3d Hitech Systems Limited Profile Consolidated
3d Hitech Systems Limited Profile Consolidated
3d Hitech Systems Limited Profile Consolidated
PROFILE
CIVIL
ELECTRICAL
ENGINEERING MECHANICAL
MARINE
FEED
DRILLING
STRUCTURES
CONSTRUCTION
PIPELINES
WELLHEAD SERVICES
SUPPLIES
INSTALLATIONS
PROCUREMENT
INSPECTION
Page |2
Page |3
OVERVIEW
We are simply into engineering, designs & fabrication, construction & consulting
services, haulage, oil and gas, implementation and strategy. We are heavily invested
in the present Nigerian gas revolution, and are poised to actively participate in piping
and Gas pipeline construction network across the nation.
Our employees work in a future oriented and quality conscious way to ensure
effective and efficient service delivery in all parts of the country.
Little wonder, that we are able to plan and competently execute projects at all stages
according to required specification, thus giving us the National and international
recognition and accolade that we enjoy today. Our services are tailored to the needs
of our clients. We do this by proffering innovative/original solutions and deploy best
in standard equipments/employs the services of highly experienced professionals to
execute projects. We conduct our operations with reliance on the latest technology.
Page |4
Safety in all areas of our operations is critical and therefore ensures that necessary
precautions and training are offered to everyone in our employment.
3D Hitech Systems Limited believes in the viability and sustenance of projects and
guarantees this by laying a solid foundation at the onset, starting with project
identification, screening through feasibility studies and engineering design to project
commissioning, conduct post project execution evaluation, maintenance and audit
services. We have established close working relationship with architectural,
surveying and other engineering firms, whose services are often elicited and
complimented with in-house skills, thereby, making available to the client the
broadest range of expertise. Our rich database on project executed in-house and
projects executed by our Technical partners serves as invaluable reference materials
for new project design and execution. This is of course supported by technology for
feasibility analysis and reporting, computer aided design (CAD), software in the
areas of engineering, architecture and project management all of which ensure that
most assignments are concluded in record time and to approved standards. The
company believes that the proper monitoring and control of project is just as
important as well as formulating and designing projects.
The primary drivers of our business are cost consideration coupled with deep
concern for environmental impact, safety, security and community relations. We are
highly sensitive to the environment by ensuring that necessary assessment is carried
out in line with international practices before embarking on any project
Customers demand results and we deliver. 3D Hitech Systems' commitment and
dedication to deliver quality results to our customers is our single goal.
Do business with us
And you ll be glad you did
Page |5
1. INTRODUCTION - - - - - -- 2
2. COMPANYS OVERVIEW - - - - - 3
3. CONTENT - - - - 5
6. OUR TEAM 12
8. MARINE - - 36
10. ELECTRICAL - - - - - - 72
11. INSTRUMENTATION 80
Vision:
The Companys vision is to be the leading Oil and Gas Services Solution provider in
our areas of operation.
Mission:
To be an oil & gas industry leader, offering effective services using high level
technologies and motivated professionals to deliver quality projects to our clients
and benefits to our stakeholders
Page |7
Company Objectives
3D Hitech Systems Limited is a wholly owned Nigerian Oil & Gas service company
incorporated in Nigeria to offer engineering and specialist services to Oil & Gas/allied
companies of the Nigeria economy. It was established as a one stop engineering
service firm to meet the business goal of our clients. Throughout our short period of
operations, we have proven this fact by the quality of projects executed so far.
Our services are tailored to the needs of our clients. We do this by proffering
innovative/original solutions and deploy best in standard equipments/employs the
services of highly experienced professionals to execute projects. We conduct our
operations with reliance on the latest technology. Safety in all areas of our operations
is critical and therefore ensures that necessary precautions and training are offered to
everyone in our employment.
3D Hitech Systems Limited believes in the viability and sustenance of projects and
guarantees this by laying a solid foundation at the onset, starting with project
identification, screening through feasibility studies and engineering design to project
commissioning, conduct post project execution evaluation, maintenance and audit
services. We have established close working relationship with architectural, surveying
and other engineering firms, whose services are often elicited and complimented with
in-house skills, thereby, making available to the client the broadest range of expertise.
Our rich database on project executed in-house and projects executed by our
Technical partners serves as invaluable reference materials for new project design
and execution. This is of course supported by technology for feasibility analysis and
reporting, computer aided design (CAD), software in the areas of engineering,
architecture and project management all of which ensure that most assignments are
concluded in record time and to approved standards. The company believes that the
proper monitoring and control of project is just as important as well as formulating and
designing projects.
The primary drivers of our business are cost consideration coupled with deep concern
for environmental impact, safety, security and community relations. We are highly
sensitive to the environment by ensuring that necessary assessment is carried out in
line with international practices before embarking on any project.
Page |9
Therefore in line with our community relations and social response and contracting
policies, we have established the following principles: We shall utilize goods and
services produced in Nigeria and project host communities in Nigeria, especially
Niger Delta.
The company shall continue to develop indigenous contractors and utilize local labour
and locally manufactured materials wherever possible as enshrined in the contract
policy. The company shall provide training to develop human capital and building
competencies in the management field of sustainable local development.
manner and in line with the agreement signed between us and our client
To provide adequate control of the health and safety risks arising from our work
activities.
To consult with our employees on matters affecting their health, security and safety.
To ensure all employees are competent to do tasks, and give them adequate training
Core Values
Due to the nature of the work undertaken the company has very high standards and
guidelines of Safety Management and HSE Systems.
The company carries out regular monitoring of all its Systems and Operating
Procedures to ensure that all works undertaken or materials supplied through its
approved major suppliers are carried out in full compliance with the very latest
legislation and Oil & Gas recommendations.
In line with this Total Quality Commitment the company has in-house Quality
Assurance Systems to monitor and control all aspects of our work including
materials, welding standards, pipeline work assembly, testing and commissioning.
P a g e | 11
Coupled with its in-house specialized personnel and the logistical, manpower and
plant support, we have the capacity to tackle any specialized oil/gas project including
Pipelines, Terminal & Refined Product Storage Tanks, Shutdowns, Hot Tapping,
Diversions and other related projects.
3D Hitech Systems has the equipments, manpower, resources and expertise work
force for providing Industry solutions for the transmission and distribution of OIL &
GAS Pipeline and Pipeline Installation. Our work force mainly concentrate on HSS &
E, cost-effective & time bound budgetary solutions to project.
Services Offered
Our Team
Currently, we have 45 staff in our team with a wide range of experience and skills to
ensure we can successfully deliver on any project. Very high average employment
duration of 7.25 years signifies the devotion, reliability, experience and commitment
that customers can expect us to provide on every job we undertake.
At 3D Hitech Systems Limited we fully believe the adage Your staff are your most
important asset. We realise that the personal and professional development of our
team is imperative in ensuring the successful delivery of projects, and thus the
success of our business. We therefore invest in our staff through comprehensive
training programmes, mentoring and coaching. The rewards of this philosophy are
inevitably shared with customers through increased satisfaction and better quality
service.
Our in-house design team provides site and master planning, architectural,
electrical, plumbing and HVAC consultation, specifications and design criteria
specifically tailored to your company's requirements. Every project is "value-
engineered" to meet your budget.
P a g e | 13
Our project management staff delivers results you can count on. Our field
crews self-perform the following trades: masonry, concrete, rough and finish
carpentry, electrical, plumbing, HVAC, interior painting and finishes.
Our real estate team offers comprehensive analysis of your existing and future
real estate needs. We manage office, warehouse and manufacturing space in
Nigeria, maintaining a continual commitment to your complete satisfaction
through the value enhancement of each property.
When you build with 3D Hitech Systems Construction, you can relax knowing that
your home is in the hands of a highly skilled, hand-picked team. We want you to
benefit from our tradesmens years of experience building and renovating across the
country.
To bring fresh, innovative ideas to the table, we have hired top apprentices to work
alongside our tradesmen. Each apprentice is closely supervised by one of our
experienced staff to make sure that all of their skill and efficiency is being passed on
to the next generation. These are the people you want on your project.
P a g e | 14
Management
Patrick Azi
CEO
Patrick Azi has worked with reputable companies locally and abroad, bringing wealth of
experience, spanning 15 years from Shell petroleum development Company(spdc west)
Daewoo Engineering the dorsche gruppe and 3D Hitech Systems Oil Company (to mention
a few) to bear in Business development and execution.
Otah Mariere
General Manager (Commercial & Communication)
He has BSc in Industrial Relations & Personnel Management from the University of
Lagos, Akoka and MBA in International Business Management from the Lagos State
University. He is a member of several professional associations including the
Chartered Institute of Management Consultant. He has attended both local and
International training programmes including the prestigious Lagos Business School
Emenuwe Emmanuel
Chief Finance Officer
He has BSc in Accounting and MBA Financial Management from the Lagos State
University. He is a Fellow of Institute of Chartered Accountants of Nigeria with over
25 years practical work experience which cut across various sectors of the Nigerian
economy. He started his career with Glaxo Nigeria PLC as a Cost Accountant and
helped in redesigning the costing system. He later joined Rosabon Investment Group
as the Group Accountant. The company has interest in financial services, Oil and
Gas, Telecommunication, Information Technology and Real estate. He successfully
set up the accounting and internal control system of the entire group.
He later joined the Insurance Brokers Association of Nigeria and later and Minet
insurance Brokers as Financial Controller where he worked a couple of years before
joining 3D Hitech Systems as Chief Finance Officer. He recorded verifiable record
breaking achievements in various organizations with lots of awards to his credit. He
is an author of one of the bestselling books on Personal Money Management. He is
a Financial Intelligence instructor and trainer with series of life changing seminars.
Akpa Jide
General Manager, JV Operations & New Business
He has first degree in Estate Management from the University of Lagos. He worked in
several organizations including Ikonoba Industries Limited Lagos and Precious & George
Investment Limited, Abuja at both middle and senior level management positions before he
joined Cold & Chill Properties Limited Abuja as Executive Director.
He has excellent knowledge of government relations, a good business strategist with strong
negotiating skills. While at Cold & Chill Properties Limited Abuja, he made major
contributions towards the companys profitability and growth. He has made significant
contributions in the organizations he worked for before joining 3D Hitech Systems limited as
Executive Director, JV Operations & New Business.
P a g e | 16
Ishani Isaac
General Manager, Engineering & Projects
He has HND from Rivers State Polytechnic, Bori, River State with about 16 years practical
experience in the oil and gas industry. He has worked in several organizations including,
Southern Gas Construction Nig Ltd, Hyundai Nigeria Limited, EC / Delattre-Bezons Nigeria
Limited, TSKJ Nigeria Limited / Techint Cimimontubi Nig Ltd, Oversea Technical Services) /
Nigeria Liquefied Natural Gas,BRT Exxon Mobil / Daewoo E&C Nigeria Ltd, (DN 49& DN
25), Japan Gas Company (JGC) / Exxon Mobil Production Nigeria,
Mamudu Faruk
Senior Project Manager
with Biddy OSA Oil and Gas Limited where he managed all QA/QC and HSE issues
in oil and gas facilities.He attended several professional training courses in metal
fabrications, steel fabrication, piping, construction, installation & safety training.
P a g e | 18
ENGINEERING
One of 3D Hitech Systems's key strengths is the ability to communicate to our clients
and projects teams through our information management systems and virtual work
environments. We are able to utilize our entire vast expertise, regardless of their
physical location. 3D Hitech Systems clients benefit both from our cost effective
distributed project execution and our ability to utilize 3D Hitech Systems's wealth of
niche experts efficiently and effectively.
Our EPC expertise can successfully execute challenging projects in the areas of
power and industrial, infrastructure, downstream markets, oil and gas, LNG/GTL,
and government and defence.
3D Hitech Systems helps to lay the foundation of an engineering project with best-in-
class FEED solutions for clients. Our combination of technical expertise and
P a g e | 19
3D Hitech Systems aims to provide front-end engineering and design (FEED) of the
topsides for any proposed development facility.
Our seasoned staff of engineers and FEED specialists ensure that the design of a
project meets the project's time frame, ROI, operating costs and budget, while
sustaining our commitment to operational excellence.
3D Hitech Systems Limited, performs pipeline integrity work across the United
States. We offer a wide variety of services on Natural Gas, LPG and Crude Oil
pipelines with-out service interruptions, including (but not limited to) excavation, re-
coating, painting, Clock Spring installation, welding of sleeves, cut outs, line
lowering, and hot taps. We also perform DOT hydro testing and pipeline
displacement.
As the World's network of gas and oil transmission lines becomes older, the need to
revalidate these lines, and rehabilitate segments of these lines, becomes
increasingly important. 3D Hitech Systemss special services division has the
capability to inspect, test, and replace when necessary all sizes of pipelines.
3D Hitech Systems has tested over 3,500 miles of in-place pipelines, and replaced
approximately 1,000 miles of 10-inch to 36-inch pipelines. Using the most advanced
technology, Associated is fully qualified to provide inspection, testing and
replacement services which meet the stringent of requirements.
INSPECTION SERVICES
We organize, plan, execute, control and verify the quality of the work in accordance
with customer requirements and the 3D Hitech Systems Management System and
take action to identify, report, correct and prevent nonconformity.
Our Logistics Simulation group also executes material delivery strategies for
proposals and projects. Using discrete event simulation technology, we have the
ability to simulate storage, loading, transportation, and delivery systems to balance
the capacity for materials movements against risk, unforeseen events, and the
overall project schedule requirements for materials delivery and usage.
Our clients turn to us for logistics management in the refinery industry, crude and
refinery product blending, LNG storage and shipping, batch processes and our own
internal work processes.
MATERIALS MANAGEMENT
Over the past several decades, 3D Hitech Systems has worked to help minimize our
clients' total material costs through innovative planning and logistics systems. We
ensure the correct quality and quantity of materials, timely delivery of equipment to
be installed, and subcontracted resources obtained at a reasonable cost, all
available on-time and under budget.
We offer the expertise, processes and tool utilization needed to facilitate frequent
status updates on all material control information including quantities required,
materials allocated, requisitioned, received and issued. Our processes provide cost
control through rigorous materials management.
We also tailor materials control programs to our clients' project needs by leveraging
a network of tools to achieve competitive pricing, flexible sourcing, timely delivery
and efficient distribution of materials to the end-user.
P a g e | 21
PROCUREMENT MANAGEMENT
3D Hitech Systems effectively manages the procurement of global projects large and
small, creating top-to-bottom consistency throughout the entire logistics, delivery and
installation process.
SUBCONTRACT SERVICES
3D Hitech Systems utilizes its Contract Management System (CMS) to facilitate all
subcontracted activities. Accessible via the internet, CMS is scalable for use on
small engineering or construction projects and is built primarily for large-scale
initiatives requiring a high degree of standardization, organization, security, and
collaboration. Our clients turn to us for support - provided with 24 hour coverage.
We have a global track record of ensuring timely and accurate material receipt
through innovative expedition and quality assurance with vendors to minimize
P a g e | 22
We also leverage the latest supply chain technology to ensure our customers'
material is accurately tracked throughout its journey to its destination and installation.
3d Hitech Systems has the tools needed to ensure the proper installation and
operation of systems prior to the handover to the end user. Our successful track
record of testing and commissioning procedures helps develop a steadfast facility
commissioning plan and comprehensive schedule to meet our client needs.
Construction Management
We provide services which include the management of design and construction team
activities, process installations, coordination of utility and infrastructure and
contingency construction. Our seasoned management team can facilitate
benchmarking analysis and provide assistance in the development of best-in-class
facilities programs through the asset-specific maintenance programs, supply and
demand-side energy programs and asset lifecycle analysis.
Major Construction
3d Hitech Systems has provided major construction services on large scale, global
projects for the petrochemical, refining, power, manufacturing, infrastructure and
forest product industries. From government buildings to complex refineries, we have
the people, equipment, construction materials, and experience to complete any sized
project on time and on budget.
Whatever the size and complexity of a construction project, we have met challenges
with optimism and experience whether it is a large and refined university to a small
retrofit project, we have the tools, resources and experience to deliver a project on
time and on budget.
Our teams of skilled project managers are experts at scheduling and tracking the
progress of all segmented construction trades, equipment delivery and phases of
construction. Additionally, our client base ranges from school districts and
transportation authorities to federal facilities and healthcare organizations. We are
committed to delivering high-quality solutions at the best value to our customers.
3D Hitech Systems' small and mid-capital construction services provide clients with a
variety of cost-effective services, from minor renovations to major expansions or
relocations. With our continuously present on-site teams, we meet customer needs
from project startup to completion.
3D Hitech Systems has provided Advanced Chemical Engineering services and has
an established track record of bringing tangible economic and efficiency benefits to
customers.
We offer effective contract administration, cost and schedule control, work order
management, quality control and design supervision to our client base. We have
P a g e | 25
worked with a number of organizations to provide the most inventive and refined
solutions for key initiatives in services including preconstruction, purchasing, field
supervision, project scheduling and subcontractor management and security.
In a global economy where budgets are carefully crafted and expenses closely
monitored, our clients depend on us to provide total maintenance services projects of
any scale that align with their business goals and our professional commitment to
excellence and safety.
Our efforts to ensure the safety of our customers through dedicated maintenance
work have helped us develop some long-lasting partnerships.
For us, clients are more than projects; our reputation hinges on the continued
satisfaction of each one. Through every step of our partnership, 3D Hitech Systems
will assemble the right workforce, with the right skills, to meet your short and long-
term maintenance goals.
Logistics Support
With a full range of responsive, effective and reliable planning, procurement and
supply chain management services, 3D Hitech Systems is a leader in field of global
logistical support. We move people, products and vital supplies from one side of the
globe to the other through a variety of effective delivery methods.
Lifecycle Services
This full spectrum of services during the life cycle of any project can only be offered
by a company like 3D Hitech Systems with the history and ability to deliver quality
services through our aggressive recruitment and hiring of a highly-trained, multi-craft
workforce focused on safe and timely delivery.
As part of our goal of being the countrys leading contractor, we deliver an array of
services to our clients' project needs
P a g e | 27
PIPELINE PROJECTS
P a g e | 28
P a g e | 29
P a g e | 30
P a g e | 31
P a g e | 32
P a g e | 33
P a g e | 34
P a g e | 35
3D Hitech Systems also carries The U, S, and R Code Stamps. This allows us a
full Turnkey Services to the Oil and Gas industries, providing an ability to perform
any re-pairs, alterations and/or fabrication of coded vessels or equipment. Copper-
head is run by a highly experienced management team who have spent their lives in
the Oil and Gas industries and understand the unique require-ments that are critical
to delivering quality service and product on time and on budget.
P a g e | 36
MARINE
3D Hitech Systems Limited, offers a variety of Marine services to the offshore and
maritime industries
Some of our present senior personnel have been active in the company since its
inception. 3D HITECH SYSTEMS LIMITED's strength lies within its in-house team of
Master Mariners who are fully conversant with the technical and operational skills
required in today's offshore environment.
The qualifications and experience of our Mariners coupled with the complementary
skills of our offshore broking staff, maritime work ethic, and philosophy of providing a
superior service to our customers,enables 3D HITECH SYSTEMS LIMITED to offer
the wide range of integrated services which centres around the movement of Mobile
Drilling Units and Offshore transportation and installation in general.
MOORING SYSTEM
P a g e | 37
P a g e | 38
P a g e | 39
P a g e | 40
P a g e | 41
A commitment is only as good as the company that makes it, building facilities that are
economical, reliable and efficient has been 3D Hitech Systems Limited 's commitment.
Our team of construction professionals offers a single source solution for all of your
construction related needs. Whether its restoration, site preparation, a new facility or
facility renovation, we have the experience and personnel to provide the highest quality
construction on schedule and within budget.
Building Construction
Its scope of work covers the whole spectrum of building and construction consultancy,
technical due diligence, management and compliance and incorporates a wide range of
building types: commercial, industrial, retail, residential, public and historic.
3D Hitech Systems Limited takes an active role in setting the standards within the local
market and actively seeks to adapt its skills to meet the constantly changing needs of its
clients. Deepocean Fluid Limited enjoys a unique reputation, not only for the high
standard and quality of work, but also for a forward-looking approach to changing times.
P a g e | 42
The practice is widely recognised in the Nigerian market for the breadth of its service
areas in property. Professional services are enhanced by ISO 9001:2000 Quality
Assurance systems and supported by a locally managed library and information centre,
extensive investment in information technology and ongoing research and development
activities.
The Building Surveying team specialise in providing proactive advice throughout the life
cycle of the building and with a dedicated team of highly skilled individuals, our success
has been our ability to provide focused commercial advice tailored individually to suit
our Client's needs, with the aim of maximising the value and managing Client risk.
P a g e | 43
The plain fact is we love to build buildings. Maybe it stems from the pleasure of
overcoming the intricate challenges of construction. Or the feeling of accomplishment
when a project has been successfully completed. But most likely it simply comes from
the delight we share with the building's owners and with all the project team members at
a job well done.
That passionate energy and aggressive enthusiasm for a construction project begins
even before you award it to us. Prior to making a presentation, we analyze every project
down to the last detail to ensure that it matches our capabilities. Fact is, 3D Hitech
Systems Limited will submit a proposal only if we are certain we can do a first-rate job.
P a g e | 44
More importantly, that analysis also allows us to discover potential problems, develop
ways to address them in advance and give you a more realistic construction plan. In the
end, that means being able to build more efficiently.
Resources
The Integrated Management System (IMS) integrates quality, occupational health &
safety and environmental practices that 3D Hitech Systems Limited has developed
and used successfully. The IMS specifically outlines the following:
Please note that if we do not currently have any equipment that is required for a
project we will hire it for the duration of that project at discounted prices and these
savings are passed on to the customer.
Equipment is available for hire subject to availability. Please contact us with your
requirements.
It is the combination of these capital resources and our valuable human resources
that enables us to deliver a successfully completed project on budget and on time.
What We Do
Civil Engineering/Construction
Building Constructions
Shopping centres
Office blocks
Retail outlets
Residential
Churches
Our Services
Building trusting relationships with our clients by being responsive to their expectations
and providing the highest quality possible is the cornerstone of our corporate culture. Our
attentiveness to our clients and all aspects of every project has resulted in long-term
client relationships just within our one-year history.
3D Hitech Systems Limited has been providing services under the CM-at-Risk and
Design-Build umbrellas, in addition to the traditional Agency CM and General
Contracting methods. You can trust that we have "been there-done that." We understand
the ins and outs of each project delivery method and will apply our knowledge and
lessons learned to your projects.
3D Hitech Systems Limited practices open and honest communication, with our clients
trusts a priority from the get-go. By being held accountable for our actions and offering
complete transparency throughout the construction process, our clients have received
not only higher quality projects on time and on budget, but also peace of mind that we
acted as their agent with their best interests at heart.
Not sure which construction delivery method is right for your project?
Below is a list and a short description of our services, all of which are available no matter
the construction delivery method you chosen.
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
PLUMBING
HVAC
INTERIOR FINISHES
Build
CONCRETE MASONRY
ROUGH CARPENTRY
FINISH CARPENTRY
ELECTRICAL PLUMBING HVAC
PAINTING INTERIOR FINISHES
Manage
BROKERAGE MARKETING
PROPERTY MANAGEMENT
ASSET MANAGEMENT
DEVELOPMENT
FACILITIES MANAGEMENT
trades and subcontractors. 3D Hitech Systems Limited Civil Works Services attends
all project meetings with the architects/design team and clients to discuss job progress,
procedures, scheduling and coordination issues, maintaining a high standard quality,
raising the performance level of the entire team. To construct durable, functional
facilities while effectively managing the scope of work, cost / budget, and the
construction schedule.
For 3D Hitech Systems Limited Civil Works Services the pre-construction services it
is not only estimating services, these are important, but we believe that a more pro-
active management of the design phase will help to assure that the design reflects the
budget, schedule, and the design needs of the clients. The 80% of the control of the
budget and schedule are within the design phase of the project. As project designers 3D
Hitech Systems Limited Civil Works offers a Pre-Construction Technical Analysis
Services approaching clients goals.
As part of 3D Hitech Systems Limited Civil Works Services quality policy our
technicians designed, executed and implemented a comprehensive Quality Control
Program for the Testing and Monitoring of all materials and construction projects. We
have Certified Engineer Inspectors to verify earthwork, mix concrete, steel,
reinforcements, precast, concrete, masonry, fireproofing, roofing, pavements, sub-
grades and foundation of any construction project.
P a g e | 49
Our fundamental belief in Quality Commitment is applied to all tasks. It applies to all
employees, procedures, equipment, state of mind and attitude. It is one of the bases
that separate us from any other company the true base that we endeavor to find
quality in our employees and teach them to seek quality in all other tasks.
Company Projects
3D Hitech Systems Limited project portfolio includes a variety of types and size of the
project from the smallest stand alone fire alarm installation fully to integrate electrical
and mechanical installations. Projects include work for private and public sector clients
on a number of commercial, leisure, and, light industrial projects.
We provide the following Detailing and Drafting Services in Plumbing including supply,
install and
Maintenance:
Domestic Cold and Hot Water System layouts
Waste Water System layouts
Storm Water System layouts
Riser Diagrams of Domestic Hot / Cold Water Diagram, Sanitary Drainage and
Vent Diagram, Storm Water Drainage Diagram, Compressed Air Diagram, Fuel /
Medical Gas Diagram, Fire Protection Diagram, Laboratory / Radioactive
Drainage and Vent Diagram, Oral / Laboratory Vacuum Diagram
Typical Enlarged Diagram showing all the details of the plumbing accessories and
P a g e | 51
Preconstruction Services
Preconstruction Estimating
Provide project estimating and a reliable cost model drawn from our extensive cost
histories.
Feasibility Studies
Analyze life cycle costs for building system alternatives.
Scheduling
Develop a complete team schedule showing who and what goes where and when.
MEP Review
Evaluate evolving mechanical, electrical and plumbing system concepts and coordinate
P a g e | 52
engineering services.
Constructability Review
Help determine the ease and speed of the building process.
Risk Management
Control cost, schedule and owner objectives to mitigate risk.
Market Analysis
Understanding the unique requirements of your project in the context of market
conditions and trends.
Cost Control
Provide the most efficient design and construction methods to achieve value.
Quality Control
Monitor methods, procedures and checks from start to finish with the goal of meeting
established standards.
Construction Services
LEED TM Certification
Meet sustainable design and construction criteria for Leadership in Energy &
Environmental Design certification and recognition.
Progress Monitoring
Monitor actual versus forecasted schedule/budget.
Labor Relations
Proactive resolution of potential issues.
Post-Construction Services
Commissioning
Ensure that building systems are designed, installed and activated according to owner's
operational needs.
P a g e | 53
Lien Releases
Severing of contractual ties to vendors.
O&M
Development of operations and maintenance instructions.
Final Closeout
Completion of punch listed items.
One-Year Walkthrough
Final verification of operational status.
3D Hitech Systems Limited culture begins with our people; we like to think of
ourselves as one big family working together toward one goal - Building Excellence.
Our company culture is a mix of hard work, fun, mutual respect and a strong
commitment to our clients and community. There is close friendship among the
employees of this family-oriented company that adds value to their working and
personal lives. We strive to maintain an open, family-like atmosphere in our offices
and on our job sites. Like most families, our expectations are high. We recruit and
retain only the most talented and enthusiastic employees, many of whom have been
with 3D Hitech Systems Limited for over 8 years.
Each year everyone looks forward to planning and attending the many traditional 3D
Hitech Systems Limited events like the annual family picnic and annual meeting,
as well as group outings, holiday parties and retreats.
P a g e | 54
Safety
Our supervisors receive training in the 30-hour Construction Out Reach Program, as
well as classes in Fall Protection, Excavation and Trenching, First Aid, CPR and
Confined Space Entry Procedures, Substance Abuse Awareness and Recognition.
New employees are required to complete our New Hire Safety Orientation Program.
Our substance abuse program includes Pre-hire, Post Accident, Fitness for Duty, For
Cause and Random Drug and Alcohol Testing. All employees, including
management, are subject to random testing equal to 25% of our annual workforce.
Plant Hire
3D Hitech Systems Limited has an extensive fleet of machinery
and equipment all available for hire subject to availability.
Site Works
3D Hitech Systems Limited provides a wide range of earth and
site work services including; house site construction, driveway
construction, landscaping, drainage and trenching.
P a g e | 56
Subdivisions
3D Hitech Systems Limited has extensive experience in the
construction of subdivisions including; earthworks, drainage,
service relocation/installation, footpaths, pavements, surfacing
and landscaping.
Construction
With a passion for construction, we provide the highest level of
service to every client by dedicating our time and energy to
producing only the finest quality of workmanship to enhance the
lifestyles of our customers.
All 3D Hitech Systems Limited projects are assigned a supervisor from the initial
survey through to project completion. On-site personnel carry cell phones, Black
Berry PDA computers, and laptops making all 3D Hitech Systems Limited
supervisors and project managers available at any time throughout the project. We
go to extraordinary lengths to insure that each job flows smoothly, efficiently, and on
budget.
Our unwavering attention to the business side of building benefits everyone: The
Owner and Design Team see a final product that follows the spirit of the original
vision, the subcontractors get in and out with no down time, increasing their profit
margin and providing incentive to offer their services at lowest possible price, and
the client knows exactly what the job will cost and precisely when it will be finished.
Get some scissors and a stack of magazines. Try magazines like Architectural
Digest, Elle Dcor, Sunset, House Beautiful, In Style or even National
Geographic. Cut out any picture that intrigues or inspires you.
Snip swatches of color, too, using everything from ads to feature articles. Then
separate them into piles along with any color chips and material samples (ribbon,
fabric, tile, wallpaper) you may have collected.
For your bathroom, you might have a picture of a bamboo forest, another of Windsor
Castle, and a chip of tile. Look at the colors and textures and see if they agree.
Perhaps you will end up with a granite finish on the tub and muted green walls, and
decide to save the tile for the kitchen.
E-Construction
Foundation
Framing
Rough Mechanicals
Finishes
Trims
Finals
Final Orientation
Pre-Construction
During the pre-construction meeting, you are invited to sit down with your sales
person, superintendent and possibly a customer service representative to do a final
review of your Dream Home package. Together, you'll verify the placement of the
house, review the blueprints, and find out what to expect during the building process.
Once city and county permits are cleared, construction can begin.
Your sales rep will remain your primary contact throughout the process, but make
sure you have contact information for your superintendent as well.
P a g e | 59
Electrical
P a g e | 60
Our skilled teams of staff ensure that the most intricate electrical work is carefully
and correctly completed, ensuring guaranteed peace of mind.
Partitioning
Drywall, Chip Board, Vitrex Toilet Partition System and demountable types? we have
the expertise required to complete each and every installation.
Project Management
Building Alterations
We have the expertise to complete both exterior and interior building alterations for
any requirements.
Turnkey projects
Having handed over a number of projects fully completed and in a ready to use
condition, whatever the clients requirement, we deliver.
Shop fitting
Star Contractors supply the services in manufacturing and installation of shop fitting
projects, using the best possible quality raw materials and supplying the most
appropriate fittings to the full satisfaction of its clients.
Suspended Ceilings are hung from the ceiling joints with a metal grid. This creates a
cavity between the joints and the ceiling where pipes, wires and ductwork can be
installed and worked on. We use Gypsum boards with a standard thickness from
6mm-15mm or any type of acoustic materials. Specialised designs can also be
created utilising these materials.
Moldings
P a g e | 61
A moulding is a strip of material with various cross sections used to cover transitions
between surfaces or for decoration, made from wood plaster or plastic. We create
definition by applying light and dark shaded stripes to a structure or object, without
having to change the material or apply pigment.
General Construction
Retaining Walls
3D Hitech Systems Limited can provide certified soil and rock anchors for a range
of applications including retaining walls, uplift tie down and emergency soil
stabilisation by overburden removal, pore-pressure dewatering and manta ray
anchors.
ANCHORING
Stingray & Manta Ray Earth Anchors driven tipping plate soil anchors for
reaction of tensile loads. Fast and easy to install, they require no grout or
excavation and are environmentally friendly.
Duckbill Earth Anchors used to secure any objects that may be stolen,
moved or blown down (e.g. fences, trees, sheds, playground equipment,
towers, antennae etc)
Soil Nails usually steel reinforcing bars inserted and grouted into place to
reinforce soil slopes, excavations and retaining walls
Anchored pole type walls
Shotcrete construction sprayed concrete used in conjunction with rock & soil
anchor systems which provides immediate reinforced ground support for
underground tunnel openings, rock slope stabilisation and the protection of
bridge abutments etc
Gabion walls robust wire mesh rock-filled baskets used for retaining walls
P a g e | 63
Specialist Services
GROUTING
3D Hitech Systems Limited also uses Foamcrete (thermal insulating concrete) from
Canterbury Foam Concrete Ltd as a suitable product for void filling or annulus
grouting.
DE-WATERING
3D Hitech Systems Limited has the specialty knowledge and expertise in sewage
treatment plants and water reticulation systems including:
upgrades
pump installations
screen structures
Other Services
Renovations: We thrive on helping our clients modify their existing buildings to suit
their needs. Our skill is in working with the existing buildings strengths to create
something new that complements and enhances the existing structure.
Additions: Our team can make an extension to your home feel as if the house was
built that way from the very start. The team will make sure that any extension to your
home will be a perfect fit for your needs and your budget.
New housing: Is your dream building a brand new house, customized to your
specific needs? Then we should be the first place you call. Our team combines the
best in design with our practical knowledge of building to avoid potential problems
before they arise. You can have peace of mind knowing that your new home will be
on time, on budget and exactly what you want.
Pools and Landscaping: With our diverse range of skills our team also specialise in
swimming pool construction, garden design and landscaping services. We customise
solutions for your specific back yard needs.
P a g e | 65
GALLERY
WAREHOUSE CONSTRUCTION
P a g e | 66
L&T COMPACTOR
CAT AP 800B
P a g e | 67
CAT AP 800D
VOLVO GRADER
P a g e | 68
COMPACTORS
P a g e | 69
VOLVO PAVER
CAT 950
P a g e | 70
ELECTRICAL
In household and commercial usage, most water heaters are of the tank type.
Furthermore, called storage water heaters, these consist of a cylindrical
vessel/container in which water is kept continuously hot and ready for use.
Tank less water heaters, also called instantaneous, continuous flow, inline,
flash, on-demand or instant-on water heaters, are also available and gaining in
popularity. These water heaters instantly heat water as it flows through the device,
and does not retain any water internally except for what is in the heat exchanger
coil.
P a g e | 71
STEAM BOILER
ELECTRICAL
Our Sources:
OKONITE CABLE USA & NIGERCHIN NIG
Products description:
Model No:112
Specification: Copper conductor solid polythene insulated communication cable with laminated Al-
plastic composite sheathStandard: IEC 11028, EIA/TIA568Conductor: Solid Annealed Copper
Conductor, Copper Clad Aluminum ConductorColor: Grey, WhiteNo. of Pairs: Up to client's
requirementApplication:...
Products description:
Model No:113
Specification: Copper conductor solid polythene insulated communication cable with laminated Al-
plastic composite sheathStandard: IEC 11028, EIA/TIA568Conductor: Solid Annealed Copper
Conductor, Copper Clad Aluminum ConductorColor: Grey, WhiteNo. of Pairs: Up to client's
requirementApplication:...
Products description:
Model No:015
Specification: Annealed copper stranded circular, PVC insulatedStandard: 227IEC, BS6004,
AS5000.1Conductor: Copper Conductor Rated Voltage: 450/750VColor: Green/YellowPackage: Coils,
Plywood reelApplication: Used in electric equipment, household electrical appliances, small
electrical tools;...
Products description:
Model No:016
Specification: Annealed copper stranded circular, PVC insulatedStandard: 227IEC, BS6004,
AS5000.1Conductor: Copper Conductor Rated Voltage: 450/750VColor: Green/YellowPackage: Coils,
Plywood reel Application: Used in electric equipment, household electrical appliances, small
electrical tools;...
P a g e | 75
UTP Cable
Products description:
Model No:114
Specification: Copper conductor solid polythene insulated communication cable with laminated Al-
plastic composite sheathStandard: IEC 11028, EIA/TIA568Conductor: Solid Annealed Copper
Conductor, Copper Clad Aluminum ConductorColor: Grey, WhiteNo. of Pairs: Up to client's
requirementApplication:...
Products description:
Model No:115
Specification: Copper conductor solid polythene insulated communication cable with laminated Al-
plastic composite sheathStandard: IEC 11028, EIA/TIA568Conductor: Solid Annealed Copper
Conductor, Copper Clad Aluminum ConductorColor: Grey, WhiteNo. of Pairs: Up to client's
requirementApplication:...
P a g e | 76
Communication Cable
Products description:
Model No:117
Specification: Copper conductor solid polythene insulated communication cable with laminated Al-
plastic composite sheathStandard: IEC 11028, EIA/TIA568Conductor: Solid Annealed Copper
Conductor, Copper Clad Aluminum ConductorColor: Grey, WhiteNo. of Pairs: Up to client's
requirementApplication:...
LAN Cable
Products description:
Model No:119
Specification: Copper conductor solid polythene insulated communication cable with laminated Al-
plastic composite sheathStandard: IEC 11028, EIA/TIA568Conductor: Solid Annealed Copper
Conductor, Copper Clad Aluminum ConductorColor: Grey, WhiteNo. of Pairs: Up to client's
requirementApplication:
Products description:
Model No:120
Specification: Copper conductor solid polythene insulated communication cable with laminated Al-
plastic composite sheathStandard: IEC 11028, EIA/TIA568Conductor: Solid Annealed Copper
Conductor, Copper Clad Aluminum ConductorColor: Grey, WhiteNo. of Pairs: Up to client's
requirementApplication:...
FTP Cable
Products description:
Model No:121
Specification: Copper conductor solid polythene insulated communication cable with laminated Al-
plastic composite sheathStandard: IEC 11028, EIA/TIA568Conductor: Solid Annealed Copper
Conductor, Copper Clad Aluminum ConductorColor: Grey, WhiteNo. of Pairs: Up to client's
requirementApplication:...
Communication Cable
Products description:
Model No:122
Specification: Copper conductor solid polythene insulated communication cable with laminated Al-
plastic composite sheathStandard: IEC 11028, EIA/TIA568Conductor: Solid Annealed Copper
Conductor, Copper Clad Aluminum ConductorColor: Grey, WhiteNo. of Pairs: Up to client's
requirement Application:
P a g e | 78
Products description:
Model No:088
Specification: Aluminum Conductor XLPE Insulated Power CableStandard: IEC 60840,
IEC62067Voltage: 50/66KV, 64/110KV, 76/132KV, 127/220KV, 290/500KVConductor: Plain circular
compacted copper or aluminium conductorConductor screen: Extruded semiconductive
compoundInsulation: Extruded...
Products description:
Model No:089
Specification: Copper Conductor XLPE Insulated Power CableStandard: IEC 60840, IEC62067Voltage:
50/66KV, 64/110KV, 76/132KV, 127/220KV, 290/500KVConductor: Plain circular compacted copper
or aluminum conductorConductor screen: Extruded semi-conductive compoundInsulation: Extruded
super-clean...
Products description:
Model No:092
Specification: Aluminum Conductor XLPE Insulated Power CableStandard: IEC 60502Voltage:
0.6/1KV, 3.6/6KV, 6/10KV, 8.7/15KV, 12/20KV, 18/30KV, 19/33KV, 26/35KVConductor: Aluminum
ConductorInsulation: Extruded super-clean cross-linked polyethylene (XLPE)Cross Section: Based on
clients...
P a g e | 80
INSTRUMENTATION
FLOW METERS
Our Sources:
FLOWTECH UK & WARREN ALLOY USA
Counters
P a g e | 81
Professional Range
KELM Air Preparation
Regulators
P a g e | 82
VALVES:
We engaged in sales & installations
Our Sources:
FLOWTECH UK & WARREN ALLOY USA
Cast Gate Valve of superior quality is available with us. The Cast Gate Valves are fabricated with the
best quality Cast steel with smooth flowing contours, uniform metal sections and generous radius
fillets to prevent stress concentrations. Designed for structural stability, mechanical strength and
safe weld ability, the Cast Gate Valve is highly demanded in the industry. The magnetic particles in
the Cast Gate Valves are inspected for special applications.
P a g e | 83
Cast Check Valves are designed to suit the clients for various industrial and commercial applications
of their business. The Cast Check Valves are fabricated from the premium quality high grade steel to
ensure high tensile strength and durability. The Cast Check Valves are extensively used to prevent
the back flow of liquid in gas lines.
P a g e | 84
Avail the high performance Butterfly Valves at Flow-Tech Industries, manufactured in various types
that include Slim Seal (centre) disc type, Offset (Eccentric) disc type and Lugs type. FLOWTECH
Butterfly valves are applicable for tight shut off service, low leakage rate and/or flow control. Easy
operation, absence of sliding parts, low head loss, savings in weight, space etc. is some of the key
features of the Butterfly Valve. We use different grades of optimum quality cast iron, cast carbon
steel and cast stainless steel for high performance yielding Butterfly Control Valves. Butterfly Valves
offered by our company are economical along with that they come with Lever, Worm Gear and
Pneumatic Actuator for handling operation. We are enlisted as one amongst the forefront Butterfly
Valves Manufacturers.
The core of the companies business comes through the distribution and
commissioning of selected Principle products which are well established, technically
advanced, price competitive and well supported.
Offered Services
Panel Building
The design and build of Control Panels, Marshalling Boxes / Junction Boxes
Specifications or to our standard designs, drawings
We make it easy for you to get the get technical assistance and training services you
want to get the most out of your 3D Hitech Systems product. And, we make it easy to
stay in touch with your 3D Hitech Systems representative to handle your questions
and requests.
Our dedicated Technical Service and Repair Group is always ready to provides after-
sale technical, warranty repair as well as a full range of paid services. Our expert
staff includes managers, technical service engineers, coordinators, instrument
technicians, and calibrators all dedicated to after sales support for our customers.
Why Recalibrate?
Why is it necessary to recalibrate my flow meters? All instrumentation and process
equipment is subject to wear and tear from their environment. This includes
temperature, mechanical stress, component tolerance shift, contaminant buildup,
oxidation, and other influences.
The effects are gradual, but over time the changes can affect the accuracy of even
the best equipment. Ensuring the success of your process 3D Hitech Systems
Instrument understands your need to keep your flow meters and flow controllers
working at their best accurate and reliable. That is why we have improved and
expanded our operations to offer the most complete recalibration and repair service
available.
Quantim is the first miniaturized Coriolis mass flow controller that measures and
controls flow directly, without any need to compensate for fluid properties or process
conditions. Quantim's Coriolis technology, internal control valve and PID bring a new
level of measurement accuracy and control all in one compact package.
Metal seal devices for the vacuum thin film and semiconductor industry
NEMA 4X/IP66 MFCs for wash down applications
Downport MFCs for installation and service ease
High-pressure capability for demanding research applications
Our products also have an array of certifications and approvals for ingress protection
P a g e | 88
and use in hazardous areas. Plus, we have the best trained and most responsive
flow experts with application experience in virtually every industry, all over the world.
They make sure your Coriolis mass flow device is selected correctly and maintained
properly.
Thermal mass flow technology uses thermodynamic principles to derive actual mass
flow. A thermal mass flow sensor can be combined with an integral valve and PID
controller in one compact, efficient instrument that can accurately control the flow of
gases or liquids over a wide range of flow rates.
TMF products exhibit high repeatability and accuracy, providing an effective way to
ensure a reliable and stable process.
Principle of Operation
1) Body: The body provides a compact platform for all of the other mass flow
controller elements, as well as the primary flow path for the fluid being measured.
3) Sensor: The sensor is the heart of the mass flow controller. It uses
heat and a differential temperature measurement to provide a signal that is
proportional to mass flow. There are two-wire, three-wire and MEMS sensors
available. The type of sensor used depends on the supplier and the application.
P a g e | 89
4) Circuit board: The circuit board is the brain of the mass flow controller. It manages
the external inputs and outputs (I/O) to and from the device, as well as the internal
I/O with the sensor and control valve. If the flow signal does not match the set point
signal (command input), the valve drive is adjusted to reposition the valve as
required.
P a g e | 90
When you put all of these elements together, you have a fully functioning mass flow
controller.
For a typical mass flow sensor, a precision power supply provides a power heat input
P a g e | 91
(P) at the heater, which is located at the midpoint of the sensor tube. At zero (no
flow) conditions, the heat reaching each temperature sensor is equal. The
temperatures T1 and T2, therefore, are equal. When fluid flows through the tube, the
upstream sensor is cooled, and the downstream sensor is heated, which produces a
temperature difference. The temperature difference T2-T1 is directly proportional to
the gas mass flow.
Analytical/Gas Analyzers
Sample gas preparation and measurement
Calibration gas control
Automotive
Engine test
Emissions test
Leak test
Verification of SHED (Sealed Housing for Evaporative Determination) operations
P a g e | 92
Biotech/Pharmaceutical
Reactor gas control for fermentation
Bioreactor gas control of dissolved oxygen and pH
Tablet coating
Chemical/Petrochemical
Measurement of gases in chemical processes and manufacturing
Catalyst research
Pilot plant flow control
Electronics Manufacturing
Manufacture of computers
Monitors
Memory devices and other electronic equipment
Fuel Cells
Control fuel delivery
Atmospheric simulations
Production efficiency testing
P a g e | 93
Furnaces
Flame control
Gas mixing and blending
Gas distribution
Gas consumption measurement for internal accounting purposes
Heat Treating
Burner control
Blanket gas control
LED Lighting
Metal organic chemical vapor deposition
Vapor control
Medical
Equipment performance validation
Anesthesia
Medical equipment manufacturing
Specialty coatings
Metal Processing
Blank gas control
Sparging
Improved quality of manufactured metals
Packaging
Protective gases in packages
Solar/Photovoltaic
Chemical deposition
Thin film coatings
Semiconductor Manufacturing
P a g e | 94
These specialized Front Opening Universal Pod devices hold 300mm wafers
securely and safely and need high flow purge between etch and post-etch clean
steps, which must be carefully controlled because exposure to moisture and oxygen
immediately begins to destroy nanometer-scale critical dimensions of features on the
wafer surface.
Variable Area Technology
Variable area (VA) flow meters, commonly called rotameters, are a cost-effective
solution for flow measurement of liquids and gases. The VA meter has excellent
measurement repeatability, which provides process stability and consistency.
External power is not required for operation; therefore, they deliver a fail-safe flow
rate under any circumstance.
VA flow meters can be made from a variety of wetted materials for process fluid
compatibility, high-pressure and high temperature conditions, and hazardous
locations.
P a g e | 96
1. Metering tube a tapered chamber that contains the fluid and the float
2. Float a spherical or symmetrically shaped object that moves up or down based on
flow rate
3. Scale a device marked with increments of the flow units used to read the flow rate
4. Process connections (end fittings) the flanged or threaded assembly that the
customer uses to connect the process fluid lines along with meter size, this is very
important to the customer
5. Body or housing the frame or structure that contains the metering tube, float,
scale and customer connections
A variable area meter (rotameter) is a flow meter that measures volumetric flow of
liquids and gases. Its operation is based on the variable area principle, where flow
raises a float in a tapered tube, increasing the area for passage of the fluid flow. The
float will reach a stable position when the force exerted by the flowing fluid + the
buoyancy equals the gravitational force.
A change in flow rate upsets this force balance and the float will move up or down
until it again reaches a position where the forces are in balance. The pressure drop
across the float is low and remains essentially constant as the flow rate changes.
Float response to flow rate changes is linear and usually a 10 to 1 flow range is
standard. Variable area meters can be installed directly after pipe fittings or valves
without adverse effects on the meter accuracy. The meters are also inherently self-
cleaning since the flow of gas or liquid between the tube wall and the float provides a
scouring action that discourages the build-up of foreign matter.
The forces or influences involved in the rotameter can be seen in the diagram below.
P a g e | 97
Repeatability
Accuracy
Accuracy of a variable area meter is calculated using the full scale accuracy method
as opposed to the percent of rate method. The difference is shown in the diagram
below.
P a g e | 98
Process Analyzers
The variable area flow meter with 4-20 mA output continuously monitors sample
flow to the analyzer, unlike a flow alarm or flow switch. When flow starts to drop
indicating the onset of plugging users can schedule maintenance to clear the
problem before the analyzer is starved of the sample. Rotameters without 4-20 mA
output are often used for sample flow in analyzer applications.
Rotating Equipment
Large rotating equipment requires effective and reliable flow monitoring on a number
of fluid supplies like lubrication fluids, coolants, and dry gas seal gasses to
ensure efficient and safe operation. Metal tube variable area meters are commonly
used to monitor lube oil and coolant flows. The optimum solution is using a 4-20 mA
transmitting variable area meter so that flow can be continuously monitored. But
glass tube or plastic body variable area meters are frequently used to ensure proper
P a g e | 99
Operators of offshore platforms require reliable products that operate under extreme
conditions such as high pressure and difficult environmental conditions. Common
offshore applications involve injecting a fluid (many times a proprietary fluid) into the
high pressure extraction fluid to either prevent corrosion, prevent freezing of the
extraction fluid, or add lubrication. In all cases, the goal is to provide local monitoring
of the extraction process, which improves the overall process yield. Since the
extraction process normally operates under very high pressures, the flow meter
choices are limited. The model 3809 variable area meter is an excellent choice
because it is simple, proven, reliable (only one moving part) and is available for
operating pressures to 20,000 psi/1350 bar. The unique 3809 meter will have heavy
wall construction with stainless steel indicator housing. If remote monitoring is
required, the model 3809 can be supplied with 4- 20 mA analog output and
worldwide approvals.
1. Chemical injection/dosing controls the flow rate of the fluid to be mixed (added)
to the primary fluid
2. Boiler control measures steam flow to a boiler or measure the gases that heat
the boiler
3. Purge applications controls the purge gas or liquid to keep process lines clear, to
create a positive pressure and/or be the shielding gas in a contained welding
application, or to create a positive pressure where electrical components are
installed in an area where hazardous gases could explode if they entered the
electrical compartment
4. Tank blanketing inert gas is the blanket over the liquid in a tank, which
prevents the liquid from giving off vapors which could ignite and then explode
5. Simple flow measurement options such as flow switch (alarm) or continuous
electronic output (4-20 mA output with HART) allow flow conditions to be monitored
P a g e | 100
and controlled remotely; a valve is also available to maintain flow at a given set-
point.
3D Hitech Systems now offers a very diverse line of pressure and vacuum products
including pressure/vacuum controllers, pressure gauges, pressure transducers,
pressure regulators, capacitance manometers, and more.
Heres how it works a float equipped with a 360 permanent magnet follows the
level variation of the liquid to be measured. Because the only moving part in contact
with the fluid is the float, these instruments are highly rugged and durable. And many
process connection options are available to enhance application flexibility.
WELLHEAD SERVICES
3D Hitech Systems. Provide 24/7 services to the oil, gas and petrochemical plants.
3D Hitech Systems specializes in providing Bolting Solutions, including Joint
Integrity, Bolt and Flange Inspection , Internal and External Casing Cutting and In
Situ Machining for the Wellhead Manufacturers and Installers, Rig and Platform
Operators.
We aim to deliver a Quality Job, whilst ensuring the Safety of our People and our
Clients Property. We will add value to the customers business by delivering our jobs
on time, at the most competitive price, backed by professional engineered designs
and experienced technicians using the best designed tools available on the market.
Our aim is to reduce down time, have no NPT, work efficiently, and perform all
our services as cold work.
We have performed In Situ/In Place Bolting and/or Machining Services on: Choke
valves, Choke-and-kill manifolds, Christmas trees, Blowout Preventers, Diverters,
Marine Risers, Gate Valves, SSV, Surface and Platform Wellheads, Fas-lok Clamps
and Connectors, Butterfly Valves, Annular BoPs, Blind Flanges, Check Valves, Wing
Valves, Bonnet, Bleed Rings, Flowlines, Production lines, Casing Head, Casing
Spools, Double Stud Adaptors (DSAs), Single Stud Adaptors (SSAs), Adaptor
Spools, Top Connectors, Ring Gaskets, Hubs, Companion Flanges, Adaptor
Flanges, 5 bolt or Dual Flanges, Swivel Flanges, Crown Flanges, Tree Caps, etc.
Our primary focus is the sale and installation of wellhead equipment, ancillary
product lines which include valves, manifolds, frac trees, repair, remanufacture, and
field service. Our products are used both in the drilling and completion phases of the
oil and gas industry. 3D Hitech Systems has in-house machine capabilities which
allows us to quickly and efficiently repair existing customer owned wellheads. We
maintain computer generated inventory programs that enable us to utilize our
customers inventory while providing them with detailed accurate inventory reports.
SERVICES
designed to be placed on off-shore platforms and eliminates the need for costly,
time-consuming shut-downs.
The 3D Hitech Systems Habitat's walls expand to suit the available space on the
platform and isolate the welding area, safely containing the heat-source by
maintaining a positive air-pressure within. This positive-pressure system works in the
same way as that of the accommodation block on an off-shore platform by creating a
virtual air-lock within the Habitat and is maintained by means of continuous air-flow
input and extraction. The ratio of 2:1 input to extraction guarantees that the 3D
Hitech Systems Habitat is inflated at all times and that the air inside is always clean
and free of outside contaminants.
Fumes circulating around the weld area are quickly dispersed outside to a safe, non-
flammable area of the platform through flame-retardant, spiral ducting. This allows
the occupants to carry out welding and fabrication safely, while working in an
enclosed environment.
The welding chamber's floor and walls are manufactured from a light-weight, heat-
resistant fabric which confines sparks and splatters. Custom-built sleeves slip easily
over pipes and around beams to create a seal.
The Habitat is placed around or over the area to be welded and secured and inflated
using a blower which applies an air-input of between 700 and 1200 CFM and a
positive pressure of between 10 and 20 Pascals. An additional exhaust blower
provides positive pressure and constant air circulation inside the welding chamber.
The blowers are available as air or electrically-driven units and can be located away
from the Habitat itself.
P a g e | 103
Our Press-Test eliminates the use of these damaging substances and utilizes a
pressure testing system which is reliable, safe and accurate.
Once flanges and cavities are pressurized, a Hot-Chek Sniffer, used in detecting
weld leaks, is used to 'sniff' flanges and lockdown screws to establish the presence
of any leaks. Wellhead leak repairs can then be conducted as necessary. Holding
the pressure for a specified amount of time also enables the detection of any internal
leaks.
Upon completion of testing, the gas is vented to atmospheric pressure. This allows
the gas to expand during well flow conditions and be within the acceptable pressure
limits of the sealing mechanisms.
Our Torque Tools cover a full range of sizes from 1/2" to 5" studs and 7/8" to 7-5/8"
a/f nuts. Torque capacity is from 20 lb/ft (34 N/m) to 59,400 lb/ft (80,524 N/m) with
manual and hydraulic equipment. All 3D Hitech Systems Torque Tools are tested
P a g e | 105
We offer Hydraulic Torque Tools with both air and electricity-driven power packs
which can be used within hazardous environments such as off-shore platforms,
eliminating the need to shut down.
3D Hitech Systems also offers a range of Low-height Ratchet Torque Tools that can
be utilized in confined spaces or areas with restricted clearance where a socket and
conventional square-drive tool would not fit.
3D Hitech Systems Hydraulic Bolt Tensioning offers the quickest, safest, most
accurate means of applying a specified residual load to stud bolts.
pipeline flanges
heat exchangers
pressure vessels
compressor covers
boiler feed pumps
anchor bolts
many others
All 3D Hitech Systems hydraulic bolt tensioners are designed for easy, multiple-
tensioner connections with user-friendly operations and maintenance procedures.
Assembly of the tensioners to the bolts is quick and easy, providing that bolts are
clean, well-lubricated and in good condition.
Hot Bolting is a proven, effective method of preparing bolted joints for disassembly
prior to shutdown.
Bolts are loosened one bolt at a time (while in service and hot). Lubricant is applied
and Bolts are reassembled or replaced in order. This allows the flange assembly to
be easily disassembled cold at a later stage, saving time during the shutdown period
for gasket replacement.
Hot Bolting also allows corroded studs or bolts to be removed and replaced, while
maintaining the integrity of the joint, as well as eliminating the need for shutdown.
The 3D Hitech Systems split frame cold cutters are air driven and capable of both
cutting and beveling all grades of pipe and casing. Capacity covers a range of sizes
between 7" to 32" O.D. and wall thickness up to 2-1/2".
In addition to eliminating the need for hazardous flame cutting, the cold cutting
method enables operators to meet all potential requirements, both onshore and
offshore.
Our cold cutting system produces a lathe-type beveled finish on casing ends without
altering metallurgical properties. Cutting equipment quickly splits to mount to casing
O.D. and requires minimal radial and axial clearance. The cold cutter can be set up
and operational in less than 30 minutes.
3D Hitech Systems's cold cutters are portable, lightweight and compact, allowing for
easy transport of equipment to any site.
P a g e | 108
We provide hot tap drilling tools and equipment which are manually or pneumatically
power-driven and are capable of making 1/2" through 4" (DN15-DN100) taps. This
allows 3D Hitech Systems Service Crews to tap into pipe and tanks while they are
still under pressure, without the need to shutdown. Our Hot Tapping tools are also
used to install 2" and 3" completion plugs in tapping nipples to permit recovery of
tapping valves.
P a g e | 109
Our Diesel Pile Hammer consists of upper and lower cylinders in which the piston is
led. The Hammer is equipped with a rope-controlled, adjustable fuel pump with 4
settings. This serves to regulate the stroke of the piston and therefore the impact
energy. This is a particular advantage when soil formations change. The maximum
stroke of the piston is 3.7M, dependant on soil conditions. The Diesel Hammer
utilizes a tripping device to lift the piston and start the Hammer.
Since 3D Hitech Systems Diesel Hammers do not have any piston rods, crank
shafts, cams or bearings, they have little wear and are extremely reliable. Our Piling
Hammers are nearly maintenance free and can be used on various pile types.
Other advantages to 3D Hitech Systems's Diesel Pile Hammers are the unmatched
ratio of total weight to impact energy (which allows the use of lighter rigs) and the
extremely low fuel consumption.
The rugged design, the reliability and minimal maintenance time has convinced
thousands of customers around the world that the 3D Hitech Systems Diesel Pile
Hammer is always the right choice.
P a g e | 110
3D Hitech Systems offers a wide range of offshore fabrication and welding services
for the petroleum and gas industries. Our welders are certified to AWS-D11/6GR
standards and are capable of taking on any welding job - large or small - worldwide.
Past offshore fabrication jobs for Clients include Rig Modifications and Upgrades,
custom-made mud tanks, cargo boxes with valid certification, completion baskets
and trash boxes that are inspected and load tested.
3D Hitech Systems also specializes in repairing wellheads and is well-known for it's
other services such as offshore barge repairs, top drive installation, stand pipes and
custom welding services.
P a g e | 111
3D Hitech Systems is one of the few oil tool companies in the oil industry that has
installed and repaired wellheads for various large petroleum and gas companies
around.
Our Wellhead Installation Services are guaranteed to be provided onsite by our fully-
qualified and extensively-experienced engineers and technicians.
.
P a g e | 112
3D Hitech Systems's hydrostatic testing complies with API and ANSI standards and
can detect leaks as small as 5 scf/yr. 3D Hitech Systems uses Nitrogen,
P a g e | 113
During a 3D Hitech Systems hydrostatic test, the pressure vessel or pipe spool is
placed inside a closed system, and a specified internal water pressure is applied.
The hydrostatic testing procedure is used to determine if a pressure vessel is safe
for continued use, or has suffered from a degradation in its structural integrity and
must be condemned.
3D Hitech Systems's Hydraulic Nut Splitters are a fast, positive, safe method of
removing corroded or seized nuts or bolts of any grade up to HRc-44 hardness.
All sizes of nuts, from 1/2" to 5-3/5" A/F, are covered by our wide range of nut
splitting tools designed to fit all API and ANSI flanges.
Nuts are removed quickly and safely, avoiding such hazardous and time consuming
removal and replacement procedures such as grinding, sawing and flame cutting.
Nuts can be removed without any damage to the studs; easy set up means cuts are
made in only seconds.
Our Nut Splitters are powered by a manual 10,000psi hydraulic pump, which means
they can be used in the field or at any remote onshore or offshore location without
the requirement of an additional power source.
P a g e | 114
The JITS software features a P&ID interface that allows P&ID drawing files in both
Autodesk DWG and Adobe Acrobat PDF to be opened and navigated in order to
select joints. The software will allocate and number joints automatically and relate to
Flange Master register. Each unique number will be one-of-a-kind, and will not be
reused/repeated.
Joints can be organized into projects and work packs to reflect the physical
maintenance activities occurring on the asset. This means that over a number of
P a g e | 115
The software reflects this giving the users the ability to search and retrieve joints
either within or across work packs. The search facilities within the software are
powerful and flexible. Different parameters can be researched. For example:
Visibility of all activities carried out by a specified competent technician(s), or for a
particular type of stud fastener, or for a particular rating flange, flange size, etc.
At any stage, the software allows the recording of information relating to irregularity.
This forces the user to enter comments which are then compiled into a concise
report format can be configured in any way client wishes which best suits project. By
flange rating , workpack , test pack , flange size , Work order, Nut size, Critical
flanges, or those that Pass, etc.
The software will not allow progress to be made when anomalies are identifies until
solution confirmed. From these Anomalies trends are analyzed and gathered to
action preventative measures. The JITS allows data to be imported from and
exported to MS Excel.
It features a secure database and a security model that allows software features to
be locked out, depending on user access level. The system will regularly (based on
administrator-defined settings) prompt the user to take data back-ups and to indicate
the type of back-up being taken.
Not only can we identify trends, but analyze them and agree/implement preventative
measures relating to our shared 100% safe and Leak free objective.
The system can be stored on site, or offsite, or at our site, and managed by
ourselves.
The JITS software allows for the input of the certificates of conformance for the
hardware (eg: Mil Certs. for the studs, certs. for the gasket manufacturer, etc). All
supporting certification on equipment as regards to the People resource
P a g e | 116
(Competency Training, HSSE, etc.), Service provider (third party equipment) such as
Tools (gages, pump, calibration, test, hoses, wrenches, calipers, camera, etc.) are
captured. Certification that is expired or not approved will be highlighted. Approved
Procedures for Joint Integrity will be logged and stored, as well as Delivery Notes,
MOCs, etc.. All specifications on the flange, studs, nuts, gaskets, and conditions
therein are captured and inputted into the JITS. Torque values cross referenced with
the Gasket and stud specifications will be generated, and compared with the QA QC
Checklist.
Products
Casing Heads
Casing Spools
Casing Hangers
Tubing Heads
Secondary Seals
Tubing Hangers
Adapters
Tees & Crosses
Tree Caps
Gate Valves
Chokes
Frac Stacks
Mobil Test Units
Portable Greasing Skids
Surface Safety Systems
Hydraulic Torque Wrench Systems
P a g e | 117
DRILLING
Drilling services
3D Hitech Systems provides raiseboring services for civil and mining projects, with
shafts up to 7.3m in diameter and 1,300m in depth.
Raisebore drilling is a method used to drill ore passes and ventilation shafts required
for production in an underground mine, without the use of explosives.
The raisebore drilling machine is set up on the upper level of the two levels to be
connected. A small pilot hole (circa 300mm in diameter) is drilled to the level
required. The pilot hole is then reamed to a larger diameter (up to 6m in diameter) by
attaching a reamer head to the drill rods at the lower shaft and pulling it back
towards the drilling unit in a circular motion.
The tungsten-carbide cutters cut the rock during the circular motion. The drill cuttings
from the reamer head fall to the floor of the lower level and are removed by a
standard loader.
The boring principle is attractive because it offers the following advantages over
conventional drilling and blasting methods:
Safer working conditions
Speed of completion
A hole with a more stable structural shape
A hole with smooth sidewalls and low frictional loss in ventilation airways, reducing
the likelihood of blockages in the ore-passes.
Typical applications of raiseboring holes include:
Service ways for drainage, cables, pipes, etc
Ventilation
Mineral transport
Shafts for the transport of men and material
Mine production
Penstocks and surge shafts for hydroelectricity projects
Horizontal and low-angle drilling
Boxhole boring
To excavate raises where access to the upper level is limited, boxhole boring is
employed.
With the machine at the lower level, a full-diameter raise is bored upward. At the
same time, stabilisers are added to the drill string at intervals to reduce oscillation
and bending stress.
The cuttings are carried down the hole by gravity, deflected from the machine and
then removed at the lower level.
P a g e | 119
Exploration drilling
Our wide range of drilling services have been designed for greenfield exploration,
ore-body definition, reserve evaluation and ground investigation, grade control and
cover drilling.
Auger drilling
With auger drilling, the rotation of a helical screw causes the blade of the screw to lift
the sample to the surface. This can be used for shallow environmental drilling,
geotechnical drilling, soil engineering and mineral deposits where the formation is
soft and the hole does not collapse.
Air-core drilling
To drill holes in fairly soft ground, air-core drilling generally uses hardened steel and
tungsten blades in coal formations. The head of the drill is surrounded by blades,
which cut the coal. The rods are hollow and the sample is fed through the rod.
Diamond-core drilling
For exploration drilling worldwide, the mining industry uses diamond coring almost
exclusively with wireline systems that enable the cave to be retrieved without
retracting the drill rods.
Diamond-core sizes
Core sample can be obtained in different sizes and vary from 3mm diameter to
116mm. The core is removed from the tube and washed, measured, marked and
placed into sample trays.
P a g e | 120
Direct-push samples
Direct-push is done with Selby tubes, which advance a drill string by pushing or
hammering without rotating the drill string. While this does not meet the proper
definition of drilling, it does achieve the same result of core recovery. This method is
ideal for very shallow sampling in soft material.
Underground drilling
Underground core drilling is conducted to identify sufficient ore reserves above the
main haulage level and for the safety of the mines in establishing the position of
possible gas or water intersections.
Grade control
During exploration, grade control is the process used to check quality and control the
grade and variability of ore. The purpose of grade control is to develop mining plans
and the budgeting process. Drilling samples are further analysed to establish the
mineral content of the drill area.
The grade of an ore body and the mineral being mined are rarely constant. It can be
more concentrated near the surface and dissipate in other areas. Grade control
drilling helps to define the economic limits and mine planning.
Blasthole drilling
Blasthole rigs are used to drill blastholes into benches in quarries and opencast
mines. They achieve high production rates and are used for either rotary or down-
the-hole drilling.
P a g e | 121
Value-added services
Support options:
Long-range dry crete system:
Currently used successfully in Mexico, this system allows for shaft-lining with a
dry crete mix, which can be loaded on surface and mixed with water in a nozzle
body to minimise wastage. A camera and a control device, lowered into the
shaft, enable remote operation of the machine. The advantages of this system
include a reduction in safety risk as no people are in the shaft when the process
is underway; there are no limitations in terms of the depths it can reach; the
thickness of the shaft lining is measured by laser; the entire process is
controlled from surface; a core log is used as reference for inspection before
spraying begins; a skin layer is applied to high-risk areas; and hole depth is
recorded on a video.
Short-range wet crete system:
The wet-crete mix is loaded on surface and fed into a nozzle body via a hose
system. The system is also controlled remotely using a camera and control
device. This short-range wet crete system presents similar advantages to the
long-range dry crete system. It is used successfully in South Africa.
Over the years, the Company has positioned itself by leveraging its main
competitive advantages: specialized equipment, long-standing relationships with the
worlds largest mining companies, access to capital and skilled personnel.
During the last several years, the Company has achieved strong growth while
remaining focused on the long-term objective of building a solid company for the
future.
P a g e | 122
1. be the world leader in specialized drilling and expand our specialized capacity;
2. modernize our conventional fleet and expand our footprint in strategic areas;
3. diversify our services within the drilling field;
4. maintain a strong balance sheet and a sustainable dividend;
5. be the best in class in safety and human resources.
. We provide a variety of top quality drilling services to extract oil and gas safely and
efficiently for our clients and we are well positioned to handle the most challenging
drilling programs.
We Specialize in:
Our Offshore units including ultra heavy-duty Jack-up outfitted with high
specification equipment and capable of drilling in 375ft of water. Also available are a
self propelled Multi Purpose Service Vessels (MPSV ) AD20 & AD40 providing
well intervention and well testing services. The onshore fleet ranges from medium to
ultra-heavy rigs, capable of handling the most challenging drilling programs and
designed to work in harsh climatic conditions supported by a highly qualified and
experienced staff.
Drilling Services
Drilling Methods
Standard Wireline
Sizes
Core Hole
Size Diameter Diameter
(inches / millimeters)
1.890 /
AO-AQ-U 1.064 / 27.0
48.0
2.360 /
BQ-BQ-U 1.438 / 36.5
60.0
2.980 /
NQ-NQ-U 1.875 / 47.6
75.7
3.782 /
HQ 2.500 / 63.5
96.0
4.827 /
PQ 3.345 / 85.0
122.6
2.980 /
NQ-3 1.775 / 45.0
75.7
3.782 /
HQ-3 2.406 / 61.1
96.0
4.827 /
PQ-3 3.270 / 83.0
122.6
Core Hole
Size Diameter Diameter
(inches / millimeters)
1.890 /
AQ-TK 1.20 / 30.5
48.0
2.360 /
BQ-TK 1.601 / 40.7
60.0
1.890 /
AGM 1.193 / 30.3
48.0
2.360 /
BGM 1.654 / 42.0
60.0
2.980 /
NGM 2.248 / 57.1
75.7
P a g e | 124
Supply Chain
The mission of supply chain management is to purchase the right materials and
services at the proper time , in the proper place , at the lowest cost , considering the
guide lines of quality , delivery and services.
Procurement Management
Suppliers Identification and Assessment.
Cooperation with Internal & External Supplier.
Negotiation with supplier.
PO order placement (JDE).
Expediting.
Supplier Audit.
Supplier Management (KPI).
Inventory Management
Dhahran Central Warehouse.
Rigs Warehouses.
Consignment.
Stock Control .
Logistic Management
Import & Export Material.
Custom Clearance.
Cooperation with freight forwarder.
F. Asset tracking & Capitalization.
P a g e | 125
P a g e | 126
P a g e | 127
POLICIES
A risk analysis has been undertaken and effort expended on Public Awareness,
Marine Risk Mitigation strategies and Marine Protection measures which culminated
in the offshore Damage Prevention Programme (DPP).
Since April 2007, 3D Hitech Systems has been part of the campaign initiated by
WAPCo and the WAGP Authority, who have been conducting Safety Awareness
Publicity across the region to sensitize the maritime communities on the safety and
security precautions for safe transmission. WAPCo's awareness campaign has been
well established in the four main ports on the pipeline route. All Port and Naval
officials are cognizant of the pipeline and the need to ensure it is protected from
marine damage. The campaign is also a continuous process intended to cover all
coastal communities especially the fisher folks along the pipeline rout. WAPCo has
additionally trenched the two branches of pipeline in Togo and Benin under the sea
bed that were recognized as vulnerable pipeline sections.
In conjunction with WAGP Authority Regulations, and as part of the risk mitigation
measures a one nautical mile Exclusion Zone either side of the pipeline known as
Pipeline Protection Zone (PPZ) has been adopted across the four countries to
minimize the chances of causing damage to the pipeline. This zone and the pipeline
are published in new editions of Admiralty charts especially Chart Number 1383 and
1384 which all mariners are encourage to consult when operating within the West
Coast of Africa. Special marker buoys equipped with AIS transmitters and MMSI
numbers are also installed at selected sections of the pipeline where shipping traffic
is relatively heavy such as close to the ports of Takoradi, Tema, Lome, Cotonou and
the Benin/Nigeria frontier.
Activities which constitute potential risk to offshore pipeline damage and which are
strictly forbidden within the PPZ include but not limited to:
a. Anchoring
b. Ship Anchor Drag and trawl board impact.
c. Bottom Trawling
d. Illegal Fishing Methods such as use of dynamite
e. Mining including sand winning
f. Construction
g. Any activity that risk the chance of making physical contact with the sea bed within
the zone and involves a risk of damaging the pipeline.
In line with our offshore pipeline safety requirements, 3D Hitech Systems and
WAPCo deem it important that the maritime community is made aware of the
inherent dangers to human lives and property as well as the safety of the pipeline,
should there be any violation of the identified safety precautions.
Mariners are particularly advised not to anchor or trawl within the PPZ as gas from a
damaged pipeline could cause an explosion, loss of vessel buoyancy or other
serious hazards. It must also be noted that the main pipeline is not buried and it may
P a g e | 128
reduce charted depths by up to 2 meters especially at the Tees where the valves are
encaged. The pipeline has also spanned seabed undulations and may cause fishing
gear to become irrecoverably snagged putting a vessel in severe danger.
With the introduction of gas into the pipeline, a vessel causing damage to a it could
face an immediate hazard either by loss of buoyancy due to gas aerated water, or by
fire or explosion, or a combination of all the three, and result in an environmental
hazard. A breach will also result in the contents of the pipeline escaping into the
marine environment. The pollution hazard will depend on the composition of the
gas. Hazardous pollution situations could result if the composition of H2S in natural
gas is high.
STATEMENT
medical restrictions.
P a g e | 130
OCCUPATIONAL SAFETY
STATEMENT
standards laid down in this Act and its associated Regulations and
take precedent over and above 3D Hitech Systems Occupational Safety and
One of our core values is to "Never do a job if it can not be done safely". We maintain
this through our in-house safety staff and the employees focus toward safety. It is our
commitment to provide our employees, clients and the public a safe place to live and work.
Our employees attend tailgate safety meetings each day while on the job. They are
empowered to stop a job that is seen as unsafe. Our personnel attend safety trainings and
obtain required certifications as necessary. Our company understands the importance of
providing quality equipment and quality personnel on the job site. We maintain our
equipment well and maintain a vast crew of highly skilled workers.
Safety defines our company. We understand that safety is for the protection of our
employees, the protection of our company, and also, ultimately, for the protection of our
client's assets as well. That is why we maintain in house two (2) Master Trainers with
NCCER and Veriforce. We have an exceptional safety track record and maintain programs
with ISNetworld.
POLICY STATEMENT:
Our policy covers a broad spectrum from head of engineering services, head of
departments, supervisors, welders, grinders, helpers, drivers, messengers, cleaners, etc.
It is the policy of 3D HITECH SYSTEMS LIMITED to guide her staff and all persons
associated with her OPERATIONS, in other to ensure total physical fitness on health
matters, and also to practice and maintain safe and healthy environment taking into
P a g e | 132
HEALTH :
The basis for admitting any personnel to work on our site, they must be medically certified fit
for handling physical operations.
All forms of self medications are discouraged and disallowed. Any ailment emanating from
work should be reported immediately and appropriate medical treatment given.
A standard and well stocked first aid box, and associated first aid equipment manned by
a qualified nurse or First Aider shall be available on site.
The Health and Safety at Work Act of 1974 ( applicable in Nigeria ), shall be compulsorily
enforced and mandatorily adhered to by all employee and associates of 3D HITECH
SYSTEMS LIMITED at work site and during transit.
Safety policies will be enforced by Safety Officers / Engineers along with full
involvement of Sectional Heads and Management.
Security Guards : In other to ensure adequate security for staff, equipment and materials, it
is the practice of our company to deploy and maintain professionally trained security Guards
at our WORKSHOPS, WORK SITES and administrative office areas.
ALSO TO LIASE WITH THE NIGERIAN POLICE FORCE, AND NIGERIAN ARMY
IF THE PEACE OF THE ENVIRONMENT IS THREATHENED BY DISSIDENT
YOUTH OR ARMED BANDITS.
3D Hitech Systems Limited has acquired the latest knowledge on labels and signs designs
and printing from Multisigns & Traffics Company Ltd -Ghana, in partnership with us. We
are experts in reflective signs such as road and industrial safety signs (Prohibitions, Warning
and), Pipeline Markers, directional and office signs, pavements and lane markings. Our aim
is to increased Safety signs in the workplace as an indispensable way of protecting
employees from accidents. In case of a fire, for instance, well placed signs that can speed
up the evacuation of a building and help those giving first aid.
There is no longer excuses like it was night " I Didn't See It.
This is absolutely . . . Where Signs Talk And Direct, and a trial will
certainly convinced you.
Traffic Control
It has over 20 years guarantee before damage, not like the normal
wooden or plastics signs normally produce in Nigeria.
The sign design will include graphic design of landscaping and even
roadside amenities such as picnic sites.
Replacing missing traffic signs can provide long life benefits to society
and also brings It economic benefits
ENVIRONMENT :
where our operations are carried out in other not to destabilize the
ecology.
Sustainability
Risk assessments are conducted to identify and understand all potential hazards.
The safety of our customers employees hinges on proactive practices.
At 3D Hitech Systems, our aim is to avoid any harm to people and the environment.
We strive to continuously improve the quality and safety of our products and
services. We view the occupational health and safety of our employees and
environmental protection as a vitally important part of our business strategy. Our
global, integrated management system helps us achieve these goals by embedding
health and safety in our daily operations. Our proactive SHERQ culture also helps
our customers meet their legal and safety responsibilities.
All of these activities fall under the wider umbrella of our corporate SHERQ policy,
which is dedicated to uniting the goals of customer value and sustainable
development.
Customers or partners of 3D Hitech Systems Ltd can expect a lot more than just the
right products and services at the right prices. We have a duty to ensure that our
operations have minimal or no adverse effects on human health and the
environment. We frame our sense of responsibility in this area in our SHERQ policy,
which provides a defining framework for various tools and processes that steer our
daily actions and approach to business in general. Above all, it embeds a sense of
P a g e | 139
And beyond
We expect people working for our partner and contractor companies to conduct
themselves in a manner that demonstrates the highest prioritisation of health, safety
and environmental care at all times.
SHERQ values form an intuitive and intrinsic part of every investment and
recruitment decision, business trip and site visit. At work or at home, developing or
P a g e | 140
QAQC
To give quality and prompt services in the field of NDT. The company
had a modest beginning with only 3 personnel on Roll, and carrying out
Gamma Radiography work, in Petrochemical Plants, Cross Country
Pipelines and Storage Tank farms. We provide all the High Technology
inspection services, such as Phased Array (PA), Time of Flight
Diffraction (ToFD), Automated Ultrasonic Testing for pipelines (AUT),
Eddy Current Testing (ECT), Magnetic Flux Leakage (MFL), Remote
Field Eddy Current Testing (RFET), Internal Rotary Inspection
Systems (IRIS), Remote Videoscopic Inspection (RVI) for the Oil and
Gas Industry, for maintenance and upkeep, and during annual
turnarounds. We also provide Digitisation of Radiographs. We have the
rich experience of working on Offshore Platforms and Offshore Barges
for NDT of Subsea Pipelines, Risers etc.,
These include;
Corporate Governance
Committees
The Board committees include the Executive Committee, Audit Committee, Risk
Committee, Nominations and Remuneration Committee and the Social and Ethics
Committee.
Executive Committee
The Executive Committee is constituted at the discretion of the Chief Executive
Officer (CEO) and comprises 3D Hitech Systems most senior line and functional
executives. The primary objective of the Executive Committee is to enhance the
companys growth and sustainability beyond that encapsulated in the strategies,
plans and budgets of subsidiary companies by driving and co-ordinating new
initiatives, innovation and intra-company activities.
Lagos
10a,
Iweanya Igbogho Street,
Off Durosimi Etti Street,
Lekki Phase 1,
Lagos.