Dear Sir
Reference your above cited letter through which layout drawings for the HFO Power Plant for TBM
work at C2 site were submitted for review.
The two submitted drawings present the basic layout concept with very limited information on civil,
electrical and mechanical works. A lot more drawings would be required to enable construction of the
facility and to fulfill the requirements of a meaningful review of the proposed works. Our specific
comments are marked on the attached reviewed drawings. The status of the drawings is given in the
table below.
It is to be noted that the HFO Power Plant must be commissioned/operational to start the TBM mining.
It is suggested that a face to face meeting be organized to discuss details and submittal of additional
drawings so as the construction work would be completed in a timely manner and not delay the TBM
operation.
Yours faithfully
For NEELUM JHELUM CONSULTANTS
Encl: As mentioned
14. CABLE TRAYS, CABLE LADDER AND CABLE TRENCHES SHALL BE SHOWN. FURTHER THESE SHOULD NOT INTERFERE WITH OTHER EQUIPMENT, PIPES AND DUCTS.
15. FIRE FIGHTING AND FIRE ALARM EQUIPMENT PANELS INSIDE THE GENERATOR HOUSE SHALL BE INDICATED.
16. USE SAME DRAWING PANEL AS ALREADY APPROVED BY WAPDA FOR ALL NJC DRAWINGS.
17. SHOW THE DRAWING REFERENCE LIST FOR ALL RELATED DRAWINGS.
18. YOU HAVE NOT INDICATED 11kV SWITCHGEAR, 400V SWITCHGEAR, 220V DC AND 48V DC BATTERIES AND CHARGERS AND DISTRIBUTION BOARDS , EQUIPMENT
POWER AND CONTROL PANELS, PLANT CONTROL AND PROTECTION EQUIPMENT AND THEIR PANELS, TELECOMMUNICATION EQUIPMENT ETC. PLEASE INDICATE THE
SAME ON THE LAYOUT AND SECTION DRAWINGS.
13.04.2012
NOTE
PLEASE REPLY TO EACH OF
OUR COMMENT. IF YOU ARE
UNABLE TO PROVIDE SOME DISCLAIMER
INFORMATION IMMEDIATELY CHECKING IS ONLY TO CONFORMANCE WITH
GIVE REASON WHY IT IS SO THE ELECTRICAL DESIGN CONCEPT OF THE
AND GIVE TENTATIVE PROJECT AND COMPLIANCE WITH THE
SCHEDULE WHERE IN IT IS INFORMATION GIVEN IN THE CONTRACT
INDICATED THE TIME OF DOCUMENTS AND SUBSEQUENT
DELIVERY OF THE AMENDMENTS. THE CONTRACTOR IS SOLELY
REQUESTED INFORMATION RESPONSIBLE FOR EQUIPMENT SIZING AND
SELECTION IN ACCORDANCE WITH TECHNICAL
GUARANTEES, APPLICABLE IEC STANDARDS,
AND ITS OWN CALCULATIONS; FOR LOGIC AND
19. PROVIDE A DRAWING SHOWING THE LIGHTNING PROTECTION FOR THE POWERHOUSE AND OTHER
ACCURACY OF SCHEMATIC AND WIRING
BUILDINGS. LIGHTNING PROTECTION SHALL BE AS PER B.S.S OR NFPA 780 9U.S.A0 STANADARD DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB
SITE; FOR INFORMATION THAT PERTAINS
SOLELY TO THE FABRICATION PROCESS AND
FILL THE REVISION TO TECHNIQUES OF CONSTRUCTION; AND FOR
BLOCK COORDINATION OF ELECTRICAL DESIGN WITH
OTHER DISCIPLINES.
DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH
THE ELECTRICAL DESIGN CONCEPT OF THE
PROJECT AND COMPLIANCE WITH THE
INFORMATION GIVEN IN THE CONTRACT
DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS
SOLELY RESPONSIBLE FOR EQUIPMENT
SIZING AND SELECTION IN ACCORDANCE
WITH TECHNICAL GUARANTEES,
APPLICABLE IEC STANDARDS, AND ITS OWN
CALCULATIONS; FOR LOGIC AND ACCURACY
OF SCHEMATIC AND WIRING DIAGRAMS; FOR
PHYSICAL DIMENSIONS TO BE CONFIRMED
AND CORRELATED AT THE JOB SITE; FOR
INFORMATION THAT PERTAINS SOLELY TO
THE FABRICATION PROCESS AND TO
TECHNIQUES OF CONSTRUCTION; AND FOR
13.04.2012
COORDINATION OF ELECTRICAL DESIGN
WITH OTHER DISCIPLINES.