Today many industries are categorised by end customer demand for a wide variety of product models and variants.
Moreover, large number of product variants has implications on the material flows with in the assembly plants. This
requires logistics system that can support production in small lot size for excavator industry. Since, continuous material
feeding system resulted in increased inventory value, operator walk and search time, an attempt to increase production
throughput is made.
In this paper, best practice for material feeding system has been tested to support the assembly line with more
variants in end product. Existing continuous supply material feeding system has been studied to find the effects on
production hindering volume growth. Part flow, inventory and volume growth plan data have been collected and analysed
for effects on production time. Subsequently, operators walk time and distance have been analysed. Consequently,
alternate material feeding systems have been explored through literature. Model station analysis has been performed on
engine line to find the suitable material feeding system using simulation techniques. Finally, lean kitting supply system has
been tested through warehouse zoning and re-profiling activity.
Hence, continuous supply system has been replaced by lean kitting supply system. Results showed reduction of line
side storage space by 69%, inventory value by 54.3%, operator walk time by 78.3% and line side replenishment by 29.6%.
This helped in achieving the takt time of four machines per day. Further, kitting gave flexibility to introduce five new
variants in the existing assembly line without any additional investments.
Keywords: Continuous Supply, Kitting, Inventory Level, Warehouse Zoning
Abbreviations searching time. According to TPS and Lean theories,
DES Discrete Event Simulation these issues are defined as waste and have to be reduced
JIT Just in Time or eliminated especially to increase the line capacity [2,
MHE Material Handling Equipment 3]. Hence, company wants to increase their assembly
POU Point of Use line capacity in order to manage model variation along
SCM Supply Chain Management with satisfying customer demand. In order to address
VSM Value Stream Mapping line side storage space and motion waste issues,
company is looking at new techniques to deliver
material. This project focuses mainly on developing
1. INTRODUCTION lean material feeding system to eliminate waste
operations at assembly line in order to achieve desired
The growing number of product variants that is takt time [2, 4].
reality for many manufacturing companies results in
more number of parts. These parts are to be delivered to
the assembly lines. Delivering them in the traditional
way with continuous supply becomes a problem since 2. PROBLEM
increase in number of parts demands an increase in line Caterpillar manufacturing introduced a new
side storage space [1]. An increase in storage space and product called excavator with single variant. Due to
part numbers create longer operator walking and search increased customer demand for more variants, the
time for parts at assembly line. Currently, Caterpillar company decided to introduce four more variants and
Excavator Division is assembling one of the product increase assembly line capacity from two machines per
types. The machine is assembled in an assembly line day to four machines per day. However, the existing
and method of delivering parts to the assembly line is material feeding system proved to be difficult to achieve
continuous supply system. Meaning all parts that are the given takt time. Continuous supply system or line
used for assembly are stored in Kanban system at line side storing system proved impractical to cope up with
side. The variation in the end product causes the line 500 extra parts, thus, leading to increase in search time
side stores to keep high inventory of different part and walk movements. As the line side stock increased,
numbers even though usage of some parts are very low. the inventory value increased more than the estimated
Increase in assembly capacity demands more line side plan. So, the company is looking for alternate material
space, which currently does not exists. Besides using feeding system, which supports the production. The
big line side space, increases operator walking and
Analysis Report: