Manual Arizona PDF
Manual Arizona PDF
Manual Arizona PDF
1 . General Information
2 . Standards
3 . Instructions of installation
5 . Installation
8 . Servicing
Installation
Installation of the boilers and of auxiliary parts of the heating
system shall comply with all current standards and
regulations.
Installation and commissioning of the boilers and the heating
system shall be performed by authorised and professionally
qualified persons.
A professionally qualified person is someone with the relevant
technical skills in the field of heating system components
for domestic heating and hot water production, and in
particular, the customer service personnel authorised by the
manufacturer.
Commissioning
The main aim of the commissioning is to check that all the
safety and monitoring devices function correctly.
Before leaving the installation, the person responsible for
commissioning shall monitor the boiler for at least one
complete operating cycle.
Standards
The installer shall comply with local regulations on heating,
safety devices, flues, fuel supply lines, electrical systems
and all other local requirements and safety instructions.
We certify by this form that the following specified range of devices is conform with the type described in the CE
type inspection certificate, that is produced and put in the market place in conformity with the requirements of
the following European Guidelines :
CE Number : 1312BR4873
Date : 23/07/07
In particular :
4. Excess pressure
In no circumstances shall the pressure exceed the maximum
service pressure indicated on the data badge, included with
each boiler model.
The boilers have a horizontal cylinder with a reverse flame. The boilers are fitted with a single entry combustion cylinder.
All aspects of construction comply with the instructions given The central burner flame reverses peripherally back to the
in European Standard EN 303 part 1. front, where the burnt gases enter the fire tubes; at the end
The steel sheets of the pressurized parts are S235JRG2 steel, of the fire tubes the gases collect in the smoke box and are
in accordance with standard EN 10025, certified 3.1.B sent up the flue.
compliant in accordance with EN 10204; and the pipes are When the burner is in operation within the boiler output range
ST 37.0 steel in accordance with DIN 1626. the combustion chamber is always under pressure. For this
Welding and welding procedures have been certified pressure value see the tables on pages 5 and 6, in column
compliant with Standards EN 287 - EN 288 by the TV (D) - "Smoke load losses". The flue shall be fitted so that no
UDT (PL) - SAQ (S) and ISPESL (I). positive pressure can be detected at its base.
Up to model P 300, the fire base is linked to the back tube
plate.The boilers are fitted with an reversible door, assembled
on hinges that can be opened from the left or the right, when
the burner is assembled, depending on the layout of the boiler
room.
The boiler combustion chamber is covered with an insulation
jacket of 80 mm thick glass wool, in turn protected by a
mineral fibre fabric.
The upper part of the boiler body is provided with handling
hooks.
Bton
T1-T2-T3 C
T3 T1 H T2 F
A
G
190
Y
50
3 4
T4
1
R
B
T5 2 T5
M
N
T6 208
Z
U E V D
Type DIMENSIONS
A B C D E F G H M N R U V Y Z
mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm
99 762 845 855 195 150 240 400 520 603,5 440 880,5 700 845 0 62
115 / 145 782 845 995 200 182 265 510 655 602 440 956,5 720 860 76 62
175 802 920 1040 200 153 265 530 710 677 500 1046 740 1030 76 92,5
232 / 290 862 960 1219 200 180 305 665 845 717 512 1090,5 800 1209 76 72
349 912 980 1457 200 180 317 850 1030 737 510 1111 850 1447 76 52,5
465 1082 1135 1497 200 203 317 850 1030 858 595 1271 1020 1491 76 58
580 / 700 1187 1230 1497 200 200 317 850 1030 890 640 1364 1125 1491 76 56
815 / 930 1187 1230 1735 200 228 317 1050 1265 890 640 1364 1125 1729 76 56
For the filling and draining of the boiler, a valve may be fitted
on connection T6, which is located in the lower back part of
the boiler models 99-940.
5 . 8 Anti-explosion valve
Ensure of the good functioning of the valve by manoeuvring it
several times.
Type A L
99 145 280
115 155 280
145 175 280
175 175 280
232 175 280
290 175 280
349 175 280
465 175 300
580 245 300
700 245 300
815 245 300
930 245 300
A) Position the left hand side panel. The ports in the side F) Secure the boiler data badge on the right side panel (the
panels should be to the front of the boiler assembly. badge can be found in the information file inside the body).
Insert the lower fold of the side panel into the L-shaped
support welded onto the lower part of the boiler body. G)Secure the front piece bracket.
B) Assemble the left hand decking. H) Secure the front piece on this bracket.
C) Position the front piece on the decking. I) Fix the logo on the cross piece.
1
2
349 930 1 18
2
10
8
3
Pr Recycling pump
C Boiler
Pi Boiler pump
Vm Mixing control valve
M Mixing control valve motor
Sm Flow sensor
Se External sensor
Pi
80
Tcm
70
Tmi
60
Tcr
50
T(Pr)
Tcm Boiler flow temperature
40 Tcr Boiler return temperature
Tri Tmi System flow temperature
30 Tri System return temperature
T (Pr)T compensated for by the
20
recycling pump
10
0
0 10 20 30 40 50 60 70 80 90 100
%Load