PROJECT
SEMESTER II, SESSION 2016/7
A. The site investigation of the Slope Remedial Work Project was carried out accordance
to the British Standard Code of Practice, BS 5930:1981 to explore the subsurface
condition of the failure slope. A total of 5 boreholes was drilled on site where BH3,
BH4 and BH5 are located on the Cross Section A-A.
The Location Plan, Survey Plan and Cross Section of A-A are given in Figure 1 and
Figure 2.
The Borelogs of BH3, BH4 and BH5 present the results of the site investigation works.
The Standard Penetration Test (SPT) was conducted to determine the natural bearing
resistance of the subsoil.
Note:
Water Head at the WSP locations are calculated from the assumed ground level of 0.00mRL as the Reduce
level of these locations are not available.
D. Produce the soil profile of the slope for Cross-section A-A. The profile shall include the
followings:
1. Find the best location for the constructing the retaining wall if the potential slip
surface failure is as shown in Figure 4. Explain why?
F. Acting as the geotechnical engineer for the site, you have to carry out the geotechnical
analysis for designing the retaining wall.
Draw the final detail of the designed retaining wall (i.e. the geometry of the wall, the
pressure distribution, as well as the forces acting on the wall, and the calculation of the
analysis) as shown in APPENDIX D (Figure 5: Example).
APPENDICES
APPENDIX A
APPENDIX B
APPENDIX C
APPENDIX D
Figure 5: Example