DBKL Maintenance Rate
DBKL Maintenance Rate
DBKL Maintenance Rate
GA0201 Supply all labours, equipment, material, excavate and No. 690.00
grub up tree-stump not exceeding 600mm girth and all
its roots to depth not exceeding 3.0m backfill excavation
and remove all trunk, stumps and roots from site to a tip
to be provided by the contractor.
GA0202 do but tree-stump of girth exceeding 600mm and all its No. 862.50
but not exceeding 1200mm measured 1000mm from
the ground level.
GA0203 do but tree-stump of girth exceeding 900mm but not No. 1,035.00
exceeding 1200mm.
GA0204 do but tree-stump of girth exceeding 1200mm but not No. 1,150.00
exceeding 1500mm.
GA0205 do but tree-stump of girth exceeding 1500mm but not No. 1,495.00
exceeding 1800mm
GA0206 do but tree-stump of girth exceeding 1800mm but not No. 1,955.00
exceeding 2100mm
97
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
GB0101 Clear the whole area of the construction site of grass, m 12.40
lallang, belukar, shrubs and all debris and construction
materials, structural or else where is directed by S.O.
GB0102 Extra over for clearing site of tree by heavy machineries No. 34.50
including carting away and grubbing of roots.
GC0102 Supply generator set and air compressor to site to break m 44.30
up existing concrete block drain, pudu cut drain, rubble
wall and brick wall in headwall, wingwall, slabs,
manholes, culverts, drains, rock, etc and dispose of
rubble at site to be provided by contractor or as directed
by S.O
HA0100 EARTHWORKS
98
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
IA0102 Do but to depth exceeding 1.5 m but not exceeding 3.0 m 12.00
m -do- (Volume of excavation to be calculated from
ground level to the actual depth)
IA0103 Do but to depth exceeding 3.0 m but not exceeding 4.5 m 14.60
m -do- (Volume of excavation to be calculated from
ground level to the actual depth)
99
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
IC0103 Do but to depth exceeding 3.0 m but not exceeding 4.5 m 14.60
m -do- (Volume of excavation to be calculated from
ground level to the actual depth)
ID0100 HAND EXCAVATION
ID0101 Supply all necessary labour and tools for hand m 20.70
excavation, get out and remove to a tip provided by the
Contractor. On completion, return selected spoil and
ram.
CONCRETOR
JA0100 CONCRETE TO DRAINS
JA0101 Provide and lay concrete (1:3:6-38 aggregate) in base m 271.40
and haunching to block drain. "Pudu Cut" drain and
H.R.G.W channels all as per details in Drawings.
Include for all mixing and placing as required.
JA0102 Provide and lay (1:2:4-19 aggregate) in concrete m 278.30
revetment to side of H.R.G.W. drains all as per details in
Drawings.Include for all mixing and placing(casing
including struts etc. and float rendering measured
separately).
JB0100 CONCRETE IN PIPE CULVERT
JB0101 Provide and lay concrete (1:3:6-38 aggregate) in base m 271.40
and surround to pipe culvert all as per details in
Drawings. Include for all mixing and placing as required.
100
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
101
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
MB0101 Provide and lay in position precast concrete cover slabs No. 70.00
1443 x 305 x 100mm thick, reinforced with 3 Nos.
12mm dia.bars and 8 nos.6mm dia.distribution bars all
as per details in Drawings.
NA0101 Supply and lay well burn clay brickwork in cement m 79.35
mortar 1:3 in walls and shafts of inspection chambers
and manholes, piers to suspended pipe lines, columns,
walls to any depth or height not exceeding 3 m
measurement not excluding openings. Include for flush
pointing of joints (reduced to 225mm thickness for
measurement)
NA0102 Supply approved wire cut clay bricks and construct m 79.35
225mm thick brickwork walls in English bond over
concrete foundations at sides of inverts (measured
separately). Include for laying and jointing in cement
mortar (1:3) and for rendering all exposed surfaces with
cement mortar 12 mm thick (1:3) where applicable
include for forming a recess 115x89/100/125 mm deep
to receive slabs.
NA0103 Do but for 338 mm thick brickworks walls and -do- m 113.70
NB0100 RENDERING
OA0101 Supply all necessary materials and labour and construct m 253.00
mass limestone rubble wall inclusive to sides of drain.
The spalls to be 150mm to 225mm sizes. Include for
packing interstices with 1:3:6-40 mm concrete and
jointing and flush pointing faces with cement mortar 1:3.
OA0102 Supply all necessary materials and labour and construct m 109.25
rubble pitching to average thickness of 225 mm laid on
graded side slopes of drain. The average face size
blocks should be not less than 225mm by 150 mm.
Include for jointing and filling interstices with 1:3:6-19
mm concrete.
102
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
OA0104 Supply and build into limestone rubble wall or pitching m 29.10
75 mm dia.galvanised iron pipe (Class A) to form weep
holes.
103
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
PB0101 Supply and fix in position steel grating 610mmx457mm No. 151.80
including frame to required level and position and all as
per detail in the Drawings.
PB0112 Supply and fix in position Hot Zinc Galvanised Iron No. 204.20
grating 610mmx457mm including frame and hinge (to
hook grating) to required level and position and all as
per detail in the Drawings.
PB0113 Do but for 610mmx610mm Hot Zinc Galvanised Iron No. 269.10
grating -do-.
PB0118 Supply and fix in position Hot dip Galvanized Iron No. 345.00
Grating 610mmx457mm (using 75mmx75mmx6mm
Angle Frame) to required level and position and all as
per detail in the drawing).
PB0122 Supply and fix in position Hot dip Galvanized Iron No. 151.80
Grating 610mmx457mm (using 30mmx30mmx5mm
Angle Frame) to required level and position and all as
per detail in the drawing).
PB0123 Do but for Grating size 610mmx610mm -do- No. 200.10
104
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
105
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
106
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
107
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
108
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
109
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
110
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
111
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
112
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
113
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
114
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
115
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
HPDE Pontoon 500mm (P) X 500mm (L) X 400MM (Ht) nos 469.00
Grass must grow closed, short but fertile and its also
must have less than 5% in any other weed-size pieces
and at least 225 mm x 150 mm (flat area)
116
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
Top Dressing
QA0108 Supply and spread 50 mm top soil with fertilizer on the m 15.00
ground surface prior to receiving grass. The contractor
shall follow with the standard and approval of the
Landscape Architect
QC0106 Supply and lay 100mm dia. Class B G.I pipe. Include m 46.00
for connection to 100mm dia. PVC pipe.
QB0107 Supply and lay 150mm dia. PVC pipe on 100mm thick m 103.50
hardcore and river sand surround including all
necessary excavation back filling and carting away all
excavated material.
117
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
RA0105 Supply approved sand, trasport to site spread, roll and m 4.60
consolidate to thickness less than 30mm with a roller of
not less than 2 tonne weight.
RA0110 Provide labour and materials, carefully take out existing m 13.80
interlocking paving units, transport to Dewan Bandaraya
Store at Jalan Cheras or to any site in the Wilayah
Persekutuan Kuala Lumpur as directed by the S.O
118
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
119
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
RC0112 Membekal dan memasang baru jubin lantai jenis tile m2 94.10
200mm x 200mm
RC0113 Membekal dan memasang baru jubin lantai tile 300mm m2 96.60
x 300mm
120
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
.
RC0125 Kerja-kerja membekal dan memasang baru jubin lantai m2 154.80
dari jenis 'Reconstitude Rough Face Granite'
berukuran 100mm x 100mm x 11mm dari jenis MML-
RFG 604 atau setanding dengan warna, bentuk dan
ukuran jubin adalah mengikut arahan Pegawai Projek.
121
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
122
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
123
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
RE0100 INTERLOCKING
RE0101 Membekal peralatan perlu dan mesin serta tenaga m 2.99
pekerja untuk kawasan bagi memasang siarkaki,
termasuk memandatkan tanah
RE0102 Membekal peralatan perlu dan mesin serta tenaga m 9.20
pekerja untuk meratakan batu Crusher Run setebal
100mm dan memandatkannya bagi tujuan kawasan
bagi memasang siarkaki.
RE0103 Membekal peralatan perlu dan mesin serta tenaga m 3.00
pekerja untuk meratakan pasir sungai setebal 30mm
dan memandatkannya bagi tujuan memasang siarkaki.
124
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
125
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
SB0100 OVERLAY
126
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
PENENTUAN
KAYU
Kesemua kayu yang digunakan hendaklah mengikut
senarai berikut melainkan dicatitkan :
127
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
128
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
UA0100 REFLEKSOLOGI
UA0211 Membekal dan memasang meja taman jenis terazo Set 1,092.50
bentuk bulat beserta 4 bangku
129
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
UA0223 Membekal dan memasang tiang gol bolasepak dari besi No 1,035.00
paip jenis G.I. Class B 3 dia. Ukuran 20 lebar dan 8
tinggi dari aras tanah termasuk kerja menanam dalam
asas konkrit serta dicat dengan satu lapis cat tahan
karat dan dua lapis cat kilat
130
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
131
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
132
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
133
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
134
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
135
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
136
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
137
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
ACCESSORIES
WA1206 Flat seat c/w Plastisol coated chain No 750.00
WA1207 Toddler seat c/w Plastisol coated chain No 1,128.00
WA1208 Belt seat c/w Plastisol coated chain No 750.00
WA1209 Flat seat No 600.00
WA1210 Toddler seat No 820.00
WA1211 Belt seat No 600.00
WA1212 Conveyer belt seat No 192.00
138
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
ACCESSORIES
ACCESSORIES
139
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
140
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
141
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
142
JADUAL KADAR HARGA BAGI KERJA-KERJA PENYELENGGARAAN
143