Drill Report: PT. Humpuss
Drill Report: PT. Humpuss
Drill Report: PT. Humpuss
PT. Humpuss
Intermoda Transportasi Tbk
DRILL REPORT
At 10.00 Lt, Abandon ship alarm has been sounded by master from bridge and all crews heard this
sign hasty to use personal safety equipments such as lifejacket, safety shoes, helmet, and assembly at
respective boats stations. At this occurrences each station leader check and account his members and
then reported to master. Master assigning order to second mate to lowering lifeboat no. 1 (Rescue
Boat) until sea water. Member of lifeboat No. 1 take rapid action , after all lifeboat lashing have
realized , water proof plug have closed and then lifeboat lowered until boat deck , and all crews enter
to lifeboat. So when the lifeboat is waterborne one members release the hook the engine direct starting
to maneuver for leaving ship and leader lifeboat order to engineer members to tested sprinkler system
by pulling sprinkler control lever and found ok. At 10.22 LT
, drill finished.
Result :
- Lifeboat equipments in complete condition.
- Boat davit in good condition.
- Check and tested engine lifeboats no.1 and 2 and found good condition and ready for used
- Familiarizations about task and duties and position for new crew joiner
Assessment of Personal :
- All crews participation within this drill exemption Chief Officer, AB, cadet and oiler on duty.
CAPT.AGUSTINUS PAWOLE
Master Verified by M. Rep S&Q
Original : Vessel
COPY : M.Rep S&Q
PT. Humpuss
Intermoda Transportasi Tbk
DRILL REPORT
CAPT.AGUSTINUS PAWOLE
MASTER Verified by M.Rep S&Q
Original : Vessel
COPY : M.Rep S&Q
Ar. : SMKK/Format/7-8.xls Rev. No : 00 Tgl : 01 Sept 2004
PT. Humpuss
Intermoda Transportasi Tbk
DRILL REPORT
At 11.05 Lt,Oil spill alarm was raised continuously by master and crews heard this alarm readily wear
safety equipments properties such as safety shoes, helmet and proceed to muster point and assembly to
respective team. Assumed suction pipe line from Cargo pum break effect of back pressure . so that
a lot of cargo drop to pump room and officer on duty look this condition directly stop discharge
activity.Deck team readily take actions to prevent cargo drop to river water by regarding scupper plug
on deck and used IOPP equipments to cope leakage cargo on deck. On this opportunity second mate
as safety officer give explanations concerning all IOPP equipments especially to new joiners and also
their functions. Finally at 11:30 Lt,this drill has been carried out with satisfied result.
Result :
- Equipments of oil prevention pollution in good and complete condition.
- Check and tested Foam Applicator unit and found good condition and can be used
- Good cooperation’s between teams and all members understood to each of duty
- Familirization on the new crews joiner about position and type IOPP equipment.
Assessment of Personal :
- All crews complying within this drill except to engineer and oiler on duty.
CAPT.AGUSTINUS PAWOLE
Master Verified by M. Rep S&Q
Original : Vessel
COPY : M.Rep S&Q
DRILL REPORT
At 10.40 Lt,Emergency steering alarm continuously was arised by master from bridge.All crews heard
this alarm directly proceed to respective station with safety personal equipments such as
boilersuit,helmet and safety shoes.At this moment assumed vessel navigate at musi river and suddenly
steering machine blackout and second mate directly go to forecastle to prepare anchore and standby
for letgo.Chief officer and his member proceed to steering room to prepare emergency steering. After
emergency steering ready master give order to chief mate to synchronized indicating rudder indicator
on bridge and in steering room and order to chief to bring rudder to port 5,10 and vice versa.At this
moment chief also remind again to crews how are procedure to prepare emergency steerig.Finally drill
complated at 11.00 Lt within satisfy condition.
Result :
- Equipments for emergency steering in good and complete conditions and also placed at duly
place.
- Valves at steering machine in good condition.
Assessment of Personal :
- All crews follow this drill exemption to oiler on duty.
Original : Vessel
COPY : M.Rep S&Q
DRILL REPORT
Result : NONE
Assessment of Personal :
- All crews attending this drill exempted to oiler on duty.
CAPT.BUDIARTO
Master Verified by M. Rep S&Q
Original : Vessel
COPY : M.Rep S&Q
Ar. : SMKK/Format/7-8.wk4 Rev. No : 03 Tgl : 09 Jan 01
PT. Humpuss
Intermoda Transportasi Tbk
DRILL REPORT
Result : - Liferaft and other safety equipments in good positions and complates entire accordance with
SOLAS requirements.
Assessment of Personal :
- All crews attending these drills exempted to oiler on duty.
CAPT.BUDIARTO
Master Verified by M. Rep S&Q
Original : Vessel
COPY : M.Rep S&Q
DRILL REPORT
Result: NONE
Assessment of Personal :
- All crews attending this drill exempted to oiler on duty.