Method Statement Machnical, Electrical Plumbing
Method Statement Machnical, Electrical Plumbing
Method Statement Machnical, Electrical Plumbing
MACHNICAL , ELECTRICAL
PLUMBING
FIRE FIGHTING WORK
CHECK LIST
PUMP HOUSE:
Pump Installation
Leveling of pump bed
Installation of motors
Coupling of ump with motors
Required lift setting
Free movement of pump shaft
Valve etc. opened
Connection of motor
In panel proper fuse etc. fitted
Commissioning of pump
CHECK LIST
CONDUITING:
All conduits shall be of heavy gauge solid drawn ERW welded manufactured
out of 16 SWG MS sheet as approved by client / consultant
Both inner & outer surface shall be smooth without burrs, dents & kinks and
shall
Be black enameled
Ensure that conduits shall be laid before sating in the upper of slab
Ensure sufficient depth of chases will be made to accommodate the conduit
Ensure that conduit shall be kept as a minimum distance of 100mm from the
pipes of other services
Conduit in chases shall be held by steel hooks at a distance of 600mm center
The embedment of conduits in wall shall be so that minimum 12mm plaster
covers the same.
Conduits run on surface shall be supported with metal 1.2mm thick saddle.
Conduits run on surface shall be saddled at a distance of 500mm centers
Ensure that Back Japan paints on all joints
Ensure proper tightening of screws
Ensure plugging of unused opening
Ensure check nuts on either side of switch boxes
WIRING:
EARTHING:
POLE:
DISTRIBUTION BOARD:
CABLES:-
Supplying and laying in ready built-up trenches/ excavated trenches, through
hume pipes laid by other agencies/ on walls or on walls of lift shafts or on
columns or on ceiling using G.I. spacers and G.I. saddles/ G.I clamps made
from G.I. strips, or on cable trays (cable tray supply & installation covered
under item D.3) with nylon cable ties, the following XLPE insulated 1.1 KV
grade, armoured and overall sheathed copper/aluminum conductor cables are
made to IS:7098 (Part-l) 1988.(All these cables will be from New Transformer
to Main LT panel and DG set to Main LT panel).
End Termination:-
Supplying and making end terminal joints to the following 1.1 KV grade PVC
insulated armoured overall sheathed copper/ aluminum conductor cables,
using nickel plated double compression brass cable glands, copper
compression type cable sockets (no sockets necessary for cables of size 10
sq.mm. and below), PVC insulating tapes, etc.
EARTHWORK:
Excavation for Sewer / Pipe trenches to the required grade & level in earth, soils of all types of
sand, gravel & soft & hard murum, & boulders up to 0.03 c.u.m. of size including removing the
excavated material upto a distance of 50 meters beyond the edges of trenches & lifts up to 1.5
m, stacking refilling the excavated trenches & spreading as directed, bailing out water,
including cost of required material if any including shoring, strutting etc. complete.
FILLING -Filling murum/Sand bedding below pipeline and filling on the top of the pipeline
with selected material in 15 to 20 cm layers including watering, ramming etc. complete.
(Murrum filling available at site)
UPVC PIPES: - Providing and laying UPVC pipes of standard make in line and level
including necessary labour, bends, tees, fixtures complete. Confirming to IS: 4985-2000.etc.
and testing the pipes. (DIAMETER-150 mm, 200 mm, 250 mm)
SUPPLY AND FIXING: - Supply and fixing SFRC cover (Rectangular/circular, Heavy Duty)
with frame confirming to IS: 1726-1974 (Part I - VII) with locking arrangement including
taxes and duties.
Sewer Appurtenances:-
The given in Bill of Quantities and drawings shall be internal finished size of chamber.
The work shall be done strictly as per standard drawing and following specifications.
2. Bed Concrete:-
Shall be in 1:3:6 cement concrete 200 mm thick.
3. Brick Work:-
Brick work shall be with best quality bricks in 1:5 cement mortars.
4. Plaster:-
Inside of the wall of chamber / manhole shall be plastered with 20/15 mm thick cement
plaster 1:3 (1 cement: 3 coarse sand) and finished smooth with a floating coat of neat
cement. Manholes shall be plastered from outside as above but with rough plaster.
Water proofing compound as approved by the clients Representative shall be added in the
cement sand mortar ratio as specified by manufacture
EARTHWORK:-
Excavation for Sewer / Pipe trenches to the required grade & level in earth, soils of all types of
sand, gravel & soft & hard murum, & boulders up to 0.03 c.u.m. of size including removing the
excavated material upto a distance of 50 meters beyond the edges of trenches & lifts up to 1.5
m, stacking refilling the excavated trenches & spreading as directed, bailing out water,
including cost of required material if any including shoring, strutting etc. complete.
Supply & installation of Pumps as per below specifications.
1. 25 mm diameter
2. 32 mm diameter
3. 40 mm diameter
4. 50 mm diameter
5. 63 mm diameter
6. 75 mm diameter
7. 90 mm diameter
HEAVY DUTY CP BRASS BALL VALVE / WEEL VALLVE :- Providing & fixing in
position heavy duty CP brass Ball Valve/Wheel valve/Scour Valve conforming to latest BIS
codes including necessary socket/union nut etc. complete for fixing cocks, sun and safeda
must be used to make joint perfectly watertight.
SINGLE BALL AIR VALVES: - Providing, fixing In position and jointing Single Ball Air
Valves, Screw Down Type with nipple and with / without isolating thread stop cock
conforming to IS: 14848-2000, tested to 200 M head of water (working pressure). [Rates to
include cost of gaskets, bolts, nuts and any other material required for jointing and also cost of
Valve, its transportation etc. including taxes and duties
1. Chamber 600 mm x 600 mm x 1200 mm deep (Internal Size- for water meter, control
valve, scour valve and non return valve near inlet)
2. Chamber 900 mm x 900 mm x 1200 mm deep (Internal Size- For control valve, scour valve
and air valve)
WATER METERS :- Providing and Fixing Water meters ISI marked class B confirming to
ISI 4064 / 1 including non return valve, strainer, isolation valves etc complete including all
Taxes, Duties etc complete.
UPVC PIPES:-