CS507 Mcqs (24-6-2010)
CS507 Mcqs (24-6-2010)
CS507 Mcqs (24-6-2010)
3. Incremental
4. Rapid prototyping
3. Prototyping PAGE 89
4. Questionnaires
3. Incremental
4. Waterfall
2. Waterfall
3. Spiral PAGE 88
4. Incremental
2. QA
3. Exploration
4. Design PAGE 81
2. Waterfall
3. Iterative PAGE 86
4. XP
3. increased productivity
4. failure PAGE 76
2. Abstract
3. Internal
4. Diagrammatic PAGE 96
2. IT planning PAGE 67
3. Requirements planning
4. Configuration planning
3. Extreme programming
4. Waterfall
3. Rapid prototyping
4. Waterfall
1. Operational feasibility
2. Economic feasibility
3. Tactical feasibility
4. Technical feasibility
1. success
2. efficiency
3. increased productivity
4. failure
1. Logical
2. Physical
3. Random
4. Top to Bottom
1. Spiral
2. Incremental
3. Iterative
4. Waterfall
1. System Analysts
2. Software Engineers
3. System Designers
4. Chief Executives
1. SDLC
2. System programming
3. Software testing
4. Software configuration
1. programmer
2. designer
3. customer
4. system analyst
1. Data integrity
2. Data accessibility
3. Data consistency
4. Data analysis
Question # 1 of 10 ( Start time: 01:53:48 AM ) Total Marks: 1
In which of the following models the phases are in a cascading manner linking the output of
one to the input of next phase.
Select correct option:
1. Rapid prototyping
2. Spiral
3. Waterfall PAGE 83
4. Extreme programming
1. True PAGE 98
2. False
1. Operational feasibility
2. Economic feasibility
3. Tactical feasibility
1. Designing
2. Analyzing
3. Planning PAGE 67
4. Implementation
1. Iterative PAGE 71
2. XP
3. Rapid prototyping
4. Waterfall
1. Spiral
2. Incremental PAGE 69
3. Extreme programming
4. Waterfall
2. Second increment
3. Last increment
4. Final increment
1. Organizing
2. Monitoring
3. Plans PAGE 67
4. Implementation
3. Procedural manual
4. Testing manual
1. Procedural
2. Abstract
3. Internal
4. Diagrammatic PAGE 96
Which of the following may lead management and customers to believe that the final
product is almost ready for delivery?
1. Mockups
2. Efficient models
3. Malfunctioning prototypes
4. Working prototypes
Which of the following phase involves converting design specifications into executable
programs?
Select correct option:
1. Prototyping
2. Configuration
3. Development
4. Testing
Which of the following model can lead to scope creep due to user feedback after each
phase?
Select correct option:
1. Iterative
2. XP
3. Rapid prototyping
4. Waterfall
A problem solving technique that decomposes a system into its component pieces for the
purpose of studying, how well those component parts work and interact to accomplish their
purpose can be one of the definitions of System development.
1. True
2. False
1. Waterfall
2. Spiral
3. Incremental
4. Rapid prototyping
Which of the following provides a structured means of addressing the impact of technologies
on an organization?
1. Business planning
2. IT planning
3. Requirements planning
4. Configuration planning
Which of the following enunciate business goals and the actions that need to be initiated to
achieve those goals including related benefits, resources and timeframes?
2. Monitoring
3. Plans
4. Implementation
1. Waterfall
2. Iterative
3. Incremental
4. Spiral
Which of the following model is preferred for its simplicity and more disciplined approach?
1. Incremental
2. Waterfall
3. Spiral
4. Iterative
Apart from the value to cost ratio, modules are also selected on the basis of
___________requirements and needs.
1. programmer
2. designer
3. customer
4. system analyst
1. SRS
2. System design
3. Database design
4. Prototyping
Which of the following defines the operations of the system in layman’s terms?
1. User manual
2. Technical manual
3. Procedural manual
4. Testing manual
In ____________ model, software is constructed step by step in the same way a building is
constructed.
1. Spiral
2. Incremental
3. Extreme programming
4. Waterfall
1. success
2. efficiency
3. increased productivity
4. failure
1. Iterative models
2. Incremental models
3. Waterfall models
4. Extreme programming
_________ provide a direction and framework for action while __________ planning is an
accepted responsibility of management.
1. Businesses, plan
2. Plans, quality
3. Configuration, system
4. Plans, business
1. Waterfall
2. Rapid prototyping
3. Extreme programming
4. Spiral
Data updates in master file will automatically update the data in the whole system, refers to
data ______________.
1. analysis
2. accessibility
3. integrity
4. consistency
1. Incremental
2. Waterfall
3. Iterative
4. XP
Which of the following may lead management and customers to believe that the final
product is almost ready for delivery?
1. Mockups
2. Efficient models
3. Malfunctioning prototypes
4. Working prototypes
Question # 1 of 10 ( Start time: 01:52:22 PM ) Total Marks: 1
In drawing a proper flowchart, all necessary steps that are a part of process should be listed
out in ________________ order.
Select correct option:
1. Logical
2. Physical
3. Random
4. Top to Bottom
1. System analysis
2. System design
3. System check
4. System configuration
1. True
2. False
1. Interfaces
2. Inference engines
3. Early prototypes
4. Development engines
1. SDLC
2. System monitoring
3. Operational planning
4. System development
Question # 6 of 10 ( Start time: 01:52:22 PM ) Total Marks: 1
Which of the following allows manufacturers to rapidly and inexpensively test the parts of
the design which are most likely to have problems?
1. Physical Model
2. Prototype
3. Trial version
4. Carbon copy
1. System Analysts
2. Software Engineers
3. System Designers
4. Chief Executives
1. Business planning
2. IT planning
3. Requirements planning
4. Configuration planning
1. Workers, autocratic
2. top management, autocratic
3. top management, democratic
4. Middle level management, democratic
1. Computerized
2. Automated
3. Manual
4. Semi-computerized
1. SDLC
2. System programming
3. Software testing
4. Software configuration
1. Iterative models
2. Incremental models
3. Waterfall models
4. Extreme programming
1. Strategic planning
2. Tactical planning
3. Operational planning
4. Requirements planning
1. Interfaces
2. Inference engines
3. Early prototypes
4. Development engines
Question # 5 of 10 ( Start time: 02:29:20 PM ) Total Marks: 1
______________ time is saved through an error free designed system.
Select correct option:
1. Deployment
2. Development
3. Configuration
4. Testing
1. System Analysts
2. Software Engineers
3. System Designers
4. Chief Executives
Question # 7 of 10 ( Start time: 02:31:09 PM ) Total Marks: 1
Which of the following is an iterative approach to system development?
Select correct option:
1. Waterfall
2. Incremental
3. Prototyping
4. Spiral
Question # 8 of 10 ( Start time: 02:31:59 PM ) Total Marks: 1
Which of the following model is preferred for its simplicity and more disciplined approach?
Select correct option:
1. Incremental
2. Waterfall
3. Spiral
4. Iterative
1. Operational feasibility
2. Technical feasibility
3. Tactical feasibility
4. Economic feasibility
1. Waterfall
2. Spiral
3. Incremental
4. Rapid prototyping