Set Batter Board
Set Batter Board
Set Batter Board
Claw hammer
Pencil/ marking pen
Pull-push rule
Engineers rule (50meters)
Water hose level
Nylon string
Plum bob
Steel square
Try-square
Cross cut Saw
Sledge hammer
Bolo
EQUIPMENT:
o Personal Protective Equipment (PPE)
MATERIALS:
o Plan and working drawing
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page
24
of
o Rough lumber
o Assorted nails
o
METHODOLOGIES:
1. Modular (self-paced learning)
2. Demonstration
LEARNING EXPERIENCES/ACTIVITIES
LEARNING OUTCOME 2
Special Instructions
batter boards.
Key 1.2-2
2. Perform Task sheet 1.2-2 on securing
batter boards with tolerance for
dimension
Key 1.2-3
correctly
CARPENTRY NC II
Set batterboard
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page
24
of
Learning Activities
Special Instructions
Key 1.2-4
correctly.
BATTER BOARDS
-are the horizontal boards ace at the corner and at the sides of the
projected building when final layout takes place. The reference for
foundation is marked on this boards.
2. Two types of Batter Boards:
Batter boards for foundation posts may be either joined by continuous
pieces surrounding the site of foundation or by individual piece for its
foundation.
a.
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page
24
of
b.
2. Kinds of batter boards for the foundation walls are either single or
double batter boards which are placed at corner.
a. Singe batter board
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page
24
of
The standard height of batter board is 40 cm, but there are instances
that the height is compromise and will be set in another height based on the
ground and the tallest foundation.
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page
24
of
c. 4m
d. the tallest foundation is set as the height.
4. Part of stake out building line where you marked the reference for
foundation.
a. batter board
c. corner stakes
b. better board
d. stakes
II.
Answer briefly:
1. What do you call the horizontal boards placed at the corners and at
the sides of the projected building when final layout takes place?
2. What should be the standard height of a batter board?
3.4.
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page
24
of
C
B
A
A
II
1. Batter board
2. 40cm
3. Corner batter boards
4. Continuous batter boards
5. Tallest foundation
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page
24
of
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page
24
of
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page
24
of
D. Regulator Stage
The regulator stage is a circuit that maintains a constant voltage
for variations in the input linear voltage or in the load or to keep up
with the varying need for power. This is because the output voltage
suffers when the maximum power load is connected to the power
supply.
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 10 of
24
SELF-CHECK 1.1-2
Directions Answer the following questions and write your answers on a
separate sheet of paper.
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 11 of
24
1. It has 3 stages.
2. Capacitor
3. Transformer stage
4. 2 types. Full-wave Center Tapped , Full wave Bridge type
5. it has 4 diodes
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 12 of
24
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 13 of
24
1. Electrical hazards are fatal like electric shocks from open wire and
grounded electrical appliance.
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 14 of
24
c. Soldering tools can cause extreme heat and can burn the skin.
SAFETY REQUIREMENTS/PRECAUTIONS:
For your protection, observe the following:
1. Follow all cautions, warnings and instructions.
2. All passage must be free from any obstruction that will
hamper the movement of persons in the area.
3. All tools and equipment must be checked to be in
an A1 condition.
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 15 of
24
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 16 of
24
SELF-CHECK 1.1-3
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 17 of
24
Away
5. True
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 18 of
24
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 19 of
24
considerations.
2. Arrange materials together in the cabinet
as to facilitate the measures regarding occupational
health and safety practices.
3. Clean and dust the tables and chairs.
4. Arrange working tables, chairs and other related
facilities in line with the standard occupational
health and safety practices.
5. Prepare an occupational health and safety practices
report according to the result of the operations made
CRITERIA
YES
NO
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 20 of
24
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 21 of
24
1.
2.
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 22 of
24
CRITERIA
YES
NO
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 23 of
24
CARPENTRY NC II
Set batterboard
Document No.________
Issued by:
Date Prepared:
October 2016
Tagum National
Trade School
Prepared by:
PATRICK
CUEVAS
E.
Revision # : ____
Page 24 of
24