SLD MV

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GENERAL KEY PLAN:

PRIMARY SUBSTATION
VAULT DMP
HV/MV

TO DISCOVER CLUSTER
HV/MV
THROUGH ROOF LEVELS

GENERAL NOTES:

TS.NW - TRANSMISSION SUBSTATION NORTH-WEST TS.NE - TRANSMISSION SUBSTATION NORTH-EAST

MV BUSBAR - 33kV MV BUSBAR - 33kV

FEEDER NE-NW→NE #01 FEEDER NW-NE→NE #01


FEEDER NE-NW→NE #02 FEEDER NW-NE→NE #02
FEEDER NE-NW→NE #03 FEEDER NW-NE→NE #03
FEEDER NE-NW #05 FEEDER NE-NW→NE #04 (RESERVE) FEEDER NW-NE→NE #04 (RESERVE)
(WESTERN ARRIVAL) FEEDER NW-NE→NE #05
(DISCOVER CLUSTER) NEON HILLS

NORTH

FROM BSP

SOUTH

NOTE: These drawings are based on the design freeze of 2021/04/01 and do not reflect the
latest programme update as this came after.
REV DESCRIPTION APP DATE
A Stage 3A Concept Design Advanced Submission 30.04.21

PURPOSE OF ISSUE: FOR INFORMATION


CLIENT:

NEOM
Information Technology and
Communications Complex (ITCC)
2nd Floor, Building IN-01
Al Nakheel District 12382
P.O. Box 10, Riyadh 11411
TS.SW - TRANSMISSION SUBSTATION SOUTH-WEST TS.SE - TRANSMISSION SUBSTATION SOUTH-EAST Kingdom of Saudi Arabia

LEAD CONSULTANT ARCHITECTURE & MASTERPLAN:


LAVA Berlin GmbH
Saarbrücker Strasse 24
Haus D
10405 Berlin
Germany
© GEG Limited or its group companies. All Rights reserved. Unauthorised reproduction infringes crown copyright and may lead to prosecution or civil proceedings.

MV BUSBAR - 33kV MV BUSBAR - 33kV


PROJECT MANAGEMENT: LANDSCAPE ARCHITECT:
FEEDER SW #01 FEEDER SE #01 Drees & Sommer ASPECT Studios
FEEDER SW #02 FEEDER SE #02 Dubai Design District Dubai Silicon Oasis
FEEDER SW #03 FEEDER SE #03 Building 02 HQ Building
FEEDER SE-SW #05 FEEDER SW #04 (RESERVE) FEEDER SE #04 (RESERVE) PO Box: 500128 Dubai 4th Floor, 341041
(WESTERN ARRIVAL) FEEDER SE #05 United Arab Emirates United Arab Emirates
(DISCOVER CLUSTER)
CIVIL, GEOTECHNICAL & HYDRO ENGINEERING: SPORTS & TOURISM CONSULTANT:
GEG Engineering Ecosign Mountain
R. de Justino Teixeira Porta A Resort Planners Ltd.
Piso 3 - 307 8073 Timber Lane, P.O. Box 63
4300-273 Porto Whistler, B.C
Portugal Canada
DESIGN CONSULTANT / CONTRACTOR: GEG NEOM'S REVIEW:
DRAWN: LS
CHECKED: LO CHECKED:
APPROVED: HM APPROVED:
LEGEND SCALE: NTS SHEET SIZE: A0
DISCIPLINE NAME: ELECTRICAL
CONCEPT DESIGN
MV FEEDER #01 [33kV] ELECTRICAL DISTRIBUTION - SINGLE LINE DIAGRAM (HV/ MV)
PROJECT NAME:
NEOM VAULT CONCEPT DESIGN
MV FEEDER #02 [33kV] NEOM MOUNTAIN
NEOM

HV FEEDER [132kV] REGION WBS CODE


KINGDOM OF SAUDI ARABIA
CONTRACT CODE-WORK ORDER/SERVICE ORDER
07 020100 0000101050
DRAWING NUMBER
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.
GEG ELE DRG 016001 A