NPTEL Course: Ground Improvement
NPTEL Course: Ground Improvement
NPTEL Course
GROUND
IMPROVEMENT
Prof. G L Sivakumar Babu
Department of Civil Engineering
Indian Institute of Science
Bangalore 560012
Email: gls@civil.iisc.ernet.in
DYNAMIC COMPACTION
INTRODUCTION
Approximate grid
spacing
Plot of a/D and b/D vs. NWHh/Ab
1. The required significant depth of densification, DI
is obtained from
DI = (WHh)
Where DI = significant depth of densification (m)
WH= Weight of hammer (metric ton)
h = height of drop (m)
2. From the figure given above, DI = b
3. The hammer weight (WH), height of drop (h),
dimensions of the cross section, and thus the
area A and depth D is determined
4. Determine DI/D = DI/b
5. Using the plot given by Poran and Rodriguez
(1992), determine the magnitude of NWHh/Ab
for the value of b/D obtained.
6. Since the magnitude of WH, h, A and b are
known (or assumed), the number of hammer
drops can be estimated .
7. With known value of NWHh/Ab, determine a/D
and thus a.
8. The grid spacing, Sg, for dynamic compaction
may now be assumed to be equal to or
somewhat less than a.
The following is a typical example,
Weight of the hammer, WH = 185kN
Height of drop, h =26m
Width of hammer, D = 5m
1. DI = (WHh)
=(18.5*26) =10.96m
2. DI = b = 10.96 m, assume D= 5m A= 25 sq.m
3. DI/D=b/D= 10.96/5 = 2.2
4. From the plot given in fig 3 we got NWHh/Ab =
220 kN/m2
5. Since we know WH, h, A and b. Number of
hammer drops, N= 14 blows
6. With the known value of NWHh/Ab, determine
a/D from the fig 3 and thus a = 16 m .
7. The grid spacing, Sg ~ a = 16m.