RCC92 Ribbed Slabs (Tables)
RCC92 Ribbed Slabs (Tables)
RCC92 Ribbed Slabs (Tables)
LOADING
Self Wt kN/m 4.00
+ Dead kN/m 1.50
Total Dead, gk kN/m 5.50
Imposed qk kN/m 5.00 A F A F
Design load, n = kN/m 15.70 Geometry and Loading Indicative Bending Moment Diagram
OUTPUT/SUMMARY
END END FIRST INT INTERIOR INTERNAL
PROVIDE SUPPORTS SPANS SUPPORTS SPANS SUPPORTS
MAIN STEEL 3H10 /rib 2H8 T 2H20 /rib 2H8 T 2H20 /rib
+ 3H10 T + 2H10 T + 2H10 T
Nominal B 2H20 B Nominal B 2H20 B Nominal B
LINKS 2H6 @ 175 2H6 @ 175 2H6 @ 175 2H6 @ 175 2H6 @ 175
from edge of solid for 875 for 175
RIB SHEAR
END FIRST INT INTERNAL
SUPPORTS SUPPORTS SUPPORTS
Factor 0.46 0.6 0.5 Table 3.12
V max kN/m 52.01 67.85 56.54 -=-
V rib kN/m 37.24 44.99 36.51
v N/mm 0.8625 1.0630 0.8626 Eqn 3
vc N/mm 0.8975 0.9080 0.9080 NOMINAL Table 3.8
(v-vc)bv N/mm 68.0 68.0 68.0 68.0 Table 3.7
Link ok 6 ok 6 ok 6 ok 6 3.12.7.1
@ mm 191 187 187 194 Spacing
adjust to mm 175 175 175 175 Spacing
for mm 0 795 75 --- from solid
adjust to mm 0 875 175 --- from solid
As Dist ok 64.4 ok 0 ok 0 ok 0 OK 3.4.5.5
BOTTOM STEEL
LINKS
SUMMARY Density = 12.5 kg/mApprox. total reinf. per rib (kg) 340.2
Project Spreadsheets to BS 8110
Location 2nd Floor slab
RIBBED SLAB DESIGN to BS 8110:2005 using table 3.12 coefcients GRAPH DATA I Made by rmw Job No R68
Originated from RCC92.xls v4.0 on CD 2006 TCC Date 31-May-17
LOADING DIAGRAM
Support 1 2 3 4 5 6 7 8 9 gk = 5.50 gk = 5.50 kN/m
Distance 0 0 7.2 14.4 21.6 28.8 36 36 36 36 36 qk = 5.00 qk = 5.00 kN/m
Dead 0 5.00 5 5 5 5 5 0 0 0 0
Imposed 5 6.50 6.5 6.5 6.5 6.5 6.5 5 5 5 5
Base 0 0 0 0 0 0 0 0 0 0 0
1 2 3 4 5 6 7 8 9
Grids 0 0 7.2 7.2 14.4 14.4 21.6 21.6 28.8 28.8 36 36 36 36 36 36 36 36
-1.3 0 -1.3 0.00 -1.3 0 -1.3 0 -1.3 0 -1.3 0 -1.3 0 -1.3 0 -1.3 0
BM DIAGRAM
Support 1 End 2 Mid 3 Mid
Local X 0 0 0.72 1.44 2.16 2.88 3.6 4.32 5.04 5.76 6.48 0 0.72 1.44 2.16 2.88 3.6 4.32 5.04 5.76 6.48 0 0.72 1.44 2.16 2.88 3.6
Global X 0 0 0.72 1.44 2.16 2.88 3.6 4.32 5.04 5.76 6.48 7.2 7.92 8.64 9.36 10.08 10.8 11.52 12.24 12.96 13.68 14.4 15.12 15.84 16.56 17.28 18
Base 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Moment 0 16.283 -14.98 -38.102 -53.082 -59.921 -58.619 -49.174 -31.589 -5.8619 28.007 70.017 31.507 1.1398 -21.086 -35.171 -41.114 -38.916 -28.577 -10.095 16.527 51.291 14.655 -13.84 -34.194 -46.406 -50.477
36.637 65.132 85.485 97.698 101.77 97.6975 85.485 65.132 36.637
B Labels A to grid 2
M Labels 32.566 61.061 70.017 51.291 51.291 51.291
Grids 0 0 7.2 7.2 14.4 14.4 21.6 21.6 28.8 28.8 36 36 36 36 36 36 36 36
-59.921 77.018 -59.921 77.018 -59.921 77.0182 -59.921 77.018 -59.921 77.018 -59.921 77.018 -59.921 77.018 -59.921 77.018 -59.921 77.018
Project Spreadsheets to BS 8110
Location 2nd Floor slab
RIBBED SLAB DESIGN to BS 8110:2005 using table 3.12 coefcients GRAPH DATA II Made by rmw Job No R68
Originated from RCC92.xls v4.0 on CD 2006 TCC Date 31-May-17
4 Mid 5 End 6
4.32 5.04 5.76 6.48 0 0.72 1.44 2.16 2.88 3.6 4.32 5.04 5.76 6.48 0 0.72 1.44 2.16 2.88 3.6 4.32 5.04 5.76 6.48 0 0 0 0
18.72 19.44 20.16 20.88 21.6 22.32 23.04 23.76 24.48 25.2 25.92 26.64 27.36 28.08 28.8 29.52 30.24 30.96 31.68 32.4 33.12 33.84 34.56 35.28 36 36 36 36
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-46.406 -34.194 -13.84 14.655 51.291 16.527 -10.095 -28.577 -38.916 -41.114 -35.171 -21.086 1.1398 31.507 70.017 28.007 -5.8619 -31.589 -49.174 -58.619 -59.921 -53.082 -38.102 -14.98 16.283 0 0 0
0 0 3
51.291 51.291 70.017 61.061 32.566
Project Spreadsheets to BS 8110
Location 2nd Floor slab
RIBBED SLAB DESIGN to BS 8110:2005 using table 3.12 coefcients GRAPH DATA III Made by rmw Job No R68
Originated from RCC92.xls v4.0 on CD 2006 TCC Date 31-May-17
0 7 0 8 0 9
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 4
Disclaimer
All advice or information from MPA-The Concrete Centre is intended for those who will evaluate the significance and limitations of its
contents and take responsibility for its use and application. No liability (including that for negligence) for any loss resulting from such advice
or information is accepted by MPA-The Concrete Centre or its subcontractors, suppliers or advisors. Users should note that all MPA-The
Concrete Centre software and publications are subject to revision from time to time and they should therefore ensure that they are in
possession of the latest version.
This spreadsheet should be used in compliance with the accompanying publication 'User Guide RC Spreadsheets: v4' available from The
Concrete Centre www.concretecentre.com/rcdesign Tel +44 (0)1276 606800
Status of spreadsheet This spreadsheet is shareware but may not be used for commercial purposes until the user
Public release version. has registered with The Concrete Centre using the licence validation form available on The
Concrete Centre website www.concretecentre.com/rcdesign