Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Manolito G. Bicera

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 7

Curriculum Vitae

Of

MANOLITO G. BICERA
POSITION APPLIED FOR

TIG AND ARC WELDER

OBJECTIVE

Filipino highly qualified conscientious


hardworking.Self motivated and seeks jobs with
several windows of advancement

Education

High school Graduate

MALAYA NATIONAL HIGH SCHOOL


(Former Malaya Barangay High School)
Malaya,Pililla,Rizal 1983-1987

WORKING EXPERIENCES:
From
Position
Company
Project

:
:
:
:

July 28,2011 to December 28, 2011


Tig and Arc Welder
DAEWOO E & C
1st EPC 3 LNG Proj. Laba, Papua New Guinea

Duties and Responsibilities :


Full welding of carbon steel and low temp carbon steel pipes, small bore and
heavy wall sizes 2, 4, 6, 8, 10, 12, 16, 18, 24, 36 and 48.
From
Position
Company

:
:
:

February 3, 2007 to August 3,2009


TIG AND ARC WELDER
International Plant Services 1602 Old Underwood
Road La Porte, Texas 77571 United State of
America

Project

SHUT DOWN OF COFFEYVILLE


Resources Kansas City U.S.A.

FREEPORT LNG
Freeport, Texas U.S.A.

OMAHA POWER PUBLIC DISTRICT Nebraska City


Station 2 Pulverized coal steam generator.
Nebraska City U.S.A. :
TRUNKLINE LNG
Lake Charles, Louisiana U.S.A.

:
:

Duties and Responsibilities :

CAMERON LNG
Hackberry, Louisiana U.S.A.

Full welding of carbon steel pipe sizes 2,4,6,8,10,12,16,18,24,36


Full welding of stainless steel pipe sizes 2,4,6,8,10,12,16,18,24,36
schedule 10,40,80 and 100.

From
Position
Company

:
:
:

Project

:
:
:

November 10,2005 to November 23,2006


TIG AND ARC WELDER
Thong Sheng Engineering Co. Pte. Ltd.
A Pioneer Road North No. 01-62
S(628546) Tel. No. +6562659509.
EXXON MOBIL SINGAPORE
F 3001 LVPS Upgrade Project
SINGAPORE OLEFINS PLANT
9th Furnace EJF -01
SMAG SINGAPORE METHYL
Methracry Late Pte. Ltd.
SMAG lll Project (SMM-lll Plant)
TK-8380 A and B Project Tank 3208 M3 DRT

Duties and Responsibilities :


Full welding of 6 alloy pipe schedule 60 9 cm.
Full welding of 6 conviction pipe schedule 60 ER 316L.
Full welding of 6 & 10 alloy pipe schedule of 120 2cm.
Full welding of 3 transfer line exchanger pipe schedule 80 metrode 21.35.4NB.
Full welding of 10carbon steel pipe schedule 120.
Full welding of 6 and 4 carbon steel pipe schedule 60.
Full welding of 1, 3/42,1/2 carbon steel pipe socket weld.
Full welding of TK-8380 A&B product tank 3208 M3 DRT. Stainless plate schedule
60 308 L.
From
Position
Company

:
:
:

Project

January 20, 2005 to May 20, 2005


TIG & ARC Welder
Qatar Engineering & Construction Co. WLL.
Qatar Ras Laffan
Air Product
Qatar Ras Laffan

Duties and Responsiblities :


Full welding of 2, 4, 6, 8, 10, 12 18, 24 pipes schedule 40, 60 and 80.

From
Position
Company

:
:
:

September 30, 2002 to March 2004


TIG AND ARC WELDER
Al-Yusr Townsend & Bottom Co. Ltd.
Jubail Industrial City
Jubail, KSA.

Project

PROPYLENE DEHYDROGENATION
Polypropylene Project
Saudi Polyolefins Co. (SPC)
Jubail, K.S.A.

RETUBING OF SEVEN FURNACES


Al-Jubail Petrochemical Company
(Kemya) Jubail K.S.A.

Duties and Responsibilities :


Welding of different high service piping for the hot section of propane
dehydrogenaration plant (POH), such as 42 to 90 inch diameter stainless steel
(321H). Regeneration air pipelines, 42 to 64 inch diameter process line CA335 GR.
P 11/22
Full welding of 5 conviction pipe of furnace ER705/7018.
Full welding of pipe spools for utility lines (phosphate, biocide etc.), boiler feed
water lines etc.)
Full welding of 6 de coke nozzle pipe schedule 80 ER-70S-2 and 7018.
Full welding of 10Y piece between radiant coil and transfer line exchanger KHR
35CL WELTIG 35CL.
Full welding of 4 and 6 radiant coil inlet and outlet joints KHR 35CT
ER35354CNB KHR 45 A-ER-35-45.
Full welding of 2 high tension cross over pipe ER 308 H.
From

Position

Company

April 3,2001 to January 30,2002


TIG AND ARC WELDER
Thong Sheng Engineering Co. Pte. Ltd.
9 Pioneer Road North No. 01-62 S(62846)
Singapore

Project

RETUBING OF FURNACES

PALAU SERAYA 2X 370 MW CCP SINGAPORE


Seraya Power Plant Singapore

Duties and Responsibilities :

Full welding of conviction pipe 5 ER 308H and 6 ER70S.


Full welding of 8 header to radiant coil inlet joint ER 308 H.
Full welding of carbon steel pipes ER 70S & 7016 KOBELCO LB 53. Sizes
2,4,6,8,24.

From
Position
Company

:
:
:

Project

January 1996 to 2000


TIG AND ARC WELDER
Al-Yusr Townsend & Bottom Co. Ltd.
Jubail Industrial City
Jubail K.S.A.
(KTI) KINETICS TECHNOLOGY
International B.V

Expansion of Olefins 3 Plant (8 Furnaces)


Arabian Petrochemical Company
(Petrokemya) Jubail K.S.A.

PIPE LINE FROM KING FAHAD INDUSTRIAL


Port up to chevron petrochemical company
Jubail K.S.A.

UPGRADING OF SAUDI IRON STEEL COMPANY


(HADEED)
Jubail K.S.A.

EXPANSION OF SAUDI PETROCHEMICAL COMPANY


EDC Area(Sadaf)
Jubail K.S.A.

UPGRADING KING FAHAD


Industrial Port
Jubail, K.S.A.

Duties and Responsibilities :


Full welding of 6 and 8 heavy wall pipe ER 70S-2 and7018.
Full welding of 4 high tension cross over ER 308 H.
Full welding of 6 header to radiant coil inlet joints ER Ni Cr Co Mo 1.
Full welding of 10 Y piece between radiant coil and transfer line exchanger
GTAW-UTP 2133 and SMAW SAF B01.
Full welding of radiant coil 5 by 3 concentric reducer and 1 pipe ER Ni Cr Mo1 6170
Full welding of 8 pipe header to radiant coil ER 309 L and pig tail pipe socket
and but weld ER 347 S-1
Full welding of pipe but weld ER 308 H.
Full welding of 6 and 8 pipe schedule 40 ER 70S and 7018
From
Position
Company

:
:
:

November 1992 to November 2,1994


PIPE FITTER
Agap Arabia Ltd.
Jubail K.S.A.

Project

CONSTRUCTION OF HAWIYAH WATER


Injection Plant (Saudi Aramco)
Hawiyah Saudi Arabia

ZULUF WET CRUDE HANDLING


Facilities (Saudi Aramco)
Safaniya, Saudi Arabia

FABRICATION OF PIPE SLEEVES


(Saudi Aramco)
Agap Steel Fabricators Ltd.
Jubail, K.S.A

Duties and Responsibilities :

Fit up of pipes small bore and heavy wall.


Installation of pipes such as water lines, steams lines, gas lines, pipe support.
Aligning and fit-up of PVC pipes, hydraulics and pneumatic pipes.
Erection and aligning of heavy wall pipes.
Checking all values and pipe joints and hydrotesting.
Hauling of materials form stockyard to stocker area.
Fabrication and erection of pipe support.

PERSONAL DATA

MANOLITO GUINTO BICERA


Mobile Number:

09473353096

Present Address

: 137 Naval St.,

Date of Birth

: October 3, 1971

Place of Birth

: Malaya,

Civil Status

: Married

Passport Number

: XX3292857

In case of emergency
Pls. notify his spouse

Contact No.

: Zarah M. Bicera

MANOLITO G. BICERA
Signature over Printed Name

You might also like