80040 / 10130
CIVIL WORK SUBCONTRACT
OVERALL SCOPE OF WORKS
MAIN TASKS:
OPTIONAL TASKS
- Precast concrete foundations, channels and manholes
- Asphalts
- Construction of access roads
- Supply and installation of site fences
SCOPE OF WORKS: Works to be quoted involve the Civil Works for the construction
of:
SCOPE OF WORKS: Works are to be executed in the following seventeen (17) Locations
Type of Process
Location No. UNIT No. UNIT DESCRIPTION
Unit
1 HWGCP-1 Hawiyah Gas Compression Plant (Unit 510)
2 HDGCP-1 Haradh Gas Compression Plant (Unit 521)
3 HDGCP-2 Haradh Gas Compression Plant (Unit 522)
Gas
4 HDGCP-4 Harah GCP-4 (Unit 523)
Compression
5 Plants GZGCP-1 Ghazak GCP-1 (Unit 526)
6 (GCP’s) WQGCP-1 Waqr GCP-1 (Unit 529)
7 HDGCP-3 Haradh Gas Compression Plant (Unit 522)
8 MDGCP-1 Midrikah Gas Compression Plant (Unit 527)
9 TNGCP-1 Tinat Gas Compression Plant (Unit 528)
10 HWYH LSS Hawiyah Liquid Separation Plant
11 SAHB Sahba LSS (Unit 533)
Liquid
12 MNJR Manjurah LSS (Unit 533)
Separation
13 Stations SHDN Shaden LSS (Unit 533)
14 (LSS’s) ZMLH Zimlah LSS (Unit 533)
15 JUFN-LSS Jufayn Liquid Separation Plant JUFN-LSS
16 Administrative OSB&CMB North Haradh Administrative Area
17 Areas OSB&CME South Haradh Administrative Area
LOCATIONS: The locations are spread over an approx. 150 km x 120 km area.
GPs GCPs LSSs OSB&CMB
So yah LSS
dh
w FN-
ra
HB SS
GC 1
DN S
YN S
LH S
GC 1
QG 1
NJ S
HW P-3
M P-4
HD P-1
TN P-2
Ha
HD P-1
HW P-1
SH -LS
JF -LS
ZM -LS
HD CP-
HD CP-
W CP-
M -LS
SA H-L
Ha /JU
R
h
GC
GC
GP
GC
GC
DG
i
Y
ut
P
HD
GZ
Hd
HDP - 133 236 119 20 138 163 185 77 102 176 42 171 196 204 221 149 66 127
GPs
SHDN-LSS 204 114 77 97 194 116 141 32 140 109 156 197 49 81 - 200 131 135 106
ZMLH-LSS 221 133 232 115 211 85 76 181 157 127 120 215 167 192 200 - 159 152 123
JFYN/JUFN-LSS 149 23 163 39 144 64 83 112 90 58 44 147 98 123 131 159 - 85 26
Hawiyah 66 68 167 50 62 69 94 116 5 33 112 66 102 127 135 152 85 - 58
OSB
&
HWGCP-1
HWYH-LSS
OSB&CMB
HDGCP-1
HDGCP-2
MNJR-LSS
HDGCP-3
SAHB-LSS OSB&CMB
WQGCP-1
JUFN-LSS
GZGCP-1
TNGCP-1
SHDN-LSS HDGCP-4
MDGCP-1
ZMLH-LSS
DIRECT UNIT RATES: Unit Rates shall represent only the Direct Cost per
Work Unit, which shall be quoted in Unit Rates sheet of BOQ.
Direct Unit Rate shall be the same for each of the Work Unit independently of the
quantity and the location of each plant.
INDIRECT COST AMOUNT: for each location, related Indirect Costs shall be
quoted as a Lump Sum in dedicated Indirect Cost Sheet of BOQ, where all
considerations of each location shall be taken into account.
HWYH-LSS
HWGCP-1
WQGCP-1
MNJR-LSS
MDGCP-1
SHDN-LSS
ZMLH-LSS
SAHB-LSS
JUFN-LSS
HDGCP-3
HDGCP-4
HDGCP-1
HDGCP-2
GZGCP-1
TNGCP-1
INDIRECT
REMARKS
COST %
DISCOUNT
Scenario 1 x x x x x Pack. 1
Scenario 2 x x x x Pack.1 without Admin Area
Scenario 3 x x x x Pack 1. without LSS
Scenario 4 x x Pack. only LSS & Admin Area
Scenario 5 x x x Pack.1 only GCPs
Scenario 6 x x x x x x x Pack. 2
Scenario 7 x x x Pack.2 only GCPs
Scenario 8 x x x x Pack. without LSS
Scenario 9 x x x x x Pack. 3
Scenario 10 x x x x Pack.3 without Admin Area
Scenario 11 x x x x Pack 3. without LSS
Scenario 12 x x Pack. without LSS & Admin Area
Scenario 13 x x x Pack.3 only GCPs
Scenario 14 x x x x x x North Zone 1
Scenario 15 x x x x North Zone 2
Scenario 16 x x x x x x x x West Zone 1
Scenario 17 x x x x x x x West Zone 2
Scenario 18 x x x x x x South Zone
Scenario 19 x x x x x x East Zone
Scenario 20 x x All Admin. Areas
Scenario 21 TO BE PROPOSED BY BIDDER
Scenario 22 …
SUBCONTRACTOR shall propose other discounts by doing his own
combinations of plants.
HARADH AND HAWIYAH GAS COMPRESSION PROJECT 8
CIVIL WORK SUBCONTRACT
SAMPLE OF ADMINISTRATION AREA
0 Topographical study including benchmarks (by others) NOTE: Feed civil foundations layout for
Administration Area is not available. To
1 Fence (Early Works) be checked when applicable.
NOTE: Fence foundations should be
precast.
4 Auxiliary Buildings,
Shelters, Gasoline
Station, Skids and
Equipment
foundations (2)
5 Parking areas,
remaining
foundations and
underground
system.
(1) Only soil preparation. Asphaltic concrete works will be made later on.
(2) Including underground around these areas.
3D Model View
3’’ Compressors
foundations
Including
underground
around these
areas.
4 Secondary Rack
Including underground
around this area.
5 Remaining foundations
and underground
system.
(1) Only soil preparation. Asphaltic concrete works will be made later on.
3D Model View