Deep-Water Pipelay: Having The Right Tools
Deep-Water Pipelay: Having The Right Tools
Deep-Water Pipelay: Having The Right Tools
Giorgio Martelli
Saipem
AOEC Bali, September 2012
Objectives
No need:
there is a handful of
high quality
contractors
Initially, during
installation, the pipe will
be empty and the EMPTY
FULL
pressure will come from
outside
In operation, internal
pressure from Oil/Gas
can be much higher
Product pressure could be
as high as 600 bar
THE INNOVATION
DNV X-Stream
A smart concept based on taking advantage of differential pressure to reduce pipe
wall thickness
Will allow larger pipelines in deepewater to be deployed by existing equipment
J-LAY
TRAVELLING
CLAMP
FIXED FIXED
CLAMP CLAMP
Step 1: the pipe is held by the J-Lay tower lower & fixed Clamp;
Step 2: a new QJ is transferred into the J-Lay tower by the loading arm;
Step 6: load is transferred to fixed Clamp and a new cycle can start.
200
150
100
50
0 nominal route
-500 0 500
-50
-100
-150
-200
200
150
100
50
0 nominal route
-500 0 500
-50
-100
-150
-200
19
21
An unprepared pipeline repair in deep-water for a serious rupture could take up to 2 years
(engineering, procurement, manufacturing, testing, commissioning, operations)
20 million cubic meters per day 101 USD / thousand cubic meters 2 million USD / day
Qualified by DNV:
The connection technology has a Type Approval Certificate
covering applications for water depth up to 2,200 m