a- Processes avarage = 7 loans / day & design capacity = 10 loans / day & effective capacity = 8 loans / day
b- Services an avarage of 4 furnaces / day & design capacity = 6 furnaces / day & effective capacity = 5 furnaces / day
c- Regarding the systems that have higher efficiency ratios than other systems will always have higher uitilization ratios than
those other systems , from pervious exampls we can see when the systems have higher efficiency it have higher uitilization
Problem # 2
a- Q bep= FC / ( R - VC ) = 9200 $ / ( 0.9 $ - 0.7 $ ) = 9200 / 0.2 = 46000 unit so Q bep = 46000 unit
b- For Q = 61000 unit so P = Q (R-v) - FC = 61000 ( 0.9 - 0.7 ) - 9200 = 3000 $ or P = 3000 $ when Q = 61000 unit .
P = 8200 $ when Q = 87000 unit .
c- For P = 16000 $/month Q=? So Q = ( P + FC )/( R - v ) = ( 16000 + 9200 )/( 0.9 - 0.7 ) = 126000 $ or Q = 126000 unit when P = 16000$
d- For TR = 23000 $/month Q=? Since TR = R * Q so Q = TR/R = 23000/0.9 = 25555.56 or Q = 25556 unit when TR=23000$/month
Problem # 3
a- Q bep for A = FC / ( R - v ) = 40000/(15-10)= 8000 unit & Q bep for B = FC / ( R - v) = 30000/(15-11)=7500 unit
b- For the same profit Q=? So since P=Q(R-v)-FC so Q(15-10)-40000=Q(15-11)-30000 or 5Q = 4Q + 10000 , finally .Q=10000 units at Pa=Pb
Problem # 4
a- If purchasing costs are considered, which m/c would have the lowest TC? & how many of that m/c would be needed ?
Machines operats 10h/day and 250D/year..
Annual Processing time per unit (Min.) Total Processing Time
Product
Sure Machine B should be the lowest TC & 2 of it Demand A B C A B C
will be needed considering giving data and total 1 16000 3 4 2 48000 64000 32000
processing time available/piece of machine equal 2 12000 4 4 3 48000 48000 36000
10h/day * 250 day/year = 2500 h/year 3 6000 5 6 4 30000 36000 24000
4 30000 2 2 1 60000 60000 30000
b- If A m/cs its OC=10$/h & B m/cs its OC=11$/h & Total in Min 186000 208000 122000
C m/cs its OC=8$/h which M/C would be selected ? Total in hous / year 3100 3466.67 2033.33
Since Total OC of Demand to 4 products of M/C A = 3100 * 10 = 31000$ & Total OC of Dmand to same 4 products of M/C B = 3467 * 11 =38137$
& Total OC of Demand to the same 4 products of M/C C = 2033 * 8 = 16264$ & since TC=FC+VC or TC=FC+OC in our case & consider FC
is the cost / machine so TC for A =71000$ & for B =68137$ & for C =96264$ so M/C B would be selected to mnimize Total cost .