SPEEDY CONSTRUCTIONS
Applied to buildings in which the walls are at right angles to the principal axis
lateral front and rear external walls are non-load bearing.
the open end of the boxes being the cladded main external walls.
In contemporary cross wall construction, the external walls are of relatively light cladded construction,
which is resistant to rain transmission and is adequately insulated .
USES
This type of construction is most suited to building types that are upto 5 storeys high.
The spacing of cross walls varies from 3-5.5 m
used at the site where speedy construction is done.
Crosswall is a modern and effective method of construction that employs factory precast, precision
engineered, concrete components. Each component is custom-designed and manufactured to suit the
specific project. This method of construction was developed to facilitate swift and adaptable
residential buildings such as hotels, student residences, prisons and military barracks.
Benefits
Crosswall buildings are durable, have good acoustic values and are virtually maintenance free. They
are quick to erect, offering the client a rapid room occupancy program. The precast components are
brought to site ready to be placed within the structure.
Acoustics
Acoustic separation and additional finishes are minimized as the floor and wall panels can provide the
required airborne noise separation. To reduce the impact sound through floors, a carpet or resilient
layer is also necessary.
Build
Fast overall project times are possible as, once part of the structure is erected, following trades can
quickly commence work. This is the case because the wall and floor units provide a semi-internal
environment.
Finishes
Good surface finishes to wall and floor units minimize site works in making good and necessary additional finishes.
It is possible to simply give a skim finish. This has the benefit of fast and cost-effective construction and skim-
finished walls and ceilings need a minimum of ongoing maintenance.
Sustainability
Crosswall fully utilizes the thermal mass that concrete enables through having minimum finishes which allows full
exposure of the concrete surface.
Fire resistance
Concretes inherent fire resistance meets and often surpasses the requirements for structural integrity for
the prescribed fire duration.
CONSTRUCTION & MATERIALS
SPEEDY CONSTRUCTIONS
TYPES OF FLOOR CONSTRUCTION
WASHINGTON DC SUBWAY
waffles
WAFFLE SLAB STANDING COMMITTEE ASSEMBLY HALL FOR RAJKOT
MUNICIPAL CORPORATION
Wedge
welded to
weld
block,
column,
and lifting
collar.
Lift-slab construction shall be designed and planned by a registered professional engineer who has
experience in lift-slab construction.
Jacks/lifting units shall be marked to indicate their rated capacity as established by the
manufacturer(shall be capable of supporting at least two and one-half times the load being lifted).
Jacking shall be synchronized in such a manner to ensure even and uniform lifting of the slab. During
lifting, all points at which the slab is supported shall be kept within 1/2 inch of that needed to maintain
the slab in a level position.
When making temporary connections to support slabs, wedges shall be secured by tack welding, or an
equivalent method of securing the wedges to prevent them from falling out of position. Lifting rods
may not be released until the wedges at that column have been secured.
Load transfer from jacks/lifting units to building columns shall not be executed until the welds on the
column shear plates (weld blocks) are cooled to air temperature.
cast-in-situ
CAST IN SITU
1. IN SITU CAST FRAME