10.Symbols
10.Symbols
10.Symbols
SCALE: SCALE:
ACU, LAUNDRY, REF, RANGE S2 DUPLEX (2 SINGLE POLE SWITCHES 3.) CONTRACTOR SHALL VERIFY AND ORIENT THE ACTUAL LOCATIONS OF
ON ONE SWITCH POLE) CONCRETE TERMINAL.
SERVICE LINE
S3 TRIPLEX (3 SINGLE POLE SWITCHES 4.) ALL INSTALLATION SHALL BE CONCEALED FROM VIEW, WIRING SHALL BE
PP PANEL BOARD ON ONE SWITCH POLE) INCASED IN PVC PIPE CONDUIT EXCEPT POWER SERVICE SERVICE WHICH
SHALL BE IN RIGID METAL CONDUIT.
S3W THREE WAY (3 SINGLE POLE
1 HOME RUN
SWITCHES ON ONE SWITCH POLE) 5.) THE MINIMUM SIZE OF WIRE SHALL BE 2 - 2.0 SQ.MM AND 20MMø.
M WATT METER
LINE WIRES 6.) ALL MATERIALS SHALL BE NEW AND APPROVED TYPE. APPROPRIATE FOR
BOTH LOCATION INTENDED USE.
SUB FEEDER SWITCH WIRES
7.) ELECTRICAL INSTALLATION SHALL BE UNDER A DIRECT SUPERVISION OF
LP LIGHTING BOARD
CIRCUIT BREAKER DULY LICENSED ELECTRICAL ENGINEER OR REGISTERED MASTER ELECTRICIAN.
PROJECT TITLE: STUDENT NAME/ CAD BY INSTRUCTOR DATE DRAWN SHEET NO.
PHINMA UPANG INDUSTRIAL AND COMMERCIAL
POWER SYSTEM JASIEL A. PASCUA
PHINMA EDUCATION NETWORK
COLLEGE OF ENG'G. & ARCHITECTURE
2ND SEM A.Y. 2022-2023
2:30 - 4:00PM T/S
MULTI FAMILY DWELLING UNIT MARLON M. DE GUZMAN
DENZEL DELOS T. SANTOS
JOHN DOMINIC BRAVO
ENGR. JC A. PENULLAR 03/09/2023
10