Practice Note for Authorized Persons,

Buildings Department Registered Structural Engineers and APP-143


Registered Geotechnical Engineers

Quality Control and Supervision of Precast Concrete Construction

Introduction

In recent years, the use of precast concrete in private building developments


in Hong Kong has increased. To ensure that the precast concrete elements are of good
quality, proper supervision and adequate quality control are necessary during the
production, erection and inspection processes of the concrete elements. This practice
note sets out the requirements for the quality control and supervision of key precast
concrete elements not fabricated on the building site. The requirements stipulated in this
practice note do not apply to minor elements such as non-structural precast concrete
block work, architectural features and planters.

Duties of the Authorized Person, Registered Structural Engineer and Registered


Contractor

2. The Authorized Person (AP), Registered Structural Engineer (RSE) and


Registered Contractor (RC) have the responsibilities under the Buildings Ordinance
(BO) to ensure that the precast concrete works comply with the provisions and standards
of the BO and the approved plans. In accordance with Section 4(3)(a) of the BO and
Regulation 37 of the Building (Administration) Regulations (B(A)R), adequate
supervision has to be provided by the AP and RSE for the carrying out of the precast
concrete works, whereas the RC has to provide continuous supervision, as required under
Section 9(5)(a) and 9(6)(a) of the BO and Regulation 41 of the B(A)R, for the carrying
out of such works.

Quality Assurance

3. Under item 6 in Section 17(1) of the BO, a condition will be imposed, when
giving approval of plans, that precast concrete elements should be manufactured by a
factory with ISO 9000 quality assurance certification.

4. Under Regulation 10 of the B(A)R, a requirement will be imposed, when


giving approval of plans, that a copy of the Quality Assurance Scheme of the
manufacturer should be submitted prior to the application for consent to the
commencement of the works. Such submission should be appended with a statement
signed by the RSE to confirm that the scheme has adequate provisions in ensuring the
quality of production complying with the provisions of the BO and the approved plans.

5. The Quality Assurance Scheme should cover the following items:

(a) Quality control tests of materials;

(b) Calibration of laboratory equipment for quality control


tests;
/(c) …..
-2-

(c) Efficiency and proper operation of equipment at the casting


yard;

(d) Production process;

(e) Testing procedures and requirements;

(f) Frequency and extent of inspection by in-house staff and


independent parties; and

(g) Frequency and extent of audit by in-house staff and


independent parties.

Qualified Supervision

6. Under item 6 in Section 17(1) of the BO, a condition will be imposed, when
giving approval of plans, that qualified supervision should be provided by the RSE and
the RC for the fabrication, erection and examination of precast concrete elements.

7. The RSE should assign a structural quality control supervisor to supervise


the precast concrete production works. The RSE should determine the necessary
frequency of supervision, which should be no less than once a week. The minimum
qualifications and experience of the quality control supervisor are to be the same as grade
T3 technically competent person (TCP) under the RSE’s stream, as stipulated in the
Code of Practice for Site Supervision.

8. The RC should assign a quality control co-ordinator to provide continuous


supervision of the precast concrete production works in the factory. The minimum
qualifications and experience of the quality control co-ordinator are to be the same as
grade T1 TCP under the RC’s stream, as stipulated in the Code of Practice for Site
Supervision.

9. The names and qualifications of the supervisory personnel assigned by the


RSE and RC respectively should be recorded in an inspection log book. The details of
precast concrete production, inspection, auditing and testing should be recorded in the
log book by the supervisory personnel. The log book should be kept in the factory and a
copy of it should be kept at the building site office and, when required, produced to
officers of the Buildings Department for inspection.

10. In addition, the RSE and the Authorized Signatory (AS) of the RC should
inspect and carry out audit checks to the precast concrete factory at least once every
month. Under Regulation 10 of the B(A)R, a requirement will be imposed, when giving
approval of plans, that a copy of the RSE’s audit reports of the precast concrete factory
and a copy of the AS’s audit reports of the precast concrete factory duly endorsed by the
RSE should be submitted to the Buildings Department for record purpose. The RSE and
AS’s audit reports should respectively also cover the qualified supervisions by the
structural quality control supervisor of RSE’s stream and the quality control co-ordinator
of AS’s stream. Minimum requirements of the audit checks are detailed in Appendix A.

/11. …..
-3-

11. As an alternative to the requirement for the RSE’s qualified supervision at


the precast concrete factory specified in paragraph 10 above, the RSE may consider
carrying out on-site audit checks to the quality of the precast concrete elements delivered
to the building site. In such situation, the RSE is required to notify the Building
Authority in writing before commencement of works, and to submit a copy of on-site
audit reports on the quality of the precast concrete elements delivered to the building site
to the Buildings Department for record purpose, covering the qualified supervisions by
the structural quality control supervisor. Minimum requirements of the on-site audit
checks by the RSE are detailed in Appendix B.

12. For good practices in the design, construction and quality control of precast
concrete works, reference should be made to the recommendations and guidelines given
in the Code of Practice for Precast Concrete Construction issued by the Buildings
Department.

Separate Registered Structural Engineer

13. For precast concrete elements not affecting the stability of the parent
structure, such as the precast concrete façade or staircase, a separate RSE may be
appointed to prepare the design and to supervise the production and erection of such
precast concrete elements. In such situation, the specified Forms BA4 and BA5 notifying
the appointment of a separate RSE and the scope of works for which he/she is
responsible are required to be submitted together with the plans for approval. The project
RSE shall also notify the Building Authority in writing that he/she is fully aware of the
appointment of a separate RSE and the demarcation of responsibilities. Upon completion
of the precast concrete construction works, the separate RSE so appointed is required to
certify the satisfactory completion of the works in accordance with Regulation 25(3) of
the B(A)R.

14. The separate RSE’s submission should be accompanied by an assessment


report prepared by him/her giving an account of the effect of the proposed precast
concrete works on the parent structure. The assessment report shall be appended with a
statement of the project RSE to confirm that he/she is fully aware of the connection
details and their effects on the parent structure.

15. The separate RSE shall be responsible for the supervision of the production
and erection of the precast concrete elements, including the connection between the
precast concrete elements and the parent structure, i.e. ties, anchor plates, cast-in embeds
etc., except in the event where such associated works have been installed in the parent
structure prior to his/her appointment. For such cases, the structural details and layout of
the pre-installed parts should be given in the superstructure plans submitted for approval
by the project RSE who shall then be responsible for the supervision of the installation of
such parts. The separate RSE should refer to the pre-installed connection details when
designing the precast concrete elements and should co-ordinate with the project RSE for
any necessary amendment if different connection details are to be used.

16. The separate RSE shall ensure that the conditions and requirements of the
quality assurance and qualified supervision as stipulated in paragraphs 3 to 5 and 6 to 11
above respectively are complied with. He/she shall also be responsible for the
submission of the documents required in paragraph 4 above.
/17. …..
-4-

17. A similar practice note is issued to registered contractors.

( AU Choi-kai )
Building Authority

Ref. : BD GR/1-125/54

This PNAP is previously known as PNAP 299


First issue August 2006
Last revision April 2010
This revision July 2012 (AD/NB2) (para. 3, 4, 6, 8 & 10 amended; and para. 11,
Appendix A & B added)
Appendix A
(PNAP APP-143)

Minimum Requirements of the RSE and AS’s Audit Check


at Precast Concrete Factory

The audit checks carried out by the RSE and the AS at the precast concrete
factory should include the following works items:.

Works Item Scope


1 Formworks z Smoothness, cleanliness and dimensions of steel mould
z Application of mould releasing agents

2 Steel z Size, pattern, fixing and layout of the steel reinforcing


reinforcing bars
bars z Spacers
z Concrete covers
z Material testing reports

3 Concrete z Placing and compaction


z Curing
z Material testing reports

4 Finished z Concrete surface


products z Sizes and dimensions
z Starter steel reinforcing bars

5 Inspection z Log books of the structural quality control


records supervisor/quality control co-ordinator

6 Others z Any other items considered essential by the RSE/AS for


the project.

( 07/2012)
Appendix B
(PNAP APP-143)

Minimum Requirements of the RSE’s On-site Audit Check


on Precast Concrete Elements delivered to the Building Site

The audit checks on the precast concrete elements delivered to the building site
carried out by the RSE as an alternative to the audit check on precast concrete elements
at the precast concrete factory as specified in Appendix A should comply with the
requirements specified in paragraph 2 below.

2. The rate of sampling for the audit checks shall be at least 1% of the precast
concrete elements with a minimum of one per every 20 batches of delivery to the
building site. The audit check for each sample of the precast concrete element should
include the following works items

Works Item Scope


1 Steel z Opening-up of the concrete surface at 3 locations, each
reinforcing with an area of 100mm x 300mm, to check the size,
bars pattern and layout of the steel reinforcing bars; and the
concrete covers
z Measurement of the concrete cover to steel reinforcing
bars by covermeter at 6 locations, each with 6 readings
taken in an area of 450mm x 450mm
z Material testing reports
2 Concrete z Concrete coring at 3 locations tested for verification of
concrete strength
z Material testing reports
3 Finished z Concrete surface
products z Sizes and dimensions
z Starter steel reinforcing bars

4 Inspection z Log books of the structural quality control supervisor


records

5 Others z Any other items considered essential by the RSE for the
project.

Remarks :
Tests for compressive strength of concrete cores should be carried out in accordance with
the method specified in CS1:2010, by a laboratory accredited under HOKLAS for the
particular test concerned. Test results should be reported on a HOKLAS Endorsed
Certificate and submitted within 60 days of the delivery of the precast concrete elements
to the building site.

( 07/2012)