40
8.44
3.90
5.50
1.84
1.84
5.50
6.79
9.43
8.20
8.96
3.90
5.50
11.25
7.60
11.25
5.50
0.94
9.43
3.90
5.50
6.59
1.00
4.65
2.92
1.20
1.00
28.80
12.64
6.72
5.12
2.24
14.40
3.20
5.60
30.16
46.08
27.01
12.09
17.05
5.70
5.70
17.05
21.73
30.16
26.24
28.66
12.09
17.05
34.88
23.56
34.88
17.05
3.00
29.22
12.09
17.05
21.09
3.20
14.87
9.35
3.84
3.20
P21
P22
P23
P24
P25
P26
P27
P28
P29
P30
P31
P32
P33
P34
P35
P36
P37
P38
P39
P40
P41
P42
P43
P44
P45
P46
P47
P48
P49
P50
P51
P52
P53
P54
P55
Uniformly
distributed
Area to be
deducted Net area WEIGHT(KN/m2)
28.80
0.00
2.79
0.00
0.00
0.00
0.00
0.00
0.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.64
6.72
5.12
2.24
14.40
2.40
5.60
30.16
46.08
27.01
12.09
17.05
5.70
5.70
17.05
21.73
30.16
26.24
28.66
12.09
17.05
34.88
23.56
34.88
17.05
3.00
29.22
12.09
17.05
21.09
3.20
14.87
9.35
3.84
3.20
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
Weight
80.35
X
-1.40
Y
4.20
Mx
-112.49
My
337.48
35.27
-0.16
3.50
-5.71
123.25
18.75
-0.25
2.48
-4.69
46.40
14.28
-0.37
1.67
-5.29
23.86
6.25
0.65
2.05
4.06
12.81
40.18
1.59
0.76
63.80
30.41
6.70
-0.80
-0.20
-5.36
-1.34
15.62
0.00
3.75
-4.68
3.61
7.50
7.50
7.35
7.30
7.50
8.37
11.25
12.67
11.54
15.00
15.00
16.38
22.05
16.38
15.00
15.60
18.75
22.50
22.50
29.62
27.85
26.15
29.06
24.40
20.26
-2.08
14.96
4.20
-5.98
17.25
11.94
7.22
1.18
-3.54
-9.94
14.96
4.20
-6.22
17.25
11.94
7.95
4.20
0.45
-3.54
-7.28
14.96
17.25
11.94
11.82
10.30
8.27
7.65
1.92
-1.90
84.15
128.56
75.35
33.73
47.57
15.91
15.91
47.57
60.63
84.15
73.21
79.95
33.73
47.57
97.30
65.74
97.30
47.57
8.38
81.52
33.73
47.57
58.84
8.93
41.49
26.08
10.71
8.93
2040.41
0.05
-32.47
315.55
1259.08
-601.16
539.97
272.25
-450.31
252.98
581.86
356.77
567.98
116.97
114.90
116.17
18.78
356.77
-168.40
507.29
-602.66
946.65
1259.08
927.42
307.48
922.39
-497.21
505.97
581.86
713.54
567.98
1593.31
773.54
1449.59
276.11
1593.31
43.69
713.54
-168.59
130.78
-61.05
1528.44
1219.74
758.95
581.86
1070.31
567.98
1742.85
695.72
248.62
91.96
1085.05
343.23
757.77
199.45
261.41
20.55
180.85
-16.96
16921.27 12053.73
201
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
Area
S11
S12
30.82
45.87
57.54
19.12
33.75
49.50
28.98
49.50
24.75
24.75
49.50
24.75
33.75
49.50
33.75
49.50
24.84
51.64
40.10
9.28
2.48
25.34
S13
S14
S15
S16
S17
S18
S19
S20
S21
S22
S23
S24
S25
S26
S27
S28
S29
S31
S
'
S32
S33
S34
S35
S36
S37
Uniformly
distributed
WEIGHT(KN/m2) Weight(KN)
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
10.18
7.22
4.05
4.81
26.73
211.12
314.21
400.88
130.97
231.19
339.08
198.51
339.08
169.54
169.54
339.08
169.54
231.19
339.08
231.19
339.08
170.15
353.73
274.69
63.57
16.99
173.58
69.73
49.46
27.74
32.95
183.10
5568.93
Mx(KNm)
My(KNm)
-3.43
-3.48
-3.48
-3.59
3.75
3.75
17.25
3.75
5.00
10.00
11.25
17.50
11.25
11.25
18.75
18.75
25.38
26.42
25.68
4.24
7.45
14.40
27.78
23.05
31.47
30.73
9.02
17.25
11.70
4.20
-1.33
17.30
11.70
4.20
-3.30
-8.80
-8.80
-3.30
-2.20
17.30
11.70
17.30
11.70
17.02
11.59
5.60
-11.02
-14.26
-8.11
3.71
-0.71
6.90
12.70
4.20
-724.13
-1093.45
-1395.07
-470.19
866.95
1271.53
3424.35
1271.53
847.69
1695.38
3814.59
2966.91
2600.86
3814.59
4335.00
6358.00
4318.51
9345.65
7053.91
269.66
126.59
2499.54
1936.90
1139.98
873.08
1012.51
1651.57
59812.44
3641.77
3676.25
1683.71
-174.45
3999.54
3967.18
833.75
-1118.95
-1491.93
-1491.93
-1118.95
-372.98
3999.54
3967.18
3999.54
3967.18
2896.02
4099.78
1538.24
-700.52
-242.25
-1407.73
258.85
-35.21
191.28
418.45
769.02
35752.38
Beams
depth
0.50
Area
B16
Length
8.40
Uniformly
distributed
WEIGHT
4.20
10.00
B18
4.50
0.50
2.25
10.00
B19
6.60
0.50
3.30
B20
6.85
0.50
B21
6.85
0.50
B22
6.85
B23
6.85
Item
Weight
My
42.00
X
-7.48
Y
4.20
Mx
-313.95
176.40
22.50
-6.95
17.30
-156.38
389.25
10.00
33.00
-6.95
11.70
-229.35
386.10
3.43
10.00
34.25
-3.48
19.60
-119.02
671.30
3.43
10.00
34.25
-3.48
15.00
-119.02
513.75
0.50
3.43
10.00
34.25
-3.48
8.40
-119.19
287.70
0.50
3.43
10.00
34.25
-3.48
0.00
-119.19
0.00
202
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
Length
depth
Area
Uniformly
distributed
WEIGHT
B24
4.50
0.50
2.25
10.00
22.50
0.00
17.30
0.00
389.25
B25
6.60
0.50
3.30
10.00
33.00
-6.00
11.70
-198.00
386.10
B26
8.40
0.50
4.20
10.00
42.00
0.00
4.20
0.00
176.40
B27
6.15
0.50
3.08
10.00
30.75
0.00
-3.30
0.00
-101.48
B28
7.50
0.50
3.75
10.00
37.50
3.75
19.60
140.63
735.00
B29
7.50
0.50
3.75
10.00
37.50
3.75
15.00
140.63
562.50
B30
7.50
0.50
3.75
10.00
37.50
3.75
8.40
140.63
315.00
B31
8.40
0.50
4.20
10.00
42.00
3.45
4.20
144.94
176.40
B32
7.50
0.50
3.75
10.00
37.50
3.75
0.00
140.63
0.00
B33
7.50
0.50
3.75
10.00
37.50
3.75
-6.60
140.63
-247.50
B34
9.99
0.50
5.00
10.00
49.95
3.74
-9.90
187.01
-494.31
B35
4.50
0.50
2.25
10.00
22.50
7.50
17.30
168.75
389.25
B36
6.60
0.50
3.30
10.00
33.00
7.50
11.70
247.50
386.10
B37
8.40
0.50
4.20
10.00
42.00
7.50
4.20
315.00
176.40
B38
6.15
0.50
3.08
10.00
30.75
7.50
-3.30
230.63
-101.48
B39
6.65
0.50
3.33
10.00
33.25
7.50
-9.89
249.38
-328.98
B40
7.50
0.50
3.75
10.00
37.50
11.25
19.60
421.88
735.00
B41
7.50
0.50
3.75
10.00
37.50
11.25
15.00
421.88
562.50
B42
7.50
0.50
3.75
10.00
37.50
11.25
8.40
421.88
315.00
B43
8.40
0.50
4.20
10.00
42.00
10.55
4.20
443.10
176.40
B44
7.50
0.50
3.75
10.00
37.50
11.25
0.00
421.88
0.00
B45
7.50
0.50
3.75
10.00
37.50
11.25
-6.60
421.88
-247.50
B46
9.99
0.50
5.00
10.00
49.95
11.25
-9.90
561.94
-494.51
B47
4.50
6.60
0.50
2.25
10.00
22.50
15.00
17.30
337.50
389.25
B48
0.50
3.30
10.00
33.00
15.00
11.70
495.00
386.10
B49
6.15
0.50
3.08
10.00
30.75
15.00
-3.29
461.25
-101.29
B50
7.50
0.50
3.75
10.00
37.50
18.75
19.60
703.13
735.00
B51
7.50
0.50
3.75
10.00
37.50
18.75
15.00
703.13
562.50
B52
7.50
7.50
0.50
3.75
10.00
37.50
18.75
8.40
703.13
315.00
B53
0.50
3.75
10.00
37.50
18.75
0.00
703.13
0.00
B54
9.99
0.50
5.00
10.00
49.95
18.75
-3.30
936.56
-164.84
B55
4.50
0.50
2.25
10.00
22.50
22.50
17.30
506.25
389.25
B56
6.60
0.50
3.30
10.00
33.00
22.50
11.70
742.50
386.10
B57
8.40
0.50
4.20
10.00
42.00
22.50
4.20
945.00
176.40
B58
1.95
0.50
0.98
10.00
9.75
22.50
-0.98
219.38
-9.51
B59
3.54
0.50
1.77
10.00
17.70
24.27
19.60
429.58
346.92
B60
7.50
0.50
3.75
10.00
37.50
23.25
15.00
871.88
562.50
B61
9.58
0.50
4.79
10.00
47.89
27.29
8.40
1306.92
402.23
B62
12.74
0.50
6.37
10.00
63.70
27.28
4.21
1737.86
268.18
B63
1.95
0.50
0.98
10.00
9.75
23.48
0.00
228.88
0.00
B64
5.99
0.50
3.00
10.00
29.97
28.02
17.25
839.76
516.98
B65
3.11
0.50
1.55
10.00
15.53
31.06
13.82
482.30
214.62
B66
6.60
0.50
3.30
10.00
33.00
30.00
11.70
990.00
386.10
B67
2.90
0.50
1.45
10.00
14.50
31.17
11.63
451.97
168.64
B68
1.95
0.50
0.98
10.00
9.75
23.48
0.00
228.88
0.00
Weight
1755.89
Mx
My
19010.61 11820.20
203
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
C10
C11
C12
C13
C14
C15
C16
C17
C18
C19
C20
C21
-6.85
20.79
26.25
26.25
26.25
26.25
26.25
26.25
26.25
26.25
26.25
26.25
20.79
20.79
26.25
26.25
26.25
26.25
20.79
20.79
20.79
20.79
20.79
26.25
26.25
26.25
26.25
638.81
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.24
0.24
0.30
0.30
0.30
0.30
0.24
0.24
0.24
0.24
0.24
0.30
0.30
0.30
0.30
0.00
-6.95
8.40
-6.90
15.00
-6.90
19.55
0.00
19.60
0.00
15.00
0.00
8.40
0.00
0.00
0.00
-6.60
7.50
-13.20
7.50
-6.60
7.50
0.00
7.50
8.40
7.50
15.00
7.50
19.60
15.00
19.60
15.00
15.00
15.00
8.40
15.00
0.00
15.00
-6.60
22.50
0.00
22.50
8.40
22.50
15.00
22.50
19.60
26.04
19.60
30.00
15.00
-142.40
-182.44
-181.13
-181.13
0.00
0.00
0.00
0.00
0.00
196.88
196.88
155.91
155.91
196.88
196.88
393.75
393.75
311.83
311.83
311.83
467.74
467.74
590.63
590.63
683.55
787.50
5723.00
0.00
220.50
393.75
513.19
514.50
393.75
220.50
0.00
-173.25
-346.50
-173.25
0.00
174.62
393.75
514.50
514.50
393.75
174.62
0.00
-137.20
0.00
174.62
393.75
514.50
514.50
393.75
5582.85
0.30
0.24
C10
C11
C12
C13
C14
C15
C16
C17
C18
C19
C20
C21
C22
C23
C24
C25
C26
C27
C28
C29
C30
C31
C32
C33
C34
C35
C
0.20
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.20
17.18
21.88
21.88
21.88
21.88
21.88
21.88
21.88
21.88
21.88
21.88
17.18
-6.85
0.00
-6.95
8.40
-6.90
15.00
-6.90
19.55
0.00
19.60
0.00
15.00
0.00
8.40
0.00
0.00
0.00
-6.60
7.50
-13.20
7.50
-6.60
7.50
0.00
-117.69
-152.03
-150.94
-150.94
0.00
0.00
0.00
0.00
0.00
164.06
164.06
128.85
0.00
183.75
328.13
427.66
428.75
328.13
183.75
0.00
-144.38
-288.75
-144.38
0.00
204
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
0.20
C22
C23
C24
C25
C26
C27
C28
C29
C30
C31
C32
C33
C34
C35
0.25
0.25
0.25
0.20
0.20
0.20
0.20
0.20
0.25
0.25
0.25
0.25
W4
W5
W6
W7
W8
W9
W10
W11
W12
W13
W14
W15
W16
W17
W18
W19
17.18
21.88
21.88
21.88
21.88
17.18
17.18
17.18
17.18
17.18
21.88
21.88
21.88
21.88
531.19
0.25
7.50
8.40
7.50
15.00
7.50
19.60
15.00
19.60
15.00
15.00
15.00
8.40
15.00
0.00
15.00
-6.60
22.50
0.00
22.50
8.40
22.50
15.00
22.50
19.60
26.04
19.60
30.00
15.00
128.85
164.06
164.06
328.13
328.13
257.71
257.71
257.71
386.56
386.56
492.19
492.19
569.63
656.25
4755.12
144.32
328.13
428.75
428.75
328.13
144.32
0.00
-113.39
0.00
144.32
328.13
428.75
428.75
328.13
4649.72
1.69
3.90
6.25
6.90
6.90
6.90
2.94
5.74
1.69
1.30
7.91
19.44
11.27
3.80
4.82
14.08
5.25
12.09
19.38
21.39
21.39
21.39
9.11
17.81
5.25
4.03
24.52
60.27
34.95
11.78
14.95
43.63
3.24
6.29
0.00
6.52
6.52
6.52
0.00
4.40
0.00
1.29
5.00
28.19
17.02
0.00
0.00
22.95
2.01
5.80
19.38
14.87
14.87
14.87
9.11
13.41
5.25
2.74
19.52
32.08
17.93
11.78
14.95
20.69
Uniformly
distributed
WEIGHT(KN/m2)
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
8.76
25.26
84.38
64.75
64.75
64.75
39.69
58.39
22.86
11.94
85.01
139.72
78.08
51.30
65.11
90.09
954.83
30.82
-7.05
-3.43
3.75
11.25
18.75
24.27
28.17
30.82
31.91
27.82
14.53
3.63
-0.20
-5.74
-20.60
14.37
17.25
19.70
19.70
19.70
19.70
19.70
17.38
14.37
13.14
2.99
-8.81
-11.02
-4.40
-4.72
9.18
269.99
-178.09
-289.00
242.81
728.44
1214.07
963.31
1644.89
704.50
380.83
2365.43
2030.06
283.13
-10.26
-373.68
-1855.76
8120.67
125.89
435.74
1662.25
1275.58
1275.58
1275.58
781.92
1014.98
328.49
156.82
254.02
-1230.33
-860.78
-225.73
-307.33
827.16
6789.84
205
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
&
SW1
SW2
SW3
SW4
SW5
SW6
SW7
Uniformly
distributed
WEIGHT(KN/m2)
Height
3.50
3.50
3.50
3.50
Area
16.45
21.00
15.75
5.81
5.69
5.69
5.69
5.69
5.69
5.69
5.69
83.64
41.82
41.82
41.82
12.94
21.91
12.94
256.90
5.30
6.45
6.45
6.45
7.60
7.60
7.60
4.20
2.20
4.20
6.20
5.98
4.20
2.43
443.31
269.75
269.75
269.75
98.38
166.49
98.38
1615.80
351.30
92.01
175.65
259.29
77.41
92.01
31.46
1079.12
'
Uniformly
distributed WEIGHT
5.69
5.69
5.69
5.69
Weight
93.60
119.49
89.62
33.06
335.77
X
33.76
33.06
31.36
30.41
y
11.06
7.43
31.36
30.41
Mx
3159.48
3950.82
2810.49
1005.16
10925.95
My
1035.22
887.93
2810.49
1005.16
5738.80
2.80
2.80
2.80
2.80
'
Length
4.70
6.00
4.50
1.66
St2
t
14.70
7.35
7.35
7.35
2.28
3.85
2.28
3.50
3.50
3.50
3.50
3.50
3.50
3.50
st1
t
4.20
2.10
2.10
2.10
0.65
1.10
0.65
Item
SW8
SW9
SW10
SW11
13.52
13.52
15.60
15.60
37.86
37.86
43.68
43.68
163.07
32.70
31.50
12.05
12.05
11.10
10.05
5.05
3.35
1237.74
1192.27
526.34
526.34
3482.70
420.35
380.34
220.58
146.33
1167.60
L1
L2
C
2.90
3.20
r
1.50
1.50
Uniformly
distributed
WEIGHT(KN/m2
4.35
4.80
6.19
6.19
26.93
29.71
56.64
33.52
14.20
8.96
4.20
902.47
421.91
1324.38
241.29
124.79
366.08
CW3
CW4
5.00
7.16
17.50
25.06
Uniformly
distributed
WEIGHT
0.81
0.81
14.18
20.30
34.48
-2.85
23.49
-2.58
-1.20
-40.40
476.88
436.48
-36.50
-24.40
-60.90
206
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
W8
W9
W10
W11
W12
W13
W14
p4
p5
p6
p7
p8
p9
p10
p11
p12
p13
p14
p15
p16
p17
p18
p19
p20
p21
p22
p23
p24
p25
p26
4.0
3.9
6.3
4.0
9.0
9.0
11.1
Area to be
deducted
12.4
12.1
19.4
12.7
28.7
28.7
34.4
Uniformly
distributed
WEIGHT
9.81
5.1
0
0
20.61
11.22
0
2.6
7.0
19.4
12.7
8.0
17.4
34.4
4.36
4.36
4.36
4.36
4.36
4.36
4.36
11.28
30.44
84.38
55.30
35.04
75.93
149.86
442.23
4
3.9
6.25
3.97
17.91
11.07
3.65
12.74
17.25
19.7
-1.71
-9.39
-11.02
-4.5
45.1
118.7
527.4
219.5
627.6
840.6
546.97
2925.87
143.7
525.1
1662.2
-94.6
-329.0
-836.8
-674.35
396.34
3.90
4.00
2.90
0.20
2.24
3.55
3.80
9.00
3.45
4.04
4.04
3.05
1.00
5.00
1.60
1.60
4.10
3.95
2.10
1.60
0.70
4.65
1.00
12.48
12.80
9.28
0.64
7.17
11.36
12.16
28.80
11.04
12.93
12.93
9.76
3.20
16.00
5.12
5.12
13.12
12.64
6.72
5.12
2.24
14.88
3.20
Area to
be
deducted
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.80
0.00
0.00
0.00
0.00
0.80
0.00
0.00
0.00
0.00
0.00
0.80
0.00
0.00
0.00
0.80
12.48
12.80
9.28
0.64
7.17
11.36
12.16
28.00
11.04
12.93
12.93
9.76
2.40
16.00
5.12
5.12
13.12
12.64
5.92
5.12
2.24
14.88
2.40
Uniformly
distributed
WEIGHT
2.79
2.79
2.79
2.79
5.69
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
34.82
35.71
25.89
1.79
40.79
31.69
33.93
78.12
30.80
36.09
36.09
27.23
6.70
44.64
14.28
14.28
36.60
35.27
16.52
14.28
6.25
41.52
6.70
-0.20
-0.20
-0.97
-0.38
-2.67
-3.13
-3.27
-1.40
-3.14
-4.37
-1.79
-3.05
-0.80
1.61
-0.37
0.63
-0.28
0.16
-0.25
-0.37
0.65
1.59
-0.80
17.25
12.70
10.90
10.90
10.80
8.59
7.22
4.20
5.89
1.77
1.78
-0.10
8.60
7.49
6.38
6.38
5.45
3.50
2.48
1.67
2.05
-0.20
0.73
-6.96
-7.14
-25.09
-0.67
-108.90
-99.33
-111.01
-109.37
-96.72
-157.56
-64.52
-83.05
-5.36
71.87
-5.29
9.00
-10.25
5.71
-4.13
-5.29
4.06
65.93
-5.36
600.63
453.54
282.21
19.46
440.49
272.16
244.95
328.10
181.30
64.02
64.20
-2.72
57.59
334.31
91.14
91.14
199.61
123.25
40.88
23.86
12.81
-8.30
4.87
207
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
p27
p28
p29
p30
p31
p32
p33
p34
p35
2.00
2.70
3.55
0.85
1.2
1.20
0.80
2.90
6.90
Area to
be
deducted
6.40
8.64
11.36
2.72
3.84
3.84
2.56
9.28
22.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Uniformly
distributed
WEIGHT
6.40
8.64
11.36
2.72
3.84
3.84
2.56
9.28
22.08
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
17.86
24.11
31.69
7.59
10.71
10.71
7.14
25.89
61.60
847.29
-0.20
1.25
2.30
0.325
7.5
15.00
20.16
7.30
11.25
Area
Weight
Mx
My
C10
0.24
21.00
-6.85
0.00
-143.85
0.00
C11
0.30
26.25
-6.95
8.40
-182.44
220.50
C12
0.30
26.25
-6.90
15.00
-181.13
393.75
C13
0.30
26.25
-6.90
19.55
-181.13
513.19
C14
0.30
26.25
0.00
19.60
0.00
514.50
C15
0.30
26.25
0.00
15.00
0.00
393.75
C16
0.30
26.25
0.00
8.40
0.00
220.50
C17
0.30
26.25
0.00
0.00
0.00
0.00
C18
0.30
26.25
0.00
-6.60
0.00
-173.25
C19
0.30
26.25
7.50
-13.20
196.88
-346.50
C20
0.30
26.25
7.50
-6.60
196.88
-173.25
C21
0.24
21.00
7.50
0.00
157.50
0.00
C22
0.24
21.00
7.50
8.40
157.50
176.40
C28
0.24
21.00
15.00
0.00
315.00
0.00
C29
0.24
21.00
15.00
-6.60
315.00
-138.60
C30
0.24
21.00
22.50
0.00
472.50
0.00
1122.71
1600.99
388.50
u
-1.30
-2.40
-4.15
-5.1
-2.4
-2.40
-2.40
-4.85
-6.80
-3.57
-23.21
30.13
-57.85
72.90
-131.50
2.46636 -38.7029
80.352 -25.7126
160.70
-25.71
143.97
-17.14
189.01
-125.57
693.04
-418.90
619.58 3055.17
CW1
Item
5.00
17.50
Uniformly
distributed
WEIGHTKN/m
0.81
E
I
14.18
14.18
-2.85
-2.58
-40.40
-40.40
-36.50
-36.50
208
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
S11
S12
S
'
S14
S17
S18
S19
S20
S21
S31
3
'
S32
SW1
SW2
SW3
SW4
SW5
SW6
SW7
30.82
31.08
10.49
57.54
19.12
28.98
49.50
24.75
24.75
49.50
9.28
2.48
25.34
S13
Uniformly
distributed
WEIGHT(KN/m2)
&
4.20
2.10
2.10
2.10
0.65
1.10
0.65
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
211.12
212.90
71.86
400.88
130.97
198.51
339.08
169.54
169.54
339.08
63.57
16.99
173.58
2497.60
-3.43
4.50
-0.92
-3.48
-3.59
17.25
3.75
5.00
10.00
11.25
4.24
7.45
14.40
17.25
11.70
12.85
4.20
-1.33
4.20
-3.30
-8.80
-8.80
-3.30
-11.02
-14.26
-8.11
-724.13
958.04
-66.11
-1395.07
-470.19
3424.35
1271.53
847.69
1695.38
3814.59
269.66
126.59
2499.54
12251.87
3641.77
2490.91
923.36
1683.71
-174.45
833.75
-1118.95
-1491.93
-1491.93
-1118.95
-700.52
-242.25
-1407.73
1826.79
3.50
3.50
3.50
3.50
3.50
3.50
3.50
14.70
7.35
7.35
7.35
2.28
3.85
2.28
Uniformly
distributed
WEIGHT(KN/m)
5.69
5.69
5.69
5.69
5.69
5.69
5.69
83.64
41.82
41.82
41.82
12.94
21.91
12.94
256.90
5.30
6.45
6.45
6.45
7.60
7.60
7.60
4.20
2.20
4.20
6.20
5.98
4.20
2.43
443.31
269.75
269.75
269.75
98.38
166.49
98.38
1615.80
351.30
92.01
175.65
259.29
77.41
92.01
31.46
1079.12
209
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Uniformly
distributed
WEIGHT(KN/m)
B16
8.40
0.50
4.20
10.00
42.00
-7.48
4.20
-313.95
176.40
B18
4.50
0.50
2.25
10.00
22.50
-6.95
17.30
-156.38
389.25
B19
6.60
0.50
3.30
10.00
33.00
-6.95
11.70
-229.35
386.10
B20
6.85
0.50
3.43
10.00
34.25
-3.48
19.60
-119.02
671.30
B21
6.85
0.50
3.43
10.00
34.25
-3.48
15.00
-119.02
513.75
B22
6.85
0.50
3.43
10.00
34.25
-3.48
8.40
-119.19
287.70
B23
6.85
0.50
3.43
10.00
34.25
-3.48
0.00
-119.19
0.00
B24
4.50
0.50
2.25
10.00
22.50
0.00
17.30
0.00
389.25
B25
6.60
0.50
3.30
10.00
33.00
-6.00
11.70
-198.00
386.10
B26
8.40
0.50
4.20
10.00
42.00
0.00
4.20
0.00
176.40
B27
6.15
0.50
3.08
10.00
30.75
0.00
-3.30
0.00
-101.48
B30
7.50
0.50
3.75
10.00
37.50
3.75
8.40
140.63
315.00
B32
7.50
0.50
3.75
10.00
37.50
3.75
0.00
140.63
0.00
B33
7.50
0.50
3.75
10.00
37.50
3.75
-6.60
140.63
-247.50
B34
9.99
0.50
5.00
10.00
49.95
3.74
-9.90
187.01
-494.31
B38
6.15
0.50
3.08
10.00
30.75
7.50
-3.30
230.63
-101.48
B39
6.65
0.50
3.33
10.00
33.25
7.50
-9.89
249.38
-328.98
B44
7.50
0.50
3.75
10.00
37.50
11.25
0.00
421.88
0.00
B45
7.50
0.50
3.75
10.00
37.50
11.25
-6.60
421.88
-247.50
B46
9.99
0.50
5.00
10.00
49.95
11.25
-9.90
561.94
-494.51
B49
6.15
7.50
0.50
3.08
10.00
30.75
15.00
-3.29
461.25
-101.29
B53
0.50
3.75
10.00
37.50
18.75
0.00
703.13
0.00
B54
9.99
0.50
5.00
10.00
49.95
18.75
-3.30
936.56
-164.84
3221.42
1409.39
832.35
F
W1
W2
W3
W4
W5
W6
W7
W8
W9
3.1
3.8
6.9
6.9
2.9
5.7
1.7
2.7
1.3
9.6
11.8
21.4
21.4
9.1
17.8
5.2
8.4
4.0
0
0
15.52
15.52
0.00
5.352
0
0
0
9.6
11.8
5.9
5.9
9.1
12.5
5.2
8.4
4.0
Uniformly
distributed
WEIGHT
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
4.36
41.85
51.30
25.56
25.56
39.69
54.25
22.84
36.45
17.55
315.07
1.86
5.3
11.25
18.75
24.27
28.17
30.82
31.83
30.4
19.69
19.7
19.7
19.7
19.7
17.38
14.37
6.34
6.08
77.8
271.9
287.6
479.3
963.3
1528.3
704.02
1160.25
533.54
6006.06
824.1
1010.6
503.6
503.6
781.9
942.9
328.3
231.1
328.25
5454.35
210
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
p1
p2
p3
p4
p5
p6
p7
p8
p9
p10
p11
p12
p13
p14
p15
p16
p17
Length
3.90
4.70
2.85
2.70
7.90
0.40
0.95
4.55
2.90
15.21
2.90
1.20
1.20
1.20
1.00
4.09
3.92
Area
12.48
15.04
9.12
8.64
25.28
1.28
3.04
14.56
9.28
48.66
9.28
3.84
3.84
3.84
3.20
13.09
12.55
Uniformly distributed
WEIGHT
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
Weight
26.21
31.58
19.15
18.14
53.09
2.69
6.38
28.90
19.49
102.18
19.49
8.06
6.38
8.06
6.72
27.49
26.35
410.37
X
-0.20
-0.13
1.26
1.16
5.12
7.60
8.18
10.92
7.30
15.00
22.70
7.50
15.00
22.50
27.85
29.97
28.53
Y
17.25
12.42
18.33
17.00
17.50
19.00
16.98
17.80
13.25
14.60
13.25
10.80
10.80
10.80
10.80
12.43
9.23
Mx
-5.24
-4.20
24.07
20.96
272.02
20.43
52.19
315.60
142.16
1532.66
442.38
60.48
95.76
181.44
187.13
823.92
751.79
4913.56
My
452.09
392.18
351.08
308.36
929.20
51.07
108.37
514.44
258.22
1491.79
258.22
87.09
68.95
87.09
72.58
341.75
243.12
6015.58
Item
Area
Weight
Mx
My
C14
0.30
10.50
0.00
19.60
0.00
205.80
C15
0.30
10.50
0.00
15.00
0.00
157.50
C16
0.30
10.50
0.00
8.40
0.00
88.20
C22
0.24
8.40
7.50
8.40
63.00
70.56
C23
0.30
36.75
7.50
15.00
275.63
551.25
C24
0.30
36.75
7.50
19.60
275.63
720.30
C25
0.30
36.75
15.00
19.60
551.25
720.30
C26
0.30
36.75
15.00
15.00
551.25
551.25
C27
0.24
29.40
15.00
8.40
441.00
246.96
C28
0.24
8.40
15.00
0.00
126.00
0.00
C30
0.24
8.40
22.50
0.00
189.00
0.00
C31
0.24
29.40
22.50
8.40
661.50
246.96
C32
0.30
36.75
22.50
15.00
826.88
551.25
C33
0.30
36.75
22.50
19.60
826.88
720.30
C34
0.30
36.75
26.04
19.60
956.97
720.30
C35
0.30
36.75
30.00
15.00
1102.50
551.25
6847.47
6102.18
409.50
211
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
'
Uniformly
distributed
WEIGHT(KN/m2)
33.75
49.50
33.75
49.50
33.75
49.50
63.00
24.84
51.64
40.10
S27
S28
S29
S35
S36
B
S15
S16
S23
S24
S25
S26
S
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
6.85
4.05
18.30
231.19
339.08
231.19
339.08
231.19
339.08
431.55
170.15
353.73
274.69
27.74
125.36
3094.01
3.75
3.75
11.25
11.25
18.75
18.75
18.75
25.38
26.42
25.68
31.47
32.18
17.30
11.70
17.30
11.70
17.30
11.70
4.20
17.02
11.59
5.60
6.90
10.69
866.95
1271.53
2600.86
3814.59
4335.00
6358.00
8091.56
4318.51
9345.65
7053.91
873.08
4033.80
48929.65
3999.54
3967.18
3999.54
3967.18
3999.54
3967.18
1812.51
2896.02
4099.78
1538.24
191.28
1339.79
34437.99
Uniformly
distributed
WEIGHT(KN/m2)
B24
B25
4.50
6.60
0.50
0.50
2.25
3.30
10.00
10.00
22.50
33.00
0.00
-6.00
17.30
11.70
0.00
-198.00
389.25
386.10
B28
7.50
0.50
3.75
10.00
37.50
3.75
19.60
140.63
735.00
B30
7.50
0.50
3.75
10.00
37.50
3.75
8.40
140.63
315.00
B35
4.50
0.50
2.25
10.00
22.50
7.50
17.30
168.75
389.25
B36
6.60
0.50
3.30
10.00
33.00
7.50
11.70
247.50
386.10
B40
7.50
0.50
3.75
10.00
37.50
11.25
19.60
421.88
735.00
B41
7.50
0.50
3.75
10.00
37.50
11.25
15.00
421.88
562.50
B42
7.50
0.50
3.75
10.00
37.50
11.25
8.40
421.88
315.00
B43
8.40
0.50
4.20
10.00
42.00
10.55
4.20
443.10
176.40
B47
0.50
2.25
10.00
22.50
15.00
17.30
337.50
389.25
B48
4.50
6.60
0.50
3.30
10.00
33.00
15.00
11.70
495.00
386.10
B50
7.50
0.50
3.75
10.00
37.50
18.75
19.60
703.13
735.00
B51
7.50
0.50
3.75
10.00
37.50
18.75
15.00
703.13
562.50
B52
7.50
7.50
0.50
3.75
10.00
37.50
18.75
8.40
703.13
315.00
B53
0.50
3.75
10.00
37.50
18.75
0.00
703.13
0.00
B55
4.50
0.50
2.25
10.00
22.50
22.50
17.30
506.25
389.25
B56
6.60
0.50
3.30
10.00
33.00
22.50
11.70
742.50
386.10
B57
8.40
0.50
4.20
10.00
42.00
22.50
4.20
945.00
176.40
B59
3.54
0.50
1.77
10.00
17.70
24.27
19.60
429.58
346.92
B60
7.50
0.50
3.75
10.00
37.50
23.25
15.00
871.88
562.50
212
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Uniformly
distributed
WEIGHT(KN/m2)
B61
9.58
0.50
4.79
10.00
47.89
27.29
B62
12.74
0.50
6.37
10.00
63.70
B64
5.99
0.50
3.00
10.00
29.97
B65
3.11
0.50
1.55
10.00
B66
6.60
0.50
3.30
B67
2.90
0.50
1.45
e
I
SW8
SW9
SW10
SW11
e
I
4.70
6.00
4.50
1.66
1306.92
402.23
27.28
4.21
1737.86
268.18
28.02
17.25
839.76
516.98
15.53
31.06
13.82
482.30
214.62
10.00
33.00
30.00
11.70
990.00
386.10
10.00
14.50
31.17
11.63
451.97
168.64
St
a
t
e
I
'
h
t
5.69
5.69
5.69
5.69
93.60
119.49
89.62
33.06
335.77
33.76
33.06
31.36
30.41
11.06
7.43
31.36
30.41
3159.48
3950.82
2810.49
1005.16
10925.95
1035.22
887.93
2810.49
1005.16
5738.80
h
t
13.52
13.52
37.86
37.86
75.71
32.70
31.50
11.10
10.05
1237.74
1192.27
2430.01
420.35
380.34
800.69
h
t
h
t
L1
2.80
2.80
16.45
21.00
15.75
5.81
Uniformly
distributed
WEIGHT(KN/m2)
3.50
3.50
3.50
3.50
15157.23 10595.37
8.40
903.29
S
2.90
1.50
4.35
Uniformly
distributed
WEIGHT(KN/m2)
6.19
h
t
26.93
33.52
8.96
902.47
241.29
213
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
Length
depth
Area
Uniformly
distributed
WEIGHT(KN/m2)
B16
8.40
0.50
4.20
10.00
42.00
-7.48
4.20
-313.95
176.40
B18
4.50
0.50
2.25
10.00
22.50
-6.95
17.30
-156.38
389.25
B19
6.60
0.50
3.30
10.00
33.00
-6.95
11.70
-229.35
386.10
B20
6.85
0.50
3.43
10.00
34.25
-3.48
19.60
-119.02
671.30
B21
6.85
0.50
3.43
10.00
34.25
-3.48
15.00
-119.02
513.75
B22
6.85
0.50
3.43
10.00
34.25
-3.48
8.40
-119.19
287.70
B23
6.85
0.50
3.43
10.00
34.25
-3.48
0.00
-119.19
0.00
B24
4.50
0.50
2.25
10.00
22.50
0.00
17.30
0.00
389.25
B25
6.60
0.50
3.30
10.00
33.00
-6.00
11.70
-198.00
386.10
B26
8.40
0.50
4.20
10.00
42.00
0.00
4.20
0.00
176.40
B27
6.15
0.50
3.08
10.00
30.75
0.00
-3.30
0.00
-101.48
B32
7.50
0.50
3.75
10.00
37.50
3.75
0.00
140.63
0.00
B33
7.50
0.50
3.75
10.00
37.50
3.75
-6.60
140.63
-247.50
B34
9.99
0.50
5.00
10.00
49.95
3.74
-9.90
187.01
-494.31
B38
6.15
0.50
3.08
10.00
30.75
7.50
-3.30
230.63
-101.48
B39
6.65
0.50
3.33
10.00
33.25
7.50
-9.89
249.38
-328.98
B44
7.50
0.50
3.75
10.00
37.50
11.25
0.00
421.88
0.00
B45
7.50
0.50
3.75
10.00
37.50
11.25
-6.60
421.88
-247.50
B46
9.99
0.50
5.00
10.00
49.95
11.25
-9.90
561.94
-494.51
B49
0.50
3.08
10.00
30.75
15.00
-3.29
461.25
-101.29
B53
6.15
7.50
0.50
3.75
10.00
37.50
18.75
0.00
703.13
0.00
B54
9.99
0.50
5.00
10.00
49.95
18.75
-3.30
936.56
-164.84
3080.80
1094.39
Weight
Mx
794.85
S
S18
S19
S20
S21
S22
S32
My
49.50
24.75
24.75
49.50
24.75
25.34
Uniformly
distributed
WEIGHT(KN/m2)
7.15
7.15
7.15
7.15
7.15
7.15
353.93
176.96
176.96
353.93
176.96
181.18
1419.92
3.75
5.00
10.00
11.25
17.50
14.40
-3.30
-8.80
-8.80
-3.30
-2.20
-8.11
1327.22
884.81
1769.63
3981.66
3096.84
2609.01
13669.16
-1167.95
-1557.27
-1557.27
-1167.95
-389.32
-1469.38
-7309.14
214
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
C10
0.28
19.60
-6.85
0.00
-134.26
0.00
C11
0.36
25.20
-6.95
8.40
-175.14
211.68
C12
0.36
25.20
-6.90
15.00
-173.88
378.00
C13
0.36
25.20
-6.90
19.55
-173.88
492.66
C14
0.36
25.20
0.00
19.60
0.00
493.92
C15
0.36
25.20
0.00
15.00
0.00
378.00
C16
0.36
25.20
0.00
8.40
0.00
211.68
C17
0.36
25.20
0.00
0.00
0.00
0.00
C18
0.36
25.20
0.00
-6.60
0.00
-166.32
C19
0.36
25.20
7.50
-13.20
189.00
-332.64
C20
0.36
25.20
7.50
-6.60
189.00
-166.32
C21
0.28
19.60
7.50
0.00
147.00
0.00
C28
0.28
19.60
15.00
0.00
294.00
0.00
C29
0.28
19.60
15.00
-6.60
294.00
-129.36
C30
0.28
19.60
22.50
0.00
441.00
0.00
896.84
1371.30
350.00
P
P4
P5
P6
P7
P8
P9
P10
P11
P12
P13
P14'
P14
P15
P16
P17
P18
P19
P20
P21
P22
P23
P24
P25
P26
4.64
4.10
1.01
3.49
3.40
3.40
2.30
3.23
2.30
1.00
0.80
2.45
0.80
2.30
3.40
1.40
5.40
1.00
1.05
3.90
6.00
7.80
1.91
6.90
14.85
13.12
3.23
11.17
10.88
10.88
7.36
10.34
7.36
3.20
2.56
7.84
2.56
7.36
10.88
4.48
17.28
3.20
3.36
12.48
19.20
24.96
6.11
22.08
Uniformly
distributed
WEIGHT(KN/m2)
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
41.43
36.60
9.02
31.16
30.36
30.36
20.53
27.05
20.53
8.93
5.36
21.87
7.14
20.53
28.57
12.50
48.21
7.14
9.37
34.82
53.57
69.64
17.05
61.60
653.35
-2.62
-4.87
-6.45
-2.05
5.83
7.6
6.35
5.3
6.35
7.6
5.3
5.98
5.3
6.35
5.3
6.1
7.59
5.9
7.98
-0.2
-0.2
-0.2
13.75
18.75
14.88
12.75
10.78
10.80
-0.12
-2
-2
-3.71
-5.4
-5.1
-5.88
-6.6
-7.33
-7.8
-9.58
-9
-10.35
-11.18
-13.86
17.25
11.7
4.2
0.1
0.1
-108.54
-178.27
-58.16
-63.88
176.97
230.70
130.39
143.37
130.39
67.85
28.39
130.80
37.85
130.39
151.42
76.25
365.92
42.14
74.81
-6.96
-10.71
-13.93
234.47
1155.06
2866.75
616.42
466.71
97.21
336.51
-3.70
-60.71
-41.07
-100.36
-110.89
-45.53
-31.50
-144.37
-52.35
-160.17
-273.70
-112.49
-498.99
-79.85
-129.93
600.63
626.75
292.48
1.71
6.16
1198.97
215
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
C14
0.36
25.20
0.00
19.60
0.00
493.92
C15
0.36
25.20
0.00
15.00
0.00
378.00
C16
0.36
25.20
0.00
8.40
0.00
211.68
C22
0.36
25.20
7.50
8.40
189.00
211.68
C23
0.36
25.20
7.50
15.00
189.00
378.00
C24
0.36
25.20
7.50
19.60
189.00
493.92
C25
0.36
25.20
15.00
19.60
378.00
493.92
C26
0.36
25.20
15.00
15.00
378.00
378.00
C27
0.36
25.20
15.00
8.40
378.00
211.68
C28
0.36
25.20
15.00
0.00
378.00
0.00
C30
0.36
25.20
22.50
0.00
567.00
0.00
C31
0.36
25.20
22.50
8.40
567.00
211.68
C32
0.36
25.20
22.50
15.00
567.00
378.00
C33
0.36
25.20
22.50
19.60
567.00
493.92
C34
0.36
25.20
26.04
19.60
656.21
493.92
C35
0.36
25.20
30.00
15.00
403.20
S15
S16
S23
S24
S25
S26
S27
S28
S29
S35
S39
756.00
378.00
5759.21
5206.32
33.75
49.50
33.75
49.50
33.75
49.50
24.84
51.64
40.10
4.05
5.20
Uniformly
distributed
WEIGHT(KN/m2)
4.96
4.96
4.96
4.96
4.96
4.96
4.96
4.96
4.96
4.96
4.96
167.40
245.52
167.40
245.52
167.40
245.52
123.21
256.13
198.90
20.09
3.75
3.75
11.25
11.25
18.75
18.75
25.38
26.42
25.68
31.47
17.30
11.70
17.30
11.70
17.30
11.70
17.02
11.59
5.60
6.90
627.75
920.70
1883.25
2762.10
3138.92
4603.75
3126.98
6767.07
5107.65
632.19
2896.02
2872.58
2896.02
2872.58
2896.02
2872.58
2096.97
2968.60
1113.82
138.51
25.80
-6.22
-4.31
-160.35
-111.16
29410.00
23512.55
1862.88
216
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Uniformly
distributed
WEIGHT(KN/m2)
B24
4.50
0.50
2.25
10.00
22.50
0.00
17.30
0.00
389.25
B25
6.60
0.50
3.30
10.00
33.00
-6.00
11.70
-198.00
386.10
B28
7.50
0.50
3.75
10.00
37.50
3.75
19.60
140.63
735.00
B30
7.50
0.50
3.75
10.00
37.50
3.75
8.40
140.63
315.00
B35
4.50
0.50
2.25
10.00
22.50
7.50
17.30
168.75
389.25
B36
6.60
0.50
3.30
10.00
33.00
7.50
11.70
247.50
386.10
B40
7.50
0.50
3.75
10.00
37.50
11.25
19.60
421.88
735.00
B41
7.50
0.50
3.75
10.00
37.50
11.25
15.00
421.88
562.50
B42
7.50
0.50
3.75
10.00
37.50
11.25
8.40
421.88
315.00
B43
8.40
0.50
4.20
10.00
42.00
10.55
4.20
443.10
176.40
B47
0.50
2.25
10.00
22.50
15.00
17.30
337.50
389.25
B48
4.50
6.60
0.50
3.30
10.00
33.00
15.00
11.70
495.00
386.10
B50
7.50
0.50
3.75
10.00
37.50
18.75
19.60
703.13
735.00
B51
7.50
0.50
3.75
10.00
37.50
18.75
15.00
703.13
562.50
B52
7.50
0.50
3.75
10.00
37.50
18.75
8.40
703.13
315.00
B55
4.50
0.50
2.25
10.00
22.50
22.50
17.30
506.25
389.25
B56
6.60
0.50
3.30
10.00
33.00
22.50
11.70
742.50
386.10
B57
8.40
0.50
4.20
10.00
42.00
22.50
4.20
945.00
176.40
B59
3.54
0.50
1.77
10.00
17.70
24.27
19.60
429.58
346.92
B60
7.50
0.50
3.75
10.00
37.50
23.25
15.00
871.88
562.50
B61
9.58
0.50
4.79
10.00
47.89
27.29
8.40
1306.92
402.23
B62
12.74
0.50
6.37
10.00
63.70
27.28
4.21
1737.86
268.18
B64
5.99
0.50
3.00
10.00
29.97
28.02
17.25
839.76
516.98
B65
3.11
0.50
1.55
10.00
15.53
31.06
13.82
482.30
214.62
B66
6.60
0.50
3.30
10.00
33.00
30.00
11.70
990.00
386.10
B67
2.90
0.50
1.45
10.00
14.50
31.17
11.63
451.97
168.64
865.79
S
SW8
SW9
SW10
SW11
14454.11 10595.37
4.70
6.00
4.50
1.66
2.85
2.85
2.85
2.85
13.40
17.10
12.83
4.73
Uniformly
distributed
WEIGHT(KN/m2)
5.69
5.69
5.69
5.69
76.22
97.30
72.97
26.92
273.41
33.76
33.06
31.36
30.41
11.06
7.43
31.36
30.41
2572.72
3217.09
2288.55
818.48
8896.85
842.97
723.03
2288.55
818.48
4673.02
217
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
P1
P2
P3
P4
P5
P6
P7
P8
P9
P10
R
Length
3.90
6.00
7.80
6.90
7.80
1.91
1.95
7.80
3.39
4.32
Area
12.48
19.20
24.96
22.08
24.96
6.11
6.24
24.96
10.85
13.82
Uniformuly
distributed Weight
42.75
5.25
X
-0.2
-0.2
-0.2
11.25
15.1
13.75
21.225
22.35
28.93
29.45
Y
17.25
11.7
4.2
8.55
4.2
0.1
8.5
4.2
7.18
7.18
Mx
-6.96
-10.71
-13.93
693.04
1051.54
234.47
369.52
1556.42
875.59
1135.86
5884.83
My
600.63
626.75
292.48
526.71
292.48
1.71
147.98
292.48
217.31
276.93
3275.45
224.44
224.44
2.75
4.30
617.20
617.20
965.08
965.08
Weight
34.82
53.57
69.64
61.60
69.64
17.05
17.41
69.64
30.27
38.57
462.20
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
2.79
R1
Uniformly
distributed
WEIGHT(KN/m2)
Item
Length
depth
Area
Uniformly
distributed
WEIGHT(KN/m2)
Weight
Mx
My
B32
7.50
0.50
3.75
10.00
37.50
3.75
0.00
140.63
0.00
B33
7.50
0.50
3.75
10.00
37.50
3.75
-6.60
140.63
-247.50
B34
9.99
0.50
5.00
10.00
49.95
3.74
-9.90
187.01
-494.31
B38
6.15
0.50
3.08
10.00
30.75
7.50
-3.30
230.63
-101.48
B39
6.65
0.50
3.33
10.00
33.25
7.50
-9.89
249.38
-328.98
B44
7.50
0.50
3.75
10.00
37.50
11.25
0.00
421.88
0.00
B45
7.50
0.50
3.75
10.00
37.50
11.25
-6.60
421.88
-247.50
B46
9.99
0.50
5.00
10.00
49.95
11.25
-9.90
561.94
-494.51
B49
6.15
7.50
0.50
3.08
10.00
30.75
15.00
-3.29
461.25
-101.29
B53
0.50
3.75
10.00
37.50
18.75
0.00
703.13
0.00
B54
9.99
0.50
5.00
10.00
49.95
18.75
-3.30
936.56
-164.84
432.10
4454.89 -2180.39
218
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
0.00
C17
0.36
25.20
0.00
C18
0.36
25.20
0.00
-6.60
0.00
-166.32
C19
0.36
25.20
7.50
-13.20
189.00
-332.64
C20
0.36
25.20
7.50
-6.60
189.00
-166.32
C21
0.36
25.20
7.50
0.00
189.00
0.00
C28
0.36
25.20
15.00
0.00
378.00
0.00
C29
0.36
25.20
15.00
-6.60
378.00
-166.32
C30
0.36
25.20
22.50
0.00
567.00
0.00
1890
-831.6
201.6
S
R1
0.00
S18
S19
S20
S21
S22
S32
R
0.00
49.50
24.75
24.75
49.50
24.75
25.34
Uniformly
distributed
WEIGHT(KN/m2)
4.96
4.96
4.96
4.96
4.96
4.96
245.52
122.76
122.76
245.52
122.76
125.69
985.01
3.75
5.00
10.00
11.25
17.50
14.40
-3.30
-8.80
-8.80
-3.30
-2.20
-8.11
920.70
613.80
1227.60
2762.10
2148.30
1809.88
9482.38
-810.22
-1080.29
-1080.29
-810.22
-270.07
-1019.32
-5070.40
39.60
Uniformly
distributed
WEIGHT(KN/m2)
5.25
207.90
207.90
17.78
4.20
3696.46
3696.46
873.18
873.18
219
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Uniformly
distributed
WEIGHT(KN/m2)
B24
4.50
0.50
2.25
10.00
22.50
0.00
17.30
0.00
389.25
B25
6.60
0.50
3.30
10.00
33.00
-6.00
11.70
-198.00
386.10
B26
8.40
0.50
4.20
10.00
42.00
0.00
4.20
0.00
176.40
B28
7.50
0.50
3.75
10.00
37.50
3.75
19.60
140.63
735.00
B29
7.50
0.50
3.75
10.00
37.50
3.75
15.00
140.63
562.50
B30
7.50
0.50
3.75
10.00
37.50
3.75
8.40
140.63
315.00
B32
7.50
0.50
3.75
10.00
37.50
3.75
0.00
140.63
0.00
B35
4.50
0.50
2.25
10.00
22.50
7.50
17.30
168.75
389.25
B36
6.60
0.50
3.30
10.00
33.00
7.50
11.70
247.50
386.10
B37
8.40
0.50
4.20
10.00
42.00
7.50
4.20
315.00
176.40
B40
7.50
0.50
3.75
10.00
37.50
11.25
19.60
421.88
735.00
B41
7.50
0.50
3.75
10.00
37.50
11.25
15.00
421.88
562.50
B42
7.50
0.50
3.75
10.00
37.50
11.25
8.40
421.88
315.00
B43
8.40
0.50
4.20
10.00
42.00
10.55
4.20
443.10
176.40
B44
7.50
0.50
3.75
10.00
37.50
11.25
0.00
421.88
0.00
B47
4.50
6.60
0.50
2.25
10.00
22.50
15.00
17.30
337.50
389.25
B48
0.50
3.30
10.00
33.00
15.00
11.70
495.00
386.10
B50
7.50
0.50
3.75
10.00
37.50
18.75
19.60
703.13
735.00
B51
7.50
0.50
3.75
10.00
37.50
18.75
15.00
703.13
562.50
B52
7.50
0.50
3.75
10.00
37.50
18.75
8.40
703.13
315.00
B55
4.50
0.50
2.25
10.00
22.50
22.50
17.30
506.25
389.25
B56
6.60
0.50
3.30
10.00
33.00
22.50
11.70
742.50
386.10
B57
8.40
0.50
4.20
10.00
42.00
22.50
4.20
945.00
176.40
B59
3.54
0.50
1.77
10.00
17.70
24.27
19.60
429.58
346.92
B60
7.50
0.50
3.75
10.00
37.50
23.25
15.00
871.88
562.50
B61
9.58
0.50
4.79
10.00
47.89
27.29
8.40
1306.92
402.23
B62
12.74
0.50
6.37
10.00
63.70
27.28
4.21
1737.86
268.18
B64
5.99
0.50
3.00
10.00
29.97
28.02
17.25
839.76
516.98
B65
3.11
0.50
1.55
10.00
15.53
31.06
13.82
482.30
214.62
B66
6.60
0.50
3.30
10.00
33.00
30.00
11.70
990.00
386.10
B67
2.90
0.50
1.45
10.00
14.50
31.17
11.63
451.97
168.64
1062.29
15472.23 11510.67
220
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
0.36
25.20
0.00
19.60
0.00
493.92
C15
0.36
25.20
0.00
15.00
0.00
378.00
C16
0.36
25.20
0.00
8.40
0.00
211.68
C17
0.36
25.20
0.00
0.00
0.00
0.00
C21
0.36
25.20
7.50
0.00
189.00
0.00
C22
0.36
25.20
7.50
8.40
189.00
211.68
C23
0.36
25.20
7.50
15.00
189.00
378.00
C24
0.36
25.20
7.50
19.60
189.00
493.92
C25
0.36
25.20
15.00
19.60
378.00
493.92
C26
0.36
25.20
15.00
15.00
378.00
378.00
C27
0.36
25.20
15.00
8.40
378.00
211.68
C28
0.36
25.20
15.00
0.00
378.00
0.00
C30
0.36
25.20
22.50
0.00
567.00
0.00
C31
0.36
25.20
22.50
8.40
567.00
211.68
C32
0.36
25.20
22.50
15.00
567.00
378.00
C33
0.36
25.20
22.50
19.60
567.00
493.92
C34
0.36
25.20
26.04
19.60
656.21
493.92
C35
0.36
25.20
30.00
15.00
756.00
378.00
5948.21
5206.32
SW8
SW9
SW10
SW11
R
C14
453.60
R1
4.70
6.00
4.50
1.66
3.50
3.50
3.50
3.50
Uniformly
distributed
WEIGHT(KN/m2)
16.45
21.00
15.75
5.81
5.00
5.00
5.00
5.00
82.25
105.00
78.75
29.05
295.05
33.76
33.06
31.36
30.41
11.06
7.43
31.36
30.41
2776.35
3471.72
2469.68
883.27
9601.01
909.69
780.26
2469.68
883.27
5042.88
42.75
Uniformly
distributed
WEIGHT(KN/m2)
5.25
224.44
224.44
2.75
4.30
617.20
617.20
965.08
965.08
221
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Item
st1
2.80
2.80
2.80
2.80
st1'
St2
St2'
X
32.70
Y
11.10
Mx
1237.74
13.52
37.86
31.50
10.05
1192.27
15.60
43.68
12.05
5.05
526.34
15.60
43.68
12.05
3.35
526.34
163.07
L
Item
L1
L2
3482.70
420.35
380.34
220.58
146.33
1167.60
2.90
3.20
Length
Area
Uniformly
distributed
WEIGHT(KN/m2)
Weight
1.50
4.35
6.19
26.93
33.52
1.50
4.80
6.19
29.71
14.20
8.96
4.20
56.64
902.47
421.91
1324.38
241.29
124.79
366.08
ROOF
DESCRIPTION
Weight(KN)
SOLID SLAB
SLAB IN SHEAR
PARAPET WALLS
CURTAIN WALLS
BEAMS
SHEAR WALL&LIFT SHAFT
Mx (KNm)
My (KNm)
6155.29
113.55
297.49
12.64
1534.42
300.94
69135.40
732.41
3875.29
1733.15
16539.28
1892.80
40383.12
476.92
1820.98
-18.86
9640.27
1264.12
8414.34
93908.33
53566.54
11.16
6.37
222
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
DESCRIPTION
&
Weight(KN)
RIBBED SLAB
EXT WALLS
CURTAIN WALLS
PARTITIONS
BEAMS
COLUMNS
SHEAR WALLS
SHEAR WALL&LIFT SHAFT
STAIRS
LANDING
Mx (KNm)
My (KNm)
5498.09
783.25
40.71
1401.75
1786.64
358.36
335.77
256.90
163.07
58981.09
9059.56
391.43
13703.29
18780.75
3273.77
10925.95
1615.80
3482.70
35455.65
4357.14
0.22
5320.73
11725.64
3068.69
2933.63
1079.12
1167.60
56.64
1324.38
366.08
10681.19
121538.73
65474.52
11.38
6.13
Weight(KN)
RIBBED SLAB
CURTAIN WALLS
EXT WALLS
PARTITIONS
BEAMS
COLUMNS
SHEAR WALLS
SHEAR WALL&LIFT SHAFT
STAIRS
LANDING
5568.93
34.48
954.83
2040.41
1755.89
531.19
335.77
256.90
163.07
Mx (KNm)
My (KNm)
59812.44
436.48
8120.67
16921.27
19010.61
4755.12
10925.95
1615.80
3482.70
35752.38
-60.90
6789.84
12053.73
11820.20
4649.72
5738.80
1079.12
1167.60
56.64
1324.38
366.08
11698.11
126405.42
79356.58
10.81
6.78
1st floor
DESCRIPTION
Weight(KN)
RIBBED SLAB
CURTAIN WALLS
EXT WALLS
PARTITIONS
BEAMS
COLUMNS
SHEAR WALLS
SHEAR WALL&LIFT SHAFT
STAIRS
LANDING
Mx (KNm)
My (KNm)
5568.93
34.48
954.83
2040.41
1755.89
638.81
335.77
256.90
163.07
59812.44
436.48
8120.67
16921.27
19010.61
5723.00
10925.95
1615.80
3482.70
35752.38
-60.90
6789.84
12053.73
11820.20
5582.85
5738.80
1079.12
1167.60
56.64
1324.38
366.08
11805.73
127373.31
80289.71
10.79
6.80
223
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
DESCRIPTION
Weight(KN)
RIBBED SLAB
CURTAIN WALLS
EXT WALLS
PARTITIONS
BEAMS
COLUMNS
SHEAR WALL&LIFT SHAFT
Mx (KNm)
My (KNm)
2497.60
14.18
442.23
847.29
832.35
388.50
256.90
12251.87
-40.40
2925.87
619.58
3221.42
1122.71
1615.80
1826.79
-36.50
396.34
3055.17
1409.39
1600.99
1079.12
5279.04
21716.85
9331.30
4.11
1.77
Floor at 0.00
DESCRIPTION
Weight(KN)
RIBBED SLAB
EXT WALLS
PARTITIONS
BEAMS
COLUMNS
SHEAR WALLS
STAIRS
LANDING
3094.01
315.07
410.37
903.29
409.50
335.77
75.71
48929.65
6006.06
4913.56
15157.23
6847.47
10925.95
2430.01
34437.99
5454.35
6015.58
10595.37
6102.18
5738.80
800.69
26.93
902.47
241.29
5570.64
96112.42
69386.25
17.25
12.46
Weight(KN)
SOLID SLAB
PARTITIONS
BEAMS
COLUMNS
My (KNm)
DESCRIPTION
Mx (KNm)
Mx (KNm)
My (KNm)
1419.92
653.35
794.85
350.00
13669.16
2866.75
3080.80
896.84
-7309.14
1198.97
1094.39
1371.30
3218.12
20513.55
-3644.48
6.37
-1.13
224
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Weight(KN)
SOLID SLAB
PARTITIONS
BEAMS
COLUMNS
SHEAR WALLS
RAMP
Mx (KNm)
My (KNm)
1862.88
462.20
865.79
403.20
273.41
224.44
29410.00
5884.83
451.97
5759.21
8896.85
617.20
23512.55
3275.45
168.64
5206.32
4673.02
965.08
4091.92
51020.05
37801.06
12.47
9.24
Floor at -4.20
DESCRIPTION
Weight(KN)
SOLID SLAB
BEAMS
COLUMNS
RAMP
Mx (KNm)
My (KNm)
985.01
432.10
201.60
207.90
9482.38
4454.89
1890.00
3696.46
-5070.40
-2180.39
-831.60
873.18
1826.61
19523.73
-7209.20
10.69
-3.95
Floor at -5.60
DESCRIPTION
Weight(KN)
BEAMS
COLUMNS
SHEAR WALLS
STAIRS
LANDING
RAMP
Mx (KNm)
My (KNm)
1062.29
453.60
295.05
163.07
15472.23
5948.21
9601.01
3482.70
11510.67
5206.32
2577.89
1167.60
56.64
1324.38
366.08
224.44
617.20
965.08
2255.09
36445.74
21793.64
16.16
9.66
225
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
WEIGHT
Mx (KNm)
My (KNm)
Floor at -5.68
2255.09
36445.74
21793.64
Floor at -4.20
1826.61
19523.73
Floor at -2.85
4091.92
51020.05
3218.12
20513.55
Floor at 0.00
F
&
ROOF
Xbar
Ybar
16.16
9.66
-7209.20
10.69
-3.95
37801.06
12.47
9.24
-3644.48
6.37
-1.13
5570.64
96112.42
69386.25
17.25
12.46
5279.04
21716.85
9331.30
4.11
1.77
11805.73
127373.31
80289.71
10.79
6.80
11698.11
126405.42
79356.58
10.81
6.78
10681.19
121538.73
65474.52
11.38
6.13
8414.34
93908.33
53566.54
11.16
6.37
226
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
ETABS v9.2
- Three-dimensional views
Structural 1
227
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Structure 2
228
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
229
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
- Deflection model
Structure 1
230
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Structure 2
231
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
232
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
233
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
234
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
CHAPTER EIGHT
FRAME ELEMENT DESIGN
235
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
BEAMS DESIGN
DESIGN OF AXIS 6 BEAM
Structure 2, Typical floor 6 (Roof)
D= 400mm
b= 400mm
fcd = 11.33MPa fyd= 260.87 MPa
Concrete cover -25mm (EBCS2-art7.1.3.6)
Reinforcement provided 20mm rods
Stirrup diameter 6
From serviceability (EBCS2-1995, art 5.2.3):
= 0.85*
=113.84
d=
dprovided =400-25 - -
6 =359mm
Span1
Span2
Span3
Span4
Span
S
S
S
2
3
4
Fig: Bending moment diagram for combination 1 @ axis 6 (roof)
Design of girder beams is done using design table
Assume 20% moment distribution
Support 1
Md =56.28KNm
Km=
S
5
S
6
=33.04
=47.63
236
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Km=
=45.22
K*m=
=44.9
=54.56
= 1858.4mm2
= 401.98mm2
=39.73
Ks=4.165
=
As =
= 944.144mm2
=53.77
= 1806.4mm2
= 368.81mm2
=47.44
=34.69
Span 5
Since we have a negative bending moment at the mid span, minimum
reinforcements should be provided at the bottom for mid span.
min=
= 0.002
=40.64
143.44KN
122.06KN
3.191m
3.75m
Shear force at critical section (Vsd) =122.06KN
239
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Vrd =0.25*fcdbwd
=0.25*11.33*400*359*10-3
=406.87KN > 122.06KN
OK
At the support there are 524mm rods, 216 rods taken as 124rod
Fctd=
= 1.03MPa
lb =
= 633.179mm
l b,net = alb
Ascal
10
0.3l b
Aseff
200mm
[EBCS-2, 1995
Art7.1.6.2]
Where: - Ascal = theoretical area of reinforcement required by the
design
Aseff = Area of reinforcement actually provided
For span1
240
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Span2
S
Span3
Span1
S
S
2
3
Fig: Bending moment diagram for combination
1 @ Axis 2
Material properties-fcd=11.33MPa
fyd=260.87MPa
Section dimensions- D=400mm
d=400-25-20/2-6=359mm
be =400mm
Support 1
Md =46.61KNm
Km=
S
4
=30.07
241
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Span 1
Since we have a negative bending moment at the mid span, minimum
reinforcements should be provided at the bottom for mid span.
min=
= 0.002
=48.23
=43.6625
=54.997
K*m=
= 1887.46mm2
= 431.196mm2
242
=45.726
=40.5424
150.06KN
127.69KN
3.191m
3.75m
Shear force at critical section (Vsd) =127.69KN
243
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Vrd =0.25*fcdbwd
=0.25*11.33*400*359*10-3
=406.87KN > 127.69KN
Fctd=
OK
= 1.03MPa
lb =
= 633.179mm
l b,net = alb
Ascal
10
0.3l b
Aseff
200mm
244
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
245
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
COLUMN DESIGN
Column design in this project is performed by ESCP 2, 1983 since the
EBCS2 dose not provide any provisions for calculating when its value
is greater than 10
Slenderness
According to ESCP 2 for column with constant section isolated or
belonging to a frame the slenderness is defined by
= Le/i
( ESCP 2,1983 Art. 5.7.2)
where Le the effective buckling length derived from linear
elastic theory
i the redius of gyration of the gross concrete section in the
plane of buckling
effective buckling length of a column in a framed structure may be
obtained from
for an unbraced column lesser of
Le =L [1.0+0.15(c1+ c2)]
Le =L [2.0+0.3cmin)]
Where L =clear height b/n end restraints
k + kc
k + kc
c1 = 1
,
. c 2 = 2
,
k11 + k12
k 21 + k 22
246
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
1
K11
K12
KC
2
K21
K22
K2
K11=(bh3/12)/L
K11=((0.4*0.43)/12)/6.15
K12=((0.4*0.53)/12)/8.4
= 3.47 10 4
K21=((0.4*0.53)/12)/6.15
= 6.78 10 4
= 4.96 10 4
K22=((0.4*0.53)/12)/8.4
= 4.96 10 4
Kc=((h 0.44)/64)/3.5
= 3.59 10 4
K2 = 3.59 10 4
c1 = KC/(K11+K12)
=0.43
c2= (KC+K2)/(K21+K22)
=0.61
Le =L [1.0+0.15(c1+ c2)]
=3.05[1+0.15(0.43+0.61)]
=3.53
Le =L [2.0+0.3cmin)]
=3.05[2+0.3*0.43]
=6.493
247
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
ok !
K22=((0.4*0.53)/12)/7.5
= 5.56 10 4
Kc=((h 0.44)/64)/3.5
= 3.59 10 4
K2 = 3.59 10 4
c1 = KC/K12
=1.26
c2= (KC+K2)/K22
=1.29
Le =L [1.0+0.15(c1+ c2)]
=3.05[1+0.15(1.26+1.29)]
=4.15
Le =L [2.0+0.3cmin)]
=3.05[2+0.3*1.26]
=7.2529
Le will be the lesser of the two values, which is 4.15
Slenderness
= Le/i
i= I/A=h/16
=(4.15*16) /0.4 =41.5 <140
ok !
248
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
Calculation of eccentricity
Total eccentricity
etot = eo + ei + e2
where
249
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
As=2621.56mm2
Using i24 bar
Number of bars = 2621.56/h *242*0.25=5.794
Use 6, i24 bar
Aseff = (h *242*0.25)*6
=2714.336
Lateral Reinforcement Determination
Max shear force =165 KN, it occurs at the second floor with
Nsd=2857.90
Limiting value of ultimate shear force:
v RD = 0.25 f cd bw d
= 0.25*13.6*550*550
= 1028.5 KN > 165KN
Shear resistance of cross-section:
Vc = 0.25*fctd*k1*k2*bw*d
k1= (1+50*0.016) = 1.81
k2= 1.6-0.358 = 1.24 >1.0
= 1.24
Vc = 0.25*1.0*1.81*1.24*550*550
=169.73 KN
Additional shear capacity of concrete:
0.1 bw d
N sd
Ac
0.1 506 506 2857.90
Vcn =
550 550
Vcn =
= 241.89 KN
Vtot = 169.73+241.89
= 411.62 KN > 165.61 KN
Nominal shear reinforcement is to be provided
For reinforcing concrete section to resist shear force ties are used as
lateral reinforcement. The diameter of ties shall not be less than 6mm or
one quarter of the diameter of the longitudinal bars.
The center to center spacing of lateral reinforcement shall not exceed:
- 12 times the minimum diameter of longitudinal bars
- Least dimension of column
- 300 mm
6mm
40/4=10mm
251
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
S 12*24 =288
400
300
Use 10 c/c 285
Lap Length
The length of lap, lo, shall be at least equal to
l o a1l b , net l o, min
where
l o , min = 0.3aa1l b 15
or 200mm
As
lb , min
As , eff
For bar in tension
lb , min = 0.3lb 10
l b , net = alb
or 300mm
For bar in compression
lb , min = 0.6lb 10
or 200mm
Where As, cal = the theoretical area of reinforcement required by the
design
As, eff = the area of reinforcement actually provided
a = 1.0 for straight bar anchorage in tension or compression
= 0.7 for anchorage in tension with standard hook
lb, min = minimum anchorage length
The basic anchorage length is the embedment length required to
develop the full design strength of a straight reinforcing bars
Basic anchorage length, lb, for a bar diameter is
lb =
f yd
4 f bd
For good bond condition the design bond strength of deformed bars
may be taken as twice the value for plain bars:
252
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
260.87
*
4 2 * 1 .0
=1.0 for straight bar anchorage
lb=(260.87*24)/4*2*1=782.61mm
For bar in compression
lb , min = 0.6lb 10
or 200mm
lb,min=0.6*782.61=469.566 240
l o , min = 0.3aa1lb 15
or 200 mm
1 = 1.4
= 1.0
lo,min =0.3*1*1.4*782.61=328.692 360
lo,min=360
lb , net = alb
As
lb , min
As , eff
l b , net = 1 * 782.61
2621.56
l b , min
2714.33
Lb ,net =755.86
The length of lap, lo
l o a1l b , net l o , min
lo 1.4*755.86=1058.20mm
provide lap length
lo=1060mm
The rest of columns are designed and shown in excel sheet
253
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
24.00
300.00
Fcd
Fsd
13600.0
260869.6
NB Unit of Measurment
Force in KN
Length in m
l
7.50
7.50
k
0.00E+00
0.00E+00
Top col
0.40
0.40
Cent col
0.40
0.40
Bot col
0.50
0.50
Effective Length in y-dir
Left
b
h
Top beam 0.40
0.50
Bot beam 0.40
0.50
3.50
3.50
3.50
3.59E-04
3.59E-04
8.77E-04
l
6.15
6.15
k
6.78E-04
6.78E-04
Top col
Cent col
Bot col
3.59E-04
3.59E-04
8.77E-04
0.40
0.40
0.50
0.40
0.40
0.50
3.50
3.50
3.50
X-dir
Alpha Value
Alpha-1
1.29
Alpha-2
2.22
Leff
4.58
Lamda
39.69
b
0.40
0.40
Right
h
0.50
0.50
l
7.50
7.50
k
5.56E-04
5.56E-04
b
0.40
0.40
Right
h
0.50
0.50
l
8.40
8.40
k
4.96E-04
4.96E-04
0.00E+00
0.00E+00
0.00E+00
Y-dir
Load in
X-dir
Y-dir
Axial Load
943.78
Moment
45.98
98.00
Eccentricity
Imperfection
1st Order
2nd Order
Total ecc
ei
e0
e2
et
0.015
0.115
0.032
0.161
Alpha Value
Alpha-1
Alpha-2
0.61
1.05
Leff
3.75
Lamda
32.47
Total
943.78
108.25
Resultant Load
Nu
943.78
Mu
152.40
Design of Members
n
0.43
m
0.18
w
0.40
chart 13
As
2621.56
Dia
24.00
6.00
254
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
24.00
300.00
Fcd
Fsd
13600.0
260869.6
NB Unit of Measurment
Force in KN
Length in m
l
7.50
7.50
k
0.00E+00
0.00E+00
Top col
0.40
0.40
Cent col
0.50
0.50
Bot col
0.50
0.50
Effective Length in y-dir
Left
b
h
Top beam 0.40
0.50
Bot beam 0.40
0.50
3.50
3.50
3.50
3.59E-04
8.77E-04
8.77E-04
l
6.15
6.15
k
6.78E-04
6.78E-04
Top col
Cent col
Bot col
3.50
3.50
3.50
3.59E-04
8.77E-04
8.77E-04
0.40
0.50
0.50
0.40
0.50
0.50
X-dir
Right
h
0.50
0.50
l
7.50
7.50
k
5.56E-04
5.56E-04
b
0.40
0.40
Right
h
0.50
0.50
l
8.40
8.40
k
4.96E-04
4.96E-04
0.00E+00
0.00E+00
0.00E+00
Y-dir
Alpha Value
Alpha-1
2.22
Alpha-2
3.16
Leff
5.42
Lamda
37.56
Load in
X-dir
Y-dir
Axial Load
1496.64
Moment
94.32
196.00
Eccentricity
Imperfection
1st Order
2nd Order
Total ecc
n
m
w
As
Dia
b
0.40
0.40
ei
e0
e2
et
0.018
0.145
0.035
0.199
Alpha Value
Alpha-1
Alpha-2
1.05
1.49
Leff
4.15
Lamda
28.73
Total
1,496.64
217.51
Resultant Load
Nu
1,496.64
Mu
297.36
Design of Members
0.44
0.17
0.40
chart 13
4096.19
28.00
7.00
255
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
24.00
300.00
Fcd
Fsd
13600.0
260869.6
NB Unit of Measurment
Force
Lengthin inKNm
l
7.50
7.50
k
0.00E+00
0.00E+00
Top col
0.50
0.50
Cent col
0.50
0.50
Bot col
0.55
0.55
Effective Length in y-dir
Left
b
h
Top beam 0.40
0.50
Bot beam 0.40
0.50
3.50
3.50
3.50
8.77E-04
8.77E-04
1.28E-03
l
6.15
6.15
k
6.78E-04
6.78E-04
Top col
Cent col
Bot col
3.50
3.50
3.50
8.77E-04
8.77E-04
1.28E-03
0.50
0.50
0.55
0.50
0.50
0.55
X-dir
Right
h
0.50
0.50
l
7.50
7.50
k
5.56E-04
5.56E-04
b
0.40
0.40
Right
h
0.50
0.50
l
8.40
8.40
k
4.96E-04
4.96E-04
0.00E+00
0.00E+00
0.00E+00
Y-dir
Alpha Value
Alpha-1
3.16
Alpha-2
3.89
Leff
6.17
Lamda
42.75
Load in
X-dir
Y-dir
2176.41
Axial Load
Moment
103.13
166.00
Eccentricity
Imperfection
1st Order
2nd Order
Total ecc
n
m
w
As
Dia
b
0.40
0.40
ei
e0
e2
et
0.021
0.090
0.046
0.156
Alpha Value
Alpha-1
Alpha-2
1.49
1.84
Leff
4.50
Lamda
31.18
Total
2,176.41
195.43
Resultant Load
Nu
2,176.41
Mu
339.65
Design of Members
0.54
0.20
0.45
chart 13
4608.21
28.00
8.00
256
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
24.00
300.00
Fcd
Fsd
13600.0
260869.6
NB Unit of Measurment
Force in KN
Length in m
l
7.50
7.50
k
0.00E+00
0.00E+00
Top col
0.50
0.50
Cent col
0.55
0.55
Bot col
0.55
0.55
Effective Length in y-dir
Left
b
h
Top beam 0.40
0.50
Bot beam 0.40
0.50
3.50
3.50
3.50
8.77E-04
1.28E-03
1.28E-03
l
6.15
6.15
k
6.78E-04
6.78E-04
Top col
Cent col
Bot col
3.50
3.50
3.50
8.77E-04
1.28E-03
1.28E-03
0.50
0.55
0.55
X-dir
0.50
0.55
0.55
Alpha Value
Alpha-1
3.89
Alpha-2
4.62
Leff
6.83
l
7.50
7.50
k
5.56E-04
5.56E-04
b
0.40
0.40
Right
h
0.50
0.50
l
8.40
8.40
k
4.96E-04
4.96E-04
0.00E+00
0.00E+00
0.00E+00
Y-dir
Lamda
43.02
Load in
X-dir
Y-dir
Axial Load
2857.90
Moment 126.71
204.00
Eccentricity
Imperfection
1st Order
2nd Order
Total ecc
n
m
w
As
Dia
b
0.40
0.40
Right
h
0.50
0.50
ei
e0
e2
et
0.023
0.084
0.051
0.158
Alpha Value
Alpha-1
Alpha-2
1.84
2.19
Leff
4.81
Lamda
30.32
Total
2,857.90
240.15
Resultant Load
Nu
2,857.90
Mu
450.66
Design of Members
0.69
0.20
0.51
chart 13
6319.40
28.00
11.00
257
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
24.00
300.00
Fcd
Fsd
13600.0
260869.6
NB Unit of Measurment
Force
Lengthin inKNm
b
0.40
0.40
Right
h
0.50
0.50
l
7.50
7.50
k
5.56E-04
5.56E-04
k
4.96E-04
4.96E-04
0.00E+00
0.00E+00
0.00E+00
l
7.50
7.50
k
0.00E+00
0.00E+00
Top col
0.55
0.55
Cent col
0.55
0.55
Bot col
0.60
0.60
Effective Length in y-dir
Left
b
h
3.50
3.50
2.80
1.28E-03
1.28E-03
2.27E-03
Right
h
Top beam
Bot beam
Top col
Cent col
Bot col
6.15
6.15
3.50
3.50
2.80
6.78E-04
6.78E-04
1.28E-03
1.28E-03
2.27E-03
0.40
0.40
0.50
0.50
8.40
8.40
Leff
5.35
Lamda
33.69
0.40
0.40
0.55
0.55
0.60
0.50
0.50
0.55
0.55
0.60
X-dir
Y-dir
Alpha Value
Alpha-1
4.62
Alpha-2
6.40
Leff
7.96
Lamda
50.14
Load in
X-dir
Y-dir
Axial Load
3540.90
Moment 130.43
143.00
Eccentricity
Imperfection
1st Order
2nd Order
Total ecc
n
m
w
As
Dia
ei
e0
e2
et
0.027
0.055
0.069
0.150
Alpha Value
Alpha-1
Alpha-2
2.19
3.03
Total
3,540.90
193.55
Resultant Load
Nu
3,540.90
Mu
532.32
Design of Members
0.86
0.24
0.58
chart 13
7186.77
28.00
12.00
258
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
24.00
Fcd
13600.0
Fys
300.00
Fsd
260869.6
Diam of RE
NB Unit of Measurment
Force in KN
8.00 Cover
25.00 Length in m
Right
T op beam
0.00
0.50
7.50
0.00E+00
0.40
0.50
7.50
5.56E-04
Bot beam
0.00
0.50
7.50
0.00E+00
0.40
0.50
7.50
5.56E-04
T op col
0.55
0.55
3.50
2.18E-03
Cent col
0.60
0.60
2.80
3.86E-03
Bot col
0.60
0.60
1.40
7.71E-03
Right
T op beam
0.40
0.50
6.15
6.78E-04
0.40
0.50
8.40
4.96E-04
Bot beam
0.40
0.50
6.15
6.78E-04
0.40
0.50
8.40
4.96E-04
T op col
0.55
0.55
3.50
2.18E-03
0.00E+00
Cent col
0.60
0.60
2.80
3.86E-03
0.00E+00
0.60
0.60
1.40
7.71E-03
Bot col
X-dir
Alpha Value
Alpha-1
10.86
Alpha-2
20.83
Load in
Leff
Lamda
Alpha Value
12.10
69.84
Alpha-1
5.14
Alpha-2
9.86
X-dir
Axial Load
Moment
0.00E+00
Y-dir
Y-dir
4135.35
Leff
Lamda
7.48
43.16
T ot al
4,135.35
177.71
168.00
X-dir
Y-dir
Imperfection
ei
0.040
0.025
Nu
4,135.35
1st Order
e0
0.043
0.04
Mux
949.57
0.2296215
2nd Order
e2
0.146
0.06
Muy
502.20
0.1214403
T otal ecc
et
0.230
0.12
Eccentricity
0.72
mx
0.27
my
0.15
0.50
As
11040.00
Dia
28.00
chart 20
18.00
259
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
CHAPTER NINE
FOUNDATION DESIGN
260
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
R
= c ' N c S c ic + q ' N q S q iq + 0.5 ' B ' N S i
A'
With the design value of dimensionless factors for the bearing resistance
N c = (N q 1)cot '
))
S q = 1 + sin '
S = 0 .7
= 1.40
For rectangular, square or circular shape
Sc =
(S
N q 1)
Nq 1
(1.40 * 9.13 1)
9.13 1
= 1.29
261
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
R
= c ' N c S c ic + q ' N q S q iq + 0.5 ' B ' N S i
'
A
= 75.85*18.68*1.29+17.5*1.4*9.13*1.4+0.5*17.5*2.5*7.07*0.7
= 2249.2 KN/m2
A recommendation for the allowable bearing capacity qa to be used for
design is based on the ultimate bearing capacity divided by a suitable safety
factor (SF)
qa =
qult
S .F
qa =
qult
2249.2
=
= 749.73 KN m 2
S .F
3 .0
Mx
22.52
=
= 0.0086 0
2747.62
b
P
= 0.5 >> e y & e y
My
6
22.59
ex =
=
= 0.0086 0
P
2747.62
ey =
L = L
B = B
R 2747.62
=
= 686.91 KN m 2 < q allowable = 749.73 KN m 2
A ' 2 .0 * 2 .0
As we can see from the above value the soil has a good bearing resistance.
Thus the load coming from the structure can easily be transferred to the
foundation soil by using isolated footing.
P 6e y 6e x
A
b
a
P
P
2747.62
A= =
= 2.76m 2
A
749.73 * 1.33
, ex & e y 0
2.76 = 1.66m
Use B = 2.0m
Actual safety factor of allowable bearing capacity
262
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
S .F =
qult 2249.2
=
q all 749.73
= 3.00
a+d
200
b +d
d/2
200
The acting force is
)(
263
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
pc = 0.5 f ctd (1 + 50 e )
, s=686.91KN/m2
pc
min imum
reif .ratio
0.35 f ck
= 1.17 Mpa
1.5
= 0.5 * 1.17 * 10 3 (1 + 50 * 0.005)
= 730 KN / m 2
2
d
d
200
200
a'
V act = B B 2 d
2
res
V = B(d ) wc
264
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
wc = 0.3 f ctd (1 + 50 e )
= 438.75 KN / m 2
Where:-
res
=V
act
d 686.91
V act = 2.0
2
2
= 824.3 1373.83d
d = 0 .6 m
Wide beam shear govern
Provide overall depth of 0.7m
d=700-75-6 =619
Determination of design moments
The critical section for bending moment is as shown in the figure. Section
1-1 & 2-2. Since the proposed footing is square & the effective area is the same
as provided the moment acting in both section is identical.
1
2
2
200
200
265
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
min =
0.5
f yk
min =
0 .5
300
= 0.00167
= 2172.14mm2
Spacing =
1000 * 201.06
= 92.56mm
2172.14
f yd
lb = ( 4)
[EBCS-2, 1995 Art 7.1.6.1]
f
bd
f bd = 2 f ctd , the design bond strength for deformed compression bar of good
bond condition.
l b ,net = al b
10
Ascal
= 0.3lb
Aseff
200 mm
266
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
2172.17
= 492.52mm
2234
267
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
APPENDIX
268
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
COMBO
TYPE
CASE
FACTOR
LOAD
TYPE
TITLE
COMB1
ADD
DL
1.3
STATIC(DEAD)
COMB1
COMB1
ADD
LL
1.6
STATIC(LIVE)
COMB1
COMB2
ADD
EQ
STATIC(QUAKE)
COMB2
COMB2
ADD
0.75
STATIC(QUAKE)
COMB2
COMB3
ADD
-1
STATIC(QUAKE)
COMB3
COMB3
ADD
COMB1
0.75
STATIC(QUAKE)
COMB3
COMB4
ADD
COMB1
0.75
STATIC(QUAKE)
COMB4
COMB4
ADD
EQY
STATIC(QUAKE)
COMB4
COMB5
ADD
COMB1
0.75
STATIC(QUAKE)
COMB5
COMB5
ADD
EQY
-1
STATIC(QUAKE)
COMB5
COMB1
EQ
Story
Beam
Load
Loc
V2
M3
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
0.2
0.792
1.383
1.975
2.567
3.158
3.75
4.342
4.933
5.525
6.117
6.708
-127.01
-104.83
-82.65
-60.47
-38.28
-16.1
6.08
28.26
50.45
72.63
94.81
116.99
-5.94
-5.94
-5.94
-5.94
-5.94
-5.94
-5.94
-5.94
-5.94
-5.94
-5.94
-5.94
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
7.3
0.2
0.792
1.383
1.975
2.567
3.158
3.75
4.342
139.18
-93.68
-77.05
-60.41
-43.77
-27.14
-10.5
6.14
22.78
-5.94
-3.81
-3.81
-3.81
-3.81
-3.81
-3.81
-3.81
-3.81
117.403
-48.816
6.646
48.984
78.197
94.285
97.249
87.088
63.803
27.392
-22.143
-84.802
160.587
-82.667
-32.159
8.505
39.325
60.302
71.435
72.725
64.171
269
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
4.933
5.525
6.117
6.708
7.3
0.2
0.792
1.383
1.975
2.567
3.158
3.75
4.342
4.933
5.525
6.117
6.708
7.3
0.2
0.792
1.383
1.975
2.567
3.158
3.75
4.342
4.933
5.525
6.117
6.708
39.41
56.05
72.69
89.32
105.96
-96.84
-80.2
-63.56
-46.93
-30.29
-13.65
2.98
19.62
36.26
52.9
69.53
86.17
102.81
-94.25
-77.61
-60.97
-44.34
-27.7
-11.06
5.57
22.21
38.85
55.49
72.12
88.76
-3.81
-3.81
-3.81
-3.81
-3.81
-5.099
-5.099
-5.099
-5.099
-5.099
-5.099
-5.099
-5.099
-5.099
-5.099
-5.099
-5.099
-5.099
-4.752
-4.752
-4.752
-4.752
-4.752
-4.752
-4.752
-4.752
-4.752
-4.752
-4.752
-4.752
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
7.3
0.2
0.792
1.383
1.975
2.567
3.158
3.75
4.342
4.933
5.525
6.117
6.708
105.4
-96.27
-79.64
-63
-46.36
-29.72
-13.09
3.55
20.19
36.82
53.46
70.1
86.73
-4.752
-4.157
-4.157
-4.157
-4.157
-4.157
-4.157
-4.157
-4.157
-4.157
-4.157
-4.157
-4.157
45.774
17.533
-20.551
-68.479
-126.25
-93.438
-41.065
1.465
34.151
56.994
69.993
73.149
66.461
49.93
23.555
-12.663
-58.725
-114.63
-84.049
-33.207
7.79
38.944
60.255
71.722
73.346
65.126
47.062
19.155
-18.595
-66.189
123.626
-92.056
-40.016
2.179
34.532
57.041
69.706
72.528
65.507
48.642
21.933
-14.619
-61.015
270
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
7.3
0.2
0.792
1.383
1.975
2.567
3.158
3.75
3.75
4.342
4.933
5.525
6.117
6.708
7.3
0.2
0.792
1.383
1.975
2.567
3.158
3.75
3.75
4.342
4.933
5.525
6.117
6.708
7.3
0.2
0.792
1.383
1.975
2.567
3.158
3.75
3.75
4.342
4.933
5.525
6.117
6.708
7.3
103.37
-57.78
-57.78
-57.78
-57.78
-57.78
-57.78
-57.78
58
58
58
58
58
58
58
-40.34
-40.34
-40.34
-40.34
-40.34
-40.34
-40.34
46.49
46.49
46.49
46.49
46.49
46.49
46.49
-46.32
-46.32
-46.32
-46.32
-46.32
-46.32
-46.32
40.51
40.51
40.51
40.51
40.51
40.51
40.51
-4.157
-7.544
-7.544
-7.544
-7.544
-7.544
-7.544
-7.544
-7.544
-7.544
-7.544
-7.544
-7.544
-7.544
-7.544
-4.772
-4.772
-4.772
-4.772
-4.772
-4.772
-4.772
-4.772
-4.772
-4.772
-4.772
-4.772
-4.772
-4.772
-6.544
-6.544
-6.544
-6.544
-6.544
-6.544
-6.544
-6.544
-6.544
-6.544
-6.544
-6.544
-6.544
-6.544
117.254
-82.087
-47.902
-13.717
20.468
54.653
88.838
123.023
123.023
88.707
54.391
20.074
-14.242
-48.559
-82.875
-51.334
-27.465
-3.595
20.275
44.144
68.014
91.884
91.884
64.377
36.871
9.365
-18.142
-45.648
-73.154
-71.796
-44.388
-16.98
10.428
37.836
65.243
92.651
92.651
68.683
44.715
20.747
-3.222
-27.19
-51.158
271
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
COMB2
0.2
0.792
1.383
1.975
2.567
3.158
3.75
3.75
4.342
4.933
5.525
6.117
6.708
7.3
0.2
0.792
1.383
1.975
2.567
3.158
3.75
3.75
4.342
4.933
5.525
6.117
6.708
7.3
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.333
4.917
5.5
6.083
6.667
7.25
0.25
0.833
-41.33
-41.33
-41.33
-41.33
-41.33
-41.33
-41.33
45.5
45.5
45.5
45.5
45.5
45.5
45.5
-45.34
-45.34
-45.34
-45.34
-45.34
-45.34
-45.34
41.5
41.5
41.5
41.5
41.5
41.5
41.5
-57.64
-57.64
-57.64
-57.64
-57.64
-57.64
-57.64
58.14
58.14
58.14
58.14
58.14
58.14
58.14
-39.51
-39.51
-6.406
-6.406
-6.406
-6.406
-6.406
-6.406
-6.406
-6.406
-6.406
-6.406
-6.406
-6.406
-6.406
-6.406
-4.911
-4.911
-4.911
-4.911
-4.911
-4.911
-4.911
-4.911
-4.911
-4.911
-4.911
-4.911
-4.911
-4.911
-4.717
-4.717
-4.717
-4.717
-4.717
-4.717
-4.717
-4.717
-4.717
-4.717
-4.717
-4.717
-4.717
-4.717
-2.481
-2.481
-53.863
-29.41
-4.956
19.497
43.951
68.404
92.858
92.858
65.935
39.012
12.09
-14.833
-41.755
-68.678
-69.267
-42.443
-15.619
11.205
38.029
64.853
91.677
91.677
67.125
42.573
18.021
-6.531
-31.083
-55.635
-83.54
-49.92
-16.299
17.321
50.942
84.563
118.183
118.183
84.267
50.351
16.435
-17.481
-51.397
-85.313
-50.096
-27.046
272
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
1.417
2
2.583
3.167
3.75
3.75
4.333
4.917
5.5
6.083
6.667
7.25
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.333
4.917
5.5
6.083
6.667
7.25
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.333
4.917
5.5
6.083
6.667
7.25
0.25
0.833
1.417
2
-39.51
-39.51
-39.51
-39.51
-39.51
47.32
47.32
47.32
47.32
47.32
47.32
47.32
-46.94
-46.94
-46.94
-46.94
-46.94
-46.94
-46.94
39.89
39.89
39.89
39.89
39.89
39.89
39.89
-40.63
-40.63
-40.63
-40.63
-40.63
-40.63
-40.63
46.2
46.2
46.2
46.2
46.2
46.2
46.2
-45.82
-45.82
-45.82
-45.82
-2.481
-2.481
-2.481
-2.481
-2.481
-2.481
-2.481
-2.481
-2.481
-2.481
-2.481
-2.481
-4.594
-4.594
-4.594
-4.594
-4.594
-4.594
-4.594
-4.594
-4.594
-4.594
-4.594
-4.594
-4.594
-4.594
-5.03
-5.03
-5.03
-5.03
-5.03
-5.03
-5.03
-5.03
-5.03
-5.03
-5.03
-5.03
-5.03
-5.03
-2.045
-2.045
-2.045
-2.045
-3.997
19.052
42.101
65.151
88.2
88.2
60.597
32.994
5.391
-22.212
-49.816
-77.419
-75.215
-47.833
-20.451
6.93
34.312
61.693
89.075
89.075
65.804
42.533
19.262
-4.009
-27.28
-50.551
-53.298
-29.599
-5.899
17.801
41.501
65.2
88.9
88.9
61.947
34.995
8.042
-18.911
-45.863
-72.816
-72.012
-45.281
-18.55
8.181
273
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
2.583
3.167
3.75
3.75
4.333
4.917
5.5
6.083
6.667
7.25
-45.82
-45.82
-45.82
41.01
41.01
41.01
41.01
41.01
41.01
41.01
-2.045
-2.045
-2.045
-2.045
-2.045
-2.045
-2.045
-2.045
-2.045
-2.045
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.333
4.917
5.5
6.083
6.667
-72.05
-72.05
-72.05
-72.05
-72.05
-72.05
-72.05
71.75
71.75
71.75
71.75
71.75
71.75
-6.239
-6.239
-6.239
-6.239
-6.239
-6.239
-6.239
-6.239
-6.239
-6.239
-6.239
-6.239
-6.239
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
7.25
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.333
4.917
5.5
6.083
6.667
7.25
0.25
0.833
1.417
2
71.75
-49.98
-49.98
-49.98
-49.98
-49.98
-49.98
-49.98
57.88
57.88
57.88
57.88
57.88
57.88
57.88
-58.1
-58.1
-58.1
-58.1
-6.239
-3.492
-3.492
-3.492
-3.492
-3.492
-3.492
-3.492
-3.492
-3.492
-3.492
-3.492
-3.492
-3.492
-3.492
-5.868
-5.868
-5.868
-5.868
34.912
61.644
88.375
88.375
64.453
40.532
16.611
-7.311
-31.232
-55.153
109.298
-67.269
-25.239
16.79
58.819
100.849
142.878
142.878
101.021
59.164
17.308
-24.549
-66.406
108.263
-68.203
-39.05
-9.897
19.257
48.41
77.563
106.716
106.716
72.955
39.193
5.432
-28.33
-62.091
-95.852
-95.744
-61.853
-27.962
5.928
274
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
2.583
3.167
3.75
3.75
4.333
4.917
5.5
6.083
6.667
7.25
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.333
4.917
5.5
6.083
6.667
7.25
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.333
4.917
5.5
6.083
6.667
7.25
-58.1
-58.1
-58.1
49.76
49.76
49.76
49.76
49.76
49.76
49.76
-51.02
-51.02
-51.02
-51.02
-51.02
-51.02
-51.02
56.83
56.83
56.83
56.83
56.83
56.83
56.83
-57.06
-57.06
-57.06
-57.06
-57.06
-57.06
-57.06
50.8
50.8
50.8
50.8
50.8
50.8
50.8
-5.868
-5.868
-5.868
-5.868
-5.868
-5.868
-5.868
-5.868
-5.868
-5.868
-6.712
-6.712
-6.712
-6.712
-6.712
-6.712
-6.712
-6.712
-6.712
-6.712
-6.712
-6.712
-6.712
-6.712
-2.647
-2.647
-2.647
-2.647
-2.647
-2.647
-2.647
-2.647
-2.647
-2.647
-2.647
-2.647
-2.647
-2.647
STORY2
STORY2
STORY2
STORY2
STORY2
B55
B55
B55
B55
B55
COMB1
COMB1
COMB1
COMB1
COMB1
0.275
0.854
1.433
2.013
2.592
-71.96
-71.96
-71.96
-71.96
-71.96
-4.595
-4.595
-4.595
-4.595
-4.595
39.819
73.71
107.601
107.601
78.577
49.553
20.529
-8.494
-37.518
-66.542
-71.354
-41.593
-11.831
17.93
47.692
77.453
107.215
107.215
74.061
40.908
7.755
-25.398
-58.551
-91.705
-92.593
-59.31
-26.028
7.255
40.537
73.82
107.103
107.103
77.471
47.838
18.206
-11.426
-41.058
-70.69
108.807
-67.132
-25.458
16.217
57.892
275
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B55
B55
B55
B55
B55
B55
B55
B55
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
3.171
3.75
3.75
4.329
4.908
5.488
6.067
6.646
-71.96
-71.96
71.85
71.85
71.85
71.85
71.85
71.85
-4.595
-4.595
-4.595
-4.595
-4.595
-4.595
-4.595
-4.595
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
STORY2
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
7.225
0.275
0.854
1.433
2.013
2.592
3.171
3.75
3.75
4.329
4.908
5.488
6.067
6.646
7.225
0.275
0.854
1.433
2.013
2.592
3.171
3.75
3.75
4.329
4.908
5.488
6.067
6.646
7.225
0.275
0.854
1.433
2.013
2.592
3.171
71.85
-50.28
-50.28
-50.28
-50.28
-50.28
-50.28
-50.28
57.57
57.57
57.57
57.57
57.57
57.57
57.57
-57.65
-57.65
-57.65
-57.65
-57.65
-57.65
-57.65
50.2
50.2
50.2
50.2
50.2
50.2
50.2
-50.81
-50.81
-50.81
-50.81
-50.81
-50.81
-4.595
-2.185
-2.185
-2.185
-2.185
-2.185
-2.185
-2.185
-2.185
-2.185
-2.185
-2.185
-2.185
-2.185
-2.185
-4.707
-4.707
-4.707
-4.707
-4.707
-4.707
-4.707
-4.707
-4.707
-4.707
-4.707
-4.707
-4.707
-4.707
-6.005
-6.005
-6.005
-6.005
-6.005
-6.005
99.567
141.241
141.241
99.629
58.017
16.404
-25.208
-66.82
108.433
-69.273
-40.153
-11.032
18.088
47.208
76.329
105.449
105.449
72.104
38.759
5.414
-27.931
-61.276
-94.621
-93.938
-60.546
-27.154
6.238
39.629
73.021
106.413
106.413
77.339
48.266
19.192
-9.881
-38.955
-68.028
-70.727
-41.301
-11.875
17.552
46.978
76.405
276
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
3.75
3.75
4.329
4.908
5.488
6.067
6.646
7.225
0.275
0.854
1.433
2.013
2.592
3.171
3.75
3.75
4.329
4.908
5.488
6.067
6.646
7.225
-50.81
57.05
57.05
57.05
57.05
57.05
57.05
57.05
-57.13
-57.13
-57.13
-57.13
-57.13
-57.13
-57.13
50.73
50.73
50.73
50.73
50.73
50.73
50.73
-6.005
-6.005
-6.005
-6.005
-6.005
-6.005
-6.005
-6.005
-0.887
-0.887
-0.887
-0.887
-0.887
-0.887
-0.887
-0.887
-0.887
-0.887
-0.887
-0.887
-0.887
-0.887
STORY1
STORY1
STORY1
STORY1
STORY1
STORY1
STORY1
STORY1
STORY1
STORY1
STORY1
STORY1
STORY1
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
0.275
0.854
1.433
2.013
2.592
3.171
3.75
3.75
4.329
4.908
5.488
6.067
6.646
-71.67
-71.67
-71.67
-71.67
-71.67
-71.67
-71.67
72.14
72.14
72.14
72.14
72.14
72.14
-4.038
-4.038
-4.038
-4.038
-4.038
-4.038
-4.038
-4.038
-4.038
-4.038
-4.038
-4.038
-4.038
STORY1
STORY1
STORY1
STORY1
STORY1
STORY1
STORY1
B55
B55
B55
B55
B55
B55
B55
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
7.225
0.275
0.854
1.433
2.013
2.592
3.171
72.14
-50.7
-50.7
-50.7
-50.7
-50.7
-50.7
-4.038
-1.6
-1.6
-1.6
-1.6
-1.6
-1.6
105.831
105.831
72.792
39.753
6.715
-26.324
-59.363
-92.402
-92.483
-59.398
-26.312
6.774
39.859
72.945
106.031
106.031
76.651
47.272
17.892
-11.488
-40.867
-70.247
109.073
-67.565
-26.057
15.451
56.959
98.467
139.975
139.975
98.196
56.417
14.638
-27.141
-68.92
110.699
-71.608
-42.246
-12.884
16.479
45.841
75.204
277
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
3.75
3.75
4.329
4.908
5.488
6.067
6.646
7.225
0.275
0.854
1.433
2.013
2.592
3.171
3.75
3.75
4.329
4.908
5.488
6.067
6.646
7.225
0.275
0.854
1.433
2.013
2.592
3.171
3.75
3.75
4.329
4.908
5.488
6.067
6.646
7.225
0.275
0.854
1.433
2.013
2.592
3.171
3.75
3.75
-50.7
57.16
57.16
57.16
57.16
57.16
57.16
57.16
-56.8
-56.8
-56.8
-56.8
-56.8
-56.8
-56.8
51.05
51.05
51.05
51.05
51.05
51.05
51.05
-50.82
-50.82
-50.82
-50.82
-50.82
-50.82
-50.82
57.03
57.03
57.03
57.03
57.03
57.03
57.03
-56.68
-56.68
-56.68
-56.68
-56.68
-56.68
-56.68
51.17
-1.6
-1.6
-1.6
-1.6
-1.6
-1.6
-1.6
-1.6
-4.458
-4.458
-4.458
-4.458
-4.458
-4.458
-4.458
-4.458
-4.458
-4.458
-4.458
-4.458
-4.458
-4.458
-5.294
-5.294
-5.294
-5.294
-5.294
-5.294
-5.294
-5.294
-5.294
-5.294
-5.294
-5.294
-5.294
-5.294
-0.763
-0.763
-0.763
-0.763
-0.763
-0.763
-0.763
-0.763
104.566
104.566
71.463
38.361
5.258
-27.845
-60.948
-94.051
-92
-59.101
-26.201
6.698
39.598
72.497
105.397
105.397
75.831
46.265
16.699
-12.866
-42.432
-71.998
-71.779
-42.345
-12.91
16.524
45.959
75.393
104.827
104.827
71.797
38.766
5.735
-27.296
-60.327
-93.358
-91.83
-59.002
-26.175
6.653
39.48
72.308
105.136
105.136
278
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B55
B55
B55
B55
B55
B55
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
4.329
4.908
5.488
6.067
6.646
7.225
51.17
51.17
51.17
51.17
51.17
51.17
-0.763
-0.763
-0.763
-0.763
-0.763
-0.763
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
0.3
0.875
1.45
2.025
2.6
3.175
3.75
3.75
4.325
4.9
5.475
6.05
6.625
-70.91
-70.91
-70.91
-70.91
-70.91
-70.91
-70.91
73
73
73
73
73
73
-1.644
-1.644
-1.644
-1.644
-1.644
-1.644
-1.644
-1.644
-1.644
-1.644
-1.644
-1.644
-1.644
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
STORY+1.40
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
7.2
0.3
0.875
1.45
2.025
2.6
3.175
3.75
3.75
4.325
4.9
5.475
6.05
6.625
7.2
0.3
0.875
1.45
2.025
2.6
3.175
3.75
3.75
73
-51.26
-51.26
-51.26
-51.26
-51.26
-51.26
-51.26
56.67
56.67
56.67
56.67
56.67
56.67
56.67
-55.1
-55.1
-55.1
-55.1
-55.1
-55.1
-55.1
52.83
-1.644
0.081
0.081
0.081
0.081
0.081
0.081
0.081
0.081
0.081
0.081
0.081
0.081
0.081
0.081
-2.547
-2.547
-2.547
-2.547
-2.547
-2.547
-2.547
-2.547
75.498
45.86
16.222
-13.416
-43.053
-72.691
105.664
-64.893
-24.122
16.649
57.419
98.19
138.961
138.961
96.986
55.011
13.037
-28.938
-70.913
112.887
-72.871
-43.397
-13.922
15.552
45.026
74.5
103.974
103.974
71.389
38.805
6.22
-26.365
-58.95
-91.535
-85.625
-53.943
-22.261
9.421
41.103
72.785
104.467
104.467
279
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
4.325
4.9
5.475
6.05
6.625
7.2
0.3
0.875
1.45
2.025
2.6
3.175
3.75
3.75
4.325
4.9
5.475
6.05
6.625
7.2
0.3
0.875
1.45
2.025
2.6
3.175
3.75
3.75
4.325
4.9
5.475
6.05
6.625
7.2
0.3
0.875
1.45
2.025
2.6
3.175
3.75
4.325
4.9
5.475
52.83
52.83
52.83
52.83
52.83
52.83
-51.14
-51.14
-51.14
-51.14
-51.14
-51.14
-51.14
56.79
56.79
56.79
56.79
56.79
56.79
56.79
-55.22
-55.22
-55.22
-55.22
-55.22
-55.22
-55.22
52.71
52.71
52.71
52.71
52.71
52.71
52.71
-0.06
-0.06
-0.06
-0.06
-0.06
-0.06
-0.06
-0.06
-0.06
-0.06
-2.547
-2.547
-2.547
-2.547
-2.547
-2.547
-2.664
-2.664
-2.664
-2.664
-2.664
-2.664
-2.664
-2.664
-2.664
-2.664
-2.664
-2.664
-2.664
-2.664
0.198
0.198
0.198
0.198
0.198
0.198
0.198
0.198
0.198
0.198
0.198
0.198
0.198
0.198
0.192
0.192
0.192
0.192
0.192
0.192
0.192
0.192
0.192
0.192
74.09
43.712
13.335
-17.042
-47.419
-77.796
-72.286
-42.88
-13.474
15.933
45.339
74.745
104.152
104.152
71.499
38.846
6.193
-26.459
-59.112
-91.765
-86.209
-54.459
-22.71
9.04
40.79
72.54
104.289
104.289
73.98
43.671
13.362
-16.948
-47.257
-77.566
-0.653
-0.617
-0.582
-0.546
-0.51
-0.474
-0.438
-0.402
-0.366
-0.33
280
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
6.05
6.625
7.2
0.3
0.875
1.45
2.025
2.6
3.175
3.75
4.325
4.9
5.475
6.05
6.625
7.2
0.3
0.875
1.45
2.025
2.6
3.175
3.75
4.325
4.9
5.475
6.05
6.625
7.2
0.3
0.875
1.45
2.025
2.6
3.175
3.75
4.325
4.9
5.475
6.05
6.625
7.2
0.3
0.875
-0.06
-0.06
-0.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
-1.16
-1.16
-1.16
-1.16
-1.16
-1.16
-1.16
-1.16
-1.16
-1.16
-1.16
-1.16
-1.16
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
-1.19
-1.19
0.192
0.192
0.192
0.801
0.801
0.801
0.801
0.801
0.801
0.801
0.801
0.801
0.801
0.801
0.801
0.801
-0.513
-0.513
-0.513
-0.513
-0.513
-0.513
-0.513
-0.513
-0.513
-0.513
-0.513
-0.513
-0.513
-0.798
-0.798
-0.798
-0.798
-0.798
-0.798
-0.798
-0.798
-0.798
-0.798
-0.798
-0.798
-0.798
1.086
1.086
-0.294
-0.259
-0.223
3.25
2.639
2.027
1.416
0.804
0.193
-0.419
-1.03
-1.642
-2.253
-2.864
-3.476
-4.087
-4.23
-3.565
-2.9
-2.234
-1.569
-0.904
-0.238
0.427
1.092
1.757
2.423
3.088
3.753
3.375
2.743
2.112
1.48
0.849
0.217
-0.414
-1.046
-1.678
-2.309
-2.941
-3.572
-4.204
-4.355
-3.669
281
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B55
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
1.45
2.025
2.6
3.175
3.75
4.325
4.9
5.475
6.05
6.625
7.2
0
0.485
0.971
1.456
1.941
0
0.485
0.971
1.456
1.941
0
0.485
0.971
1.456
1.941
0
0.485
0.971
1.456
1.941
0
0.485
0.971
1.456
1.941
0
0.485
0.971
1.456
1.941
0
0.485
0.971
-1.19
-1.19
-1.19
-1.19
-1.19
-1.19
-1.19
-1.19
-1.19
-1.19
-1.19
-1.29
5.47
12.23
18.99
25.76
15.79
20.86
25.93
31.01
36.08
-17.73
-12.66
-7.59
-2.51
2.56
-0.24
4.83
9.9
14.97
20.05
-1.7
3.37
8.44
13.52
18.59
-34.99
-34.99
-34.99
-34.99
-34.99
5.54
5.54
5.54
1.086
1.086
1.086
1.086
1.086
1.086
1.086
1.086
1.086
1.086
1.086
-7.154
-7.154
-7.154
-7.154
-7.154
-6.539
-6.539
-6.539
-6.539
-6.539
-4.191
-4.191
-4.191
-4.191
-4.191
-4.697
-4.697
-4.697
-4.697
-4.697
-6.034
-6.034
-6.034
-6.034
-6.034
-15.444
-15.444
-15.444
-15.444
-15.444
-13.073
-13.073
-13.073
-2.984
-2.299
-1.613
-0.928
-0.243
0.443
1.128
1.814
2.499
3.184
3.87
-26.112
-27.125
-31.421
-38.998
-49.858
3.919
-4.974
-16.329
-30.146
-46.425
-43.088
-35.714
-30.802
-28.351
-28.362
-17.529
-18.642
-22.217
-28.254
-36.753
-21.64
-22.046
-24.914
-30.243
-38.034
-71.145
-54.163
-37.181
-20.199
-3.217
-8.801
-11.49
-14.179
282
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
1.456
1.941
0
0.485
0.971
1.456
1.941
0
0.485
0.971
1.456
1.941
0
0.485
0.971
1.456
1.941
0
0.473
0.946
1.418
1.891
0
0.473
0.946
1.418
1.891
0
0.473
0.946
1.418
1.891
0
0.473
0.946
1.418
1.891
0
0.473
0.946
1.418
1.891
0
0.473
5.54
5.54
-58.03
-58.03
-58.03
-58.03
-58.03
-19.01
-19.01
-19.01
-19.01
-19.01
-33.47
-33.47
-33.47
-33.47
-33.47
-31.17
-31.17
-31.17
-31.17
-31.17
16.12
16.12
16.12
16.12
16.12
-62.87
-62.87
-62.87
-62.87
-62.87
-5.65
-5.65
-5.65
-5.65
-5.65
-41.1
-41.1
-41.1
-41.1
-41.1
-26.54
-26.54
-13.073
-13.073
-10.092
-10.092
-10.092
-10.092
-10.092
-9.863
-9.863
-9.863
-9.863
-9.863
-13.302
-13.302
-13.302
-13.302
-13.302
-10.832
-10.832
-10.832
-10.832
-10.832
-9.312
-9.312
-9.312
-9.312
-9.312
-6.936
-6.936
-6.936
-6.936
-6.936
-7.518
-7.518
-7.518
-7.518
-7.518
-8.73
-8.73
-8.73
-8.73
-8.73
-3.968
-3.968
-16.868
-19.556
-97.916
-69.754
-41.592
-13.43
14.732
-41.705
-32.478
-23.251
-14.023
-4.796
-65.012
-48.766
-32.521
-16.275
-0.029
-56.736
-41.999
-27.263
-12.526
2.211
7.893
0.273
-7.347
-14.967
-22.587
-92.997
-63.272
-33.547
-3.822
25.902
-19.244
-16.571
-13.898
-11.226
-8.553
-65.86
-46.428
-26.996
-7.563
11.869
-47.494
-34.943
283
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
0.946
1.418
1.891
0
0.473
0.946
1.418
1.891
0
0.473
0.946
1.418
1.891
0
0.473
0.946
1.418
1.891
0
0.473
0.946
1.418
1.891
0
0.467
0.933
1.4
1.866
0
0.467
0.933
1.4
1.866
0
0.467
0.933
1.4
1.866
0
0.467
0.933
1.4
1.866
0
-26.54
-26.54
-26.54
24.71
24.71
24.71
24.71
24.71
-64.53
-64.53
-64.53
-64.53
-64.53
6.69
6.69
6.69
6.69
6.69
-46.51
-46.51
-46.51
-46.51
-46.51
-18.12
-18.12
-18.12
-18.12
-18.12
31.66
31.66
31.66
31.66
31.66
-58.83
-58.83
-58.83
-58.83
-58.83
21.31
21.31
21.31
21.31
21.31
-48.48
-3.968
-3.968
-3.968
-3.812
-3.812
-3.812
-3.812
-3.812
-2.14
-2.14
-2.14
-2.14
-2.14
-3.367
-3.367
-3.367
-3.367
-3.367
-2.585
-2.585
-2.585
-2.585
-2.585
-3.945
-3.945
-3.945
-3.945
-3.945
-3.686
-3.686
-3.686
-3.686
-3.686
-2.231
-2.231
-2.231
-2.231
-2.231
-4.055
-4.055
-4.055
-4.055
-4.055
-1.862
-22.392
-9.841
2.71
18.432
6.747
-4.938
-16.623
-28.307
-89.672
-59.161
-28.65
1.861
32.372
-2.869
-6.034
-9.199
-12.363
-15.528
-68.371
-46.38
-24.389
-2.398
19.593
-34.196
-25.742
-17.289
-8.836
-0.382
28.023
13.254
-1.516
-16.285
-31.055
-79.317
-51.867
-24.418
3.032
30.481
15.951
6.011
-3.93
-13.871
-23.812
-67.245
284
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
0.467
0.933
1.4
1.866
0
0.467
0.933
1.4
1.866
0
0.467
0.933
1.4
1.866
0
0.467
0.933
1.4
1.866
0
0.467
0.933
1.4
1.866
0
0.467
0.933
1.4
1.866
0
0.46
0.921
1.381
1.841
0
0.46
0.921
1.381
1.841
0
0.46
0.921
1.381
1.841
-48.48
-48.48
-48.48
-48.48
-11.86
-11.86
-11.86
-11.86
-11.86
31.21
31.21
31.21
31.21
31.21
-49
-49
-49
-49
-49
26.97
26.97
26.97
26.97
26.97
-44.76
-44.76
-44.76
-44.76
-44.76
2.8
2.8
2.8
2.8
2.8
25.93
25.93
25.93
25.93
25.93
-21.73
-21.73
-21.73
-21.73
-21.73
-1.862
-1.862
-1.862
-1.862
-3.362
-3.362
-3.362
-3.362
-3.362
-2.561
-2.561
-2.561
-2.561
-2.561
-2.481
-2.481
-2.481
-2.481
-2.481
-2.966
-2.966
-2.966
-2.966
-2.966
-2.077
-2.077
-2.077
-2.077
-2.077
-2.931
-2.931
-2.931
-2.931
-2.931
-5.157
-5.157
-5.157
-5.157
-5.157
0.76
0.76
0.76
0.76
0.76
-44.624
-22.003
0.617
23.238
-24.557
-19.024
-13.49
-7.956
-2.423
28.394
13.833
-0.728
-15.289
-29.849
-65.23
-42.369
-19.507
3.354
26.215
23.806
11.223
-1.361
-13.944
-26.528
-60.642
-39.758
-18.874
2.01
22.894
-6.414
-7.702
-8.991
-10.28
-11.568
22.104
10.168
-1.768
-13.705
-25.641
-31.724
-21.721
-11.718
-1.715
8.288
285
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
B89
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
0
0.46
0.921
1.381
1.841
0
0.46
0.921
1.381
1.841
0
0.46
0.921
1.381
1.841
0
0.46
0.921
1.381
1.841
0
0.46
0.921
1.381
1.841
0
0.46
0.921
1.381
1.841
0
0.46
0.921
1.381
1.841
22.26
22.26
22.26
22.26
22.26
-18.06
-18.06
-18.06
-18.06
-18.06
-7.98
-7.98
-7.98
-7.98
-7.98
4.72
4.72
4.72
4.72
4.72
-16.69
-16.69
-16.69
-16.69
-16.69
4.47
4.47
4.47
4.47
4.47
-16.44
-16.44
-16.44
-16.44
-16.44
-10.365
-10.365
-10.365
-10.365
-10.365
5.968
5.968
5.968
5.968
5.968
0.326
0.326
0.326
0.326
0.326
0.861
0.861
0.861
0.861
0.861
-0.373
-0.373
-0.373
-0.373
-0.373
0.431
0.431
0.431
0.431
0.431
0.058
0.058
0.058
0.058
0.058
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
B102
B102
B102
B102
B102
B102
B102
B102
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
0.2
0.789
1.377
1.966
2.555
3.143
3.732
4.32
-152.24
-126.81
-101.38
-75.95
-50.52
-25.09
0.34
25.76
1.803
1.803
1.803
1.803
1.803
1.803
1.803
1.803
17.636
7.391
-2.855
-13.1
-23.345
-27.257
-18.944
-10.632
-2.32
5.993
-7.362
-3.689
-0.015
3.659
7.332
5.781
3.608
1.436
-0.736
-2.908
-16.824
-9.141
-1.459
6.224
13.906
5.806
3.749
1.692
-0.364
-2.421
-16.849
-9.282
-1.715
5.852
13.419
159.242
-77.112
-9.95
42.243
79.467
101.723
109.01
101.328
286
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B102
B102
B102
B102
COMB1
COMB1
COMB1
COMB1
4.909
5.498
6.086
6.675
51.19
76.62
102.05
127.48
1.803
1.803
1.803
1.803
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
0.2
0.789
1.377
1.966
2.555
3.143
3.732
4.32
4.909
5.498
6.086
6.675
-112.6
-93.53
-74.46
-55.39
-36.32
-17.24
1.83
20.9
39.97
59.04
78.12
97.19
1.466
1.466
1.466
1.466
1.466
1.466
1.466
1.466
1.466
1.466
1.466
1.466
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
0.2
0.789
1.377
1.966
2.555
3.143
3.732
4.32
4.909
5.498
6.086
6.675
-115.76
-96.68
-77.61
-58.54
-39.47
-20.4
-1.32
17.75
36.82
55.89
74.96
94.04
1.239
1.239
1.239
1.239
1.239
1.239
1.239
1.239
1.239
1.239
1.239
1.239
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
STORY6
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
0.2
0.789
1.377
1.966
2.555
3.143
3.732
4.32
4.909
5.498
6.086
6.675
-113.5
-94.43
-75.36
-56.29
-37.22
-18.14
0.93
20
39.07
58.14
77.22
96.29
1.548
1.548
1.548
1.548
1.548
1.548
1.548
1.548
1.548
1.548
1.548
1.548
STORY6
B102
COMB5
0.2
-114.86
1.157
78.678
41.059
-11.528
-79.084
115.053
-54.384
-4.94
33.277
60.267
76.031
80.568
73.879
55.964
26.822
-13.547
-65.141
123.809
-61.284
-9.985
30.088
58.934
76.553
82.947
78.113
62.053
34.767
-3.746
-53.485
117.545
-56.345
-6.372
32.374
59.894
76.188
81.255
75.096
57.71
29.097
-10.741
-61.807
121.318
287
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
0.789
1.377
1.966
2.555
3.143
3.732
4.32
4.909
5.498
6.086
6.675
0.2
0.792
1.383
1.975
2.567
3.158
3.75
3.75
4.335
4.92
5.505
6.09
6.675
0.2
0.792
1.383
1.975
2.567
3.158
3.75
3.75
4.335
4.92
5.505
6.09
6.675
0.2
0.792
1.383
1.975
2.567
3.158
3.75
-95.79
-76.71
-57.64
-38.57
-19.5
-0.43
18.65
37.72
56.79
75.86
94.93
-39.42
-39.42
-39.42
-39.42
-39.42
-39.42
-39.42
47.24
47.24
47.24
47.24
47.24
47.24
-26.62
-26.62
-26.62
-26.62
-26.62
-26.62
-26.62
38.37
38.37
38.37
38.37
38.37
38.37
-32.51
-32.51
-32.51
-32.51
-32.51
-32.51
-32.51
1.157
1.157
1.157
1.157
1.157
1.157
1.157
1.157
1.157
1.157
1.157
0.784
0.784
0.784
0.784
0.784
0.784
0.784
0.784
0.784
0.784
0.784
0.784
0.784
1.149
1.149
1.149
1.149
1.149
1.149
1.149
1.149
1.149
1.149
1.149
1.149
1.149
0.027
0.027
0.027
0.027
0.027
0.027
0.027
-59.322
-8.553
30.99
59.306
76.396
82.26
76.897
60.307
32.492
-6.551
-56.82
-62.423
-39.097
-15.771
7.554
30.88
54.206
77.531
77.531
49.897
22.264
-5.37
-33.004
-60.638
-38.613
-22.862
-7.111
8.64
24.391
40.142
55.893
55.893
33.444
10.995
-11.454
-33.903
-56.351
-55.021
-35.784
-16.546
2.691
21.929
41.166
60.404
288
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
3.75
4.335
4.92
5.505
6.09
6.675
0.2
0.792
1.383
1.975
2.567
3.158
3.75
3.75
4.335
4.92
5.505
6.09
6.675
0.2
0.792
1.383
1.975
2.567
3.158
3.75
3.75
4.335
4.92
5.505
6.09
6.675
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.325
4.9
5.475
6.05
32.48
32.48
32.48
32.48
32.48
32.48
-27.91
-27.91
-27.91
-27.91
-27.91
-27.91
-27.91
37.09
37.09
37.09
37.09
37.09
37.09
-31.23
-31.23
-31.23
-31.23
-31.23
-31.23
-31.23
33.77
33.77
33.77
33.77
33.77
33.77
-38.03
-38.03
-38.03
-38.03
-38.03
-38.03
-38.03
48.63
48.63
48.63
48.63
48.63
0.027
0.027
0.027
0.027
0.027
0.027
-0.77
-0.77
-0.77
-0.77
-0.77
-0.77
-0.77
-0.77
-0.77
-0.77
-0.77
-0.77
-0.77
1.946
1.946
1.946
1.946
1.946
1.946
1.946
1.946
1.946
1.946
1.946
1.946
1.946
0.851
0.851
0.851
0.851
0.851
0.851
0.851
0.851
0.851
0.851
0.851
0.851
60.404
41.402
22.4
3.398
-15.604
-34.605
-42.172
-25.659
-9.147
7.366
23.878
40.391
56.903
56.903
35.207
13.512
-8.184
-29.88
-51.576
-51.462
-32.986
-14.51
3.966
22.442
40.918
59.394
59.394
39.639
19.884
0.129
-19.626
-39.38
-54.88
-32.696
-10.512
11.672
33.857
56.041
78.225
78.225
50.262
22.299
-5.664
-33.627
289
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
6.625
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.325
4.9
5.475
6.05
6.625
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.325
4.9
5.475
6.05
6.625
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.325
4.9
5.475
6.05
6.625
0.25
0.833
1.417
2
48.63
-24.69
-24.69
-24.69
-24.69
-24.69
-24.69
-24.69
40.31
40.31
40.31
40.31
40.31
40.31
-32.36
-32.36
-32.36
-32.36
-32.36
-32.36
-32.36
32.64
32.64
32.64
32.64
32.64
32.64
-25.9
-25.9
-25.9
-25.9
-25.9
-25.9
-25.9
39.09
39.09
39.09
39.09
39.09
39.09
-31.14
-31.14
-31.14
-31.14
0.851
1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
-0.164
-0.164
-0.164
-0.164
-0.164
-0.164
-0.164
-0.164
-0.164
-0.164
-0.164
-0.164
-0.164
-1.311
-1.311
-1.311
-1.311
-1.311
-1.311
-1.311
-1.311
-1.311
-1.311
-1.311
-1.311
-1.311
2.587
2.587
2.587
2.587
-61.59
-30.011
-15.611
-1.21
13.19
27.591
41.991
56.392
56.392
33.214
10.036
-13.142
-36.319
-59.497
-52.309
-33.433
-14.557
4.318
23.194
42.07
60.945
60.945
42.179
23.412
4.646
-14.121
-32.888
-33.455
-18.345
-3.236
11.874
26.983
42.093
57.202
57.202
34.723
12.244
-10.235
-32.714
-55.193
-48.865
-30.698
-12.532
5.635
290
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
2.583
3.167
3.75
3.75
4.325
4.9
5.475
6.05
6.625
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.325
4.9
5.475
6.05
6.625
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.325
4.9
5.475
6.05
6.625
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.325
-31.14
-31.14
-31.14
33.85
33.85
33.85
33.85
33.85
33.85
-47.15
-47.15
-47.15
-47.15
-47.15
-47.15
-47.15
60.35
60.35
60.35
60.35
60.35
60.35
-31.08
-31.08
-31.08
-31.08
-31.08
-31.08
-31.08
49.54
49.54
49.54
49.54
49.54
49.54
-39.64
-39.64
-39.64
-39.64
-39.64
-39.64
-39.64
40.98
40.98
2.587
2.587
2.587
2.587
2.587
2.587
2.587
2.587
2.587
-1.112
-1.112
-1.112
-1.112
-1.112
-1.112
-1.112
-1.112
-1.112
-1.112
-1.112
-1.112
-1.112
0.178
0.178
0.178
0.178
0.178
0.178
0.178
0.178
0.178
0.178
0.178
0.178
0.178
-1.846
-1.846
-1.846
-1.846
-1.846
-1.846
-1.846
-1.846
-1.846
23.802
41.968
60.135
60.135
40.67
21.204
1.739
-17.727
-37.192
-70.095
-42.591
-15.086
12.418
39.923
67.427
94.932
94.932
60.233
25.535
-9.164
-43.862
-78.561
-39.775
-21.643
-3.51
14.622
32.755
50.887
69.019
69.019
40.535
12.051
-16.433
-44.918
-73.402
-65.368
-42.244
-19.119
4.005
27.13
50.254
73.379
73.379
49.815
291
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
4.9
5.475
6.05
6.625
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.325
4.9
5.475
6.05
6.625
0.25
0.833
1.417
2
2.583
3.167
3.75
3.75
4.325
4.9
5.475
6.05
6.625
0.275
0.854
1.433
2.012
2.592
3.171
3.75
3.75
4.32
4.89
5.46
6.03
6.6
0.275
40.98
40.98
40.98
40.98
-32.07
-32.07
-32.07
-32.07
-32.07
-32.07
-32.07
48.55
48.55
48.55
48.55
48.55
48.55
-38.66
-38.66
-38.66
-38.66
-38.66
-38.66
-38.66
41.97
41.97
41.97
41.97
41.97
41.97
-47.28
-47.28
-47.28
-47.28
-47.28
-47.28
-47.28
60.22
60.22
60.22
60.22
60.22
60.22
-31.41
-1.846
-1.846
-1.846
-1.846
-3.295
-3.295
-3.295
-3.295
-3.295
-3.295
-3.295
-3.295
-3.295
-3.295
-3.295
-3.295
-3.295
1.627
1.627
1.627
1.627
1.627
1.627
1.627
1.627
1.627
1.627
1.627
1.627
1.627
-0.881
-0.881
-0.881
-0.881
-0.881
-0.881
-0.881
-0.881
-0.881
-0.881
-0.881
-0.881
-0.881
0.487
26.251
2.688
-20.876
-44.439
-42.642
-23.934
-5.226
13.481
32.189
50.897
69.604
69.604
41.687
13.77
-14.148
-42.065
-69.982
-62.502
-39.952
-17.403
5.146
27.695
50.245
72.794
72.794
48.663
24.533
0.402
-23.728
-47.859
-70.216
-42.832
-15.449
11.935
39.318
66.702
94.085
94.085
59.763
25.44
-8.883
-43.205
-77.528
-40.51
292
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
0.854
1.433
2.012
2.592
3.171
3.75
3.75
4.32
4.89
5.46
6.03
6.6
0.275
0.854
1.433
2.012
2.592
3.171
3.75
3.75
4.32
4.89
5.46
6.03
6.6
0.275
0.854
1.433
2.012
2.592
3.171
3.75
3.75
4.32
4.89
5.46
6.03
6.6
0.275
0.854
1.433
2.012
2.592
3.171
-31.41
-31.41
-31.41
-31.41
-31.41
-31.41
49.21
49.21
49.21
49.21
49.21
49.21
-39.51
-39.51
-39.51
-39.51
-39.51
-39.51
-39.51
41.11
41.11
41.11
41.11
41.11
41.11
-31.79
-31.79
-31.79
-31.79
-31.79
-31.79
-31.79
48.83
48.83
48.83
48.83
48.83
48.83
-39.13
-39.13
-39.13
-39.13
-39.13
-39.13
0.487
0.487
0.487
0.487
0.487
0.487
0.487
0.487
0.487
0.487
0.487
0.487
-1.809
-1.809
-1.809
-1.809
-1.809
-1.809
-1.809
-1.809
-1.809
-1.809
-1.809
-1.809
-1.809
-3.565
-3.565
-3.565
-3.565
-3.565
-3.565
-3.565
-3.565
-3.565
-3.565
-3.565
-3.565
-3.565
2.244
2.244
2.244
2.244
2.244
2.244
-22.317
-4.125
14.068
32.261
50.453
68.646
68.646
40.596
12.547
-15.503
-43.553
-71.603
-64.814
-41.931
-19.049
3.834
26.717
49.599
72.482
72.482
49.048
25.613
2.179
-21.255
-44.689
-41.564
-23.153
-4.741
13.671
32.082
50.494
68.906
68.906
41.071
13.237
-14.597
-42.432
-70.266
-63.76
-41.096
-18.432
4.231
26.895
49.559
293
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
3.75
3.75
4.32
4.89
5.46
6.03
6.6
0.275
0.854
1.433
2.013
2.592
3.171
3.75
3.75
4.32
4.89
5.46
6.03
6.6
0.275
0.854
1.433
2.013
2.592
3.171
3.75
3.75
4.32
4.89
5.46
6.03
6.6
0.275
0.854
1.433
2.013
2.592
3.171
3.75
3.75
4.32
4.89
5.46
-39.13
41.49
41.49
41.49
41.49
41.49
41.49
-47.97
-47.97
-47.97
-47.97
-47.97
-47.97
-47.97
59.53
59.53
59.53
59.53
59.53
59.53
-32.51
-32.51
-32.51
-32.51
-32.51
-32.51
-32.51
48.11
48.11
48.11
48.11
48.11
48.11
-39.44
-39.44
-39.44
-39.44
-39.44
-39.44
-39.44
41.18
41.18
41.18
41.18
2.244
2.244
2.244
2.244
2.244
2.244
2.244
-1.103
-1.103
-1.103
-1.103
-1.103
-1.103
-1.103
-1.103
-1.103
-1.103
-1.103
-1.103
-1.103
0.473
0.473
0.473
0.473
0.473
0.473
0.473
0.473
0.473
0.473
0.473
0.473
0.473
-2.129
-2.129
-2.129
-2.129
-2.129
-2.129
-2.129
-2.129
-2.129
-2.129
-2.129
72.222
72.222
48.573
24.923
1.274
-22.376
-46.026
-72.805
-45.025
-17.245
10.536
38.316
66.097
93.877
93.877
59.945
26.013
-7.919
-41.851
-75.783
-44.137
-25.308
-6.478
12.352
31.181
50.011
68.841
68.841
41.418
13.995
-13.428
-40.851
-68.274
-65.071
-42.23
-19.389
3.452
26.293
49.134
71.975
71.975
48.5
25.025
1.55
294
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
6.03
6.6
0.275
0.854
1.433
2.013
2.592
3.171
3.75
3.75
4.32
4.89
5.46
6.03
6.6
0.275
0.854
1.433
2.013
2.592
3.171
3.75
3.75
4.32
4.89
5.46
6.03
6.6
0.3
0.875
1.45
2.025
2.6
3.175
3.75
3.75
4.315
4.88
5.445
6.01
6.575
0.3
0.875
1.45
41.18
41.18
-32.43
-32.43
-32.43
-32.43
-32.43
-32.43
-32.43
48.19
48.19
48.19
48.19
48.19
48.19
-39.52
-39.52
-39.52
-39.52
-39.52
-39.52
-39.52
41.11
41.11
41.11
41.11
41.11
41.11
-48.09
-48.09
-48.09
-48.09
-48.09
-48.09
-48.09
59.53
59.53
59.53
59.53
59.53
59.53
-33.94
-33.94
-33.94
-2.129
-2.129
-3.547
-3.547
-3.547
-3.547
-3.547
-3.547
-3.547
-3.547
-3.547
-3.547
-3.547
-3.547
-3.547
1.892
1.892
1.892
1.892
1.892
1.892
1.892
1.892
1.892
1.892
1.892
1.892
1.892
-1.025
-1.025
-1.025
-1.025
-1.025
-1.025
-1.025
-1.025
-1.025
-1.025
-1.025
-1.025
-1.025
0.511
0.511
0.511
-21.926
-45.401
-43.841
-25.056
-6.271
12.513
31.298
50.082
68.867
68.867
41.4
13.932
-13.535
-41.002
-68.469
-65.367
-42.481
-19.595
3.291
26.177
49.063
71.949
71.949
48.518
25.087
1.657
-21.774
-45.205
-73.017
-45.365
-17.713
9.939
37.591
65.243
92.895
92.895
59.261
25.626
-8.009
-41.644
-75.278
-48.23
-28.717
-9.204
295
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
2.025
2.6
3.175
3.75
3.75
4.315
4.88
5.445
6.01
6.575
0.3
0.875
1.45
2.025
2.6
3.175
3.75
3.75
4.315
4.88
5.445
6.01
6.575
0.3
0.875
1.45
2.025
2.6
3.175
3.75
3.75
4.315
4.88
5.445
6.01
6.575
0.3
0.875
1.45
2.025
2.6
3.175
3.75
3.75
-33.94
-33.94
-33.94
-33.94
46.78
46.78
46.78
46.78
46.78
46.78
-38.2
-38.2
-38.2
-38.2
-38.2
-38.2
-38.2
42.52
42.52
42.52
42.52
42.52
42.52
-33.67
-33.67
-33.67
-33.67
-33.67
-33.67
-33.67
47.04
47.04
47.04
47.04
47.04
47.04
-38.46
-38.46
-38.46
-38.46
-38.46
-38.46
-38.46
42.25
0.511
0.511
0.511
0.511
0.511
0.511
0.511
0.511
0.511
0.511
-2.048
-2.048
-2.048
-2.048
-2.048
-2.048
-2.048
-2.048
-2.048
-2.048
-2.048
-2.048
-2.048
-2.382
-2.382
-2.382
-2.382
-2.382
-2.382
-2.382
-2.382
-2.382
-2.382
-2.382
-2.382
-2.382
0.845
0.845
0.845
0.845
0.845
0.845
0.845
0.845
10.309
29.822
49.335
68.848
68.848
42.417
15.987
-10.444
-36.875
-63.306
-61.296
-39.331
-17.366
4.599
26.564
48.529
70.495
70.495
46.473
22.452
-1.569
-25.591
-49.612
-47.413
-28.05
-8.688
10.675
30.037
49.399
68.762
68.762
42.183
15.605
-10.974
-37.553
-64.132
-62.113
-39.997
-17.882
4.234
26.35
48.465
70.581
70.581
296
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
COMB5
COMB5
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
4.315
4.88
5.445
6.01
6.575
0.3
0.87
1.441
2.011
2.582
3.152
3.723
4.293
4.864
5.434
6.005
6.575
0.3
0.87
1.441
2.011
2.582
3.152
3.723
4.293
4.864
5.434
6.005
6.575
0.3
0.87
1.441
2.011
2.582
3.152
3.723
4.293
4.864
5.434
6.005
6.575
0.3
0.87
1.441
42.25
42.25
42.25
42.25
42.25
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
2.24
2.24
2.24
2.24
2.24
2.24
2.24
2.24
2.24
2.24
2.24
2.24
-0.29
-0.29
-0.29
-0.29
-0.29
-0.29
-0.29
-0.29
-0.29
-0.29
-0.29
-0.29
2.37
2.37
2.37
0.845
0.845
0.845
0.845
0.845
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.721
0.721
0.721
0.721
0.721
0.721
0.721
0.721
0.721
0.721
0.721
0.721
-0.533
-0.533
-0.533
-0.533
-0.533
-0.533
-0.533
-0.533
-0.533
-0.533
-0.533
-0.533
-0.821
-0.821
-0.821
46.708
22.834
-1.039
-24.913
-48.786
3.814
3.073
2.333
1.593
0.852
0.112
-0.628
-1.369
-2.109
-2.849
-3.589
-4.33
6.78
5.505
4.229
2.953
1.678
0.402
-0.873
-2.149
-3.424
-4.7
-5.975
-7.251
-1.06
-0.895
-0.73
-0.565
-0.399
-0.234
-0.069
0.096
0.261
0.426
0.591
0.756
7.198
5.846
4.495
297
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
B102
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
COMB5
2.011
2.582
3.152
3.723
4.293
4.864
5.434
6.005
6.575
0.3
0.87
1.441
2.011
2.582
3.152
3.723
4.293
4.864
5.434
6.005
6.575
2.37
2.37
2.37
2.37
2.37
2.37
2.37
2.37
2.37
-0.42
-0.42
-0.42
-0.42
-0.42
-0.42
-0.42
-0.42
-0.42
-0.42
-0.42
-0.42
-0.821
-0.821
-0.821
-0.821
-0.821
-0.821
-0.821
-0.821
-0.821
1.008
1.008
1.008
1.008
1.008
1.008
1.008
1.008
1.008
1.008
1.008
1.008
3.143
1.792
0.44
-0.911
-2.263
-3.614
-4.966
-6.317
-7.669
-1.478
-1.236
-0.995
-0.754
-0.513
-0.272
-0.031
0.21
0.451
0.692
0.933
1.174
CASE
FACTOR LOAD
TYPE
TITLE
COMB1
ADD
DL
1.3
STATIC(DEAD)
COMB1
ADD
LL
1.6
STATIC(LIVE)
COMB1
COMB2
ADD
EQ
STATIC(QUAKE)
COMB2
COMB2
ADD
COMB1
COMB3
ADD
EQ
COMB3
ADD
COMB1
0.75
COMBO
COMB4
ADD
COMB1
0.75
COMBO
COMB4
ADD
EQY
COMB5
ADD
COMB1
COMB5
ADD
EQY
1
0.75
-1
1
0.75
-1
COMBO
STATIC(QUAKE)
STATIC(QUAKE)
COMBO
STATIC(QUAKE)
COMB1
COMB2
COMB3
COMB3
COMB4
COMB4
COMB5
COMB5
Story
STORY6
STORY6
STORY6
STORY6
Column
C74
C74
C74
C74
Load
COMB1
COMB1
COMB1
COMB2
Loc
0
1.55
3.1
0
P
V2
V3
M2
M3
-232.68
-54.46
-37.33 -70.083 -84.521
-232.68
-54.46
-37.33 -12.229
-0.107
-232.68
-54.46
-37.33
45.625
84.306
-196.03
-29.22
-31.41 -57.705 -43.043
298
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
COMB2
COMB2
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
1.55
3.1
0
1.55
3.1
0
1.55
3.1
0
1.55
3.1
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
-196.03
-196.03
-152.98
-152.98
-152.98
-171.17
-171.17
-171.17
-177.85
-177.85
-177.85
-420.7
-420.7
-420.7
-375.89
-375.89
-375.89
-255.16
-255.16
-255.16
-308.62
-308.62
-308.62
-322.43
-322.43
-322.43
-619.92
-619.92
-619.92
-573.08
-573.08
-573.08
-29.22
-29.22
-52.47
-52.47
-52.47
-38.01
-38.01
-38.01
-43.68
-43.68
-43.68
-30.41
-30.41
-30.41
-12.7
-12.7
-12.7
-32.91
-32.91
-32.91
-17.99
-17.99
-17.99
-27.62
-27.62
-27.62
-54.03
-54.03
-54.03
-20.78
-20.78
-20.78
-31.41
-31.41
-24.58
-24.58
-24.58
-21.99
-21.99
-21.99
-33.99
-33.99
-33.99
-34.97
-34.97
-34.97
-30.16
-30.16
-30.16
-22.3
-22.3
-22.3
-16.05
-16.05
-16.05
-36.41
-36.41
-36.41
-46.4
-46.4
-46.4
-40.87
-40.87
-40.87
-9.027
39.652
-47.419
-9.317
28.786
-43.005
-8.913
25.179
-62.12
-9.431
43.258
-58.111
-5.649
46.813
-49.752
-4.51
40.731
-37.414
-3.963
29.488
-27.856
-3.786
20.283
-59.309
-4.687
49.936
-67.309
2.29
71.888
-59.811
1.495
62.801
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
STORY3
STORY3
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB1
COMB1
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
-356.81
-356.81
-356.81
-459.23
-459.23
-459.23
-470.66
-470.66
-470.66
-758.94
-758.94
-60.27
-60.27
-60.27
-30.22
-30.22
-30.22
-50.83
-50.83
-50.83
-42.91
-42.91
-28.73
-28.73
-28.73
-20.02
-20.02
-20.02
-49.58
-49.58
-49.58
-25.13
-25.13
-41.153
1.939
45.031
-27.89
2.144
32.178
-73.074
1.29
75.655
-43.701
-6.008
2.244
47.531
-83.739
-2.405
78.929
-58.339
0.575
59.488
-68.443
-0.736
66.972
-49.77
-4.157
41.457
-20.218
-1.165
17.889
-54.437
-5.07
44.297
-29.154
-2.168
24.818
-45.501
-4.066
37.368
-89.852
-8.8
72.252
-33.693
-2.521
28.652
101.085
-10.679
79.726
-49.889
-4.563
40.764
-84.889
-8.637
67.614
-70.26
-5.889
299
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
C74
COMB1
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
STORY1
C74
COMB1
STORY1
C74
COMB1
1.5
STORY1
C74
COMB1
STORY1
C74
COMB2
STORY1
C74
COMB2
1.5
STORY1
STORY1
STORY1
STORY1
STORY1
STORY1
C74
C74
C74
C74
C74
C74
COMB2
COMB3
COMB3
COMB3
COMB4
COMB4
3
0
1.5
3
0
1.5
-758.94
-731.1
-731.1
-731.1
-407.31
-407.31
-407.31
-569.49
-569.49
-569.49
-568.92
-568.92
-568.92
-908.82
-908.82
-908.82
-899.26
-899.26
-899.26
-463.96
-463.96
-463.96
-694.46
-694.46
-694.46
-668.76
-668.76
-668.76
1068.78
1068.78
1068.78
1068.32
1068.32
1068.32
-534.86
-534.86
-534.86
-824.39
-824.39
-42.91
-16.15
-16.15
-16.15
-48.22
-48.22
-48.22
-20.64
-20.64
-20.64
-43.73
-43.73
-43.73
-49
-49
-49
-17.33
-17.33
-17.33
-56.18
-56.18
-56.18
-21
-21
-21
-52.51
-52.51
-52.51
-25.13
-25.09
-25.09
-25.09
-12.6
-12.6
-12.6
-0.26
-0.26
-0.26
-37.43
-37.43
-37.43
-31.93
-31.93
-31.93
-34.45
-34.45
-34.45
-13.45
-13.45
-13.45
-11.81
-11.81
-11.81
-36.08
-36.08
-36.08
31.685
-42.051
-4.414
33.223
-23.5
-4.598
14.304
-0.793
-0.401
-0.009
-64.758
-8.611
47.536
-49.645
-1.752
46.141
-57.5
-5.83
45.84
-16.968
3.201
23.371
-22.278
-4.56
13.157
-52.19
1.932
56.053
58.482
-24.356
-0.125
24.105
-81.034
-8.708
63.618
-32.739
-1.772
29.195
-72.651
-7.061
58.529
-79.557
-6.05
67.458
-24.874
1.12
27.114
-94.462
-10.194
74.073
-31.836
-0.341
31.155
-87.5
-8.734
70.032
-39.1
-31.51
-53.098
-62.845
-39.1
-31.51
-5.836
-4.196
-39.1
-31.51
41.426
54.452
-17.16
-26.84
-49.834
-24.136
-17.16
-26.84
-9.568
1.602
-17.16
-41.49
-41.49
-41.49
-17.23
-17.23
-26.84
-20.42
-20.42
-20.42
9.73
9.73
30.698
-29.813
0.814
31.441
21.302
6.711
27.34
-70.131
-7.897
54.338
-24.503
1.336
300
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
C74
C74
C74
C74
COMB4
COMB5
COMB5
COMB5
3
0
1.5
3
-17.23
-41.42
-41.42
-41.42
9.73
-56.99
-56.99
-56.99
-7.881
-100.95
-15.465
70.02
27.174
-69.764
-7.63
54.504
-32.23
-27.32
-17.502
-19.968
-32.23
-27.32
13.916
17.096
-32.23
-27.32
45.334
54.161
-14.98
-17.97
-9.094
-0.14
-14.98
-17.97
11.57
17.087
2.3
-824.39
-778.79
-778.79
-778.79
1256.63
1256.63
1256.63
1238.18
1238.18
1238.18
C74
COMB1
C74
COMB1
1.15
C74
COMB1
2.3
C74
COMB2
C74
COMB2
1.15
C74
COMB2
-14.98
-17.97
32.235
34.314
C74
COMB3
-646.77
-33.37
-23.01
-17.159
-29.812
C74
COMB3
1.15
-646.77
-33.37
-23.01
9.304
8.557
C74
COMB3
2.3
-646.77
-33.37
-23.01
35.766
46.927
C74
COMB4
-962.15
-16.34
17.69
79.945
-0.696
C74
COMB4
1.15
-962.15
-16.34
17.69
59.599
18.094
C74
COMB4
2.3
-962.15
-16.34
17.69
36.883
C74
COMB5
-922.8
-32.01
-58.67
39.253
106.198
-29.257
C74
COMB5
1.15
-922.8
-32.01
-58.67
-38.725
7.551
C74
COMB5
2.3
-32.01
-58.67
28.748
44.358
C74
COMB1
11.83
8.58
9.133
9.364
C74
COMB1
0.45
11.83
8.58
5.27
4.041
C74
COMB1
0.9
11.83
8.58
1.407
-1.281
C74
COMB2
23.11
-8.61
-5.335
25.034
C74
COMB2
0.45
23.11
-8.61
-1.46
14.636
C74
COMB2
0.9
-922.8
1265.21
1265.21
1265.21
1257.02
1257.02
1257.02
23.11
-8.61
2.416
4.237
C74
COMB3
-640.8
-5.37
21.49
19.035
-10.989
301
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
C74
COMB3
0.45
-640.8
-5.37
21.49
9.365
-8.574
C74
COMB3
0.9
-640.8
-5.37
21.49
-0.305
-6.158
C74
COMB4
-967.64
24.55
6.99
70.153
26.741
C74
COMB4
0.45
-967.64
24.55
6.99
67.005
15.696
C74
COMB4
0.9
-967.64
24.55
6.99
63.858
4.65
C74
COMB5
-930.17
-6.81
5.88
-56.452
-12.696
C74
COMB5
0.45
-930.17
-6.81
5.88
-59.1
-9.634
C74
COMB5
0.9
-930.17
-6.81
5.88
-6.571
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
C80
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB5
COMB5
0
1.55
3.1
0
1.55
3.1
0
1.55
3.1
0
1.55
3.1
0
1.55
3.1
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
-423.88
-423.88
-423.88
-318.53
-318.53
-318.53
-317.29
-317.29
-317.29
-314.21
-314.21
-314.21
-321.61
-321.61
-321.61
-723.31
-723.31
-723.31
-545.51
-545.51
-545.51
-539.46
-539.46
-539.46
-527.58
-527.58
-527.58
-557.39
-557.39
2.97
2.97
2.97
8.3
8.3
8.3
-3.83
-3.83
-3.83
5.42
5.42
5.42
-0.96
-0.96
-0.96
7.93
7.93
7.93
11.08
11.08
11.08
0.82
0.82
0.82
9.74
9.74
9.74
2.16
2.16
-58.17
-58.17
-58.17
-44.94
-44.94
-44.94
-42.32
-42.32
-42.32
-35.51
-35.51
-35.51
-51.75
-51.75
-51.75
-45.56
-45.56
-45.56
-37.45
-37.45
-37.45
-30.9
-30.9
-30.9
-20.84
-20.84
-20.84
-47.51
-47.51
-61.748
102.871
-12.701
77.47
-79.073
-9.41
60.253
-75.234
-9.642
55.951
-63.842
-8.804
46.234
-90.465
-10.247
69.97
-74.573
-6.23
62.114
-61.045
-4.873
51.3
-50.815
-4.472
41.871
-34.708
-3.453
27.803
-77.152
-5.892
9.079
4.469
-0.14
17.442
4.584
-8.273
-3.823
2.12
8.063
12.307
3.907
-4.492
1.312
2.797
4.282
12.786
0.885
-11.016
18.199
1.574
-15.05
0.98
-0.247
-1.474
15.859
1.249
-13.361
3.32
0.078
302
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
C80
COMB5
STORY4
C80
COMB1
STORY4
C80
COMB1
1.5
STORY4
C80
COMB1
-557.39
1027.14
1027.14
1027.14
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
C80
C80
C80
C80
C80
C80
C80
C80
C80
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
0
1.5
3
0
1.5
3
0
1.5
3
STORY4
STORY4
STORY4
C80
C80
C80
COMB5
COMB5
COMB5
0
1.5
3
STORY3
C80
COMB1
STORY3
C80
COMB1
1.5
STORY3
C80
COMB1
STORY3
C80
COMB2
STORY3
C80
COMB2
1.5
STORY3
C80
COMB2
STORY3
C80
COMB3
STORY3
C80
COMB3
1.5
STORY3
STORY3
STORY3
STORY3
C80
C80
C80
C80
COMB3
COMB4
COMB4
COMB4
3
0
1.5
3
STORY3
C80
COMB5
STORY3
STORY3
C80
C80
COMB5
COMB5
1.5
3
2.16
-47.51
-78.48
65.368
133.545
13.63
-3.163
24.127
13.63
-78.48
-15.827
3.686
13.63
-78.48
-16.756
-777.73
-777.73
-777.73
-762.98
-762.98
-762.98
-736.23
-736.23
-736.23
19.77
19.77
19.77
0.68
0.68
0.68
17.23
17.23
17.23
-63.77
-63.77
-63.77
-53.95
-53.95
-53.95
-37.24
-37.24
-37.24
-804.47
-804.47
-804.47
1389.72
1389.72
1389.72
1055.65
1055.65
1055.65
1028.93
1028.93
1028.93
-983.06
-983.06
-983.06
1101.52
1101.52
-
3.22
3.22
3.22
-80.47
-80.47
-80.47
11.93
-64.33
101.891
107.608
-11.955
83.697
-92.71
-11.785
69.139
-65.815
-9.948
45.919
134.502
-13.792
106.918
107.669
11.93
-64.33
-11.18
3.25
11.93
-64.33
85.309
-14.642
16.15
-54.8
-91.043
28.57
16.15
-54.8
-8.841
4.343
16.15
-54.8
73.362
-19.883
1.74
-41.69
-70.46
3.144
1.74
-41.69
-7.93
0.532
1.74
15.75
15.75
15.75
-41.69
-23.45
-23.45
-23.45
54.601
-39.203
-4.023
31.157
-2.08
27.373
3.751
-19.871
2.14
-73.04
-122.3
4.341
2.14
2.14
-73.04
-73.04
-12.747
96.806
1.125
-2.092
34.287
4.638
-25.011
1.904
0.891
-0.123
29.711
3.872
-21.968
6.48
1.657
-3.166
21.143
303
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
STORY2
C80
COMB1
STORY2
C80
COMB1
1.5
STORY2
C80
COMB1
STORY2
C80
COMB2
STORY2
C80
COMB2
1.5
STORY2
C80
COMB2
STORY2
C80
COMB3
STORY2
C80
COMB3
1.5
STORY2
C80
COMB3
STORY2
C80
COMB4
STORY2
C80
COMB4
1.5
STORY2
C80
COMB4
STORY2
STORY2
STORY2
C80
C80
C80
COMB5
COMB5
COMB5
0
1.5
3
STORY1
C80
COMB1
STORY1
C80
COMB1
1.5
STORY1
C80
COMB1
STORY1
C80
COMB2
STORY1
C80
COMB2
1.5
STORY1
C80
COMB2
STORY1
C80
COMB3
STORY1
C80
COMB3
1.5
STORY1
C80
COMB3
STORY1
C80
COMB4
1101.52
1749.88
1749.88
1749.88
1333.35
1333.35
1333.35
1291.47
1291.47
1291.47
1224.52
1224.52
1224.52
-1400.3
-1400.3
-1400.3
2106.56
2106.56
2106.56
1608.21
1608.21
1608.21
1551.63
1551.63
1551.63
1460.49
14.24
-75.54
126.175
25.656
14.24
-75.54
-12.866
4.29
14.24
-75.54
-17.077
18.98
-65.56
100.443
110.622
18.98
-65.56
-12.281
5.917
18.98
-65.56
86.06
-22.549
2.39
-47.75
-78.64
4.102
2.39
-47.75
-7.018
0.518
2.39
-47.75
64.604
-3.066
19.2
-30.65
-51.584
34.171
19.2
-30.65
-5.61
5.372
19.2
-30.65
-23.426
2.17
2.17
2.17
-82.66
-82.66
-82.66
40.364
137.678
-13.689
110.3
11.24
-55.37
-85.59
20.395
11.24
-55.37
-2.536
3.535
11.24
-55.37
80.519
-13.325
13.25
-48.32
-79.144
25.126
13.25
-48.32
-6.669
5.253
13.25
-48.32
65.806
-14.62
3.61
-34.74
-49.241
5.467
3.61
-34.74
2.866
0.05
3.61
-34.74
54.972
-5.367
14.86
-7.16
1.095
27.61
34.382
4.313
1.062
-2.189
304
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
C80
COMB4
1.5
STORY1
C80
COMB4
STORY1
C80
COMB5
STORY1
C80
COMB5
1.5
STORY1
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY1.40
STORY1.40
STORY1.40
STORY1.40
STORY-
C80
COMB5
C80
COMB1
C80
COMB1
1.15
C80
COMB1
2.3
C80
COMB2
C80
COMB2
1.15
C80
COMB2
2.3
C80
COMB3
C80
COMB3
1.15
C80
COMB3
2.3
C80
COMB4
C80
COMB4
1.15
C80
COMB4
2.3
C80
COMB5
C80
COMB5
1.15
C80
COMB5
2.3
C80
COMB1
C80
COMB1
0.45
C80
COMB1
0.9
C80
C80
COMB2
COMB2
0
0.45
1460.49
1460.49
1699.35
1699.35
1699.35
2431.48
2431.48
2431.48
1856.99
1856.99
1856.99
1790.24
1790.24
1790.24
1675.95
1675.95
1675.95
1971.28
1971.28
1971.28
2433.78
2433.78
2433.78
1861.52
-
14.86
-7.16
11.832
5.316
14.86
-7.16
22.569
-16.979
-75.9
-129.48
2.983
-75.9
-15.636
-0.012
-75.9
98.209
-3.008
15.23
-54.01
-31.585
15.314
15.23
-54.01
30.526
-2.197
15.23
-54.01
92.637
-19.709
16.19
-47.29
-41.002
21.22
16.19
-47.29
13.376
2.596
16.19
-47.29
67.755
-16.028
6.65
-33.73
-6.376
1.751
6.65
-33.73
32.413
-5.892
6.65
-33.73
71.201
-13.535
17.22
7.88
89.877
22.8
17.22
7.88
80.813
2.996
17.22
7.88
-16.807
5.62
-88.9
71.748
137.255
5.62
-88.9
-35.024
-6.292
5.62
-88.9
67.208
-12.756
-5.22
26.15
16.56
3.512
-5.22
26.15
4.794
5.861
-5.22
26.15
-6.973
8.211
6.82
6.82
5
5
-16.132
-18.38
19.442
16.375
0.171
305
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
C80
COMB2
0.9
C80
COMB3
C80
COMB3
0.45
C80
COMB3
0.9
C80
COMB4
C80
COMB4
0.45
C80
COMB4
0.9
C80
COMB5
C80
COMB5
0.45
C80
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
COMB5
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
COMB1
COMB1
COMB1
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB4
0.9
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
0
1861.52
1861.52
1789.15
1789.15
1789.15
1663.29
1663.29
1663.29
1987.39
1987.39
1987.39
-253.65
-253.65
-253.65
-193.31
-193.31
-193.31
-187.17
-187.17
-187.17
-184.07
-184.07
-184.07
-196.41
-196.41
-196.41
-528.27
-528.27
-528.27
-406.12
-406.12
-406.12
-386.28
-386.28
-386.28
-376.37
6.82
-20.628
13.308
-14.65
34.23
40.972
-14.174
-14.65
34.23
25.57
-7.583
-14.65
34.23
10.169
-0.992
8.42
43.92
116.238
21.205
8.42
43.92
96.474
17.418
8.42
43.92
76.709
13.631
-16.25
-4.7
-91.398
-15.937
-16.25
-4.7
-89.283
-8.626
-16.25
49.43
49.43
49.43
40.42
40.42
40.42
33.73
33.73
33.73
38.96
38.96
38.96
35.19
35.19
35.19
16.3
16.3
16.3
14.97
14.97
14.97
9.48
9.48
9.48
14.66
-4.7
-54.81
-54.81
-54.81
-43.81
-43.81
-43.81
-38.41
-38.41
-38.41
-28.57
-28.57
-28.57
-53.65
-53.65
-53.65
-43.11
-43.11
-43.11
-37.51
-37.51
-37.51
-27.15
-27.15
-27.15
-14.26
-87.169
-99.097
-16.882
65.333
-78.246
-12.537
53.171
-70.4
-12.786
44.828
-55.067
-12.22
30.628
-93.578
-13.103
67.371
-70.207
-5.544
59.118
-60.842
-4.574
51.695
-44.468
-3.743
36.982
-23.791
-1.314
66.911
-7.236
-81.384
56.1
-4.524
-65.148
44.267
-6.331
-56.928
53.317
-5.119
-63.554
47.05
-5.736
-58.522
28.097
3.646
-20.806
25.655
3.2
-19.256
16.49
2.269
-11.953
25.009
306
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
C85
C85
C85
C85
C85
COMB4
COMB4
COMB5
COMB5
COMB5
1.5
3
0
1.5
3
-376.37
-376.37
-416.03
-416.03
-416.03
14.66
14.66
9.8
9.8
9.8
-14.26
-14.26
-50.4
-50.4
-50.4
3.027
-18.956
17.136
2.442
-12.252
-71.01
-2.395
19
-81.519
-5.921
69.677
138.579
-20.991
96.596
116.147
-16.034
84.079
-91.721
-15.452
60.816
-57.218
-13.213
30.791
-150.65
-18.273
114.103
118.761
STORY4
STORY4
STORY4
C85
C85
C85
COMB1
COMB1
COMB1
0
1.5
3
-808.7
-808.7
-808.7
34.22
34.22
34.22
-78.39
-78.39
-78.39
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
STORY4
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
COMB5
COMB5
COMB5
0
1.5
3
0
1.5
3
0
1.5
3
0
1.5
3
30.63
30.63
30.63
20.69
20.69
20.69
29.78
29.78
29.78
21.55
21.55
21.55
-66.74
-66.74
-66.74
-50.85
-50.85
-50.85
-29.34
-29.34
-29.34
-88.25
-88.25
-88.25
STORY3
C85
COMB1
28.16
STORY3
C85
COMB1
1.5
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
STORY3
C85
C85
C85
C85
C85
C85
C85
C85
C85
C85
COMB1
COMB2
COMB2
COMB2
COMB3
COMB3
COMB3
COMB4
COMB4
COMB4
3
0
1.5
3
0
1.5
3
0
1.5
3
-627.3
-627.3
-627.3
-585.75
-585.75
-585.75
-563.89
-563.89
-563.89
-649.15
-649.15
-649.15
1177.13
1177.13
1177.13
-917.52
-917.52
-917.52
-848.18
-848.18
-848.18
-810.37
-810.37
-810.37
28.16
-71.01
-12.241
6.025
28.16
24.76
24.76
24.76
17.48
17.48
17.48
25.36
25.36
25.36
-71.01
-63.66
-63.66
-63.66
-42.86
-42.86
-42.86
-19.32
-19.32
-19.32
-36.217
42.955
5.809
-31.337
29.444
3.229
-22.987
43.304
5.269
-32.766
16.88
16.88
16.88
-87.2
-87.2
-87.2
33.29
-85.17
94.28
-105.72
-10.236
85.249
-72.421
-8.125
56.171
-32.686
-3.703
25.28
145.455
-14.658
116.139
143.888
STORY3
STORY3
STORY3
C85
C85
C85
COMB5
COMB5
COMB5
0
1.5
3
STORY2
C85
COMB1
STORY2
STORY2
C85
C85
COMB1
COMB1
1.5
3
-955.32
-955.32
-955.32
1545.32
1545.32
-
33.29
33.29
-85.17
-85.17
-16.135
111.619
8.156
-41.772
58.795
7.472
-43.85
52.622
6.675
-39.272
35.57
4.533
-26.503
50.771
6.107
-38.557
37.421
5.101
-27.218
48.266
29.095
3.768
-21.559
58.084
307
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
STORY2
C85
COMB2
STORY2
C85
COMB2
1.5
STORY2
C85
COMB2
STORY2
C85
COMB3
STORY2
C85
COMB3
1.5
STORY2
STORY2
STORY2
STORY2
C85
C85
C85
C85
COMB3
COMB4
COMB4
COMB4
3
0
1.5
3
STORY2
C85
COMB5
STORY2
C85
COMB5
1.5
STORY2
C85
COMB5
STORY1
C85
COMB1
STORY1
C85
COMB1
1.5
STORY1
C85
COMB1
STORY1
C85
COMB2
STORY1
C85
COMB2
1.5
STORY1
C85
COMB2
STORY1
C85
COMB3
STORY1
C85
COMB3
1.5
STORY1
STORY1
STORY1
STORY1
C85
C85
C85
C85
COMB3
COMB4
COMB4
COMB4
3
0
1.5
3
STORY1
C85
COMB5
STORY1
STORY1
C85
C85
COMB5
COMB5
1.5
3
1545.32
1209.64
1209.64
1209.64
1108.34
1108.34
1108.34
-1052
-1052
-1052
1265.98
1265.98
1265.98
1911.64
1911.64
1911.64
1500.17
1500.17
1500.17
1367.29
1367.29
1367.29
-1289.8
-1289.8
-1289.8
1577.66
1577.66
-
29.32
-76.68
130.138
52.172
29.32
-76.68
-15.115
8.187
29.32
-76.68
99.908
-35.797
20.61
-51.07
-85.695
34.954
20.61
-51.07
-9.087
4.046
20.61
30.21
30.21
30.21
-51.07
-25.78
-25.78
-25.78
-26.862
52.93
7.617
-37.696
19.72
-101.98
67.52
-42.984
-4.321
34.342
172.849
19.72
-101.98
-19.881
4.617
19.72
-101.98
-24.963
24.98
-66.3
133.086
104.423
24.98
-66.3
-4.967
4.621
24.98
-66.3
-32.852
21.34
-61.99
94.49
102.937
21.34
-61.99
-9.945
6.207
21.34
-61.99
83.047
-25.796
16.14
-37.46
-53.697
24.933
16.14
-37.46
2.495
0.725
16.14
23.11
23.11
23.11
-37.46
-6.26
-6.26
-6.26
-23.482
40.857
6.193
-28.47
14.36
-93.2
58.687
7.17
16.562
25.953
163.805
14.36
14.36
-93.2
-93.2
-24.012
115.781
0.739
-20.808
34.196
42.095
38.21
22.286
308
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY+1.
40
STORY1.40
STORY1.40
STORY1.40
STORY1.40
STORY1.40
STORY1.40
STORY1.40
STORY1.40
STORY1.40
C85
COMB1
C85
COMB1
1.15
C85
COMB1
2.3
C85
COMB2
C85
COMB2
1.15
C85
COMB2
2.3
C85
COMB3
C85
COMB3
1.15
C85
COMB3
2.3
C85
COMB4
C85
COMB4
1.15
C85
COMB4
2.3
C85
COMB5
C85
COMB5
1.15
C85
COMB5
2.3
C85
COMB1
C85
COMB1
0.45
C85
COMB1
0.9
C85
COMB2
C85
COMB2
0.45
C85
COMB2
0.9
C85
COMB3
C85
COMB3
0.45
C85
COMB3
0.9
1577.66
2248.68
2248.68
2248.68
1765.08
1765.08
1765.08
1607.94
1607.94
1607.94
1511.16
1511.16
1511.16
1861.86
1861.86
1861.86
2250.84
2250.84
2250.84
1773.33
1773.33
1773.33
1602.93
1602.93
1602.93
29.36
-66.34
-35.474
24.347
29.36
-66.34
40.815
-9.417
29.36
-66.34
117.105
-43.182
24.4
-66.47
-65.423
25.376
24.4
-66.47
11.023
-2.686
24.4
-66.47
87.469
-30.748
19.64
-33.03
12.212
11.145
19.64
-33.03
50.2
-11.44
19.64
-33.03
88.188
-34.026
25.37
4.57
103.394
26.907
25.37
4.57
98.138
-2.271
25.37
4.57
-31.449
18.67
-104.08
92.882
156.605
18.67
-104.08
-36.915
-11.855
18.67
-104.08
82.775
-33.324
-14.43
37.88
21.869
0.351
-14.43
37.88
4.823
6.845
-14.43
37.88
-12.223
13.339
-1.59
12.23
-27.827
16.559
-1.59
12.23
-33.33
17.272
-1.59
12.23
-38.834
17.985
-20.06
44.59
60.631
-16.033
-20.06
44.59
40.565
-7.005
-20.06
44.59
20.499
2.023
9.614
309
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
C85
COMB4
C85
COMB4
0.45
C85
COMB4
0.9
C85
COMB5
C85
COMB5
0.45
C85
COMB5
0.9
1496.57
1496.57
1496.57
1879.69
1879.69
1879.69
0.01
76.26
157.964
18.32
0.01
76.26
123.648
18.315
0.01
76.26
18.31
-21.66
-19.44
-21.66
-19.44
-21.66
-19.44
89.331
125.161
116.413
107.666
-17.794
-8.048
1.698
COMBO
TYPE
CASE
FACTOR
LOAD TYPE
TITLE
COMB1
ADD
DL
1.3
STATIC(DEAD)
COMB1
COMB1
ADD
LL
1.6
STATIC(LIVE)
COMB1
COMB2
ADD
EQ
COMB2
ADD
COMB1
COMB3
ADD
EQ
COMB3
ADD
COMB1
0.75
COMB4
ADD
COMB1
0.75
COMB4
ADD
EQY
COMB5
ADD
COMB1
COMB5
ADD
EQY
Point
18
18
18
18
18
22
22
22
22
22
25
25
25
25
25
Load
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
FX
-7.36
-8.48
-2.55
-13.39
2.35
5.37
0.34
7.72
3.7
4.36
7.72
2.77
8.81
14.03
-2.45
1
0.75
-1
1
0.75
-1
FY
15.21
11.24
11.57
19.31
3.5
-19.33
-14.59
-14.4
-9.59
-19.39
-24.03
-18.13
-17.92
-11.87
-24.18
STATIC(QUAKE)
COMB2
COMBO
COMB2
STATIC(QUAKE)
COMB3
COMBO
COMB3
COMBO
COMB4
STATIC(QUAKE)
COMB4
COMBO
COMB5
STATIC(QUAKE)
COMB5
FZ
MX
MY
MZ
7949.95
1.531
-2.863
0.055
5984.33
1.336 -19.584
0.033
5940.6
0.961
15.29
0.048
5973.38
5.116
-8.475
-0.177
5951.55
-2.819
4.181
0.259
8032.37
10.371
-0.69
0.055
6052.97
7.949 -17.993
0.033
5995.59
7.608
16.958
0.048
6002.64
12.515
-0.574
-0.177
6045.91
3.042
-0.461
0.259
3367.93
11.576
-1.525
0.055
2538.37
8.855 -18.249
0.033
2513.53
8.51
15.961
0.048
2714.82
13.098
6.733
-0.177
2337.07
4.266
-9.021
0.259
310
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
12.47
6
12.7
14
4.7
-10.48
-14.11
-1.61
0.9
-16.61
-10.29
-13.92
-1.51
1.03
-16.46
-26.13
-27.78
-11.41
-10.34
-28.85
-8.51
-13.26
0.5
4.43
-17.2
-41.24
-39.28
-22.59
-19.63
-42.23
-9.59
-13.77
-0.62
-2.21
-12.18
-11.36
-15.44
-1.61
-9.22
-7.82
-9.59
-13.69
-0.69
-2.25
-26.45
-19.94
-19.73
-15.62
-24.04
-25.12
-19.47
-18.21
-19.26
-18.42
-23.46
-18.77
-16.42
-24.34
-10.85
-22.95
-19.09
-15.34
-30.3
-4.13
-18.33
-13.65
-13.84
-27.72
0.22
-0.36
4.7
-5.25
-26.56
26.01
-23.1
-18.05
-16.6
-20.39
-14.25
25.55
16.34
21.99
12.19
26.14
-22.11
-17.75
-15.41
-25.97
6321.55
4769.93
4712.4
4657.46
4824.87
3716.26
2781.01
2793.37
2914.58
2659.81
3663.49
2739.05
2756.19
2856.9
2638.33
3070.71
2178.98
2427.09
2364.18
2241.89
2042.65
1666
1397.98
1615.74
1448.23
3577.59
2489.32
2877.07
2928.63
2437.76
7369.16
5534.18
5519.56
5482.32
5571.42
3294.14
2624.3
2316.92
2919.36
2021.85
7198.28
5401.36
5396.06
5354.05
12.194
9.32
8.971
14.059
4.232
10.884
8.604
7.722
18.139
-1.813
9.49
7.83
6.405
22.589
-8.353
8.39
7.32
5.266
27.265
-14.679
6.749
5.646
4.478
28.091
-17.967
1.638
0.633
1.823
29.457
-27
10.368
8.241
7.31
18.43
-2.878
-2.087
-0.561
-2.57
10.088
-13.219
9.144
7.57
6.146
23.008
0.272
-17.065
17.473
4.836
-4.427
-6.183
-22.569
13.295
3.37
-12.645
-6.135
-22.522
13.319
3.404
-12.606
-10.189
-26.07
10.786
0.493
-15.777
-5.679
-22.353
13.834
4.276
-12.795
-13.477
-28.656
8.441
-3.774
-16.441
-5.375
-22.127
14.065
0.685
-8.747
-4.975
-22.032
14.569
-3.882
-3.58
-5.373
-22.106
14.047
0.675
0.055
0.033
0.048
-0.177
0.259
0.055
0.033
0.048
-0.177
0.259
0.055
0.033
0.048
-0.177
0.259
0.055
0.033
0.048
-0.177
0.259
0.055
0.033
0.048
-0.177
0.259
0.055
0.033
0.048
-0.177
0.259
0.055
0.033
0.048
-0.177
0.259
0.055
0.033
0.048
-0.177
0.259
0.055
0.033
0.048
-0.177
311
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
-12.13
-10.36
-14.38
-1.16
-2.73
-12.81
-4.82
-10.69
3.47
-4.67
-2.56
7.63
-0.87
12.31
5
6.44
-7.48
-10.62
-0.61
-13.6
2.38
-6.49
-9.99
0.25
-12.59
2.85
40.85
26.34
34.94
22.3
38.98
16.77
40.2
-15.04
130.68
-105.52
-150.77
-181.32
-44.83
-100.78
-125.38
-272.15
-137.56
-270.67
-7.18 5443.37
-24.65 7064.61
-20.35 5276.52
-16.63
5320.4
-34.6 5254.02
-2.37
5342.9
-11.88 4768.04
-10.06 3584.33
-7.76 3567.74
-17.08 3577.76
-0.74
3574.3
-17.96 7653.01
-15.18 5738.98
-11.76 5740.53
-28.01 5720.46
1.07 5759.05
-13.87 4390.61
-8.78 3494.19
-12.03 3091.73
-13.85 2810.56
-6.97 3775.36
36.38 5529.69
26.11 4144.97
28.47 4149.58
22.86 4147.48
31.72 4147.06
54.83 10975.15
38.32 8295.64
43.92 8167.08
29.15 8189.37
53.08 8273.35
-24.98
1380.9
-51.53 1409.81
14.07
661.55
-155.63 1826.41
118.17
244.95
-35.01 2385.07
-62.08 3883.07
9.56
-305.46
-157.73 2033.74
105.21 1543.87
33.07 4664.42
27.72 3758.67
21.89 3237.96
-9.293
8.825
7.64
5.597
28.366
-15.129
6.526
5.602
4.187
20.731
-10.942
7.113
6.319
4.35
26.68
-16.011
8.006
5.867
6.141
16.753
-4.744
-5.829
-3.657
-5.087
10.507
-19.251
-11.521
-7.379
-9.902
12.045
-29.326
-10.944
-18.789
2.373
7.708
-24.124
4.224
3.671
2.665
18.118
-11.781
-15.66
-9.242
-14.248
-8.734
-5.571
-22.284
13.927
0.552
-8.909
-3.299
-20.816
15.868
-2.715
-2.233
-0.113
-18.301
18.131
-0.239
0.07
-2.895
-20.131
15.789
-8.531
4.188
-2.642
-19.971
16.008
-8.271
4.308
9.478
-10.671
24.888
0.66
13.557
-12.22
-21.506
3.176
1.106
-19.436
5.729
-6.262
14.855
3.648
4.945
-39.083
-46.853
-11.771
0.259
0.055
0.033
0.048
-0.177
0.259
0.055
0.033
0.048
-0.177
0.259
0.055
0.033
0.048
-0.177
0.259
0.055
0.033
0.048
-0.177
0.259
0.055
0.033
0.048
-0.177
0.259
0.055
0.033
0.048
-0.177
0.259
-0.022
-0.115
0.083
-0.118
0.086
0.011
0.028
-0.012
0.272
-0.255
0.017
0.112
-0.087
312
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
-241.91
-166.31
96.42
51.53
93.1
149.87
-5.23
84.2
16.29
110.01
48.91
77.4
-65.45
-18.85
-79.32
-102.24
4.07
-82.2
-60.61
-62.69
-131.91
8.6
-0.6
-0.39
-0.5
-0.66
-0.24
25.36
9.3
28.74
61.69
-23.65
26.31
10.41
29.06
4
35.47
54.79
35.47
46.7
-30.3
112.48
-106.45
-85.49
-141.57
191.18
-110.76
-58.87
-107.28
-180.95
14.81
-114.28
-34.12
-137.31
-73.62
-97.81
175.13
61.71
200.99
16.42
246.28
-47.35
-74.49
3.47
-80.75
9.73
-17.82
-15.97
-10.76
12.45
-39.18
-106.97
-37.8
-122.66
-91.68
-68.78
-90.4
-79.38
-56.22
32.15
-167.76
41.4
-17.14
79.24
23.79
38.3
45.69
75.4
2760.66
4235.97
2240.07
640.76
2719.35
2118.4
1241.7
1040.07
266.97
1293.14
606.83
953.28
2503.5
1144.07
2611.17
1047.27
2707.97
609.41
623.38
290.74
1107.5
-193.39
276.97
431.95
-16.49
420.64
-5.18
1098.55
258.13
1389.69
1700.7
-52.88
1879.44
501.36
2317.8
1437.62
1381.54
1461.2
610.75
1581.05
244.01
1947.8
881.94
886.64
9.899
-33.389
27.164
14.707
26.039
34.592
6.154
3.962
2.619
3.324
6.799
-0.856
-1.867
0.802
-3.602
7.997
-10.797
0.601
0.838
0.064
1.243
-0.341
1.642
1.543
0.92
1.23
1.233
3.245
2.666
2.201
4.504
0.364
6.239
5.074
4.285
7.924
1.435
3.951
3.146
2.781
4.998
0.928
4.207
3.162
-33.698
-24.925
22.96
9.905
24.534
23.523
10.917
-3.044
-4.046
-0.519
-1.393
-3.172
-1.587
-7.205
4.824
-3.784
1.403
-2.521
-7.296
3.514
-2.224
-1.558
-0.333
-1.004
0.505
-0.405
-0.094
-1.614
-7.487
5.066
-2.14
-0.281
-2.138
-8.982
5.775
-3.32
0.113
-1.267
-7.308
5.408
-2.845
0.944
-2.545
-7.328
0.133
-0.108
-0.022
-0.115
0.083
-0.118
0.086
-0.019
-0.113
0.085
-0.128
0.1
0.017
0.193
-0.167
0.014
0.012
0.021
-0.11
0.141
0.083
-0.053
0
0
0
0
0
-0.05
-0.167
0.092
-0.114
0.038
-0.037
-0.029
-0.026
-0.095
0.04
-0.027
0.106
-0.147
-0.063
0.023
0.044
0.164
313
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
COMB1
COMB2
COMB3
COMB4
COMB5
-74.18
-38.97
-120.7
-0.57
-0.39
-0.47
-0.78
-0.08
-97.98
-75.5
-71.47
-89.33
-57.64
-0.58
-0.38
-0.49
-0.68
-0.19
-0.57
-0.38
-0.47
-0.74
-0.11
-6.86
-13.9
82.44
-44.67
-38.59
-28.42
-9.66
-57.35
-26.65
-23.31
-16.66
1.87
-41.84
-28.85
-23.23
-20.04
6.46
-49.74
-34.91
-32.92
-19.45
2.28
-54.65
436.27
19.22
1303.68
383.95
532.74
43.19
63.77
512.16
816.35
882.28
342.25
613.11
611.42
284.54
441.09
-14.28
320.31
106.51
339.82
493.6
16.14
134.85
374.88
3.149
4.107
2.204
3.606
2.935
2.474
2.907
2.502
3.466
2.965
2.233
2.539
2.66
2.707
2.125
1.936
1.733
2.328
2.789
2.62
1.564
1.701
2.484
3.51
-3.956
0.138
-0.308
-0.994
0.531
-0.511
0.049
-1.725
-7.065
4.478
-2.576
-0.01
-0.323
-0.999
0.514
-0.432
-0.053
-0.31
-0.993
0.528
-0.48
0.016
-0.098
0.134
-0.068
0
0
0
0
0
0.034
0.028
0.024
0.102
-0.051
0
0
0
0
0
0
0
0
0
0
314
H.U. FACULITY OF TECHNOLOGY CIVIL ENGINEERING DEPARTEMENT, MAY2009