ADVISORY CIRCULAR 21 07
1. Purpose.
This advisory circular (AC) provides an acceptable means, but not the
only means, to show compliance with the quality assurance
requirements of Civil Aviation Safety Regulations (CASR) Part 21,
Certification Procedures for Products and Parts, as applicable to the
production of software used in type certificated aircraft or related
products (airborne software). This AC also provides supplemental
guidance for the establishment of a quality control or inspection system
to control the development and production of software used in type
certification aircraft. It supplements AC 21-1, Production Certificates;
AC 21-05, Production Under Type Certificate Only; AC 21-143,
Supplier Surveillance Procedures; Radio Technical Commission for
Aeronautics Document (RTCA) DO-178, and AC 21-09, Certification
Procedures for Products and Parts.
4
No. RTCA DO-178, Software Considerations in Airborne Systems
and Equipment Certification. Copies may be purchased from the
RTCA.
3. Discussion.
4. General.
5
a. Establishment and or maintenance of software configuration
management (SCM) and software quality assurance (SQA)
disciplines such as described in RTCA DO-178, ensuring that the
SCM and SQA plans adequately address the SCM and SQA in
place for control of the production of software and are in
compliance with CASR Part 21. These plans should include, as
appropriate :
6
Production approval holders required to submit quality data, or
changes thereto, to the DGCA for approval, should ensure the SQA
and SCM plan(s) prepared as part of paragraph 5a above is also
submitted for approval. This should be accomplished by submitting
SQA and SCM plan(s), with the quality data. The SQA and SCM
plan(s) should be reviewed periodically and revised as appropriate to
ensure it is current and operational.