Actual Situation: On February 18th, 2008 at 1030 hrs local time (Time Zone: GMT + 8 hrs) in
position 3057N/12234E, ship anchored off CJK buoy waiting for orders. Current set 135 (T)
drift 1.5 knots.
Drill Events:
1030 General alarm sounded by Master from the bridge followed by an announcement of
“The ship has touched bottom, I repeat, the ship has touched bottom”.
1033 C/O reported all crew mustered at the general muster point with life jackets and
immersion suits as instructed.
1034 General announcement made on VHF (Actually no action taken).
1035 Echo sounder switched on (Actually done).
1036 C/O took head count and found all OK.
1037 Missing person was oilier on duty as he was in the engine control room manning the
engine room which he informed by phone.
1037 C/O reported same to master on Walkie Talkie.
1038 C/O informed the crew to assume the ship had touched bottom and run aground and
act accordingly.
1039 All found reporting to their respective team heads as per duties explained previously
in the safety meeting.
1039 3/O and two seamen came on the bridge immediately. Position and weather recorded
by 3/O.
1039 Both seamen kept look out on both the wings for oil spillage/ any casualty as
instructed by the Master.
1039 Master called the engine room to inform not to use engines under any circumstance to
avoid any possible damage to the propeller.
1040 Engine seawater intake changed over to high sea suction (Actually done).
1041 Nearly all of engine staff in the engine room to prepare the vessel for possible
maneuvering.
1041 Switched on second radar for good order (Actually done).
1041 Engineers started detailed examination of the engine room for damages (Actually
done). Engine cadet started to take oil tank soundings. (Actually done).
1041 3/O reminded Master to display “Vessel Aground” shapes, Master agreed and asked
3/O to exhibit same (Actually no action taken).
1042 Both steering motors switched on (Actually done).
1043 After some time C/E reported that vessel ready to maneuver on emergency grounds
(Actually no action taken).
1045 2/O reported that life boat prepared for emergency evacuation.
1045 Painters made fast and boat plugs checked (Actually done). 2/O was supported by
the cook and the GS.
1046 2/O on wheelhouse to calculate next high tide for possible re-floating.
1047 Emergency fire pump and deck compressor started. (Actually done).
1048 3/O filled up form OS-0801-PC (Actually done, attached) and same faxed to the
company (Actually no action taken).
1050 Master made telephone call to shore casualty response team to inform situation. Also
asked to make arrangements for salvage, emergency towage which may be required.
(Actually done).
1051 Stranding/Grounding check list S-0902-CU filled up (Actually done, attached).
1059 C/O and his team completed search for damage and pollution. Found None. Deck
cadet’s sounding in progress. (Actually done to check time required).
Steering Gear Low Level Alarm by E/O & 3/O at 1106 hrs.
Emergency Fire Pump tested by C/E & C/O at 1047 hrs.
Deck Compressor tested by 3/E at 1047 hrs.
Fwd Fog Horn tested by 3/O at 1130 hrs.
Navigational lights tested by 3/O at 1041 hrs.
Main mast all lights tested by 3/O at 1041 hrs.
Table Top Exercise Carried out after Practical Exercise in Ship’s Office:
Master’s Review:
This time the drill was found be faster compared to the last time on 10-Feb-08 when the
“collision” drill was held. The staff was found to be well versed with their duties and more
oriented. The company’s SMS procedures were followed and found to be well conversant with
all possible aspects for the drill and/or emergency.
Other’s Review:
The department of “Spill Prevention Preparedness and Response Program”, Columbia River,
USA recommended to create an emergency towing plan, hold an emergency towing drill at
least quarterly and that all written emergency procedures are in one folder on bridge. The
report was dated 07-Jun-07. This matter would be given thought in the near future. Some
useful tips were received form the crew as well.
Emergency Stations:
Bridge Team / Response Team – Master, Third Officer & Seaman - Assist Master, Lookout,
Log events, Navigation Safety, Communications and GMDSS procedures. Reporting to owners
and other authorities.
Engine Team – Chief Engineer, Third Engineer & Motorman - Respond to engine orders from
wheelhouse. Provide all general deck services like water and air. Follow instructions from
Master.
On Scene Command Team – Chief Officer, Second Engineer, Electrical Officer, Fitter,
Boatswain, Seaman, Motorman - Detailed examination, Inform Master status of damage, temp
repairs, Observe for pollution, fire, and any other emergency, Anti pollution measures,
preparation for evacuation or helicopter lift, selection of rescue party and preparation of rescue
boat for launching & follow instructions.
Emergency Survival and First Aid Team – Second Officer, Cook & Steward - Keep emergency
lifeboat ready for immediate launching. Stand by with first aid.
Master
Capt. Sudip Ghosh
Chief Engineer
Mr. Rangan Guha
Safety Officer
Mr. Allaudin Abbas Chogule (C/O)
Safety Representative
Mr. Kumaran Malayil (2/E)
Safety Representative
Mr. Md. Abdul Karim (Bosun)