Project - Upgradation of Road from Saundatti to Ramdurga (including Mullur ghat realignment) (Km 0+000 to

Km 37+270) in linc 21C and Ramdurga to Halgatti Junction, Ramdurga (Km 0+000 to 3+600) in link 21D in the
state of Karnataka
Client :Karnataka State Highway Improvement Project (KSHIP-II)
Consultant :M/s SMEC International PVT. LTD
Contractor :D.P JAIN & CO INFRASTRUCTURE PVT, LTD

COMBINED FLAKINESS AND ELONGATION INDEX


(IS 2386 PART I)
Sampled by :Jontly Lab No. :1
Location : D P Jain Crusher Date of Sampling :17.09.2016
Type of Sample : :WMM Date of Testing :17.09.2016
Source : Annegundi Purpose of use :WMM
IS Sieve Size FLAKINESS INDEX ELONGATION INDEX

Aggregates Passing on
Retained

Weight of Non Flaky Weight of aggregates


Passing

Total Weight of Fractions flaky gauge (sample


aggregates retained on flaky retained on Elongation
for material sieved passing through each
gauge gauge
gauge)

mm mm W1(gms) W2(gms) W3(gms) W4(gms)

63 50
50 40
3850 460 3390 400
40 31.5
31.5 25 3210 380 2830 320

25 20 2578 482 2096 280

20 16 1872 118 1754 210

16 12.5 1064 72 992 105

12.5 10 474 80 394 65

10 6.3 192 18 174 66

Total W1(gms)= 13240 W2(gms)= 1610 W3(gms)= 11630 W4(gms)= 1446

Flakiness % W=(W2/W1)*100 12.16

Elongation %w=(W4/W3)*100 12.43

Combined Flakiness & Elongation


24.59
Index=(W+w)

Remarks

Contractor's Representative Consultant's Representative


Project - Upgradation of Road from Saundatti to Ramdurga (including Mullur ghat realignment) (Km 0+000 to
Km 37+270) in linc 21C and Ramdurga to Halgatti Junction, Ramdurga (Km 0+000 to 3+600) in link 21D in the
state of Karnataka
Client :Karnataka State Highway Improvement Project (KSHIP-II)
Consultant :M/s SMEC International PVT. LTD
Contractor :D.P JAIN & CO INFRASTRUCTURE PVT, LTD

COMBINED FLAKINESS AND ELONGATION INDEX


(IS 2386 PART I)
Sampled by :Jontly Lab No. :2
Location : D P Jain Crusher Date of Sampling :17.09.2016
Type of Sample : :WMM Date of Testing :17.09.2016
Source : Annegundi Purpose of use :WMM
IS Sieve Size FLAKINESS INDEX ELONGATION INDEX

Aggregates Passing on
Retained

Weight of Non Flaky Weight of aggregates


Passing

Total Weight of Fractions flaky gauge (sample


aggregates retained on flaky retained on Elongation
for material sieved passing through each
gauge gauge
gauge)

mm mm W1(gms) W2(gms) W3(gms) W4(gms)

63 50
50 40
4010 480 3530 400
40 31.5
31.5 25 3365 390 2975 320

25 20 2680 500 2180 280

20 16 1950 116 1834 210

16 12.5 1104 70 1034 105

12.5 10 502 85 417 65

10 6.3 184 20 164 66

Total W1(gms)= 13795 W2(gms)= 1661 W3(gms)= 12134 W4(gms)= 1446

Flakiness % W=(W2/W1)*100 12.04

Elongation %w=(W4/W3)*100 11.92

Combined Flakiness & Elongation


23.96
Index=(W+w)

Remarks

Contractor's Representative Consultant's Representative


Project - Upgradation of Road from Saundatti to Ramdurga (including Mullur ghat realignment) (Km 0+000 to
Km 37+270) in linc 21C and Ramdurga to Halgatti Junction, Ramdurga (Km 0+000 to 3+600) in link 21D in the
state of Karnataka
Client :Karnataka State Highway Improvement Project (KSHIP-II)
Consultant :M/s SMEC International PVT. LTD
Contractor :D.P JAIN & CO INFRASTRUCTURE PVT, LTD

COMBINED FLAKINESS AND ELONGATION INDEX


(IS 2386 PART I)
Sampled by :Jontly Lab No. :2
Location : D P Jain Crusher Date of Sampling :17.09.2016
Type of Sample : :WMM Date of Testing :17.09.2016
Source : Annegundi Purpose of use :WMM
IS Sieve Size FLAKINESS INDEX ELONGATION INDEX

Aggregates Passing on
Retained

Weight of Non Flaky Weight of aggregates


Passing

Total Weight of Fractions flaky gauge (sample


aggregates retained on flaky retained on Elongation
for material sieved passing through each
gauge gauge
gauge)

mm mm W1(gms) W2(gms) W3(gms) W4(gms)

63 50
50 40
3950 470 3480 400
40 31.5
31.5 25 3266 395 2871 320

25 20 2590 489 2101 280

20 16 2010 125 1885 210

16 12.5 1236 73 1163 105

12.5 10 514 81 433 65

10 6.3 190 24 166 66

Total W1(gms)= 13756 W2(gms)= 1657 W3(gms)= 12099 W4(gms)= 1446

Flakiness % W=(W2/W1)*100 12.05

Elongation %w=(W4/W3)*100 11.95

Combined Flakiness & Elongation


24.00
Index=(W+w)

Remarks

Contractor's Representative Consultant's Representative