Design of Tank Bottom Beams: CRACK WIDTH CHECK (For Positive Moment)
Design of Tank Bottom Beams: CRACK WIDTH CHECK (For Positive Moment)
Input Fck =
Fy =
Bar Dia " f " =
Calculations
x =
Lever arm z = d - x/3 =
Stress in Steel "fs" = M / (z*Ast) =
stress in Concrete "fcb" = M / (z*b*x) =
Distance between compression face to section at which crack width is being calculated " a " =
a = h =
Strain at any level e1 = fs (h - x) / { Es.(d-x) }
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = 1.5b(h-x).(a - x) / { 3EsAs(d-x) } For 0.1mm crack width
e2 = b(h-x).(a - x) / { 3EsAs(d-x) } For 0.2mm crack width
e1 =
e2 =
acr =
em = e1 - e2 =
wcr =
Input Fck =
Fy =
Bar Dia " f " =
Bar Spacing " s " =
b =
h =
Min cover to Tension Reinforcement " c " =
x =
Lever arm z = d - x/3 =
Stress in Steel "fs" = M / (z*Ast) =
stress in Concrete "fcb" = M / (z*b*x) =
Distance between compression face to section at which crack width is being calculated " a " =
a = h =
Strain at any level e1 = fs (h - x) / { Es.(d-x) }
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = 1.5b(h-x).(a - x) / { 3EsAs(d-x) } For 0.1mm crack width
e2 = b(h-x).(a - x) / { 3EsAs(d-x) } For 0.2mm crack width
e1 =
e2 =
acr =
em = e1 - e2 =
wcr =
25 N/mm2
415 N/mm2
12 mm
+(2/m.pt)^0.5)-1)*d
#DIV/0! mm
#DIV/0! mm
#DIV/0! N/mm2 Max Tensile Stress= 0.8 Fy=
#DIV/0! N/mm2 Max Concrete Stress=0.45 Fck =
calculated " a " =
0 mm
h - x) / { Es.(d-x) }
en cracks " e2 " =
0.1mm crack width N/A
0.2mm crack width N/A
#DIV/0!
Not Applicable
0 mm
#DIV/0!
#DIV/0! mm
25 N/mm2
415 N/mm2
20 mm
115 mm c/c
300 mm
800 mm
40 mm
220 kNm
0.2 mm
50 mm
750 mm
1884 mm2
0.008373
25000 N/mm2
200000 N/mm2
11.00
+(2/m.pt)^0.5)-1)*d
260.1495 mm
663.2835 mm
176.0527 N/mm2
8.499811 N/mm2
calculated " a " =
800 mm
h - x) / { Es.(d-x) }
en cracks " e2 " =
0.1mm crack width N/A
0.2mm crack width Used
0.00097
0.00016
)2 + (c + f/2)2} - f/2
66.19875 mm
0.00081
0.147032 mm
332 N/mm2
11.25 N/mm2