NEELUM JHELUMCONSULTANTS

[JV between MWH-Int, NORPLAN, NESPAK, ACE & NDC] Tel: (+92) 58224 33653
Malik House, Lower Chatter Fax: (+92) 58224 32978
Muzaffarabad e-mail: njc@njproject.com

Date: 17 April 2012

Our ref: PO-8756


Your ref: GZBZJ-NJC-2831

Authorized Project Manager DELIVERY: BY HAND


CGGC-CMEC Consortium
(Office at Site C3), Chatter Kalas,
Muzaffarabad.

ATTENTION: MR DENG YINQI

NEELUM JHELUM HYDRO-ELECTRIC PROJECT


C2: SUBMISSION OF LAYOUT OF HFO POWER PLANT FOR TBM WORK

Dear Sir

Reference your above cited letter through which layout drawings for the HFO Power Plant for TBM
work at C2 site were submitted for review.

The two submitted drawings present the basic layout concept with very limited information on civil,
electrical and mechanical works. A lot more drawings would be required to enable construction of the
facility and to fulfill the requirements of a meaningful review of the proposed works. Our specific
comments are marked on the attached reviewed drawings. The status of the drawings is given in the
table below.

Sr. No. Drawing No. Title Status


01 NJ-C2-ZYFD-01 Layout Plan of HFO Power Plant for TBM Returned for Correction
Work in Site C2
02 NJ-C2-ZYFD-02 Schematic Drawing of Location of HFO Returned for Correction
Power Plant for TBM Work in Site C2

It is to be noted that the HFO Power Plant must be commissioned/operational to start the TBM mining.
It is suggested that a face to face meeting be organized to discuss details and submittal of additional
drawings so as the construction work would be completed in a timely manner and not delay the TBM
operation.

Yours faithfully
For NEELUM JHELUM CONSULTANTS

(for)CHRISTIAAN F GROSSKOPF, IntPE


Project Manager

Encl: As mentioned

Filing 130 Distribution: Addressee


Owner: Neelum Jhelum Consultants CEO(NJHPC); GM&PD
Printed: 17 April 2012 DTL, TTL
CRE-C2, CE (Structures)
Author: CE Structures
Electrical / Mechanical,
Files File
Status: Final PO 8756 C2 SUBMISSION OF LAYOUT OF HFO POWER
PLANT.docx
COMMENTS
1. PLEASE PROVIDE THE SINGLE LINE DIAGRAM (SLD) WHEREIN IT SHOULD BE INDICATED AS TO HOW THE OUTPUT OF THE FOUR (4) HFO GENSETS IS FEEDING ALL THE LOADS OF TWO (2) TBMs. IN THIS SINGLE LINE DIAGRAM,
PLEASE INDICATE THE LENGTH OF THE VARIOUS CABLES (WHICH SHOULD HAVE COPPER AS CONDUCTOR) AS WELL AS THE CABLE SIZES IN mm2. FURTHER LOADS (kW OR H.P) SHOULD ALSO BE INDICATED.
2. PLEASE SUBMIT THE MAIN / AUXILIARY POWER SINGLE LINE DIAGRAMS WHICH SHALL SHOW THE LOADS IN AMP OR KW AND AMPERE RATING OF ALL THE PROTECTION EQUIPMENT (I.E. C.BS, FUSES).
3. IS THE GENERATOR STAR CONNECTED? IF SO, INDICATE AS TO HOW THE NEUTRAL IS EARTHED (I.E. THROUGH SOME RESISTOR OR EARTHING TRANSFORMER).
.
4. GIVE FULL DETAILS ABOUT PROTECTION SCHEME OF THE GENERATOR. PROVIDE A SINGLE LINE DIAGRAM FOR THE PROTECTION IN WHICH ALL RELAYS AND METERING IS SHOWN.
5. PLEASE SUBMIT COMPLETE ELECTRICAL DRAWINGS SHOWING THE CABLING AND WIRING ON THE LAYOUT USING I.E.C STANDARD SYMBOLS. PROVIDE SEPARATE WIRING FOR EMERGENCY POWER. ALSO SHOW
RELEVANT NOTES ON THE DRAWINGS (FOR EXAMPLE HEIGHTS OF THE SOCKETS, SWITCHES AND LIGHTS ETC.).
6. PLEASE PROVIDE A COMPLETE LAYOUT OF OUTGOING CABLES FROM THE HFO GENERATOR PANELS ETC. FURTHER ALL EQUIPMENT SUCH AS STEP-UP OR STEP-DOWN TRANSFORMERS AND CIRCUIT BREAKERS PANELS ETC
SHOULD ALSO BE INDICATED ALONG WITH RATING

7. USE HIGH BAY LIGHTS WITH H.P. SODIUM LAMPS OR


MERCURY LAMPS ( E.G. HIGH BAY, OPEN METAL
REFLECTOR) TO LIT AREA OF THE ENGINE ROOM. ALSO SHOW
THAT THESE ARE NOT HINDERED BY CRANE MOVEMENT.
COORDINATES OF 8. THE COMPUTER CALCULATIONS RESULT SHEETS FOR LIGHT
ACQUIRED LAND BOUNDARY FITTINGS (E. G. THAT OF PHILIPS SOFTWARE) SHALL BE
AND POWER STATION PROVIDED SHOWING THE DETAILS OF LIGHTS AND THEIR
BUILDING NOT PROVIDED, DISTANCES USED TO FULFILL THE LUX INTENSITY
WHICH MAKES IT REQUIREMENT IN EACH ROOM. LUX REFERENCE TABLE SHALL
IMPOSSIBLE TO IDENTIFY BE PROVIDED IN THE DRAWINGS SHOWING REQUIRED LUX
THE PROPOSED LOCATION LEVELS FOR EACH TYPE OF ROOM.
OF THE POWER STATION. .
9. PROVIDE VOLTAGE DROP CALCULATIONS AS WELL AS
AMPACITY CALCULATIONS FOR ALL H.V AND L.V CABLES.
10. REFER TO NJC CONTRACT SPECIFICATIONS CH. 15.
BUILDING ELECTRICAL SERVICES AND INCORPORATE
RELEVANT CLAUSES.
11. SUBMIT THE EARTHING DETAILS OF THE COMPLETE
TEXT IS NOT LEGIBLE. POWER STATION BUILDING AND THESE SHOULD COMPLY WITH
PLEASE INCREASE FONT CLAUSE 15.3, CH. 15 OF ABOVE REFERRED CONTRACT
(TYPICAL COMMENT) DOCUMENT.
12. INDICATE LOCATION OF MAIN DISTRIBUTION BOARD,
INVERTORS, BATTERY CHARGERS, BATTERIES AND ENERGY
Please clearly write " METER.
13. SUBMIT THE COMPLETE E&M EQUIPMENT LAYOUT ON THIS
Reserved location for DRAWING TO ASSESS IF THE SPACE REQUIREMENT AND
future expansion of a WORKING CLEARANCES ARE MET.
5th Generator " SHOW THE DRAWING
REFERENCE LIST FOR
ALL RELATED DRAWINGS.

14. CABLE TRAYS, CABLE LADDER AND CABLE TRENCHES SHALL BE SHOWN. FURTHER THESE SHOULD NOT INTERFERE WITH OTHER EQUIPMENT, PIPES AND DUCTS.
15. FIRE FIGHTING AND FIRE ALARM EQUIPMENT PANELS INSIDE THE GENERATOR HOUSE SHALL BE INDICATED.
16. USE SAME DRAWING PANEL AS ALREADY APPROVED BY WAPDA FOR ALL NJC DRAWINGS.
17. SHOW THE DRAWING REFERENCE LIST FOR ALL RELATED DRAWINGS.
18. YOU HAVE NOT INDICATED 11kV SWITCHGEAR, 400V SWITCHGEAR, 220V DC AND 48V DC BATTERIES AND CHARGERS AND DISTRIBUTION BOARDS , EQUIPMENT
POWER AND CONTROL PANELS, PLANT CONTROL AND PROTECTION EQUIPMENT AND THEIR PANELS, TELECOMMUNICATION EQUIPMENT ETC. PLEASE INDICATE THE
SAME ON THE LAYOUT AND SECTION DRAWINGS.

13.04.2012
NOTE
PLEASE REPLY TO EACH OF
OUR COMMENT. IF YOU ARE
UNABLE TO PROVIDE SOME DISCLAIMER
INFORMATION IMMEDIATELY CHECKING IS ONLY TO CONFORMANCE WITH
GIVE REASON WHY IT IS SO THE ELECTRICAL DESIGN CONCEPT OF THE
AND GIVE TENTATIVE PROJECT AND COMPLIANCE WITH THE
SCHEDULE WHERE IN IT IS INFORMATION GIVEN IN THE CONTRACT
INDICATED THE TIME OF DOCUMENTS AND SUBSEQUENT
DELIVERY OF THE AMENDMENTS. THE CONTRACTOR IS SOLELY
REQUESTED INFORMATION RESPONSIBLE FOR EQUIPMENT SIZING AND
SELECTION IN ACCORDANCE WITH TECHNICAL
GUARANTEES, APPLICABLE IEC STANDARDS,
AND ITS OWN CALCULATIONS; FOR LOGIC AND
19. PROVIDE A DRAWING SHOWING THE LIGHTNING PROTECTION FOR THE POWERHOUSE AND OTHER
ACCURACY OF SCHEMATIC AND WIRING
BUILDINGS. LIGHTNING PROTECTION SHALL BE AS PER B.S.S OR NFPA 780 9U.S.A0 STANADARD DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB
SITE; FOR INFORMATION THAT PERTAINS
SOLELY TO THE FABRICATION PROCESS AND
FILL THE REVISION TO TECHNIQUES OF CONSTRUCTION; AND FOR
BLOCK COORDINATION OF ELECTRICAL DESIGN WITH
OTHER DISCIPLINES.

GIVE SCALE AND


20. SHOW LONGITUDNAL AS WELL AS TRANSVERSE SECTIONS OF POWERHOUSE BUILDING. PAPER SIZE HERE
THE SUBMITTED DRAWINGS DO NOT HAVE MECHANICAL DATA /
INFORMATION SUCH AS EQUIPMENT SIZES, DIMENSIONS,
OPERATIONAL DATA, CAPACITY ETC. THE DRAWING PRIMARILY
PROVIDE LAYOUT INFORMATION ONLY. THEREFORE, NO
COMMENTS ON MECHANICAL LAYOUT CAN BE PROVIDED AT
PRESENT. (TYPICAL COMMENT)

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH
THE ELECTRICAL DESIGN CONCEPT OF THE
PROJECT AND COMPLIANCE WITH THE
INFORMATION GIVEN IN THE CONTRACT
DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS
SOLELY RESPONSIBLE FOR EQUIPMENT
SIZING AND SELECTION IN ACCORDANCE
WITH TECHNICAL GUARANTEES,
APPLICABLE IEC STANDARDS, AND ITS OWN
CALCULATIONS; FOR LOGIC AND ACCURACY
OF SCHEMATIC AND WIRING DIAGRAMS; FOR
PHYSICAL DIMENSIONS TO BE CONFIRMED
AND CORRELATED AT THE JOB SITE; FOR
INFORMATION THAT PERTAINS SOLELY TO
THE FABRICATION PROCESS AND TO
TECHNIQUES OF CONSTRUCTION; AND FOR
13.04.2012
COORDINATION OF ELECTRICAL DESIGN
WITH OTHER DISCIPLINES.

COORDINATES OF ACQUIRED LAND


BOUNDARY AND POWER STATION
BUILDING NOT PROVIDED, WHICH
MAKES IT IMPOSSIBLE TO IDENTIFY THE
PROPOSED LOCATION OF THE POWER
STATION.

INDICATE THE DRAWING REFERENCE


LIST FOR ALL RELATED DRAWINGS.

GIVE DETAILS AS WELL AS LINE LAYOUT


AND PROFILE DRAWINGS FOR THE
OUTGOING POWER LINES FROM THE
16MW HFO POWER PLANT UPTO TO
THE TWO TBMs THROUGH THE ADIT-A3

USE WAPDA STANDARD VOLTAGE


LEVELS FOR ALL OUTGOING LINES (I.E.
11kV AND 33kV). 11kV OUTGOING LINE
FEEDERS ARE PREFERABLE TO AVOID
HIGHER RATING EQUIPMENT.(LIKE 33kV
STEP-DOWN TRANSFORMERS E.TC.)

GIVE DETAIL DRAWING WITH


GIVE SCALE AND PAPER SIZE HERE
COMPLETE DIMENSIONS SEPARATELY
FOR EACH BUILDING AND INSTILLATION

FILL THE REVISION BLOCK

You might also like