Itp Pipe Supports
Itp Pipe Supports
Itp Pipe Supports
INSPECTION ACTIVITY
Level 1 Level 2 Level 3
Selected Level of Inspection >
PRE-INSPECTION MEETING
DOCUMENTATION REVIEW
Vendor Quality Plan (To be submitted prior to Pre-Inspection Meeting)
Manufacturing Schedule
List of Major Sub-Orders
Material Substitution Requests
Material Test Reports
Welding Procedures (WPS's & PQR's)
Welder Performance Qualifications
Manufacturer's Data Report
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
W
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
FINAL ASSEMBLY
W/R
SW/R
LOAD TESTING
W/R
SW/R
SURFACE COATINGS
Galvanizing
Neoprene
Painting
Others
W
W
W
SW
SW
SW
W
W
W
W
NAMEPLATE REVIEW
Note:
H = Hold Point
W = Witness Point
SW = Spot Witness
R = Review
N/A = Not Applicable
KBR
INSPECTION TEST PLAN FOR PIPE SUPPORTS
NO.
10
INSPECTION ACTIVITY
Level 1 Level 2 Level 3
Selected Level of Inspection >
COMMENTS
Inspection is not required for the following:
Pipe supports of manufacturer's standard design without springs or insulation
material.
If a discrepancy exists between this document and the applicable purchase
order, the information listed on the purchase order shall take precedent.
Note:
H = Hold Point
W = Witness Point
SW = Spot Witness
R = Review
N/A = Not Applicable
KBR
INSPECTION TEST PLAN FOR PIPE SUPPORTS
Level 4
N/A
R
R
R
R
R
R
R
R
R
N/A
N/A
N/A
N/A
N/A
N/A
N/A
R
R
SW
SW
SW
W
W
W
Note:
H = Hold Point
W = Witness Point
SW = Spot Witness
R = Review
N/A = Not Applicable
KBR
INSPECTION TEST PLAN FOR PIPE SUPPORTS
Level 4
Note:
H = Hold Point
W = Witness Point
SW = Spot Witness
R = Review
N/A = Not Applicable