ANAND ENGINEERING PRODUCTS PRIVATE LIMITED

DURING WELDING INSPECTION CHECK LIST


Customer: Check list No:
Tower No: Section ID: Date:

Welding Inspection Stage (During): Root Inside Outside Bracket Door Repair

Weld Preheat and Consumable usage


Back gouging width
No (CS Welding current as per Arc Voltage as per Travel speed as per Interpass Cleaning & Shape of Welding Sequence As are according to
/depth/cleanliness/l
No, LS WPS? WPS? WPS? temperature as per bead Satisfactory? per WPS? SOP/IED/004 &
ocation acceptable?
No) WPS? WPS?

OK NOK OK NOK Yes No Yes No Yes No Yes No Yes No Yes No


OK NOK OK NOK Yes No Yes No Yes No Yes No Yes No Yes No
OK NOK OK NOK Yes No Yes No Yes No Yes No Yes No Yes No
OK NOK OK NOK Yes No Yes No Yes No Yes No Yes No Yes No
OK NOK OK NOK Yes No Yes No Yes No Yes No Yes No Yes No
OK NOK OK NOK Yes No Yes No Yes No Yes No Yes No Yes No
OK NOK OK NOK Yes No Yes No Yes No Yes No Yes No Yes No
OK NOK OK NOK Yes No Yes No Yes No Yes No Yes No Yes No
OK NOK OK NOK Yes No Yes No Yes No Yes No Yes No Yes No
OK NOK OK NOK Yes No Yes No Yes No Yes No Yes No Yes No

ANY INFERENCE WHICH MAY LEAD TO DISTORTION: Yes: No: IF Yes Overweld

Large fillet size over 8mm

Deep back gouging

Other