Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Post Concrete Check

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

POST CONCRETE CHECK

Location :__________________________

SR. NO DESCRIPTION

1 Date of casting

2 Type of Pouring

3 Starting time

4 Finish time

5 Curing method
Type of Finish obsorved after
6
deshuttering
7 Defects observed if any

8 Type of deffects

9 Corrective active

10 Rectified on Date

11 Proventive acion to avoid reoccurrence

( Front lino Engineer )

( Section in-charge )

You might also like