Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Schedule D

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 19

CONTRACT NO.

66000XXXXX

SCHEDULE D

SAFETY, HEALTH AND ENVIRONMENTAL REQUIREMENTS

TABLE OF CONTENTS

GENERAL PROVISIONS

1. COMPLIANCE WITH SAFETY, HEALTH AND ENVIRONMENTAL


REQUIREMENTS

2. DEVIATION FROM SAFETY, HEALTH AND ENVIRONMENTAL


REQUIREMENTS

3. FAILURE TO COMPLY

4. SAUDI ARAMCO ASSISTANCE

SECTION I - SAFETY AND HEALTH REQUIREMENTS:

1. CONTRACTOR SAFETY REQUIREMENTS

2. CONTRACTOR SITE SAFETY PROGRAM & HAZARD IDENTIFICATION PLAN

3. CONTRACTOR SAFETY STAFF

4. WORK PERMITS

5. PERSONAL PROTECTIVE EQUIPMENT (PPE)

6. SAUDI ARAMCO PLANT OPERATIONS

7. TRANSPORTATION

8. REMOVAL FROM SITE

9. INJURY AND DAMAGE REPORTING

10. FIRE PREVENTION

11. MEDICAL

12. CONTRACTOR CAMPS

13. WORK OVER OR ADJACENT TO WATER

D-i
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D CONTRACT NO. 66000XXXXX

SECTION II - ENVIRONMENTAL AND SANITARY REQUIREMENTS:

1. INTRODUCTION

2. APPLICABLE SAUDI ARAMCO AND/OR OTHER ENGINEERING


REQUIREMENTS

3. ENVIRONMENTAL MANAGEMENT PLAN

4. WATER SUPPLY PROTECTION

5. WASTEWATER MANAGEMENT

6. SPILL CONTROL

7. SOLID WASTE MANAGEMENT

8. AIR POLLUTION MITIGATION

9. NOISE CONTROL

10. FOOD SERVICE HYGIENE

11. CAMP SANITATION

D-ii
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
CONTRACT NO. 66000XXXXX

SCHEDULE D

SAFETY, HEALTH AND ENVIRONMENTAL REQUIREMENTS

GENERAL PROVISIONS

1. COMPLIANCE WITH SAFETY, HEALTH AND ENVIRONMENTAL


REQUIREMENTS

CONTRACTOR shall provide and maintain each WORK Site in a manner that is
free from recognized hazards that could cause death, physical harm or negative
impact to the health of any person entering the WORK Site.

CONTRACTOR shall comply at all times with SAUDI ARAMCO safety, health and
environmental (SH&E) requirements, specifications, regulations, procedures and
standards, including the following:

1.1 SAUDI ARAMCO General Instructions (GIs) and Environmental Impact


Assessment Procedure (SAEP-13);

1.2 the SAUDI ARAMCO Construction Safety Administrative Requirements


(CSAR), which is Volume One of the SAUDI ARAMCO Construction Safety
Manual (CSM);

1.3 the SAUDI ARAMCO Work Site Safety Manual (WSSM), which is Volume
two of the CSM;

1.4 the SAUDI ARAMCO Environmental Health Code (SAEHC),

1.5 the SAUDI ARAMCO Safety Handbook;

1,6 all applicable Saudi Arab Government SH&E regulations and, where
applicable, International Treaties and conventions ratified by the Saudi
Arabian Government; and

1.7 all additional requirements specified in this Schedule D.

(Collectively referred to in this Schedule D as the SH&E Requirements.)

Changes in SH&E Requirements shall be effective immediately, unless otherwise


noted in writing by SAUDI ARAMCO. In case of conflicting requirements, the most
stringent requirement shall apply unless otherwise noted. SAUDI ARAMCO shall
compensate CONTRACTOR, via Change Order or Amendment, for any significant
increases in the cost of the WORK resulting from changes to SH&E Requirements
after the effective standards cutoff date, or, if no effective standards cutoff date is
specified, the bid closing date or proposal submission date, as appropriate.

D-1
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D CONTRACT NO. 66000XXXXX

CONTRACTOR shall maintain at the WORK Site copies of the most current version
of the SAUDI ARAMCO Construction Safety Manual (CSM) and all applicable
SAUDI ARAMCO GIs, handbooks and engineering standards, as well as the
approved Hazard Identification Plan (HIP) and any Contractor Site Specific Safety
Plan (CSSP). CONTRACTOR may request from the Company Representative
copies of the CSM and other SAUDI ARAMCO GIs, handbooks and engineering
standards that are applicable to this Contract.

Additionally, CONTRACTOR shall comply with all SAUDI ARAMCO Operations


Instruction Manuals applicable to the WORK and/or the WORK Site, and shall
maintain at the WORK Site copies of the most recent version of the same. Without
limiting the foregoing, for offshore WORK, CONTRACTOR shall comply with
Northern Area Oil Operations' Operations Instruction Manual (OIM) Number 1.519,
"Work Around Offshore Producing Facilities".

During CONTRACTOR's performance of the WORK, CONTRACTOR shall also


take or cause to be taken any additional measures that are requested by SAUDI
ARAMCO to prevent the injury or death of any person, any damage or loss of
property, loss of process, or damage to the environment.

CONTRACTOR supervisory personnel or other qualified staff shall be present at


the WORK Site at all times while WORK is in progress.

SAUDI ARAMCO reserves the right to monitor and inspect any WORK Site, Lay
Down Yard, fabrication yard, clinic, camp or dining facility (on or off SAUDI
ARAMCO property) for compliance with the SH&E Requirements. SAUDI
ARAMCO reserves the right to reject, remove from site, or have CONTRACTOR
destroy any tools or equipment found to be defective, of substandard quality or
noncompliant. Non-third party factory produced tools, including but not limited to
home-made and shop-made tools, are strictly prohibited. SAUDI ARAMCO
reserves the right to require CONTRACTOR to fully vacate, including fully removing
all structures, materials and equipment, from Lay Down Yards, fabrication yards,
clinics, camps and dining facilities on SAUDI ARAMCO controlled land if they are
found to be non-compliant with SH&E Requirements. Costs incurred by
CONTRACTOR as a result of such removal shall be solely CONTRACTORs
responsibility, and any resultant CONTRACTOR performance delays shall not be
deemed excusable hereunder.

Without limiting the application of any other provision in this Contract,


CONTRACTOR shall be responsible to ensure that all members of the
CONTRACTOR Group fully comply with all requirements of this Schedule D.
Costs incurred by CONTRACTOR as a result of such removal shall be solely
CONTRACTORs responsibility, and any resultant CONTRACTOR performance
delays shall not be deemed excusable hereunder.

D-2
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D CONTRACT NO. 66000XXXXX

2. DEVIATION FROM SAFETY, HEALTH AND ENVIRONMENTAL


REQUIREMENTS

Any deviation by CONTRACTOR from applicable SH&E Requirements shall not be


accepted unless it is approved, in advance, in writing by the Company
Representative in cooperation with the responsible SAUDI ARAMCO
organization(s).

3. FAILURE TO COMPLY

Any non-conformance with SH&E Requirements or security protocols by


CONTRACTOR shall be considered a substantial and material breach of this
Contract. Upon receiving notification of a failure to meet any SH&E Requirement,
CONTRACTOR shall immediately take all necessary corrective actions. Unless
otherwise specifically provided in this Contract, all corrective actions shall be at
CONTRACTOR's expense. In addition, the Company Representative may direct
CONTRACTOR to suspend all or part of the WORK pursuant to Schedule A until
satisfactory corrective action has been taken. In addition to any terms contained
in this Contract, costs incurred by CONTRACTOR as a result of WORK suspension
or termination for cause by SAUDI ARAMCO resulting from a failure to meet SH&E
Requirements shall be solely CONTRACTOR's responsibility, and any resultant
CONTRACTOR performance delays shall not be deemed excusable hereunder.

4. SAUDI ARAMCO ASSISTANCE

CONTRACTOR may request clarification or explanation from SAUDI ARAMCO


regarding any of its SH&E Requirements. The Company Representative (or the
Company Representatives designated party or parties) may provide assistance to
the CONTRACTOR by explaining good safety and sound environmental practices,
pointing out unsafe conditions, and by applying experience and judgment, to assist
CONTRACTOR in improving safety and to safeguard the environment. Such
assistance by SAUDI ARAMCO shall in no way relieve CONTRACTOR of its
responsibilities as set forth in this Schedule D or make SAUDI ARAMCO
financially or otherwise responsible for such assistance.

END OF GENERAL PROVISIONS

D-3
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D SECTION I CONTRACT NO. 66000XXXXX

SECTION I - SAFETY AND HEALTH REQUIREMENTS:

1. CONTRACTOR SAFETY REQUIREMENTS

CONTRACTOR management and supervision shall be fully responsible for proper


implementation of all applicable safety-related contractual requirements and
expectations described in the SH&E Requirements. CONTRACTOR shall allocate
adequate resources to safely and effectively execute the WORK in accordance with
the SH&E Requirements.

2. CONTRACTOR SITE SAFETY PROGRAM & HAZARD IDENTIFICATION PLAN

As required by the CSAR, CONTRACTOR shall prepare and submit a contract-


specific Contractor Site Safety Program (CSSP) to the Company Representative
for concurrence within fifteen (15) working days of Contract execution.
CONTRACTOR shall ensure full implementation of the CSSP. The CSSP shall be
available at each WORK Site at all times.

For long form capital project construction contracts where SAUDI ARAMCO Project
Management is the proponent or as otherwise requested in writing by SAUDI
ARAMCO, the CONTRACTOR shall have safety audits performed by an
independent third party six (6) months after starting WORK, and at least every nine
(9) months thereafter, to verify proper implementation of the CSSP at the WORK
Site and make recommendations to improve CONTRACTOR's safety programs
and execution, per SAUDI ARAMCO Safety Management Guide for Independent
Third Party Contractor Site Safety Program (CSSP) Reviews. A list of approved
independent third parties may be requested from the Company Representative.
CONTRACTOR may use any other independent third party to conduct such safety
audits only after securing the advance written approval from the Company
Representative. CONTRACTOR shall promptly provide copies of all audit reports
to the Company Representative.

CONTRACTOR shall prepare and submit a Contract-specific Hazard Identification


Plan (HIP), along with all required pre-mobilization drawings and plans as
described in the CSAR, to the Company Representative for concurrence within
fifteen (15) working days of Contract execution. CONTRACTOR shall ensure full
implementation of all safety controls and precautions noted in the HIP. No WORK
shall commence at a WORK Site before the HIP has been concurred with by SAUDI
ARAMCO as described in the CSAR. The HIP shall be revised and amended, as
needed, when conditions change, new hazards are introduced, or the scope of
work changes.

CONTRACTOR shall develop a Job Safety Analysis (JSA) and Method Statement
prior to the start of any WORK involving high-risk activities and as requested by the
Company Representative, per the SAUDI ARAMCO Safety Management Guide for
Job Safety Analysis.

D-4
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D SECTION I CONTRACT NO. 66000XXXXX

3. CONTRACTOR SAFETY STAFF

CONTRACTOR shall provide a qualified Safety Manager/Supervisor(s) and


qualified safety staff as described in the CSAR. Safety staff shall be present at the
WORK Site at all times while CONTRACTOR Personnel are working, including
nights, weekends, holidays and extended working hours, as described in the
CSAR. CONTRACTOR safety staff shall not be assigned dual roles (e.g., not also
be work permit receivers, scaffold inspectors, etc).

4. WORK PERMITS

Work Permits shall be obtained by CONTRACTOR in accordance with SAUDI


ARAMCO GI 2.100, Work Permit System, and Chapter I-4, Work Permit System,
of the SAUDI ARAMCO Construction Safety Manual (CSM) prior to beginning
WORK.

5. PERSONAL PROTECTIVE EQUIPMENT (PPE)

CONTRACTOR shall, as a minimum, provide, maintain and enforce use of the


personal protective equipment (PPE) described in Chapter I-3, Personal Protective
Equipment, of the CSM. Minimum PPE in SAUDI ARAMCO Restricted Areas and
project WORK Sites includes hard hats, safety glasses and safety shoes for all
workers. CONTRACTOR shall also comply with all PPE requirements stipulated
by the local SAUDI ARAMCO facility or the Company Representative (e.g., Flame
Resistant Clothing).

6. SAUDI ARAMCO PLANT OPERATIONS

CONTRACTOR shall ensure that CONTRACTOR Personnel do not open or close


any valves, or operate any electrical switches or any other SAUDI ARAMCO
equipment in SAUDI ARAMCO plant facilities.

7. TRANSPORTATION

CONTRACTOR shall ensure CONTRACTOR Personnel comply with all Saudi


Arab Government and SAUDI ARAMCO traffic safety rules, laws and regulations,
including GI 6.030, Traffic and Vehicle Safety, paying particular attention to the
Vehicle Condition and Driver Responsibilities listed in Supplement-I of GI 6.030.

CONTRACTOR shall ensure that passengers travel only in vehicles that are
provided with passenger seats. Seat belts shall be installed for all seats and used
in all vehicles carrying personnel as described in the SAUDI ARAMCO Contractor
Safety Administrative Requirements (CSAR).

D-5
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D SECTION I CONTRACT NO. 66000XXXXX

8. REMOVAL FROM SITE

SAUDI ARAMCO reserves the right to require removal of any CONTRACTOR


Personnel or other personnel from the WORK Site if it is believed, in SAUDI
ARAMCOs reasonable discretion, that such person is a danger to himself or
others. Costs incurred by CONTRACTOR as a result of such removal shall be
solely CONTRACTORs responsibility, and any resultant CONTRACTOR
performance delays shall not be deemed excusable hereunder.

9. INJURY AND DAMAGE REPORTING

CONTRACTOR shall comply with the incident reporting requirements of SAUDI


ARAMCO GI 6.007, Reporting of Contractor On-Job Injuries/Occupational
Illnesses, which includes an immediate written report of all on-job injuries or
occupational illnesses regardless of severity.

CONTRACTOR shall ensure that an immediate oral report and preliminary written
report is made to the Company Representative in the case of any incident with:

Damage over SR10,000 to CONTRACTOR's plant or equipment,

Damage, in any amount, to SAUDI ARAMCO equipment or property,

Damage and all incidents involving cranes and heavy equipment, or

Fire, explosion or hazardous materials release.

For an incident resulting in CONTRACTOR Personnel fatality, serious injury to


CONTRACTOR Personnel or damage to SAUDI ARAMCO equipment or property,
the CONTRACTOR shall conduct an incident investigation, including a structural
root cause analysis. CONTRACTOR shall submit a copy of the draft incident
investigation report and the final report to the Company Representative for review
in a timely manner. In addition, SAUDI ARAMCO reserves the right to convene an
investigation committee in accordance with GI 6.003, Incident Investigation.

CONTRACTOR shall maintain a current record showing all:

WORK injuries/illnesses/fatalities

Motor vehicle collisions

Incidents to CONTRACTOR's plant or equipment over SR10,000

Incidents involving damage to SAUDI ARAMCO equipment and property

Damage and all incidents involving cranes and heavy equipment

D-6
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D SECTION I CONTRACT NO. 66000XXXXX

Fires, explosions, toxic releases.

Near miss incidents

CONTRACTOR shall submit to the Company Representative electronic and


hardcopy copies of this record as required by GI 6.007, Chapter I-2, Incident
Reporting and Investigation, of the SAUDI ARAMCO Construction Safety Manual
(CSM) and as requested by the Company Representative.

10. FIRE PREVENTION

CONTRACTOR shall provide and maintain in good working order suitable


firefighting equipment and shall provide trained and qualified fire watch personnel
for all WORK activities involving ignition sources, as per the provisions of Chapter
I-7, Fire Prevention, of the CSM.

11. MEDICAL

CONTRACTOR shall comply with all medical requirements described in the SAUDI
ARAMCO Contractor Safety Administrative Requirements (CSAR) and the SAUDI
ARAMCO Minimum Medical Standards Requirements (MMSR) Manual.

12. CONTRACTOR CAMPS

Prior to beginning construction of any new contractor camp or other worker


accommodation, or prior to occupancy of existing contractor camps or other worker
accommodations, CONTRACTOR shall provide all necessary assistance to
Company Representative to allow Company Representative and all SAUDI
ARAMCO organizations identified to fulfill their obligations pursuant to G.I.
298.010, including but not limited to timely provision of required documentation,
certifications, and access to contractor camps.

CONTRACTOR shall ensure that any CONTRACTOR camp facility provided for
CONTRACTOR Personnel and/or SAUDI ARAMCO personnel meets the
requirements of Saudi Arabia's Labor Law and the SH&E Requirements.
CONTRACTOR shall operate the camp facility in accordance with G.I. 298.010,
Attachment V, Procedure for Management of Safety and Hygiene at Contractor
Camps and Project Support Buildings.

Prior to occupancy and permanent connection of utilities, CONTRACTOR's camp


facilities either on or off SAUDI ARAMCO property shall be subject to inspection by
the Company Representative and/or the Company Representatives delegate(s),
for compliance with all applicable safety, fire and health standards. Any deficient
items noted during the inspection or otherwise brought to the attention of
CONTRACTOR shall be promptly and satisfactorily resolved prior to occupancy.

D-7
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D SECTION I CONTRACT NO. 66000XXXXX

SAUDI ARAMCO reserves the right to periodically re-inspect any camp facility
located either on or off SAUDI ARAMCO property to check that all SH&E
Requirements are being complied with.

If SAUDI ARAMCO considers that non-conformance with SH&E Requirements on


a CONTRACTOR camp are so extensive or significant as to be deemed to be
hazardous to the health of personnel residing there, then the CONTRACTOR shall,
within thirty (30) days of receipt of notice and at no cost to SAUDI ARAMCO, close
all or the identified portion of the camp and take all necessary action to relocate
personnel to a SAUDI ARAMCO specified Contractor Park or other suitable and
compliant alternate accommodations. Re-occupation of the camp will not be
allowed until such time as the specified conditions have been rectified to the
satisfaction of SAUDI ARAMCO and the camp facility meets the requirements
specified herein. SAUDI ARAMCO reserves the right to require the camp to be
vacated and personnel relocated on less than thirty (30) days notice if the
conditions pose a significant environmental, safety or health risk.

13. WORK OVER OR ADJACENT TO WATER

CONTRACTOR shall provide an adequate amount of approved lifesaving and


rescue equipment on every seagoing vessel, and at every WORK Site where
WORK is being carried out over or adjacent to water. CONTRACTOR Personnel
exposed to drowning hazards shall obtain, prior to assignment to such WORK, and
maintain a valid water survival certification, and continuously use approved,
wearable personal flotation devices appropriate for the application as prescribed in
SAUDI ARAMCO G.I. 6.020.

END OF SECTION I

D-8
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D SECTION II CONTRACT NO. 66000XXXXX

SECTION II - ENVIRONMENTAL AND SANITARY REQUIREMENTS:

1. INTRODUCTION

This section covers various environmental and sanitary requirements with which
CONTRACTOR must comply. This may include handling, treatment and disposal
of liquid and solid wastes, air quality, marine protection, biodiversity and
conservation, waste water treatment and resource conservation during execution
of SAUDI ARAMCO construction projects, both onshore and offshore. This applies
to construction sites, CONTRACTOR camps and accommodation located on or off
of SAUDI ARAMCO controlled land, and any other work related activities, facilities,
plants, utilities (permanent and temporary) that may result in an environmental
impact during performance of the WORK.

2. APPLICABLE SAUDI ARAMCO AND/OR OTHER ENGINEERING


REQUIREMENTS

2.1 All SAUDI ARAMCO and/or other engineering requirements referred to


herein shall be the current issue, which will be furnished to CONTRACTOR
by the Company Representative upon request. Company Representative
will assist CONTRACTOR obtain other (non-SAUDI ARAMCO) engineering
documents.

2.2 If current SAUDI ARAMCO and/or other engineering requirements do not


cover a specific situation, CONTRACTOR shall contact the Company
Representative for guidance and resolution.

2.3 When specific circumstances render a particular requirement of the SAUDI


ARAMCO Standard, Procedure, General Instruction or Code impractical, a
waiver or grant of variance may be requested in writing from the SAUDI
ARAMCO Environmental Protection Department in accordance with SAUDI
ARAMCO Engineering Procedure 302, Instructions for Obtaining a Waiver
of a Mandatory Saudi Aramco Engineering Requirement.

3. ENVIRONMENTAL MANAGEMENT PLAN

3.1 CONTRACTOR shall prepare and submit to the Company Representative


an Environmental Management Plan (EMP) for approval within fifteen (15)
working days of Contract execution. The EMP shall encompass the
requirements specified in Paragraphs 4 through 11 of this Section and shall
comply with the recommendations contained in any applicable Project
Environmental Impact Assessment (EIA) as per SAEP-13 requirements.

3.2 EMPs shall also address waste reuse, recycling, and resource recovery. All
EMPs shall address and include planned and implemented waste
minimization measures.

D-9
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D SECTION II CONTRACT NO. 66000XXXXX

3.3 CONTRACTOR shall implement the approved EMP and shall appoint a
qualified Environmental Coordinator to oversee its implementation.

3.4 Upon approval of the EMP, CONTRACTOR shall submit a copy of the
approved EMP together with the name, address and qualifications of the
Environmental Coordinator shall be submitted to the SAUDI ARAMCO
Environmental Protection Department (EPD).

3.5 A copy of the approved EMP together with all records generated by its
implementation shall be retained at the WORK Site and be available for
inspection by the Company Representative and any representative of EPD.

4. WATER SUPPLY PROTECTION

CONTRACTOR shall provide and maintain an adequate and safe supply of potable
water for human consumption at all sites where CONTRACTOR Personnel are
employed or housed. The water supply shall meet the design criteria specified by
SAES-S-040, SAUDI ARAMCO Water Systems, and shall comply with the
provisions of the SAUDI ARAMCO Environmental Health Code (notably SAEHC-
S-01, Water) and SAUDI ARAMCO Water Conservation Policy, INT-11.

5. WASTEWATER MANAGEMENT

5.1 The basic design of all wastewater treatment units and disposal of
sanitary/industrial wastewater shall comply with the following: SAUDI
ARAMCO Engineering Standards SAES-A-103, Discharges to the Marine
Environment; SAES-A-104, Wastewater Treatment, Reuse and Disposal;
SAEHC-S-02, Sanitary Wastewater and Sewerage Systems; SAES-S-010,
Sanitary Sewers; the Presidency of Meteorology and Environment General
Environmental Regulations; and, when applicable, the Royal Commission
Environmental Regulations, the Regional Organization for the Protection of
the Marine Environment (ROPME) Protocol Concerning Marine Pollution
Resulting from Exploration and Exploitation of the Continental Shelf, 1989,
and the International Conference for the Prevention of Pollution at Sea by
Ships (MARPOL).

5.2 All inland sanitary wastewater discharge shall meet Ministry of Water &
Electricity (MOWE) standards. Trucking wastewater to off-site disposal is
not permitted for all facilities occupied by more than 30 persons. Onsite
wastewater disposal systems (e.g., septic systems, ponds) shall comply with
SAES-A-104, Wastewater Treatment, Reuse and Disposal.

5.3 The trucking of sanitary wastewater from the point of generation to


appropriate sewage treatment plants shall be manifested in accordance with
SAUDI ARAMCO Hazardous Waste Code, Section 6.

D-10
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D SECTION II CONTRACT NO. 66000XXXXX

5.4 Municipal dumping areas shall not be used for disposal of wastewater.
CONTRACTORS wishing to utilize off-site disposal for wastewater shall
obtain approval from the General Supervisor, Environmental Engineering
Division (EED) of the SAUDI ARAMCO EPD and the Ministry of Municipal
and Rural Affairs (MOMRA) to be allowed to transport sanitary wastewater
to an off-site wastewater treatment facility.

5.5 Hydrocarbon contaminated fluids drainage systems shall be designed in


accordance with SAES-D-116, Underground Storage Tank System, SAES-
A-400, Industrial Drainage Systems, SAES-A-401, Closed Drain Systems
(CDS), SAES-A-403, Offshore Platform Drainage Systems, SAES-S-010,
Sanitary Sewers, and SAES-S-020, Oily Water Drainage Systems.

5.6 Hydrotesting shall follow the requirements of SAES-A-007, Hydrostatic


Testing Fluids and Lay-Up Procedures. Disposal of Wastewater from
Disposal of Wastewater from Cleaning, Flushing and Dewatering Pipelines
and Vessels shall be in accordance with SAEP-327.

6. SPILL CONTROL

6.1 In the event of an offshore oil spill, the procedures outlined in GI 2.400,
Offshore Oil Spill Contingency Plan, shall be followed. In the event of an
inland oil spill, the procedures of GI 2.401, Inland Oil Spill Response, shall
be followed.

6.2 CONTRACTOR shall take immediate action to stop a spill and promptly
notify the appropriate parties as per GI 2.104, Leak and Spill Reporting.

6.3 In the event of a chemical/oil spill, CONTRACTOR shall promptly notify the
Company Representative to determine whether a reportable quantity
exists, per SAUDI ARAMCO Hazardous Waste Code, Section 12.

6.4 Any soil that is contaminated due to a spill shall be disposed in accordance
with SAUDI ARAMCO Hazardous Waste Code, Section 6, and SAEHC Solid
Waste Management, Section S-03, and SAES-S-007 Solid Waste Landfill
Requirements. Shipments of hazardous waste shall be manifested as
required by SAUDI ARAMCO Hazardous Waste Code, Section 6. Only
SAUDI ARAMCO-approved waste management contractors shall be used
to dispose of hazardous waste.

7. SOLID WASTE MANAGEMENT

7.1 Waste Disposal Plan

7.1.1 The solid waste portion of CONTRACTOR's EMP shall include


provisions for waste minimization, waste recovery, temporary site
storage, collection, transportation and disposal practices.
D-11
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D SECTION II CONTRACT NO. 66000XXXXX

7.1.2 CONTRACTORs EMP must comply with the SAUDI ARAMCO


Hazardous Waste Code, the SAUDI ARAMCO Environmental Health
Code (notably SAEHC-S-03, Solid Waste Management), and SAES-
S-007, Solid Waste Landfill Requirements.

7.1.3 The specifics of the designated waste treatment facility and / or


SAUDI ARAMCO approved disposal landfill for the WORK must be
contained within the Waste Disposal Plan portion of the EMP.
CONTRACTOR must prepare, maintain and retain waste records
detailing the classification, quantities of waste generated, the waste
generator, details of the waste transporter and the final disposal /
treatment facility.

7.2 Hazardous Waste Storage and Handling

7.2.1 CONTRACTOR shall, when applicable, comply with the following


SAUDI ARAMCO General Instructions, Supply Chain Manual
references and engineering standards for its operations involving
hazardous waste storage and handling: GI 430.001, Implementing
the SAUDI ARAMCO Hazardous Waste Code; GI 150.001, Asbestos
Hazard Management; SAES-S-007, Solid Waste Landfill
Requirements, CU-22.03, Processing and Handling of Hazardous
Material; GI 2.717, Procedures and Guidelines for Handling
Polychlorinated Biphenyls (PCBs); CU-22.06, Disposal of
Polychlorinated Biphenyl (PCB); CU-22.01, Processing and Handling
of Gas and Gas Cylinders.

7.2.2 CONTRACTORs EMP (see Paragraph 3 above of this Section II)


shall address in detail the design, construction and method of
operation for hazardous waste storage, handling equipment and
facilities.

7.2.3 All hazardous waste shall be stored in tightly closed, leak proof
containers made of or lined with materials that are compatible with
the hazardous waste to be stored. Containers shall be marked with
warning labels to accurately describe their contents and detail
appropriate safety precautions.

7.2.4 Incompatible wastes are not permitted to be stored within the same
spill containment area or in such a manner that the contents could be
mixed if spilled.

7.2.5 Hazardous chemicals shall be stored and handled in accordance with


SAUDI ARAMCO Chemical Hazard Bulletins (CHBs), which are
issued by the Environmental Protection Department, the
manufacturers Material Safety Data Sheet (MSDS) or as required by
the Company Representative.
D-12
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D SECTION II CONTRACT NO. 66000XXXXX

7.2.6 CONTRACTOR shall have readily available all relevant


CHBs/MSDSs at chemical storage areas and locations where
chemicals are being used.

7.3 Method of Collection

7.3.1 Solid wastes shall be transported by CONTRACTOR to disposal


areas in vehicles equipped to minimize windblown debris.

7.3.2 CONTRACTOR shall promptly clean up all spillages and waste lost
from the vehicle on route to the disposal site.

7.3.3 Hazardous waste containers shall be collected and transported by


CONTRACTOR in a manner which minimizes environmental, fire and
explosion hazards and worker exposure. Transportation vehicles
shall be properly marked and drivers shall carry the appropriate
documents describing the quantity, classification and associated
degree of hazard for the waste transported.

7.3.4 All vehicles and containers shall be designed to prevent the release
of transported liquid and solid wastes.

7.3.5 Drivers shall have specialized training related to the handling and
disposal of their cargo and carry on board the relevant CHBs/MSDSs.
Each vehicle must carry appropriate safety and fire prevention
equipment and a telephone number to contact in an emergency.

7.4 Requirements for Establishing a Landfill Disposal Site

CONTRACTOR may apply to operate its own solid waste management


system or to utilize a central waste management system. Written approval
from the SAUDI ARAMCO Environmental Protection Department is required
prior to establishing or operating a landfill disposal site on SAUDI ARAMCO
controlled land and CONTRACTOR shall obtain through the Company
Representative a SAUDI ARAMCO Land Use Permit (LUP). Landfill design
requirements shall be in accordance with SAES-S-007, Solid Waste Landfill
Requirements, and the SAUDI ARAMCO Environmental Health Code
(notably SAEHC-S-03, Solid Waste Management).

7.5 Classification of Landfill Disposal Sites

7.5.1 If CONTRACTOR operates its own, or uses an existing solid waste


disposal site, CONTRACTOR shall dispose of waste in an area that
will adequately contain it. The following describes three landfill types
and the material that may be disposed of in each:

D-13
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D SECTION II CONTRACT NO. 66000XXXXX

7.5.1.1 Class I Landfill Disposal Site - isolates solid wastes from


surface water and groundwater. The site shall have a stable
foundation and two impermeable liners with leachate
collection and removal systems. Precipitation runoff from
surrounding areas shall be diverted away from the site. A
Class I landfill disposal site shall be used for the disposal of
Class I hazardous wastes and may be used for the disposal
of Class II biodegradable and chemically decomposable
wastes and Class III inert wastes. Class I landfills shall only
be operated by qualified environmental contractors that are
licensed by the Presidency of Meteorology and Environment
(PME).

7.5.1.2 Class II Landfill Disposal Site - shall be above the highest


groundwater elevation to prevent direct contact of the wastes
with surface water or groundwater. The landfill site shall
have a stable foundation and provisions shall be made for
diversion of runoff. A Class II landfill disposal site shall be
used for Class II wastes and may be used for Class III
wastes.

7.5.1.3 Class III Landfill Disposal Site - provides little or no protection


from underlying groundwater. Surface water adjacent to the
disposal site may contact the waste material. A Class III
disposal site is for the disposal of Class III inert waste only.

7.5.2 Waste classification will be according to the following:

Class I Hazardous Waste - Wastes which constitute a high degree of


hazard to the public health and the environment. These include
materials which are flammable, corrosive, reactive, toxic, radioactive,
infectious, carcinogenic, mutagenic or teratogenic. Wastes listed as
hazardous waste in PMEs Rules for Implementation and in the
SAUDI ARAMCO Hazardous Waste Code, shall be considered Class
I waste.

Class II Biodegradable or Chemically Decomposable Waste - Non-


hazardous solid wastes and sludges which are biologically or
chemically decomposable in the natural environment. Examples
include paper, digested and dried sewage sludge, animal wastes,
garbage and other putrescible wastes and wood.

Class III Inert Wastes - Wastes which are not biologically or


chemically active in the natural environment. Examples include
glass, most plastics, rubber products and construction debris.

D-14
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D SECTION II CONTRACT NO. 66000XXXXX

7.6 Solid Waste Disposal, Site Design and Operations

Solid waste landfills shall be designed and operated in accordance with


SAES-S-007, Solid Waste Landfill Requirements, and the SAUDI ARAMCO
Environmental Health Code (notably SAEHC-S-03, Solid Waste
Management).

CONTRACTOR shall incorporate the following into the solid waste portion
of its EMP as minimum requirements which must be followed during
disposal operations:

7.6.1 Discharge of Municipal / Construction and Demolition (C&D) Waste


and unloading of solid waste shall be confined to the smallest area
within which equipment can safely and efficiently operate.

7.6.2 CONTRACTOR may dispose of waste to SAUDI ARAMCO landfills


that comply with SAES-S-007, private landfills that have government
permits to operate, and government landfills. All landfill sites shall be
provided with a perimeter fence with locking gates regardless of the
site owner. Solid waste may not be co-disposed with liquid wastes.
Open burning, illegal uncontrolled dumping and burial of waste is
prohibited. The unauthorized disposal of material is prohibited. This
includes overboard dumping of construction debris or refuse from
offshore construction activities.

7.6.3 The Company Representative will advise on problematic waste, as


required, and provide disposal instructions.

7.6.4 Incompatible Wastes - Incompatible wastes shall not be placed in


common cells, tanks or containment areas. Exceptions to this include
the intentional combination of certain hazardous wastes to achieve
neutralization and detoxification by qualified waste management
personnel.

7.6.5 Sludge Disposal - Dried sludge from domestic wastewater treatment


plants shall be disposed in a Class II waste disposal site. The sludge
shall be placed over the working face (the area of a landfill in which
waste is currently being deposited) and shall be mixed in an
appropriate ratio with dry waste to absorb moisture.

7.6.6 Environmental/Water Pollution - Landfill operations shall not cause or


allow discharge of contaminants into the environment or adversely
impact surface or groundwater systems.

7.6.7 Waste containing free liquid (i.e., waste that fails the United States
Environmental Protection Agencys SW-846 Method 9095A: Paint
Filter Liquids Test) shall not be disposed of in landfills.
D-15
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D SECTION II CONTRACT NO. 66000XXXXX

7.6.8 All shipments of hazardous waste shall be manifested in accordance


with the SAUDI ARAMCO Hazardous Waste Code.

7.7 Offshore Disposal

7.7.1 Offshore disposal of solid and hazardous waste shall not be allowed.
All such waste shall be brought onshore for proper disposal.

7.7.2 Liquid waste treatment and disposal shall be in accordance with


ROPME and MARPOL requirements.

7.7.3 Sanitary and industrial wastewater treatment and handling shall be


per Paragraph 5, Wastewater Management, of Section II of Schedule
D.

7.7.4 Disposal of drilling mud and cuttings shall be in accordance with the
ROPME, Protocol Concerning Marine Pollution Resulting from
Exploration and Exploitation of the Continental Shelf, 1989.

8. AIR POLLUTION MITIGATION

8.1 CONTRACTOR shall comply with SAES-A-102, Ambient Air Quality and
Source Emission Standards.

8.2 All vehicles shall be properly maintained to minimize excessive exhaust


emissions and shall comply with the Standardization & Metrology
Organization for Gulf Cooperation Council (GCC) Countries Standards:

GCC Standard # 47 "Motor Vehicles - Allowable Limits of Gaseous


Pollutants Emitted to the Atmosphere from Gasoline Engine
Vehicles".

GCC Standard # 144 "Motor Vehicles - Allowable Limits of Pollutants


Emitted to the Atmosphere from Heavy Duty Diesel Engine Vehicles".

GCC Standard # 145 "Motor Vehicles - Method for Testing for


Pollutants Emitted from Heavy Duty Diesel Engine Vehicles - Part 1:
Determination of Exhaust Gaseous Pollutants".

8.3 Dust control shall be accomplished by properly wetting the WORK area prior
to commencing the WORK and/or other approved measures, such as dust
suppression/sand control chemicals that are applied to soils to bind them for
the engineered life of the project. Dust suppression and control chemicals
replace the need for daily watering of the site.

D-16
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17
SCHEDULE D SECTION II CONTRACT NO. 66000XXXXX

9. NOISE CONTROL

Control of noise shall be accomplished in accordance with SAES-A-105 Noise


Control. For construction related noise, CONTRACTOR shall use appropriate
abatement and mitigation control measures.

10. FOOD SERVICE HYGIENE

CONTRACTOR food service shall comply with the SAUDI ARAMCO


Environmental Health Code (notably SAEHC-S-04, Food Establishments.)

11. CAMP SANITATION

CONTRACTOR camp sanitation shall comply with the SAUDI ARAMCO


Environmental Health Code (notably SAEHC-S-07, Camps and Communal Living
Facilities).

END OF SECTION II

END OF SCHEDULE D

D-17
MP-LSTK / MP-IK-LSTK / MP-IK-LSPB 04/13
MP-CV-LSTK / MP-CV-IK-LSPB
Revised 02/17

You might also like