Abk 2017-18
Abk 2017-18
Abk 2017-18
SECTION
AUDIT REPORT
2017-18
Proposed by Certified by
SSE/ABS/DSL/KZJ DME/DSL/KZJ
Approved
Sr.DME/DSL/KZJ
INDEX
S. No Description Page No
1. Various jobs in section
2. Action plan HHP
3. Action plan ALCO
4. Staff competency level
5. ANALYSIS OF FAILURES,
OCCURRENCES, MESSAGES AND
SHED FINDINGS
6. Shed messages
7. Make wise population and failures
8. Stocked item position
9. Non stocked item position
10. M&P
11. Tools
12. Modifications under progress/ to be
carried out
13. Reliability improvement action plan
VARIOUS JOBS IN WDG4 LOCOMOTIVES
3) Sanders attention
1) Sanders attention
4) Trouble shooting
5) Overhauling of valves
b) HHP:
Sl. Component 2014-15 2015-16 2016-17 2017-18
No. TP OTP SF TOT TP OTP SF TOT TP OTP SF TOT TP OTP SF TOT
1 PSB CARD DBI 0 0 0 0 0 0 0 0 1 0 0 01
2 PSB CARD SV2 2 0 0 2 0 0 0 0 0 0 1 01
3 PSB CARD SVJ 0 0 0 0 0 0 0 0 0 0 0 00
4 PSB CARD DIZ 0 0 0 0 0 0 0 0 0 0 0 00
5 PSB CARD CPZ 0 0 2 2 0 0 0 0 0 0 0 00
6 PSB CARD ADZ2 0 0 0 0 0 0 0 0 0 0 0 00
7 PSB CARD SS9A 0 0 0 0 0 0 0 0 0 0 0 00
8 PSB CARD SS9B 0 0 0 0 0 0 0 0 0 0 0 00
9 PSB CARD EPA1 0 0 0 0 0 0 0 0 0 0 0 00
10 PSB CARD EPA2 0 0 0 0 0 0 1 1 0 0 0 00
11 PSB CARD EPA3 0 0 0 0 0 0 1 1 0 1 0 01
12 PSB CARD FOR4 0 0 0 0 0 0 0 0 0 0 0 00
13 Brake controller valve 0 0 1 1 1 0 0 1 0 0 0 00
14 PVERI 0 0 0 0 0 0 0 0 0 0 0 00
15 PVBIT 0 0 0 0 0 0 0 0 0 0 0 00
16 PVBC 0 0 1 1 1 0 1 2 0 0 0 00
17 BCEV 0 0 0 0 0 0 0 0 0 0 1 01
18 AW4-16 0 1 0 1 1 0 0 1 0 0 0 00
19 AW4-ER 0 0 0 0 0 0 0 0 0 0 0 00
Sl. Component 2014-15 2015-16 2016-17 2017-18
No. TP OTP SF TOT TP OTP SF TOT TP OTP SF TOT TP OTP SF TOT
20 TRANSDUCER 0 0 0 0 0 0 0 0 0 0 0 00
21 Other Valves 0 0 4 4 1 0 1 2 0 3 11 14
22 Horn Magnet Valve 0 0 3 3 0 0 5 5 0 0 2 02
23 Sand Magnet Valve 0 0 0 0 0 0 0 0 0 0 0 00
24 Horn shells 0 0 8 8 1 1 9 11 0 0 0 00
25 Wipers 0 0 10 10 0 0 11 11 0 1 1 02
26 CCB 2.0 0 1 0 1 1 0 5 6 0 0 8 08
27 Auto Drain Valves 0 0 0 0 0 0 10 10 0 0 2 02
28 OTHERS 2 1 15 18 2 2 4 8 0 9 7 16
29 Angle cock 0 0 0 0 0 1 0 1 0 0 1 01
30 GAVGES 0 0 0 0 0 0 2 2 0 0 5 05
TOTAL 4 3 44 51 8 4 50 62 01 14 44 59
b) OTP
S No Loco No Date of Actual message Shed findings Corrective action
failure taken
c) Shed findings
S No Loco No Date of Actual message Shed findings Corrective action
failure taken
a) Air dryer
FRPCPY
S ALCO WDG4 WDP4 Total Failures Failures of Failures of
Make
No LY CY
16-17 17-18 16-17 17-1816-17 17-1816-17 17-18 16-17 17-18
1 Knorr Bremse 14 18 00 00 00 00
2 FTIL 59 15 00 00 00 00
3 SIL 15 31 00 00 02 02
4 Trident 02 11 00 00 00 00
5 Prag Polymers 00 10 00 00 00 00
b) A9 valves of ALCO
FRPCPY
S Make Population Failures
Failures of Failures of
No VALVE/KIT
LY CY LY CY LY CY
1 FTIL/India Supply. Co. 60 01 0.83%
2 SIL/ India Supply. Co. 40 01 1.2 %
3. FTIL/AK 60 00 0%
4. SIL/ AK 40 00 0%
b) HHP Locos
Sl. SOH
PL.NO DESCRIPTION AAC Remarks
No Section Stores
01 17455327 D.L.FILTER 40 06 05
ELEMENT
02
b) HHP Locos
Sl. SOH Remarks
PL.NO DESCRIPTION AAC
No Section Stores
01
02
03
04
05
VI. M&P
Additional
Sl. no Description Available Remarks
Requirement
1.
2.
3.
VII. Tools
Additional
Sl. no Description Available Remarks
Requirement
1. Ratchet NIL YES
2. Extension Handle -6 NIL YES
3. Box- NIL YES
4. Box 9/16 NIL YES
5. Box 12mm NIL YES
6. Nose Pliers NIL YES
7. Cutting Pliers NIL YES
8. Pipe wrench-14 NIL YES
9. Adjustable-12 NIL YES
10. Hammer NIL YES
11. Open spanner-1011mm NIL YES
12. Open spanner-1213 mm NIL YES
13. Open spanner- 9/16 NIL YES
14. Open spanner-1415mm NIL YES
15. Open spanner-1617mm NIL YES
16. Open spanner-19/3211/16 NIL YES
17. Open spanner-3/47/8 NIL YES
18. Open spanner-2022mm NIL YES
19. Open spanner-15/161 NIL YES
20. Open spanner- 15/81 5/16 NIL YES
21. Ring spanner-1 1 1/16 NIL YES
22. Ring spanner-15/161 NIL YES
23. Ring spanner 7/8 NIL YES
24. Ring spanner 9/16 NIL YES
25. Ring spanner 12mm13mm NIL YES
26. Ring spanner 10mm11mm NIL YES
27. Allen key 3/8 NIL YES
16. Ensuring 100% calibration of all gauges 91 Locos All locos 91 Locos
Done
during Hly & above schedule.
17. Conducting failure meeting every month Every month Every Every Every
and reviewing the action plan. month Month Month
18. EMD type J filters to be fitted in yearly Sch. 91 Locos All locos 82 09 Locos
Completed
19. Monitoring of purge time during every 91 Locos All locos 91 Locos
Completed
schedule.
20. During fitment of valves surface 91 Locos All locos 91 Locos
45
preparation & certification by supervisor to
completed
be ensured.
21. Dry blowing of air brake pipe lines during 91 Locos All locos 45 45 Locos
Yly schedule. completed
22. Ensuring working of D1 emergency brake 91 Locos All locos 45 Locos
Completed
valve during every schedule.
23. Ensuring sealing of additional BP cut out 91 Locos All locos 91 Locos
Completed
COC.