Excessive List
Excessive List
Excessive List
EXCESSIVE LIST
DRILL/EXERCISE
ALONGSIDE PANVEL
PLACE / POSITION
NA NA
COURSE SPEED
NA
DISTANCE FROM LAST
PORT / NEXT PORT
MINUTES OF DRILL/EXERCISE:
1615. Master closed up in the wheelhouse. General emergency alarm
sounded. Announcement made on PA system.
1618:All crew mustered on bridge, head count taken.
1620: Crew briefed and instructed by the master about a simulated
emergency of excessive list for purpose of drill:
All actions as per f.o.m.9.5.15:
1623: While loading at Muldwarka duty officer reported vessel listed to stbd
3 to 4 degrees and unable to correct the same after closing both stbd side
material valves.
1625: Chief officer came to CCR to ascertain the cause of list.
1626: Chief officer called emergency station, sounding of all tanks taken,
found uneven sounding between opposite tanks due to list.
AMBUJA CEMENTS LTD.
REV: IX / 1 DTD. 06/06/2011 Page: 2 of 2
MASTER
NAME:Capt: S.Menon