SAP PM Configuration
Pack
Copyright 2007-08@SAPTOPJOBS
A Ware Welcome To You All! We are really excited to offer the complete
SAP PM configuration pack to the SAP community. There were lot of
consultants who were after us to come up with pack and so we are glad
to present this to you… As you are aware that our SAP FICO, PP/QM,
MM/WM and SD have already achieved the best selling status and have
received lots of accolades and really helped the consultants take their
SAP knowledge and career to the next level …I am very confident that PM
configuration package will go a step forward and do much more than
that……….
For those who have been on our list and who have bought from us earlier
you all know that we have over-delivered on each of our configuration
packs and we want to do the same thing with SAP PM config pack too…
For those who have visited our site for the first time I would like to
welcome you to our site and promise you that we would do our best to
ensure that your life at the clients place would be very comfortable…
What I have done here is given you a brief of around 98+ pages of
content in PM pack so that you can have a feel of what it would be like in
terms of structure. The whole pack is extremely voluminous, step by step
guide this is just a feeler… So I hope you enjoy this…. So lets dive in….
1. PM Technical Object Configuration
1.1 Define Planning Plant
BACKGROUND
SCENARIO
INSTRUCTION
Click
Click
Click
Click
BACKGROUND
SCENARIO
INSTRUCTION
Click
Click
Click
1.3 Define Types of technical objects
BACKGROUND
SCENARIO
INSTRUCTION
Click
Click to create new technical object type
Click
Click
1.4 Define Plant Sections
BACKGROUND
SCENARIO
INSTRUCTION
Click
Click
Click
Click
1.5 Create Structure indicator for Functional Location
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Click to create new entries.
Allowed letters and signs are given below for ready reference.
- Hyphen
/ slash
' ' blank
. Period
_ Underscore
= equals sign
+ Plus sign
; Semicolon
: Colon
Click
Click
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Click
Click
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Double click
Click on
Click
Click
Impact of this configuration in Master Data /
Transaction
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Click
1.9 Define Measuring point categories
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Click
Maintain fields as explained below
Field Name Value and Description of field
Key identifying the measuring
point category. E.g. G
Description of measuring point
category. E.g. IND6 measuring
point category
Uniqueness of the measurement
position of this measuring point
category. This measurement
category may be used in many
places, if the measurement
position is required to be unique,
it can be achieved thro this
setting.
Select.1 from available entries
Click
Click
Impact of this configuration in Master Data /
Transaction
BACKGROUND
Example: -
- Explosion in MRP
MRP only reads BOMs whose BOM status has at least one of
these indicators.
SCENARIO
1. Click
2. Click
6. Click Save .
BACKGROUND
Design,
Production
Costing.
In this way, each area is dealing only with the specific data it
requires.
Example:
Note:-
INSTRUCTIONS
Follow the Menu Path: IMG Plant Maintenance and
customer services Master data in plant maintenance and
customer service Bills of materials General Data BOM
Usage Define BOM usages
1. Click
2. Click
6. Click Save
When creating the BOM, key defined here will appear in the
BOM Usage field.
BACKGROUND
Sales
Production
Spare part
is related to Production
SCENARIO
INSTRUCTIONS
Follow the Menu Path: IMG Plant Maintenance and
customer services Master data in plant maintenance and
customer service Bills of materials General Data BOM
Usage Define Default values for item status
1. Click
2. Click
5. Click Save .
Example:-
BOM item level default setting will appear as per the setting
done here.
BACKGROUND
Mandatory
Optional
Highlight
Hide
SCENARIO
INSTRUCTIONS
Click
Double click Basic data
Select Req. radio button against
Click Field selection Req. radio button for the required work
center category. Contents column indicate the work center
category.
Click
Click
BACKGROUND
• Power
• Labour
• Setup time
• Depreciation
• Steam etc.
SCENARIO
Click
Click
Maintain the Following fields
Field Description
Parameter Parameter to hold the value.
Any alphanumeric six digit
may be entered. E.g. LABOUR
Origin Place where from the value is
to be taken. E.g. To indicate
value to be taken from task
list maintain 2 in this field.
Short key word Short description
Key work Key word to identify
Dimension Dimension of the parameter.
E.g. Any thing related to
Duration may have TIME as
dimension.
Standard Value Unit Unit of this parameter. E.g.
Time dimension may have
unit as MIN.
BACKGROUND
Example:-
• Production cost
• Set up cost
• Labour cost
• Quality Cost
• Power cost
• Steam cost
One work center can have only one standard value key.
SCENARIO
Click
Click
Maintain the Following fields
Field Description
Standard value key Enter any alpha numeric to
indicate standard value key.
E.g. STD1
Description Maintain standard value key
description. E.g.
setup/machine/labor/Power
Parameter Maintain the parameters. Up
to six parameters can be
maintained.
Tick this check box to
generate formula.
Click Save .
BACKGROUND
Usage of work center to the specific task list (i.e. only in the
maintenance task list) can be defined to restrict its usage.
SCENARIO
Define the work center usage to the specific task list types.
INSTRUCTIONS
Click
Select
Click
Update the Following fields
Field Description
Task List type A for General maintenance
task list
E – Equipment task list
T – functional location task
list
Click Save .
BACKGROUND
• Scheduling of operation
Control key is mapped with the work center in the task list
(i.e. in the routing and in the master recipe).
SCENARIO
INSTRUCTIONS
Click
Click
Maintain the Following fields
Field Description
Control Key Enter any alphanumeric four
digit key. E.g. YPM1
Description Maintain description of this
control key. E.g.
Sched,capacity,Cost,
Mustconfirm
Indicators Tick the check box as shown
above in the screen.
Tick in the Check box will
perform the respective
function to the operation /
phase which is having this
control key.
Click Save .
Click Save .
Click
Click Save .
Impact of this configuration in Master Data /
Transaction
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Click
Click
Click
Maintain the following fields
Field name Field description and value
Serial number assignment
procedure. I.e indicating the
business transaction at which
the serial number is to be
assigned. Available entries are
Click
Click
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Double click
Click
Click
Click
Double click
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Click
Click Save .
BACKGROUND
Maintenance order
Service order
Maintenance order with maintenance notification
Service order with service notification
Maintenance order with WCM objects
Maintenance notification
Service notification
Service entry sheet
Inspection lot
SCENARIO
INSTRUCTIONS
Follow the Menu Path: IMG Plant Maintenance and
customer services Maintenance plans, Work centers, Task
Lists and PRTs Maintenance Plans Set Maintenance Plan
categories
Click
Click
Click
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Click
Click
Click on
Click
Click
Click
Click
BACKGROUND
Customer complaint
Vendor complaint
Apart from the above types, any other type of notification can
be created according to the business requirements.
SCENARIO
INSTRUCTIONS
Click
To create new notification type, it is suggested to copy from
the standard Notification type.
Click
Maintain the following fields
Field Name Field description and value
Key identifying the notification
type
Origin of notification. Select
from available entries.
Click
Click
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Note: - When creating new order types it is recommended to
copy from existing one.
Click
Click
BACKGROUND
We can define any number of order type, but each order must
be assigned to maintenance plant where the physical
maintenance task is carried out.
SCENARIO
INSTRUCTIONS
Click
Click
Click
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Select plant IND6 by clicking grey box in the left side.
Click
Click
Click
Click
InsLot completion Tab screen
Click
General settings Tab screen
Click Save .
BACKGROUND
SCENARIO
INSTRUCTION
Click
Inspection type 14 (for calibration of equipment) is assigned to
order type PM05.
Click
Click
Click
http://www.sap-topjobs.com/SpecialPP/sappm20071919.html
All our packs are shipped thru FedEx and reaches you in three days
time. One more thing this configuration pack is compatible with version
4.7, version 5.0 and 6.0 So you really do have to worry about the version
at all.. We have taken care of that… Also all future version changes
which will come up will be provided as free updates to you. So you can
sit back relax and play the music….
http://www.sap-topjobs.com/SpecialPP/sappm20071919.html