Detail Estimate
Project : Toilet Construction Works.
Site: Deurali-09, Nuwakot.
5 REINFORCEMENT WORKS
6 FORM WORKS
10 Wood Works
11 PAINTING WORKS
B. SANITARY WORKS
12 (50x40)cm Porcelain clay white glaze Oval Wash
basin with mixture
complete set
2
13
Small Flat back White glazed urinal
(46.5x35.5x26.5)cm with cistern all complete set
3
14
Porcelain Clay White Glazed Toilet Paper Holder
3
Checked by : Forwarded by :
Name : Name : 2.00
Desingation : Desingation :
LTANCY PVT.LTD.
du.
500.00
Total 500.00 Sq.ft.
5 2310.00
Total 2310.00 Cu.ft.
5.000 500.00
3.750 64.68
3.750 132.18
5.000 300.00
Total 996.86 Cu.ft.
1 81.37
1 81.37
Total 162.74 Cu.ft.
0.500 50.00
0.500 8.62
0.500 17.62
Total 76.24 Cu.ft.
81.37
81.37
60.00
12.00
Total 234.74 Sq.ft.
0.25 25.00
0.25 4.31
0.25 8.81
0.25 20.34
0.25 20.34
0.25 15.00
0.25 3.00
Total 96.80 Cu.ft.
1 81.00
0.5 18.00
4.25 17.00
9 36.00
0.750 10.96
0.750 17.71
0.42 25.20
0.42 142.22
Total 376.76 Cu.ft.
1550.83
Total 1550.83 Kgs
1 324.00
4.25 68.00
9 144.00
0.750 29.25
0.750 47.25
60.00
338.62
Total 1087.62 Sq.ft.
2 58.50
2 94.50
Total 153.00 Cu.ft.
8.3 121.38
8.3 196.08
5 75.00
5 33.75
7.5 -33.75
2 -18.00
8.3 85.07
8.3 45.65
8.3 66.40
7 -52.50
Total 144.62 Sq.ft.
81.37
81.37
30.00
Total 192.74 Sq.ft
30.00
338.62
Total 368.62 Sq.ft.
7.75 162.75
5 315.00
5 50.00
5 32.50
5 120.00
5 -30.00
5 -75.00
Total 575.25 Sq.ft.
12.42 434.70
12.42 291.87
3.5 122.50
3.5 82.25
7.500 -45.00
2.000 -24.00
9 567.00
9 90.00
9 58.50
9 216.00
7.5 -45.00
7.5 -112.50
2.000 -24.00
Total 1612.32 Sq.ft.
680.82
338.62
Total 1019.44 Sq.ft.
58.00
Total 58.00 Rf.t.
0.42 4.41
0.42 6.30
0.42 5.04
Total 15.75 Cu.ft.
7.500 45.00
7.500 56.25
Total 101.25 Sq.ft.
2.000 24.00
Total 24.00 Sq.ft.
9 567.00
9 90.00
9 58.50
9 216.00
7.5 -45.00
7.5 -112.50
2.000 -24.00
12.42 434.70
12.42 291.87
3.5 122.50
3.5 82.25
7.500 -45.00
2.000 -24.00
Total 862.32 Sq.ft.
7.500 101.25
7.500 126.56
2.000 30.00
Total 257.81 Sq.ft.
2.00
Total 2.00 Set
3.00
Total 3.00 Set
3.00
Total 3.00 Set
2.00
Total 2.00 Set
2.00
Total 2.00 Set
2.00
Total 2.00 Set
3.00
Total 3.00 Set
2.00
Total 2.00 Set
8.00
Total 8.00 Set
2.00
Total 2.00 Set
3.00
Total 3.00 Set
5.00
Total 5.00 Set
5.00
Total 5.00 Set
36.00
Total 36.00 R.ft.
200.00
Total 200.00 R.ft.
24.00
Total 24.00 R.ft.
60.00
Total 60.00 R.ft
30.00
Total 30.00 R.ft.
1.00
Total 1.00 Set
1.00
Total 1.00 Set
1.00
Total 1.00 Set
1.00
Total 1.00 Set
1.00
Total 1.00 Set
18.00
Total 18.00 R.ft
1.00
Total 1.00 Set
2.00
Total 2.00 Set
Abstract of Cost
Project No:
Project : Toilet Construction Works.
Site: Deurali-09, Nuwakot.
5 REINFORCEMENT WORKS
10 Wood Works
T.LTD.
Amount Remarks
565.00
24971.10
10776.06
1227.06
5173.65
22736.92
42967.58
199287.20
170730.87
75643.97
42306.03
151090.87
29176.36
13081.26
8275.52
113968.53
54157.83
19695.58
2225.46
48832.56
46985.06
12690.24
1096564.71
54828.24
1151392.95
Bill of Quantity
Project No:
Project : Toilet Construction Works.
Site: Deurali-09, Nuwakot.
rate
S.n. Description of Works Unit Quantity
in Fig.
A CIVIL WORKS
1 SITE CLEAREANCE WORKS
E/W in Excavation in soft soils for mass cutting site Cu.ft. 2310
levelling including hauling distance & lift all complete work
2.1 as per specification and instruction of site engineer.
Providing & laying Rubble Stone Masonary Works in 1:6 Cu.ft. 153
C/S mortar in sub/superstructure in perfect line level finish
including wetting the blocks, racking the joints and curing
the work for at least 7 days as per specification, drawings
7.1 & instructions of the site engineer all complete. .
Providing & laying 1st class local chimney made brickwork Cu.ft. 374.46
in 1:4 C/S mortar in Sub/superstructure in perfect line
level finish including wetting the brick, racking the joints
and curing the work for at least 7 days as per specification,
7.2 drawings & instructions of the site engineer all complete. .
38mm thick P.C.C. in (1:2:4) (Screeding) for floors & top Sq.ft 192.74
of slab etc with approved quality of cement, sand &
crushed stone Chips/aggregare including mixing,laying
8.1 curing all complete work in approved of site eng.
Sq.ft. 368.62
3mm.th. C.S. punning(1:1) on floor, dado and skirting etc.
8.2 as per specification and direction complete work.
Err:509 Err:509
Err:509 Err:509
9 PLASTERING AND POINTING WORKS
12.50mm. Th. Cement sand plaster (1:4) on of good finish Sq.ft. 1612.32
including racking the joints, wetting the surface and curing
9.1 the work all complete
Supplying and fitting sal wooden chaukose with all Cu.ft. 15.75
10.1 neccessary hardware all complete.
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
11 PAINTING WORKS
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509
Err:509
Name of Contractor :
Phone:
Address:
Date:
ONSULTANCY PVT.LTD.
Kathmandu.
ntity
rate
Amount Re.
in Word
Signature :
Mobile:
Fax:
E-mail:
Area (Sq.m)
DESCRIPTION
GF FF SF TF TOTAL
OFFICE BUILDING 370.75 316.7 278.27 29.62 995.34
CANTEEN 140 140
GARAGE/GUARD 169.7 169.7 19.53 358.93
Total 1494.27 Sq.m
16078.3452 Sq.ft.
Rate per Sq.ft. 6048.39021589
with provisional cost
a. lab test, insurance
b. 10% physical contengency
c. 10% price excalation
d. 13% vat
e. 5 % contengency
Estimated Cost
97248105.795456