Satr H 1003

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) Rev 3 30-Jun-08

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Concrete Moisture Field Test (For Coating Purposes) SATR-H-1003 1-Nov-09 Civil
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

Test Procedures shall be in accordance with (SAES-H-003 Sec. 8.1.4) OR

1- Tape a 4 mil thick (0.1mm), 18"x 18" (450mm x 450mm) of clear plastic sheet to the surface to be coated; tape all around with duct tape.
2- Sheet shall remain in place for a minimum of 16 hours. Indicate number of hours sheet has been in place:_____ hrs.

3- Remove and visually check the underside for moisture.


4- After 16 hours if no moisture is present on the inside of the plastic, the concrete is ready for coating.
5- If droplets of moisture are present, the concrete shall be given more curing time. Pass Fail N/A

Alternate Test Procedures shall be in accordance with ( SAES-H-003 Sec. 9.6.9)

1- Drill 2 holes 6mm Diameter, 25mm deep and 150mm apart (holes to be repaired after test)
2- Surface contaminants such as laitance and form oils shall be removed.
3- Insert the Elcometer probes into each hole and seal in place with silicone putty.
4- Wait 24 hours for the effects of the drilling to stabilize.
5- Moisture Content Reading: ____________%
6- Begin coating only if the moisture content reading is less than 4%. Pass Fail N/A

Repairs during tests:

Result: Moisture Test Failed Moisture Test Passed

CONCLUSIONS
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Test results are acceptable and in accordance with Saudi Aramco
D1 N/A
Engineering Standards and contractural requirements.

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-H-003 -- Protective Coatings for Industrial Concrete Structures, 12 October 2005

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Name, Title, Department, Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Company, Initials and Name, Initials and Date:
Date:
QC Inspector PID Representative
Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) Rev 3 30-Jun-08

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Concrete Moisture Field Test (For Coating Purposes) SATR-H-1003 1-Nov-09 Civil
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED

Page 2 of 2