Productivity Rate Labor Eqpt 4
Productivity Rate Labor Eqpt 4
Productivity Rate Labor Eqpt 4
ITEM NO.
A.
WORK DESCRIPTION
M.H./ UNIT
AVERAGE
HIGH
SQ.M.
SQ.M.
SQ.M.
SQ.M.
4.00
4.70
6.16
4.70
2.00
2.35
3.08
2.35
1.60
1.88
2.46
1.88
SQ.M.
SQ.M.
3.34
6.66
1.67
3.33
1.34
2.66
SQ.M.
SQ.M.
SQ.M.
17.20
22.00
1.00
9.00
11.00
0.60
6.88
8.80
0.40
B.
FORMWORKS FABRICATION
SQ.M.
2.15
1.08
0.86
C.
STRIPPING OF FORMS
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
0.50
2.58
2.06
1.70
0.25
1.29
1.03
0.85
0.20
1.03
0.82
0.68
1.67
2.16
0.83
1.08
0.67
0.86
7.00
5.60
3.50
2.80
2.80
2.24
PC
2.00
1.00
0.80
WALL ON GROUND
WALL ABOVE 10'
BEAMS
COLUMNS
SUSPENDED SLAB
0 TO 18'
18' TO 36' UP
ELEVATED AND SHORED SLAB FORMING
STRIP OF FORMS
FLOOR SLAB AT GRADE STRIP OF FORMS
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
0.29
0.30
0.53
1.94
0.85
0.70
1.60
0.43
0.27
0.53
0.91
0.14
0.36
0.27
0.97
0.43
0.35
0.80
0.21
0.13
0.27
0.46
0.11
0.29
0.21
0.77
0.34
0.28
0.64
0.17
0.11
0.10
0.36
PC
S.F.
2.00
0.83
1.00
0.42
0.80
0.33
SQ.M.
SQ.M.
B.F.
B.F.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
2.66
2.00
0.26
0.36
1.00
14.00
9.00
7.00
1.33
1.00
0.13
0.18
0.50
7.00
4.50
3.50
1.06
0.90
0.10
0.14
0.40
5.60
3.60
2.80
PC.
PC.
0.80
4.00
0.40
2.00
0.32
1.60
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
EACH
EACH
9.26
6.24
9.26
6.34
6.76
20.00
24.00
4.63
3.12
4.63
3.12
3.38
10.00
12.00
3.70
2.50
3.70
2.50
2.70
8.00
9.60
G.
EACH
EACH
S.F.
SET
B.F.
B.F.
SQ.M.
20.00
50.00
0.63
3.20
0.44
0.66
6.24
10.00
25.00
0.31
1.60
0.22
0.33
3.12
8.00
20.00
0.25
1.28
0.18
0.26
2.50
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
3.34
2.86
4.00
10.00
21.06
8.70
6.00
9.00
8.00
1.00
6.00
4.00
2.40
3.60
17.00
2.28
1.43
1.67
1.43
2.00
5.00
10.53
4.35
3.00
4.50
4.00
0.50
3.00
2.00
1.20
1.80
9.50
1.14
0.72
1.34
1.34
1.60
4.00
8.42
3.48
2.40
3.60
3.20
0.40
3.40
1.60
0.96
1.44
6.80
0.91
0.57
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
3.20
2.66
4.00
10.66
11.94
1.60
1.33
2.00
5.33
5.97
1.28
1.06
1.60
4.26
4.78
LIFTING
INSTALLATION
INSTALLATION OF ASBESTOS ROOFING
INSTALLATION OF ALUMINUM GI SHEET
COPPER CLADDING ROOF DECK
FAB, GI GUTTER
GI SHEET ROOFING
FAB OF GI GUTTER
FAB. GI DOWNSPOUT
GUTTER CUT & SHAPE
INST. OF GUTTER
DOWNSPOUT CUT AND SHAPE
DOWNSPOUT INSTALLATION
CORR. GI ROOFING
CORR ALUMINUM ROOFING
BUILT UP ROOFING 4 PLY
PROTECTED METAL
CORR. ASBESTOS INST., LIFTING & HAULING
LEADERS & GUTTERS
H
SQ.M.
SQ.M.
SHT.
SHT.
L.M.
SHT.
SHT.
L.M.
L.M.
L.M.
L.M.
L.M.
L.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
2.16
6.12
2.00
1.60
1.01
6.94
1.64
1.05
1.94
0.32
1.78
0.59
0.27
3.60
3.60
17.00
4.00
3.40
1.20
1.08
3.06
1.00
9.80
0.51
3.47
0.82
0.53
0.97
0.16
9.00
0.30
0.13
1.80
1.80
8.50
2.00
1.70
0.60
0.86
2.45
0.80
0.64
0.40
2.78
0.66
0.42
1.78
0.13
0.71
0.24
0.11
1.44
1.44
6.80
1.60
1.36
0.48
CU.M.
CU.M.
SQ.M.
SQ.M.
10.00
50.00
2.00
2.86
5.00
25.00
1.00
1.43
4.00
20.00
0.80
1.14
KGS
KGS
KGS
CU.M.
CU.M.
0.14
0.16
0.20
32.00
3.60
0.07
0.08
0.10
16.00
1.80
0.06
0.06
0.08
12.80
1.44
CU.M.
CU.M.
14.00
28.00
7.00
14.00
5.60
11.20
WHEELING
FINISHING
CONCRETE POUR ON ELEVATED AND SHORED
SLAB FORMING CHUTE & BUCKET
PLACEMENT OF REBARS ON FOOTING
FIELD FABRICATION OF REBARS
I.
EARTH WORKS
MACHINE EXCAVATION:
SAND
SAND AND MARL
MARL
GRANULAR BACKFILL
GRANULAR SOIL BACKFILL
MANUAL FOUNDATION EXCAVATION & BACKFILL:
SAND
EXCAVATION OF SAND &MARL
EXCAVATION OF MARL
BACKFILL OF SAND
BACKFILL OF SAND &MARL
BACKFILL OF MARL
FLOOR SLAB & GRADE:
GRADING MANUAL
EXCAVATION AND BACKFILL
FINE GRADING & FINISHING
GRADING MANUAL
FINISHING SOIL SURFACE
DIKES
ROAD WORKS
BASE COURSE
CURBS & GUTTER
4" THK ROAD
6" THK ROAD
8" THK ROAD
TROWEL FINISH
CU.M.
SQ.M.
54.00
5.60
27.00
2.80
21.60
2.24
CU.M.
KGS
KGS
42.00
1.06
0.66
21.00
0.53
0.33
16.80
0.42
0.26
CU.M.
CU.M.
CU.M.
CU.M.
CU.M.
1.20
1.60
2.20
2.40
3.00
0.60
0.80
1.10
1.20
1.50
0.48
0.64
0.88
0.96
1.20
CU.M.
CU.M.
CU.M.
CU.M.
CU.M.
CU.M.
8.00
13.00
21.00
11.00
16.00
24.00
4.00
6.50
10.50
5.50
8.00
12.00
3.20
5.20
8.40
4.40
6.40
9.60
SQ.M.
CU.M.
2.60
36.00
1.30
18.00
1.04
14.40
SQ.M.
SQ.M.
CU.M.
0.90
1.10
2.40
0.45
0.55
1.20
0.36
0.44
0.96
SQ.M.
CU.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
0.24
3.60
2.60
2.80
3.00
0.64
0.12
1.80
1.30
1.40
1.50
0.32
0.10
1.44
1.04
1.12
1.20
0.26
SPECIAL TOPPING
4" STONE OR SHELL ROAD
6" STONE OR SHELL ROAD
8" STONE OR SHELL ROAD
ACID PROOFING
ASPHALT PAVING:
FINE GRADING & FINISHING
PLACE BASE COURSE
ASPHALT
ACID BLOCK OR PAVING BLOCK:
FIND GRADING
INSTALL BRICK
CRUSH STONE OR SHELL SURFACING
FINE GRADING
PLACE SPREAD AND COMPACT STONE TO 4"
OVER 9" THK
TANK CUSHION
SAND CUSHION
APHALT RETAINER RING
NON GRANULAR BACKFILL
EXCAVATION MANUAL:
COMMON EARTH
LOAN OF SAND
CLAY OR HEAVY SOIL ROCK
ROCK
MECHANICAL EXCAVATION
COMMON EARTH
ROCK W/ JACKHAMMER
BACKFILLING
COMMON MANUAL
GRAVEL FILL MANUAL
TRENCHING AND BACKFILLING OF UNDERGROUND
PIPING USING EXCAVATION MATERIALS MANUAL
FROM 0 TO 2 MTRS. DEPTH
2 TO 3
SQ.M.
SQ.M.
SQ.M.
SQ.M.
CU.M.
2.40
0.64
0.84
1.04
1.20
1.20
0.32
0.42
0.52
0.60
0.96
0.26
0.34
0.42
0.48
SQ.M.
SQ.M.
SQ.M.
0.84
0.40
0.40
0.42
0.20
0.20
0.34
0.16
0.16
SQ.M.
SQ.M.
0.84
8.40
0.42
4.20
0.34
3.36
SQ.M.
SQ.M.
SQ.M.
0.64
0.84
1.04
0.32
0.42
0.52
0.26
0.34
0.42
CU.M.
SQ.M.
CU.M.
1.40
0.40
4.00
0.70
0.20
2.00
0.56
0.16
1.60
CU.M.
CU.M.
CU.M.
CU.M.
16.00
2.62
3.28
5.26
8.00
1.31
1.64
2.63
6.40
1.05
1.31
2.10
CU.M.
CU.M.
13.34
33.34
6.67
16.67
5.34
13.34
CU.M.
CU.M.
1.64
10.00
0.82
5.00
0.66
4.00
L.M.
L.M.
2.50
3.34
1.25
1.67
1
2.34
3 TO 4
4 TO 5
PLACING BINDER GRAVEL
ESCOMBRO BACKFILLING
SPREADING, TAMPING AND GRADING
MECHANICAL COMPACTION, PLATE COMPACTION
MANUAL CLEARING AND GRUBBING
CLEARING UNDERGROWTH AND TREES 12"
CLEARING UNDERGROWTH AND SHRUBS
DISPOSAL OF SOIL
MAULING OF SOIL
GRAVEL FILL
EXCAVATION CRANE AND CLAMPSHELL
WITH 8-MEN AND 2 CARPENTERS
.
K.
L.M.
L.M.
CU.M.
CU.M.
SQ.M.
CU.M.
5.00
6.66
0.21
0.42
0.96
0.11
2.5
3.33
0.11
0.21
0.48
0.06
2
2.66
0.08
0.17
0.38
0.04
SQ.M.
SQ.M.
CU.M.
CU.M.
CU.M.
0.1
0.06
3.38
2.00
4.14
0.05
0.03
1.69
1.00
2.07
0.04
0.02
1.35
0.8
1.66
CU.M.
2.14
1.07
0.86
1.32
1.32
1.48
1.64
1.97
2.16
2.3
2.64
0.66
0.66
0.74
0.82
0.98
1.08
1.15
1.32
0.53
0.53
0.59
0.66
0.70
0.86
0.92
1.06
4.38
6.58
9.84
13.14
19.7
20.62
24.1
27.38
30.68
2.19
3.29
4.92
6.57
9.85
10.31
12.05
13.69
15.34
1.75
2.63
3.94
5.26
7.98
8.25
9.64
10.95
12.27
20"
24"
30"
3.00 LAYING PVC PIPE
1/2 TO 3/4"
1 TO 1 1/4"
1 1/2 TO 2"
2 1/2"
3"
4"
5"
6"
4.00 LAYING RCP 8 MEN (1 TEAM)
24"
36"
48"
6-18"
LAVATORY
WATER CLOSET
URINAL UTILITY STALL
URINAL PEDESTRAL TYPE
SHOWER AND INSTALL
5 MAN GROUP SHOWER
BAH TUBS
SLOPE SINK
HOT WATER HEATER
16 PERSON WASH SINK
DRINKING FOUNTAIN
EYE WASH
MISC. FIXTURES
PARTITIONS
LAYING OF 24" RCP
LAYING OF 36" RCP
LAYING OF 48" RCP
L.M.
L.M.
L.M.
32.86
36.14
41.08
16.43
18.07
20.54
13.14
14.46
16.43
L.M.
L.M.
L.M.
L.M.
L.M.
L.M.
L.M.
L.M.
0.38
1.48
1.64
1.96
2.16
2.62
3.28
4.92
0.19
0.74
0.82
0.98
1.08
1.31
1.64
2.46
0.15
0.59
0.66
0.78
0.86
1.05
1.31
1.97
L.M.
L.M.
L.M.
L.M.
9.00
12.8
21.34
2.66
4.00
6.40
10.67
1.33
3.20
5.12
8.54
1.06
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
PIPE
PIPE
PIPE
16.00
24.00
48.00
32.00
20.00
72.00
48.00
28.00
28.00
52.00
26.00
16.00
4.00
16.00
8.00
12.80
21.32
8.00
12.00
24.00
16.00
10.00
36.00
24.00
14.00
14.00
26.00
13.00
9.00
2.00
8.00
4.00
6.40
10.66
6.40
9.60
19.20
12.80
8.00
28.80
19.20
11.20
11.20
20.80
10.40
6.40
1.60
6.40
3.20
5.12
8.53
L.
TRADE INSULATION
EQUIPMENT INSTALLATION
VESSEL, EXCHANGE & TANKS
TRADE:FIRE PROOFING
INSTALL STUDS
INSTALL MESH
POURED
FORMING
STRIP FORMS
POUR CONCRETE
CURING/PATCHING
FINISHING
TROWEL, PLASTERED
PNEUMATIC APPLICATION
GUNITE
APPLY FINEBRICK OR BLOCK
S.M.
S.M.
S.M.
S.M.
5.00
24.00
10.00
10.00
2.50
12.00
5.00
5.00
2.00
9.60
4.00
4.00
S.M.
S.M.
34.00
60.00
17.00
30.00
13.60
24.00
FLG.
S.M.
L.M.
EACH
EACH
EACH
EACH
L.M.
L.M.
8.00
1.60
5.40
3.00
16.00
12.00
8.00
7.40
3.00
4.00
0.80
2.70
1.50
8.00
6.00
4.00
3.70
1.50
3.20
0.64
2.16
1.20
6.40
4.80
3.20
2.96
1.20
EACH
S.M.
1.00
2.40
0.50
1.20
0.40
0.96
S.M.
S.M.
S.M.
S.M.
S.M.
S.M.
28.00
12.00
140.00
1.20
1.40
5.40
14.00
6.00
70.00
0.60
0.70
2.70
11.20
4.80
56.00
0.48
0.56
2.16
S.M.
PC.
2.40
1.60
1.20
0.80
0.96
0.64
O.
P.
TRADE:PERMANENT FENCING
INSTALL FENCE
INSTALL GATES
TO RAIL
BARBE WIRE, 3 STRANDS
TRADE:PAINTING WORKS
NEW STRUCTURAL STEEL
OLD STRUCTURAL STEEL
NEW FLAT FLAT PLATES
SURFACE PREPARATION:
IN TERMS OF WEIGHT
IN TERMS OF AREA
SAND PREPARATION
TRADE:HEATING VENTILATING AND CONDITIONING
HEAVY PIPING
DUCT WORK INSTALL
DUCT WORK FAB.
PACKAGE UNIT AIR CONDITIONER
S.M.
S.M.
5.00
6.00
2.50
3.00
2.00
2.40
EACH
EACH
EACH
10.00
30.00
10.00
5.00
15.00
5.00
4.00
12.00
4.00
EACH
EACH
EACH
20.00
20.00
10.00
10.00
10.00
5.00
8.00
8.00
4.00
EACH
EACH
2.00
10.00
1.00
5.00
80.00
4.00
L.M.
L.M.
L.M.
L.M.
2.40
6.00
0.60
0.60
1.20
3.00
0.30
0.30
0.96
2.40
0.24
0.24
TON
S.M.
S.M.
20.00
1.10
0.64
1.00
0.55
0.32
9.00
44.00
26.00
TON
S.M.
TON
16.00
0.86
60.00
8.00
30.00
6.40
0.34
24.00
L.M.
S.M.
S.M.
EACH
7.00
12.00
36.00
48.00
3.50
6.00
18.00
24.00
2.80
4.80
14.40
19.20
Q.
UNIT HEATER
FINNED CONVERTER
EXHAUST FAN PROPELLER
GRAVITY ROOF PAINT
POWER ROOF VENT
ROUND ROOF VENT
PLUMBING PIPING
EACH
EACH
EACH
L.M.
EACH
EACH
L.M.
24.00
10.00
16.00
14.00
48.00
16.00
7.00
12.00
5.00
8.00
7.30
24.00
8.00
3.50
9.60
4.00
6.40
5.84
19.20
6.40
2.80
MISCELLANEOUS
WATER STOP INSTALLATION
CAULKING SLAB JOINT
ASPHALTING
GROUTNG AND TOOL PLASTERING
WATER PROOFING RUBBERIZED
COPPER CLADDING ROOF DECK
WATER PROOFING FLINKOTE
DEMOLITION OF ADOBE WALL
PAINTING
COPPER WATER STOP CUT AND SHAPE
COPPER WATER STOP CUT AND INSTALLATION
SETTING ANCHOR BOLT
SETTING ANCHOR BOXES
L.M.
L.M.
S.M.
S.M.
S.M.
L.M.
S.M.
CU.M.
S.M.
L.M.
L.M.
KG
CU.M.
1.34
0.40
1.60
3.34
1.10
1.00
0.54
3.20
0.68
11.00
22.00
97.00
3.64
0.67
0.20
0.80
1.67
0.55
0.50
0.27
1.60
0.34
6.00
11.00
49.00
1.82
0.54
0.16
0.64
0.84
0.28
0.25
0.14
0.80
0.17
0.03
0.06
0.24
0.91
LOW
AVERAGE
HIGH
(METER)
3 TO 4
4 TO 5
5 TO 6
6 TO 7
7 TO 8
0.58
0.59
0.60
0.61
0.64
0.22
0.23
0.23
0.24
0.25
0.16
0.16
0.17
0.17
0.18
0.60
0.61
0.64
0.66
0.68
0.23
0.24
0.25
0.25
0.26
0.17
0.17
0.18
0.18
0.19
3 TO 4
4 TO 5
5 TO 6
6 TO 7
7 TO 8
CREW:
1
3
6
10
TOOLS:
ONE LOT CARPENTRY TOOLS
8 TOOLS HOUR
8
24
48
80 MANHOURS
MEDIUM FRAME
LOW
36.00
MAN-HOURS
AVERAGE
13.85
HIGH
10.00
EQUIPMENT-HOURS
LOW
AVERAGE HIGH
7.00
2.69
1.94
HEAVY FRAME
STEEL JOIST
32.73
40.00
12.63
15.37
9.11
11.08
CREW:
1
4
4
2
1
6
18
LEAD MAN
RIGGERS
FITTERS
WELDERS
CRANE OPERATOR
HELPERS
MANDAYS
6.36
7.78
2.46
2.98
1.77
2.15
TOOLS:
0.50 TOWER CRANE
2.00 WELDING TRANSFORMER
1.00 LOT TOOLS
3.50
8
32
32
16
8
48
144 MANHOURS
LOW
MAN-HOURS
AVERAGE
HIGH
EQUIPMENT-HOURS
LOW
AVERAGE HIGH
46.67
40.00
35.00
43.08
18.06
15.56
13.33
16.47
13.02
11.20
9.66
11.91
18.33
15.71
13.75
16.92
7.10
6.11
5.24
6.47
5.12
4.40
3.79
4.68
35.00
31.11
13.33
11.91
9.66
8.62
13.75
12.22
5.24
4.68
3.79
3.38
4.00
16.00
8.00
28.00
HEAVY FRAME
STEEL JOIST
35.00
32.94
10.77
12.27
CREW:
1
2
4
2
1
4
14
LEAD MAN
RIGGERS
FITTERS
WELDERS
CRANE OPERATOR
HELPERS
MANDAYS
8
16
32
16
8
32
112 MANHOURS
7.78
9.18
13.75
12.94
TOOLS:
0.50
2.00
2.00
1.00
5.50
4.23
5.00
3.06
3.61
4.00
16.00
16.00
8.00
44.00
TOOL HOURS
EQPT. HOURS
PROJECT TITLE:
LOCATION:
ITEM NO.
ESTIMATED QUANTITIES:
A.
MATERIALS:
ITEM OF WORK:
UNIT:
DESCRIPTION
B.
NO.
LABOR/MANPOWER:
C.
NO.
EQUIPMENT/TOOLS:
DESCRIPTION
DESCRIPTION
QTY.
UNIT
UNIT COST
NO.
NO.-DAYS
DAILY RATE
NO.
NO.-DAYS
HOURLY RATE
E
F
G
H
I
AMOUNT
AMOUNT
AMOUNT
PROBABLE OUTPUT
Clearing & Grubbing
D.
30.00 cu.m./hr.
300.00 sq.m./hr
0.033 hr/m
0.003 hr/m
300
200.00
25.00
50.00
3.00
sq.m./hr
cu.m./hr.
cu.m./hr.
sq.m./hr
0.005
0.040
0.020
0.333
hr/m
hr/m
hr/m
hr/m
70.00 cu.m./hr.
0.014 hr/m
90.00 cu.m./hr.
0.011 hr/m
700.00 sq.m./hr
300.00 sq.m./hr
40.00 cu.m./hr.
0.001 hr/m
0.003 hr/m
0.025 hr/m
600.00 sq.m./hr
0.002 hr/m
135.00 cu.m./hr.
0.007 hr/m
24.00 cu.m./hr.
0.042 hr/m
240.00 cu.m./hr.
0.004 hr/m
24.00 cu.m./hr.
0.042 hr/m
1,600.00 sq.m./hr
0.001 hr/m
MATERIALS:
SPRAYING PHALT
8.00 cu.m./hr.
0.125 hr/m
40.00 cu.m./hr.
0.025 hr/m
30
Trench Excavation
m3/hr
232.55
m3/hr
232.55
m3/hr
384.62
m3/hr
125.00
m3/hr
125.00
m3/hr
303.03
m3/hr
769.23
m3/hr
29.41 m3/hr
142.86
m3/hr
769.23
125.00
333.33
m3/hr
m3/hr
588.23
1,666.67
sq.m./hr
76.92
m3/hr
115.38
m3/hr
58.82
m3/hr
88.23
m3/hr
65.00
sq.m./hr
sq.m./hr
166.67
m3/hr
250.00
m3/hr
32.50
300
MT/hr
MT/hr
SQ.M.
MT
drums