In order to facilitate the BAs audit of the AP/RSE/RGE/ASs carrying out
of their supervision duties and to provide an overview of the progress of the building
works, all the checklists and inspection records should be kept on site and available for
inspection by the officers of the Site Monitoring Section or other representatives of the
BA. A sample of record of quality supervision and inspections carried out by the
respective TCPs is given in Appendix B for reference. To suit the needs and practice
of individual building projects, the AP/RSE/RGE/AS may devise their record of quality
supervision carried out by TCPs under their respective streams.
6.
(HUI Siu-wai)
Building Authority
Ref. : BD GR/BREG/A/23
First issue : November 2016 (AD/NB2)
Appendix A
(PNAP APP-158)
Items of Works at
Various Stages of Superstructure/Excavation and Lateral Support/
Site Formation Works for Quality Supervision
Items of works at various stages of building works required for quality
supervision are given in the tables below for reference. The heads of the project management
structure shall communicate with other functional streams to derive checklists of various works,
determine appropriate inspection frequencies and critical stages of individual items of works to
suit the needs of individual project.
Item
No.
Stream
Stage/Item
Description
AP
RSE RGE RC
QC2
Verifying quality of
steel reinforcing bars
QC3
Fixing of steel
reinforcing bars
QC4
Verifying quality of
concrete
QC5
Placing, compaction
Check the quality and workmanship of concrete
and curing of concrete works.
QC6
Placing, compaction
In addition to the quality and workmanship as
and curing of concrete mentioned in Item QC5 above, check that
proper sequence of works, temporary work,
for transfer structure
concreting method and curing method are used.
QC7
Temporary formwork
and falsework
QC8
Verifying concrete
condition
-1-
QC9
Verifying quality of
couplers
QC10
Verifying cast-in
embeds or anchors
Check the location, layout and types of the castin elements and the required sampling and
testing in accordance with conditions imposed.
QC11
Verifying in-situ
concrete strength
QCn
as appropriate
Setting out of
basements and G/F
QB2
QB3
Interior and fitting out Check critical dimensions for internal dedicated
works
areas, exit routes@, firemans lift lobbies,
temporary refuge spaces, features subject to
exemptions / modifications of gross floor area
such as balconies, utility platforms, wider
corridors / lobbies, plant rooms, pipe ducts,
pipe wells, and residents recreational facilities,
etc.
Check materials and construction of fire
barriers and installation of proprietary fire
resisting products such as FRR of fire doors
and smoke seal, etc.
Check suitable waterproofing for roofs.
Check conformity with general layout.
QB4
Installation of
windows
QB5
Provision of Barrier
Free Access (if
applicable)
-2-
as appropriate
Legend:
The division of responsibility between RSE and RC for formwork and falsework is detailed in clauses
4.7 to 4.9 of the Code of Practice for Site Supervision 2009
Some examples of critical items to be checked are given for reference. These include : the continuous
path of travel from any part of a building to the ultimate place of safety; clear dimensions of staircases
including height and width together with dimensions of treads and risers and the general configuration
of staircases (e.g. not more than 16 risers); and provision of adequate signage and lighting.
-3-
Item
No.
Stream
Stage
Description
AP
RSE RGE RC
QE1
Locations of the
temporary retaining
planking
QE2
Installation of the
temporary retaining
planking
QE3
Installation of grout
curtain
QE4
QE5
QE6
Preloading of struts
QE7
Excavation works
QE8
Backfilling works
QE9
Instrumentation and
monitoring works
throughout the
excavation and lateral
support works
QEn
-4-
as appropriate
Legend :
*
AP and his TCPs are required to ensure that checking and supervision of the works are carried out by
the appropriate building professionals (RSE and/or RGE) and RC; and to coordinate for follow up
actions on non-conformity of works.
-5-
Item
No.
Stream
Stage
Description
AP
RSE RGE RC
QSF2
Site drainage
QSF3
protection
out
of
the
QSF5
Excavation works
QSF6
Backfilling works
QSF7
Records of backfilling
works
QSFn
(c)
as appropriate
QRS1
Setting out of rock slope Check the location, extent and gradient of
rock cut slope.
QRS2
Excavation
-6-
QRS3
QRS4
Verification of rock
slope treatment design
QRS5
Setting out of rock slope Check the location, extent and layout of rock
treatment works
slope treatment works.
QRS6
QRSn
Any other items considered essential for quality supervision of the rock
slope and rock slope treatment works
as appropriate
QRW2 Excavation
-7-
QRWn Any other items considered essential for quality supervision of the
retaining wall works
(e)
as appropriate
QRF1
QRF2
Verifying quality of
drainage and filter
material
QRF3
Backfilling works
QRF4
Records of backfilling
works
QRFn
as appropriate
Legend:
*
AP and his TCPs are required to ensure that checking and supervision of the works are carried out by
the appropriate building professionals (RSE and/or RGE) and RC; and to coordinate for follow up
actions on non-conformity of works.
AP and his TCPs are required to check and satisfy that the works are carried out in compliance with
the general layouts shown on the approved plans.
For retaining walls forming parts of a domestic building as required under regulation 48 of the
Building (Planning) Regulations.
(11/2016)
-8-
Appendix B
(PNAP APP-158)
Sample Record
Record of Quality Supervision Carried Out by
TCP under AP / RSE / RGE /RC* Stream
BD Ref.
BD 3/1234/15
Project
ABC Centre
Type of Works
Superstructure Works
Name
Mr X X Lee
T3
Grade of TCP
Date
Frequency of Inspection
Weekly
7/1/2015 (Wed)
Locations of the works
inspected
Inspection Findings
(if applicable)
Photos
Result2
(if any)
Item No.1
Location / Details
QC1
Zone A of 3/F
QC2
QC3
Zone C of 6/F
NS
QC4
Zone A of 6/F
QC5
Zone A of 6/F
QC7
Zone B of 6/F
NS
QC8
NA
QC9
QC10
(S/NS/NA)
Remedial / Remark
1-3
Signature
* delete if inappropriate
1
according to the checklists attached
2
S, NS and NA denote Satisfactory, Not Satisfactory and Not Applicable respectively.
(11/2016)