Nigeria LNG LTD NLNG Six Project
Nigeria LNG LTD NLNG Six Project
Nigeria LNG LTD NLNG Six Project
This document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Lagos, Nigeria. Recipients must obtain the written authority
of the said company before wholly or partly duplicating the contents or disclosing the same to others.
All rights reserved.
NIGERIA LNG LTD 6
NLNG SIX PROJECT
REVISIONS REVISIONS
SHEET SHEET
0 A B C 1 0 A B C 1
1 X X X X 51 X X X
2 X X X X 52 X X X
3 X X X X 53 X X X
4 X X X X 54 X X X
5 X X X X 55 X X X
6 X X X X 56 X X X
7 X X X X 57 X X X
8 X X X X 58 X X X
9 X X X X 59 X X X
10 X X X X 60 X X X
11 X X X X 61 X X X
12 X X X X 62 X X X
13 X X X X 63 X X X
14 X X X X 64 X X X
15 X X X X 65 X X X
16 X X X X 66 X X X
17 X X X X 67 X X X
18 X X X X 68 X X X
19 X X X X 69 X X X
20 X X X X 70 X X X
21 X X X X 71 X X X
22 X X X X 72 X X X
23 X X X X 73 X X X
24 X X X X 74 X X X
25 X X X X 75 X X X
26 X X X X 76 X X X
27 X X X X 77 X X X
28 X X X X 78 X X X
29 X X X X 79 X X X
30 X X X X 80 X X X
31 X X X X 81 X X X
32 X X X X 82 X X X
33 X X X X 83 X X X
34 X X X X 84 X X X
35 X X X X 85 X X X
36 X X X X 86 X X X
37 X X X X 87 X X
38 X X X X 88 X X
39 X X X X 89 X X
40 X X X X 90 X X
41 X X X X 91 X X
42 X X X X 92 X X
43 X X X X 93 X X
44 X X X X 94 X X
45 X X X X 95 X X
46 X X X X 96 X X
47 X X X X 97 X X
48 X X X 98 X X
49 X X X 99 X X
50 X X X 100 X X
Pages
1.0 PURPOSE...........................................................................................................................4
2.0 DEFINITIONS...................................................................................................................4
3.0 CONTROL VALVE LIST.................................................................................................5
4.0 CONCLUSION..................................................................................................................6
5.0 REFERENCES...................................................................................................................6
6.0 Appendices...........................................................................................................................7
1.0 Purpose:
The purpose of this document is to confirm the sizes of all the control valves within the
train 5 condensate stabilization unit 2000 for the NLNG Six project.
2.0 Definitions:
HOLD:
1. DELETED
CV calculated have been used to determine and confirm the size of the control valve (based
on Fischer control valve hand book). Final sizing and valve selection will be performed by
vendor.
5.0 References:
15. T-12.411.452 PFS condensate storage and Loading, case AGAA Pre-
Depentanizer, Unit 3300
6.0 Appendices:
HOLD:
1. Isometrics for HTF lines are preliminary. Lengths and associated calculated pressure
drop are to be confirmed later with final isometrics.